Home / Financial Firm (Unknown - Insurer) / Determination 250606

Determination 250606

Termite barrier and reticulation system costs excluded after flood claim

FirmFinancial Firm (Unknown - Insurer)
Decided2012-02-24
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

After Queensland floods the FSP accepted the home claim but refused the cost of a termite barrier and a reticulation system. AFCA ordered the FSP to fund termite protection of its choosing meeting BCA minimums, but not the reticulation system.

The extra-costs-to-comply-with-building-regulations benefit conflicts with the chemical exclusion, so contra proferentem favours the insured, while a reticulation system would be betterment.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 250606 Determination Page 1 of 6 Case number: 250606 General Insurance - Domestic Insurance - Home Building - FSP Decision – Scope of Works – Termite Infestation Protection 1 February 2012 Background 1. The Applicant held a Home Building and Contents Insurance policy (the policy) with the Financial Services Provider (FSP). 2. A claim was lodged under the policy seeking indemnity for extensive damage to the insured property arising from floods experienced in Queensland. 3. The FSP accepted the claim, however, excluded from co ver the costs associated with installing a termite barrier claimed to have been washed away due to the floods. 4. The Applicant remains dissatisfied with the FSP‟s declinature of this component of her claim and maintains the she is entitled to indemnity in t his respect. Summary of Applicant’s position 5. The Applicant in disputing the FSP‟s position to partially decline her claim maintains:  The termite barrier (barrier) is not merely a chemical or pesticide sprayed or applied rather is a structural component of the house.  The barrier is a requirement under current Australian Standard 3660 referenced in the Building Code of Australia (BCA).  The policy provides for extra costs associated with complying with current building laws and regulations.  Any ambiguity in the interpretation/intention of the policy provisions should be resolved in the favour of the Applicant.  The builder appointed by the FSP has confirmed that the barrier must be reinstated. The barrier must be certified as complying with the BCA.  There may be an argument that the policy excludes the cost of the chemical component of the barrier, however, the structural aspects are clearly not excluded from cover. Determination Case No: 250606 Determination Page 2 of 6  The house was completely stripped down due to the flood damage (all internal walls, flooring etc) leaving only the structural shell. Accordingly, the reinstatement of the property is essentially a rebuild, aside from the shell itself. 6. The Applicant maintains the builder has confirmed that reinstatement of the barrier is essential and precedes the comme ncement of any construction work. 7. The Applicant has quoted “W” which maintains: “When flows have passed, Queenslanders should be aware that termite barrier repair is a critical part of structural repair to minimise the risk of any impending termite attack. ” 8. The Applicant is seeking cover for the cost, including the labour component, of installing the barrier as part of reinstating the home, following the insured event. Summary of FSP’s position 9. The contract between the parties is a defined events policy which provides cover for loss or damage arising from the specified events listed in the policy. 10. The FSP has accepted the Applicant‟s claim for loss or damage to the building and contents arising from the insured event “Storm and Flood”. This dispute relates solely to the cost of reinstating a chemical termite barrier at the property. 11. The Applicant maintains the FSP is obliged to cover the cost of installing a reticulation system, which is said to involve the digging of a trench around the perimeter of the house and installation of piping to provide infrastructure as a means of delivering a termite prevention chemical. 12. Although this system of termite prevention may be her preferred option, the Applicant has not submitted any evidence to establish:  The existing barrier was affected by the flood.  The reticulation system is required/ necessary at the insured property.  Whether there are other methods of chemical application which are acceptable under the current building standards. 13. The Applicant is seeking cover for the cost of reinstatement of chemicals that had been previously applied at the property. The policy is clear and unambiguous in respect to what is or is not included within the definition of “home”. Case No: 250606 Determination Page 3 of 6 14. Further, the “General Exclusions” which apply to all sections of the policy also clearly exclude from cover the cost to replace or reapply pest control chemicals and baits in or around the home. 15. A termite barrier can reasonably be considered a pest control chemical and the cost incurred in replacing or reapplying that chemical is clearly excluded from cover under the policy. 16. The FSP relies on the following policy provisions: “Page 38 We do not cover as your home Home does not include:  Chemicals, fertilisers and pesticides that have been used or applied … Page 126 We do not cover Extra costs following an insured event Consequential losses or extra costs following an insured incident including:  cost of replacing or reapplying pest control chemicals and baits in or around your home. ” Issue 17. Whether the Applicant is entitled to indemnity under the claim for the cost to install the termite barrier and associated chemical/s. Reasons for decision 18. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the FOS Terms of Reference. This is because due to the circumstances of the dispute. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 19. There has been an exchange of material between the parties. Each party therefore i s aware of the issues and has had the opportunity to comment. As a consequence it is not necessary to go into all of this material in any great detail. 20. I am satisfied the parties do not dispute the following:  The insured property was significantly damaged due to an event for which the policy extends indemnity.  The FSP provided the Applicant with the relevant policy documentation as required by the Insurance Contracts Act 1984. Case No: 250606 Determination Page 4 of 6  The approved scope of works required the complete stripping down of home‟s inter nal walls, roof, doors etc at the lower level and to some extent at the upper level.  The FSP has accepted to provide indemnity for a majority of the loss and this dispute relates solely to the termite barrier component of the claim.  Some form of termite infestation protection was present at the property prior to the insured event. 21. The Applicant when referring her concerns to the Service, is of the opinion that the FSP at the very least is obliged to cover the cost to install a reticulation system barrier (chemical disbursement system) less the cost of the chemical/s. 22. The FSP refutes the Applicant‟s contention in this respect and maintains that not only has the Applicant failed to establish the previous termite barrier had been affected by the floods or that the reticulation system is the only option, but that the policy clearly excludes such cover. 23. I have considered the submissions put forward by the parties and note the Applicant in maintaining her position has made available very limited information to support her position. 24. Additionally, the FSP has chosen not to submit any evidence to support its position in respect of whether there is a requirement to or not to install a termite barrier and whether this forms part of its obligations under the BCA. 25. The Case Manager undertook research in this respect and in simple terms, the BCA requires that walls, roof, floor framing (structural elements), door jambs, window frames and reveals, architraves and skirting must be protected to reduce the risk of termite infestation. As a minimum builders must comply with the termite management requirements set out in the BCA, for all new constructions. 26. Further, the Applicant has also submitted: “ I have been advised by the builder appointed by [FSP], [building company], that a termite barrier, consisting of holes drilled into the concrete and filled with chemicals, will have to be installed prior to internal and external flooring” 27. This position is not denied by the FSP. 28. I also note that the policy on page 83 of the Product Disclosure Statement (PDS) states: “4 . Extra costs to comply with the latest home building regulations … Benefit We pay extra to upgrade damaged parts of your home to comply with the latest building regulations (e.g. solar design to assist with heating and cooling, insulation in ceilings and walls, building to withstand cyclones, bushfires). Case No: 250606 Determination Page 5 of 6 When Repairing your home.” 29. Accordingly, I am satisfied that it is a requirement under the current Australian Standards and BCA that termite barrier system/precautions be undertaken, such requirement being confirmed by the FSP‟s builder. Also, that the intention of the policy is clear in that it provides indemnity for the additional/extra costs involved in ensuring the repairs to the property comply with the relevant buildings regulation, which in this instance include termite infestation protection measures. 30. Having established the above, the next question is whether the FSP is obliged to cover the cost involved in installing the reticulation system as claimed by the Applicant. 31. The information sourced by the Case Manager in respect to termite barriers and the BCA, clearly establishes that there are several options available including but not limited to the reticulation system which would satisfy the minimum requirements of the BCA. 32. Therefore, although I am satisfied, the FSP is obliged under the policy to cover the additional costs involved in incorporating termite infestation protection measures within the approved scope of works, I am also satisfied it is not obliged to incur the cost of installing the reticulation system. 33. I note and acknowledge the FSP‟s reference to the exclusion provisions within the policy in respect to “chemicals, fertilisers and pest control chemicals and baits”. It is accepted that the policy‟s intention is to exclude such costs for replacing or reapplying such chemicals in or around the home. However, in my view, this is not necessarily the case when these costs are an integral and necessary component of approved repair/building work, in line with the relevant building standards and regulations. 34. In this instance the policy promise to “ pay extra to upgrade damaged parts of your home to comply with the latest building regulations ” sits at odds with the exclusion applying to chemical pest sprays. In these circumstances the principle of „contra proferentem‟ applies and the ambiguity or conflict is deemed to be resolved in favour of the insured party. 35. In light of the significant flooding (insured event) of the insured property and subsequent extensive stripping down (exposure) of the building, I am satisfied on the balance of probabilities, that any existing termite protection measures will have been to some extent if not completely rendered inade quate. Further, in view of the FSP‟s builder advising of the requirement for treatment prior to floor installations, this appears to confirm the FSP‟s obligation to provide the treatment as part of its obligations to meeting building standards. 36. Therefore, it is determined that the FSP is obliged to provide indemnity to the Applicant for the cost associated with termite infestation protection as part of the repair/rebuilding process as required by BCA standards. Case No: 250606 Determination Page 6 of 6 37. However, the FSP is not obliged to undertake the installation of the claimed reticulation system. Given that a reticulation system was not in place prior to the loss (rather the solution applied was a chemical barrier) the installation of a reticulation system would reasonably be considered to be be tterment and therefore inappropriate. The FSP‟s obligation is limited to ensuring that the minimum standard set under the BCA in this respect is met, which may be satisfied in the form of a range of available methods. 38. It is noted that the Applicant has submitted (as additional information) an invoice for Extra Termite Treatment at the insured address. The invoice does not indicate what work has been undertaken or provide details of the costs that make up the total of $3,000. Determination 39. On the basis of the available information I determine that the FSP is obliged to provide indemnity to the Applicant in respect to inclusion within the approved scope of works, termite infestation protection for the insured property. 40. The FSP within 21 days of this determination, is to arrange payment to the Applicant an amount equal to the cost of a method of termite infestation protection of its choosing, which at the very least is in line with the minimum requirements under the BCA.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.