Determination 250606
Termite barrier and reticulation system costs excluded after flood claim
Summary
After Queensland floods the FSP accepted the home claim but refused the cost of a termite barrier and a reticulation system. AFCA ordered the FSP to fund termite protection of its choosing meeting BCA minimums, but not the reticulation system.
The extra-costs-to-comply-with-building-regulations benefit conflicts with the chemical exclusion, so contra proferentem favours the insured, while a reticulation system would be betterment.
Issues
- Claim denial primary · upheld
“FSP is obliged to provide indemnity to the Applicant in respect to ... termite infestation protection for the insured property.”
- Product terms interpretation secondary · upheld
“the principle of contra proferentem applies and the ambiguity or conflict is deemed to be resolved in favour of the insured party.”
Subjects and remedies
home or building damagenatural disasterpay claim
Text of the determination
Case No: 250606 Determination Page 1 of 6
Case number: 250606
General Insurance - Domestic Insurance - Home Building - FSP Decision –
Scope of Works – Termite Infestation Protection
1 February 2012
Background
1. The Applicant held a Home Building and Contents Insurance policy (the
policy) with the Financial Services Provider (FSP).
2. A claim was lodged under the policy seeking indemnity for extensive
damage to the insured property arising from floods experienced in
Queensland.
3. The FSP accepted the claim, however, excluded from co ver the costs
associated with installing a termite barrier claimed to have been washed
away due to the floods.
4. The Applicant remains dissatisfied with the FSP‟s declinature of this
component of her claim and maintains the she is entitled to indemnity in t his
respect.
Summary of Applicant’s position
5. The Applicant in disputing the FSP‟s position to partially decline her claim
maintains:
The termite barrier (barrier) is not merely a chemical or pesticide
sprayed or applied rather is a structural component of the house.
The barrier is a requirement under current Australian Standard 3660
referenced in the Building Code of Australia (BCA).
The policy provides for extra costs associated with complying with
current building laws and regulations.
Any ambiguity in the interpretation/intention of the policy provisions
should be resolved in the favour of the Applicant.
The builder appointed by the FSP has confirmed that the barrier must
be reinstated. The barrier must be certified as complying with the BCA.
There may be an argument that the policy excludes the cost of the
chemical component of the barrier, however, the structural aspects are
clearly not excluded from cover.
Determination
Case No: 250606 Determination Page 2 of 6
The house was completely stripped down due to the flood damage (all
internal walls, flooring etc) leaving only the structural shell. Accordingly,
the reinstatement of the property is essentially a rebuild, aside from the
shell itself.
6. The Applicant maintains the builder has confirmed that reinstatement of the
barrier is essential and precedes the comme ncement of any construction
work.
7. The Applicant has quoted “W” which maintains:
“When flows have passed, Queenslanders should be aware that termite
barrier repair is a critical part of structural repair to minimise the risk of any
impending termite attack. ”
8. The Applicant is seeking cover for the cost, including the labour component,
of installing the barrier as part of reinstating the home, following the insured
event.
Summary of FSP’s position
9. The contract between the parties is a defined events policy which provides
cover for loss or damage arising from the specified events listed in the
policy.
10. The FSP has accepted the Applicant‟s claim for loss or damage to the
building and contents arising from the insured event “Storm and Flood”. This
dispute relates solely to the cost of reinstating a chemical termite barrier at
the property.
11. The Applicant maintains the FSP is obliged to cover the cost of installing a
reticulation system, which is said to involve the digging of a trench around
the perimeter of the house and installation of piping to provide infrastructure
as a means of delivering a termite prevention chemical.
12. Although this system of termite prevention may be her preferred option, the
Applicant has not submitted any evidence to establish:
The existing barrier was affected by the flood.
The reticulation system is required/ necessary at the insured property.
Whether there are other methods of chemical application which are
acceptable under the current building standards.
13. The Applicant is seeking cover for the cost of reinstatement of chemicals that
had been previously applied at the property. The policy is clear and
unambiguous in respect to what is or is not included within the definition of
“home”.
Case No: 250606 Determination Page 3 of 6
14. Further, the “General Exclusions” which apply to all sections of the policy
also clearly exclude from cover the cost to replace or reapply pest control
chemicals and baits in or around the home.
15. A termite barrier can reasonably be considered a pest control chemical and
the cost incurred in replacing or reapplying that chemical is clearly excluded
from cover under the policy.
16. The FSP relies on the following policy provisions:
“Page 38 We do not cover as your home
Home does not include:
Chemicals, fertilisers and pesticides that have been used or applied
…
Page 126 We do not cover
Extra costs following an insured event
Consequential losses or extra costs following an insured incident including:
cost of replacing or reapplying pest control chemicals and baits in or
around your home. ”
Issue
17. Whether the Applicant is entitled to indemnity under the claim for the cost to
install the termite barrier and associated chemical/s.
Reasons for decision
18. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the FOS Terms of Reference. This is because
due to the circumstances of the dispute. This dispute has not been the
subject of a FOS Recommendation and has proceeded directly to
Determination.
19. There has been an exchange of material between the parties. Each party
therefore i s aware of the issues and has had the opportunity to comment. As
a consequence it is not necessary to go into all of this material in any great
detail.
20. I am satisfied the parties do not dispute the following:
The insured property was significantly damaged due to an event for
which the policy extends indemnity.
The FSP provided the Applicant with the relevant policy documentation
as required by the Insurance Contracts Act 1984.
Case No: 250606 Determination Page 4 of 6
The approved scope of works required the complete stripping down of
home‟s inter nal walls, roof, doors etc at the lower level and to some
extent at the upper level.
The FSP has accepted to provide indemnity for a majority of the loss
and this dispute relates solely to the termite barrier component of the
claim.
Some form of termite infestation protection was present at the property
prior to the insured event.
21. The Applicant when referring her concerns to the Service, is of the opinion
that the FSP at the very least is obliged to cover the cost to install a
reticulation system barrier (chemical disbursement system) less the cost of
the chemical/s.
22. The FSP refutes the Applicant‟s contention in this respect and maintains that
not only has the Applicant failed to establish the previous termite barrier had
been affected by the floods or that the reticulation system is the only option,
but that the policy clearly excludes such cover.
23. I have considered the submissions put forward by the parties and note the
Applicant in maintaining her position has made available very limited
information to support her position.
24. Additionally, the FSP has chosen not to submit any evidence to support its
position in respect of whether there is a requirement to or not to install a
termite barrier and whether this forms part of its obligations under the BCA.
25. The Case Manager undertook research in this respect and in simple terms,
the BCA requires that walls, roof, floor framing (structural elements), door
jambs, window frames and reveals, architraves and skirting must be
protected to reduce the risk of termite infestation. As a minimum builders
must comply with the termite management requirements set out in the BCA,
for all new constructions.
26. Further, the Applicant has also submitted:
“ I have been advised by the builder appointed by [FSP], [building company], that
a termite barrier, consisting of holes drilled into the concrete and filled with
chemicals, will have to be installed prior to internal and external flooring”
27. This position is not denied by the FSP.
28. I also note that the policy on page 83 of the Product Disclosure Statement
(PDS) states:
“4 . Extra costs to comply with the latest home building regulations
…
Benefit We pay extra to upgrade damaged parts of your home to
comply with the latest building regulations (e.g. solar design to
assist with heating and cooling, insulation in ceilings and walls,
building to withstand cyclones, bushfires).
Case No: 250606 Determination Page 5 of 6
When Repairing your home.”
29. Accordingly, I am satisfied that it is a requirement under the current
Australian Standards and BCA that termite barrier system/precautions be
undertaken, such requirement being confirmed by the FSP‟s builder. Also,
that the intention of the policy is clear in that it provides indemnity for the
additional/extra costs involved in ensuring the repairs to the property comply
with the relevant buildings regulation, which in this instance include termite
infestation protection measures.
30. Having established the above, the next question is whether the FSP is
obliged to cover the cost involved in installing the reticulation system as
claimed by the Applicant.
31. The information sourced by the Case Manager in respect to termite barriers
and the BCA, clearly establishes that there are several options available
including but not limited to the reticulation system which would satisfy the
minimum requirements of the BCA.
32. Therefore, although I am satisfied, the FSP is obliged under the policy to
cover the additional costs involved in incorporating termite infestation
protection measures within the approved scope of works, I am also satisfied
it is not obliged to incur the cost of installing the reticulation system.
33. I note and acknowledge the FSP‟s reference to the exclusion provisions
within the policy in respect to “chemicals, fertilisers and pest control
chemicals and baits”. It is accepted that the policy‟s intention is to exclude
such costs for replacing or reapplying such chemicals in or around the home.
However, in my view, this is not necessarily the case when these costs are
an integral and necessary component of approved repair/building work, in
line with the relevant building standards and regulations.
34. In this instance the policy promise to “ pay extra to upgrade damaged parts of
your home to comply with the latest building regulations ” sits at odds with the
exclusion applying to chemical pest sprays. In these circumstances the
principle of „contra proferentem‟ applies and the ambiguity or conflict is
deemed to be resolved in favour of the insured party.
35. In light of the significant flooding (insured event) of the insured property and
subsequent extensive stripping down (exposure) of the building, I am
satisfied on the balance of probabilities, that any existing termite protection
measures will have been to some extent if not completely rendered
inade quate. Further, in view of the FSP‟s builder advising of the requirement
for treatment prior to floor installations, this appears to confirm the FSP‟s
obligation to provide the treatment as part of its obligations to meeting
building standards.
36. Therefore, it is determined that the FSP is obliged to provide indemnity to the
Applicant for the cost associated with termite infestation protection as part of
the repair/rebuilding process as required by BCA standards.
Case No: 250606 Determination Page 6 of 6
37. However, the FSP is not obliged to undertake the installation of the claimed
reticulation system. Given that a reticulation system was not in place prior to
the loss (rather the solution applied was a chemical barrier) the installation of
a reticulation system would reasonably be considered to be be tterment and
therefore inappropriate. The FSP‟s obligation is limited to ensuring that the
minimum standard set under the BCA in this respect is met, which may be
satisfied in the form of a range of available methods.
38. It is noted that the Applicant has submitted (as additional information) an
invoice for Extra Termite Treatment at the insured address. The invoice does
not indicate what work has been undertaken or provide details of the costs
that make up the total of $3,000.
Determination
39. On the basis of the available information I determine that the FSP is obliged
to provide indemnity to the Applicant in respect to inclusion within the
approved scope of works, termite infestation protection for the insured
property.
40. The FSP within 21 days of this determination, is to arrange payment to the
Applicant an amount equal to the cost of a method of termite infestation
protection of its choosing, which at the very least is in line with the minimum
requirements under the BCA.