Text of the determination
Case No: 249997 Determination Page 1 of 11
Case number: 249997
General Insurance - Domestic Insurance - Home Contents - FSP Decision -
Denial of claim
2 October 2012
Background
1. The Applicants insured their Home and Contents with the Financial Services
Provider (FSP). The policy covered the Applicants‟ home for $352,000 and
Contents for $104,000 subject to a $300 excess.
2. Their home in Bulimba was inundated by water on two occasions following
severe weather events in Queensland in January 2011
3. On 6 January 2011 the Applicants made a claim under the policy for water
inundation damage which was accepted and subsequently settled.
4. On 14 January 2011, the Applicants lodged a claim under the policy for
water inundation damage.
5. The FSP denied the claim on the basis the damage was d ue to “flood” which
is an excluded event under the policy. The Applicants dispute this and state
the damage was caused by an insured event.
6. Both the Applicants and the FSP have provided detailed submissions on the
relevant issues. For the sake of brevity, the Panel will only briefly summarise
these submissions given all of the material made available has been
exchanged with the other party.
Summary of Applicants ’ position
7. The water came through the street in which the insured property was
situated. The body of water which inundated their property was
approximately 500 metres long and 100 metres wide in the suburb.
8. The water was from the rain runoff together with water that rose up through
the drainage pits in the local street. At no time did the river break its banks
and directly flood via overland flow.
9. The Applicants contend that the first and second inundations were due to
similar mechanisms, being flash flood.
10. The Applicants have reviewed the FSP‟s material and respond as follows:
Determination
Case No: 249997 Determination Page 2 of 11
There was only one inspection of the property shortly after 12 January
2011 water damage.
The assessment report is misleading as it was compiled after clean-up
had occurred.
The Applicants were informed they should take photographs of all items
put out for council collection after the first water claim and this was
done, although some items went missing in the second inundation.
The Applicants note that there was also looting after the clean up.
The hydrology report is based on incomplete data and the aerial
photographs do not provide a proper representation. The property
received less coverage in the hydrology report than actually occurred.
11. The Applicants seek indemnity for their claim for damage arising from
inundation on 12 January 2011.
Summary of FSP’s position
12. The FSP submits the Applicants have not discharged their onus of proving
that the cause of loss was by flash flood and stormwater run-off. Even if flash
flood was the proximate cause, which the FSP denies, then flood was also a
proximate cause of the loss and, by application of the Wayne Tank principle,
the policy does not respond.
13. The FSP relies on a number of hydrology reports authored by SC. The Panel
notes the following from the information provided by SC:
The level of the subject property varies between 1.6m AHD and 2.3m
AHD. The minimum habitable floor level was not available. The
FloodWise summary also indicates that the interim Residential flood
level was 2.6m. (However the Panel also notes that from a range of
1.9m-2.5m the source of inundation is listed a s “storm tide”). The
property is in an overland flow path which means that during high
rainfall excess run-off will travel overland to low lying drainage paths.
This commonly occurs when underground drainage exceeds its
capacity.
SC has attached topography mapping to his report. This indicates the
Applicants‟ property is in a low -lying area and in close proximity to a
number of drainage channels.
There was no evidence that rainfall at the relevant time was sufficient to
cause inundation. The rainfall over 9-10 January 2011 was 145mm with
a further fall of 54mm on 11 January 2011. The most intense rainfall on
11 January 2011 fell between 5.00pm-6.00pm. There was no rainfall on
12 January 2011.
SC notes the terrain information does not suggest that the Applicants ‟
property is particularly vulnerable to stormwater or other local run-off
Case No: 249997 Determination Page 3 of 11
during intensities experienced on 11 January 2011 and 12 January
2011.
The timing of the rise of the Brisbane River was consistent with the
date of the inundation reported by the Applicants. SC notes the subject
property would have been inundated at approximately 2 .00pm on 11
January 2011 associated with the high tide of the Brisbane River at that
time. SC does not think the house on the property would have been
inundated prior to the level falling. The river level would then have risen
at 1.00am on 12 January and the minimum level of the property would
have been inundated again. This would have occurred around the time
the river near the property was reaching the level of 1.6m AHD. The
water level then continued to rise between 1 .00am 12 January 2011
and 14 January 2011. It would be during this level of continuous
inundation that the house on the property was inundated.
SC notes the backflow described by the Applicants is consistent with
the rising river levels. As the river level rises, this leads to water
travelling back up the storm pipes. If there is an area of higher ground
between the watercourse and given property it is possible for the
property to be inundated by the rising level of the river, even though the
water has not travelled directly from the banks of the river to the site of
the property because of the obstruction posed by higher ground.
The Brisbane River was elevated prior to the releases on 11 January
2011.
The Bremer River contributed in the order of 15-25% to the Brisbane
River‟s peak flow.
A small proportion of the overall depth of the Brisbane River prior to
6am on 12 January 2011 may be partially attributable to the rain that
fell in the Bremer River catchment on 11 January 2011. However, the
overwhelming influence on the flooding of the Brisbane River was the
rain that fell days earlier over the Wivenhoe Dam catchment and
subsequent releases from the dam.
The normal Brisbane River level is 1.5m AHD and the minimum land
level is 1.6m AHD. The maximum land level is stated as 2.3m AHD and
the approximate bench level is 1.9m AHD. The benchmark level is also
described as „elevated (possible storage areas)‟.
SC opines that the time the Brisbane River reached the approximate
benchmark level was 11.04am on Wednesday 12 January 2011.
The time the effect of the W4 releases first reached the vicinity of the
property was 4.10pm on Tuesday 11 January 2011.
The approximate contribution of W4 releases at the time of the
benchmark level inundation was 0.7m and the approximate contribution
of W4 releases to the Brisbane River level pre 4.00am on Wednesday
12 January 2011 was 0.3m. The peak contribution of the W4 releases
was 1m.
Case No: 249997 Determination Page 4 of 11
SC considers that assuming the releases from the Wivenhoe continued
at the W3 rates of discharge which applied prior to 8.00am on 11
January 2011; the river level would not have inundated the benchmark
level. On this assumption the river level at 4.00am on 12 January 2011
would have been approximately 1.5m which is 0.4m below the
benchmark level. With W4 releases, the river level at 4.00am on 12
January 2011 would have been at approximately 1.8m, which is 0.1m
below the benchmark level.
The peak of the Brisbane River was 2.6m (0.7m above the benchmark
level) at 3.52am on Thursday 13 January 2011.
14. The FSP has enclosed an assessor‟s report which suggests the property is
insured up to $400,000 for the building and $150,000 for the contents. The
reserve set on the damage is $100,000 for contents and building. It should
be noted this may have merged the two claims. A later progress report
suggests $23,700 was paid for contents and $6,701.52 for building items in
the first claim. The building damage is described as partially damaged
„moderate‟. (The Panel notes t he type of loss is described as storm relating
to rainwater but then it is stated as being caused by flood-river.)
15. The FSP submits that the inundation of the insured property to or above the
benchmark level did not occur until after 8.00am on 12 January 2011. This
would mean that the inundation occurred 24 hours after the release of
waters from the Wivenhoe Dam as a result of the W4 strategy.
16. The FSP contends that the rainfall on 9 and 10 January 2011 was more
significant than the rainfall on 11 January 2011 and this rainfall occurred
over 24 hours prior to the inundation. The W4 releases could not have
caused the inundation because the property was inundated before those
increased releases reached the home. Alternatively, even if the W4 releases
were the sole cause of the loss, the event is not a „flash flood and
stormwater run- off‟ event as the Wivenhoe Dam operators are an intervening
cause.
17. The FSP relies on the following policy p rovisions to deny the Applicants‟
claim:
Page 3 of the Certificate of Insurance (COI)
“ What optional covers are included and not included
Home Contents
...
Flood and storm surge not included not included...”
Pages 10-12 of the PDS
“ Words / terms with special meanings
Case No: 249997 Determination Page 5 of 11
Word / term Meaning
...
Flood Rising water which enters your home as a result of it
running off or overflowing from any origin or cause.
This policy does not cover flood unless we have
agreed and it is shown on your certificate of insurance.
Flash flood and
stormwater run - off
A sudden flood caused by heavy rain that fell no more
than 24 hours prior to the flash flood or stormwater
run - off .
...
Storm A violent disturbance of the atmosphere associated
with strong winds including a cyclone, lightening,
heavy rain, hail or snow, but not continuous bad
weather by itself.
...”
Pages 17-18 of the PDS
“ Insured events you are covered for
Damage caused by weather...
What is covered What is not covered
Storm Loss or damage:
caused by rain, hail or snow
after it has reached the
ground...
...
Flash flood and stormwater run-off
A sudden flood caused by heavy rain
that fell no more than 24 hours prior to
the flash flood or stormwater run - off
Loss or damage caused:
by flood...
...”
Page 27 of the PDS
“ Your home
The most we will pay you for home claims
What is covered What is not covered
Flash flood and stormwater run-off
We will pay up to 50% of your home sum
insured or $25,000, whichever is higher.
...
Case No: 249997 Determination Page 6 of 11
...”
Page 48 of the PDS
“ Optional covers for extra peace of mind
The covers outlined in this section are optional and do not apply unless you
have asked for them and we agree to cover you. Additional premiums apply
for each cover. Your certificate of insurance will show which covers operate.
All optional covers are subject to the terms and conditions of this policy.”
Page 53 of the PDS
“ Optional covers for extra peace of mind
What is covered What is not covered
Flood and storm surge
This policy does not cover flood unless
we have agreed and it is shown on your
certificate of insurance.
Home and/or contents cover
We cover you for loss of or damage to
your home or contents caused by flood
or storm surge which happens during the
period of insurance at the property
address.
We will pay up to the:
home sum insured, if your home is
insured;
contents sum insured, if your
contents are insured for damage
caused by flood or storm surge,
We will pay for loss or damage in the
same way and in the same amounts as
we do under insured events cover.
We will not pay for loss or
damage to:
paths, driveways, paving,
retaining walls (whether or
not part of the home), tennis
courts or other playing
surfaces;
shade or sail cloth;
fabric awnings, swimming
pool or spa covers or liners
and the like;
glasshouse whether or not
constructed principally of
glass;
water in swimming pools or
spas...
...”
Issues
18. Whether the cause of the Applicants‟ loss was covered under the policy.
Reasons for decision
19. Due to the nature of the dispute, the parties have been informed that the
matter has been referred to the Panel for Determination in line with the
Operational Guidelines to FOS‟s Terms of Reference. This dispute has not
been the subject of a FOS Recommendation and has proceeded directly to
Determination.
Case No: 249997 Determination Page 7 of 11
20. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
21. It is appropriate to consider the issues under the various headings.
Water Inundation
22. The FSP has relied upon material provided by their appointed hydrologist
SC.
23. The material relied upon by the FSP includes the statement from SC dated 2
September 2011 and a further statement dated 7 June 2012 together with a
document entitled Attachment A Key Conclusions.
24. When the Panel Chair Ombudsman met with the representative of the FSP
and the FSP‟s hydrologist SC on site on 19 Septemb er 2012, the Panel
Chair Ombudsman asked SC as to whether he had had been to the site
previously. Initially SC said yes.
25. The Panel Chair Ombudsman then said “so you have been here” to which
SC replied “I have driven past”.
26. The Panel Chair Ombudsman then asked SC as to how he determined the
benchmark level. SC advised that he used the photograph entitled
Attachment B, which was provided with the abovementioned Key
Conclusions document.
27. The photograph being Attachment B is an aerial photograph allegedly of the
area in which the Applicants ‟ property is located. The photograph includes
the various topography height levels known as Australian Height Datum,
which are marked on the photograph.
28. SC within his letter of 7 June 2012 says “utilising available aerial
pho tography, (Name of SC‟s company) located the house structure within
that land and, by reference to topographical data, estimated the AHD level of
the lowest point of the structure of the house (or other relevant structure) on
the land.
29. SC confirmed to the Panel Chair Ombudsman that this is the procedure he
adopted to determine the benchmark level at the Applicants‟ property.
30. When the Panel Chair Ombudsman showed the Applicants the photograph
being referred to by SC, the Applicants confirmed that the property having
been marked by SC was not in fact their property but was a completely
different property.
31. SC re-examined the photograph and confirmed that indeed the property
marked was not the correct property.
Case No: 249997 Determination Page 8 of 11
32. The FSP has subsequently made a further submission attaching an updated
report from SC. The FSP submits that the error was not a failure to consider
the correct property, but rather an error in marking the correct property on
the attached document. Further, it contends that none of the relevant
conclusions have changed. It therefore submits that the error in the marking
of the property should not have an impact on FOS‟s consideration of the
matter.
33. The Panel has considered these comments and also reviewed the Key
Conclusions sheet which it notes, are consistent with its previous
submissions.
34. The Panel notes that this is a defined events policy and thus the Applicants
bear the onus of proof in establishing a prima facie case.
35. The Panel also notes that the policy provides coverage for flash flood and
stormwater runoff.
36. The evidence of the Applicants is that when they evacuated the premises at
8am on 11 January 2011, water had already pooled to the extent of 5 or 6
inches at the rear of the house.
37. The Panel Chair Ombudsman observed a swimming pool at the rear of the
property and there were two steps up to the swimming pool and each step is
two bricks high. The Applicants described the situation whereby when they
evacuated at 8.00am on 11 January 2011, water had pooled up to the height
of the swimming pool.
38. The Panel Chair Ombudsman also noted that the property slopes
downwards from the front to the rear and the road at the front of the property
is above the ground level of the property. The Panel Chair Ombudsman
formed the view that there was likely to be stormwater runoff from the road
and the front of the property travelling through the property.
39. The rainfall record for the Bulimba rainfall gauge shows that 140mm of rain
fell over the period 9 January 2011 to 10 January 2011. A further
approximately 54mm fell during the course of the day on 11 January 2011.
The most intense rainfall fell between 5pm and 6pm on 11 January 2011.
40. Given this evidence, the Panel is satisfied that the Applicants have
demonstrated a prima facie case in respect of flash flood and stormwater
runoff, that being, a sudden flood caused by heavy rain that fell no more than
24 hours prior to the flash flood or stormwater runoff.
41. The FSP has relied upon the exception being in regard to flood, and
specifically, that by 4.00am on 12 January 2011 (that is 24 hours after the
rainfall from 4.00am on 11 January 2011) the property was not inundated at
the level of the bench mark, rather that the level of inundation was estimated
to be 0.1m below the bench mark.
Case No: 249997 Determination Page 9 of 11
42. However, as indicated above, in the Pane l‟s view it is more likely than not
that stormwater runoff would have traversed the property, and given the
height of the pooling of water at 8,00am on 11 January, it is likely that water
would have risen above the benchmark on the property at that time. Given
the finding that a prima facie claim has been established, the onus is on the
FSP to prove that the flood exclusion applies to defeat the claim.
43. Having carefully considered all of the evidence submitted by the FSP, the
Panel is not persuaded that it has met that onus. The evidence provided,
and particularly the recent evidence is focussed on the level of ‟24 hour flash
flood‟ inundation at 4.00am on 12 January 2011, .
44. The result is that the FSP has failed to prove the exception for flood in
respect of the initial inundation relating to overland stormwater run-off and
the FSP must provide coverage under the heading flash flood and
stormwater runoff.
45. In this regard the Applicants advised the Panel Chair Ombudsman that the
inundation on 11 and 12 January 2011 was to the level of about 5 or 6
inches below the floor level of the house and thus it was the ground level of
the house which was impacted and not the floor level of the house.
46. The evidence from SC indicates that the inundation would be to a level of
approximately 0.7 m from the bench mark on the ground .In this instance,
despite the previous errors in SC‟s reporting, the Panel is inclined to accept
this estimate
47. However, it is not known to what height stormwater runoff would have initially
affected the property. Given the only evidence available are the estimates
from the Applicants and SC with respect to the ultimate level of inundation,
the Panel will rely on its mandate to do what is fair in all the circumstances.
48. In the Panel‟s view, and given the surrounding topography, on the balance of
probabilities it determines stormwater runoff reached a height of 0.5m above
the ground. The Panel therefore determines that liability in respect of the
initial inundation will be to a height of 500mm above the benchmark level
that is the lowest level of the home structure on the ground.
49. The policy provides limitations on the coverage for flash flood and
stormwater runoff. Under the policy the FSP is required to pay up to 50% of
the sum insured or $25,000 whichever is higher both in respect to the home
sum insured and the contents sum insured.
50. The Applicants do not dispute receiving the product disclosure statement
(PDS) advising of the policy details nor do the Applicants challenge the
details of the policy coverage.
51. The Panel has considered these issues on previous occasions and the
Panel is satisfied that the policy limitations are easily understood and are
applicable to claims arising from the weather events in Brisbane in 2011.
Case No: 249997 Determination Page 10 of 11
52. In the absence of there being any allegation or evidence that the Applicants
did not receive the PDS, the Panel determines that the limitations applicable
to the coverage for flash flood and stormwater runoff apply in this case.
Interest
53. The FSP has argued that interest is only payable from the date from which it
was unreasonable to withhold payment. The FSP maintains that it is entitled
to a reasonable period to investigate and determine its position, and given
the complex nature of the flood disputes, the delays are not unreasonable.
Further complex situations require substantial periods of time for
independent bodies such as the Queensland Flood Commission of Inquiry
and FOS, to make conclusions on the issues in dispute.
54. The FSP maintains that it did not act unreasonably in this dispute and
therefore interest is not payable. Alternatively if some period of interest is to
be awarded if should be reduced to account for the substantial delays
through the course of the process which were not the FSP‟s fault.
55. Section 57 of the Insurance Contracts Act requires interest be paid when it
becomes “unreasonable for the insurer to have withheld payment”. An
examination of relevant case law indicates that most probably, interest will
be awarded from either when an insurer first emphatically denied liability or
disputed a matter, or from when in the normal course of events the claim
should have been paid if liability had not been disputed.
56. In this dispute the Panel accepts that the FSP was entitled to withhold
payment of the settlement monies until such time as it had properly
investigated the dispute and made its decision as to liability.
57. The FSP made its original decision to deny the claim after receiving relevant
assessment reports, hydrology reports and other information. The FSP was
aware of the terms of its policy and aware of the relevant provisions under
which liability might arise and chose to deny the claim having reviewed those
relevant provisions and the evidence available to it.
58. In the Panel‟s view, at that point the FSP has made its decision on the claim
and it is appropriate that from that time interest be paid unless it can be
established that the Applicants had withheld information from the FSP that
would have led to an alteration of its decision.
Quantum
59. The Renewal Certificate of Insurance for the relevant period provides a sum
insured of $352,000 for the home with contents of $104,000. Pursuant to the
policy cap for the insured event of “Flash flood and stormwater r unoff”, the
FSP is liable up to an amount of $176,000 for the damage to the building
and $52,000 for the contents.
60. Given the time since the loss was sustained and the assessment report
dealing with both claims, the Panel accepts that the parties may be unable to
Case No: 249997 Determination Page 11 of 11
provide an exact estimate of the total loss sustained, or a breakdown of that
loss for the claim arising from 12 January 2011.
61. The Applicants and the FSP are asked to work cooperatively together to
establish the extent of the loss sustained to the first level of the property and
to reach an agreement as to cost of repairs of the first level on replacement
of the various contents lost. Insofar as the FSP may have made payment of
a compassionate sum to the Applicants, FOS does not have jurisdiction to
deal with this payment but acknowledges that the FSP, given the terms on
which the compassionate payment was made, may be entitled to deduct this
payment from any settlement sum.
Determination
62. The FSP is to meet the cost of repairs incurred by the Applicants and the
cost of the replacement of items damaged as a result of the inundation of the
property to a level of 0.5m from the bench mark level, and in accordance
with the terms of the policy under the heading Flash Flood and Stormwater
Runoff.
63. Insofar as the FSP is to cash settle the claim, the FSP is to pay interest from
5 July 2011(being the date of rejection of the claim) to date of payment of the
claim, in accordance with Section 57 of the Act.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.