Home / Financial Firm (Unknown - Insurer) / Determination 250314
Determination 250314
Building claim declined as policy had lapsed for unpaid premium; contents claim declined under flood exclusion
Summary
A Queensland homeowner claimed building and contents damage from January 2011 flood water. The building policy had expired after an unpaid premium despite renewal and reminder notices, and the contents loss was flood, which is excluded. AFCA found the insurer owed nothing on either claim.
The building policy expired for non-payment after compliant renewal notices under section 58 of the Insurance Contracts Act, and the contents policy expressly excludes flood.
Issues
- Claim denial primary · not upheld
“the Panel determines the FSP is not obliged to cover the Applicant for his loss in terms of building damage as the policy had expired prior to and was not in place at the time of the loss.”
- Policy cancellation or underwriting secondary · not upheld
“the Panel is satisfied the renewal certificate, sent and received on or around 5 May 2010 complied with section 58.”
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Case No: 250314 Determination Page 1 of 7
Case number: 250314
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim – Flood – Insurance Contracts Act 1984 Ss 58 & 77.
29 February 2012
Background
1. The Applicant held two policies of insurance (the policies) covering his Home
Buildings and Contents individually.
2. The Applicant’s property (Building and Contents) was extensively damaged
arising from the significant weather events experienced in Queensland (Qld)
with the property inundated by water on or about 12 January 2011.
3. The FSP declined the Building claim (696) on the basis the policy was not in
operation at the time of loss and similarly declined the Contents claim (697)
on the basis that the loss was due to flood damage, an event specifically
excluded from cover.
4. The Applicant is dissatisfied with the FSP’s declinature of his claims and is
seeking indemnity under the policies.
Summary of Applicant’s position
5. The Applicant was a long term member and held building and contents
insurance with the FSP at the time the floods hit Brisbane. The Applicant
lodged two claims with the FSP seeking indemnity for his loss however the
FSP is not honouring the policies.
6. The fact that one of the policies (696) was not paid was due to the
circumstances the Applicant was facing at the time. He was going through a
divorce and had sent a cheque to pay the premium to his wife and co-
policyholder to co-sign and submit for payment of the premium, and did not
hear anymore.
7. The Applicant would be prepared to accept $25,000 as settlement of his
claim against the policy as contribution towards the re-building of his home.
8. The quote for repairs obtained by the Applicant and submitted by “SB” has
come to a total of $155,949.53.
Determination
Case No: 250314 Determination Page 2 of 7
Summary of FSP’s position
9. The Applicant contacted the FSP on 14 January 2010 to lodge two claims
seeking cover for damage to his property arising from the flood experienced
in Brisbane.
10. The FSP maintains that it is not required to provide indemnity to the
Applicant in respect to the building claim (696) as the corresponding
insurance policy was not in place at the time of loss due to non-payment of
the policy premium.
11. The FSP does not accept the Applicant’s offer to accept $25,000 under the
claim as a contribution to the cost of rebuilding his ho me.
12. In respect to the contents claim (697) the FSP maintains that although the
policy was in place, loss or damage arising from the event “Flood” is
specifically excluded from cover under the policy.
13. The Applicant does not dispute the fact that the damage to his property is
due to floodwater inundation.
14. The Applicant admits the FSP provided him with the relevant policy
documentation at inception of the policy i.e. the Certificate of Insurance
(COI) and Product Disclosure Statement (PDS). Further, that he was aware
the policies do not cover loss or damage arising from flood.
15. In addition to sending the Applicant the “Policy Renewal Documentation”
which was issued on 5 May 2010, the FSP also sent a payment reminder
notice issued on 9 June 2010, to the Applicant.
16. The Applicant having been provided with the relevant policy renewal
documents and reminder notice still failed to pay the annual premium.
Accordingly, the policy expired as at 25 May 2010, and the FSP was entitled
to decline indemnity for the building c omponent of the Applicant’s loss.
17. The FSP has fulfilled its obligations under section 58 and 77 of the Insurance
Contracts Act 1984 (the Act).
18. In maintaining its position that the Applicant’s loss (claim 697) is due to
floodwater inundation the FSP relies upon reports submitted by its assessor,
a hydrologist report submitted by “W” and a further hydrology report made
available by the Insurance Council of Australia (ICA).
19. The FSP relies on the following policy provisions:
“ Page 15 – Storm
If your home or contents suffer loss or damage caused by
a violent wind, cyclone or tornado
thunderstorm or hail which may be accompanied by rains or
snow, or
Case No: 250314 Determination Page 3 of 7
a sudden, excessive run-off of water as a direct result of a
storm in your local area
however
we will NOT cover loss or damage caused by flood
…
Page 35 – What you are not covered for – general exclusions
we will Not cover
loss, damage, injury or death that occurs as a result of flood
…
Page 70 – Flood
is the covering of normally dry land by water escaping or released from the
normal confines of a watercourse or lake, whether or not it is altered or
modified. Flood also includes water escaping from the confines of any
reservoir, channel, canal or dam.
Flood is not covered by this Policy.
…
Page 48 Paying your premium – annually or monthly
When you pay your premium
annually – and your annual payment is dishonoured or not received by the
due date noted on your current Certificate of Insurance
then
this Policy will not operate and you will not be covered if you make a claim. ”
Issue
20. Whether the FSP is entitled to decline indemnity to the Applicant for the
damage to the insured property (Building and Contents) under the respective
policies.
Relevant Law
Section 58 provides that not later than 14 days before the day on which a renewable
insurance cover provided under a contract of general insurance expires, the insurer
shall give the insured (or his agent) a notice in writing informing him of the day and the
time at which cover will expire and whether the insurer is prepared to negotiate to
renew or extend the cover. The section further provides that in the event that the
insurer fails to comply with this requirement and if before the original contract expired,
the insured had not obtained some alternative insurance cover, then by force of the
section there exists between the parties to the original contract, a statutory contract
which provides cover for the same period and on the same terms of the original
contract.
Section 77 of the Act provides that a notice or other document that is by the Act
required or permitted to be given, may be given to a body corporate in any way in
Case No: 250314 Determination Page 4 of 7
which documents may be served on that body corporate, and to a natural person,
personally or by post to that person at his last known address.
Reasons for decision
21. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the complex nature of the issues. This dispute
has not been the subject of a FOS Recommendation and has proceeded
directly to Determination.
22. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the i nsurance industry and a
representative with extensive experience in consumer claims.
23. There has been an exchange of material between the parties. Each party
therefore is aware of the issues and has had the opportunity to comment. In
these circumstances the details contained in the relevant hydrological
reports will not be recited in this determination except where considered
relevant.
24. Prior to arriving at a determination the Panel has read and considered all the
material submitted by the parties to FOS.
25. The Panel notes the parties do not dispute the following:
The Applicant lodged two separate claims seeking indemnity for loss or
damage to his building and contents.
The proximate cause for the water inundation of the Applicant’s
property was the event “Flood”.
The FSP had sent and the Applicant received the relevant policy
documentation at inception of the policy and prior to the date of loss.
The FSP had sent and the Applicant received the policy renewal
documentation and subsequent payment reminder no tice for the policy
(building), in respect to the due date for the annual premium payment
and providing the details of cover.
As at the date of loss the annual premium for the building policy
remained outstanding whilst the contents policy’s premium had be en
paid.
26. The dispute between the parties includes a number of issues and the Panel
will review each component of the dispute individually under the below sub-
headings.
Building Policy
Expiry of the policy
Case No: 250314 Determination Page 5 of 7
27. The building policy was issued on 25 May 1995 and was obviously subject to
multiple renewal periods prior to and leading up to the 2010-2011 renewal
period.
28. There is no dispute that the FSP issued and subsequently posted the policy
renewal documentation to the Applicant. This is supported not only by the
evidence of dispatch submitted by the FSP but also the Applicant’s
acknowledgement of receiving these documents.
29. The Panel is satisfied that the renewal certificate, sent and received on or
around 5 May 2010 complied with section 58, given the policy expiry date
was 25 May 2010. Secondly the notice clearly brought the Applicant’s
attention to the fact that the current policy was set to expire on 25 May 2010,
and in order to extend cover for the next 12 months (until 25 May 2011), the
Applicant was required to pay the policy premium by the due date of 25 May
2010, failing which the policy would expire.
30. The Panel has also considered the “Urgent Reminder – Policy Expired”
notice issued by the FSP and sent to the Applicant. The Panel is satisfied
that this document clearly informs the Applicant that the annual premium had
not been paid and that this meant that the policy had expired and he no
longer held indemnity for loss or damage to his building.
31. In the absence of any evidence to the contrary, the Panel is sa tisfied the
FSP did provide the Applicant with an invitation to renew the policy, a policy
premium payment reminder and inform him of the consequences in the
instance the payment was not received i.e. expiry of the cover.
32. The Panel also notes that the Applicant had successfully paid the annual
policy premium for the Contents policy due 19 May 2010. It is reasonable to
accept he was both aware and had the opportunity to pay the required
annual premium prior to the expiry/due date for the building policy on 25 May
2010.
33. Accordingly, the Panel is satisfied that the Applicant’s building policy had
expired and was not in place at the time of the loss. Therefore, the FSP was
entitled to decline indemnity to the Applicant for the damage to the building
on or about 12 January 2011.
Contents Policy
34. The Panel notes it is not in dispute between the parties that the contents
policy was in force at the time of loss. Accordingly, the matter for
consideration is whether the loss claimed falls within the scope of cover
available to the Applicant under the policy.
Flood Cover
35. It is an accepted principle of insurance law that the onus rests with an
insured to prove, upon the balance of probabilities, that they have sustained
Case No: 250314 Determination Page 6 of 7
a loss caused by an event insured for under the policy in force at the date of
loss [Regina Fur Co. Ltd v Bossom (1957) 2 Lloyd’s Rep 466 ].
36. The Panel notes that, while the Applicant disputes the FSP’s position in
respect to his claim, he has not made available any substantiating evidence
to establish that his loss (contents) was due to an event other than flood
and/or an event for which the policy provides indemnity.
37. The Panel has considered the available evidence, in the form of hydrology
and assessment reports submitted by the FSP, in support of its position that
the damage to the Applicant’s property was due to floodwater inundation.
The Panel is satisfied on the basis that, the parties do not dispute that flood
was the cause of inundation and in light of the consultants’ reports, that the
proximate cause for the loss was, on the balance of probabilities, floodwater
inundation.
38. The Panel has considered whether there is any evidence to establish the
inundation from “storm”.
39. The PDS clearly identifies that whilst cover is provided for storm, it does not
extent to flood damage.
40. The hydrology information provided together with the home assessment
report indicates the water that first entered the property at 11.00am on
Wednesday 12 January 2011 came from the direction of Lake Westlake. The
water level rose over a 12 hour period.
41. Consistent with the hydrological information, most likely, the inundation of
the property was due to flood and not stormwater run-off.
42. On review of the relevant terms of the policy the Panel is satisfied that loss
or damage arising f rom the event “Flood” is specific ally excluded from cover
by the FSP.
43. The Panel acknowledges the Applicant’s offer, to accept a $25,000
contribution to his loss by the FSP in settlement of his claim, as opposed to
the total quoted loss of approximately $166,250. However, the Panel in
providing its determination is bound by the terms of the policy and the
evidence. As such, it is unable to make a finding which does not fall within
the cover provided by the policy.
Determination
44. On the basis of the available information the Panel determines the FSP is
not obliged to cover the Applicant for his loss in terms of building damage as
the policy had expired prior to and was not in place at the time of the loss.
Case No: 250314 Determination Page 7 of 7
45. Further, the Panel determines that the loss (contents) claimed by the
Applicant was the result of the specifically excluded event “Flood” as defined
in the policy and as such the FSP was entitled to deny liability for the claim.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.