Home / Financial Firm (Unknown - Insurer) / Determination 249997

Determination 249997

Denial of claim

FirmFinancial Firm (Unknown - Insurer)
Decided2012-10-04
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Homeowners in Bulimba claimed for water inundation after the January 2011 Brisbane floods, and the FSP denied the claim as excluded flood. AFCA found the initial inundation was covered flash flood and stormwater run-off, limited liability to water 500mm above the benchmark level, and ordered interest from the date of rejection.

Where the insured establishes a prima facie flash flood or stormwater claim, the insurer must prove the flood exclusion; having failed to do so, AFCA applied fairness to set the covered inundation level.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 249997 Determination Page 1 of 11 Case number: 249997 General Insurance - Domestic Insurance - Home Contents - FSP Decision - Denial of claim 2 October 2012 Background 1. The Applicants insured their Home and Contents with the Financial Services Provider (FSP). The policy covered the Applicants‟ home for $352,000 and Contents for $104,000 subject to a $300 excess. 2. Their home in Bulimba was inundated by water on two occasions following severe weather events in Queensland in January 2011 3. On 6 January 2011 the Applicants made a claim under the policy for water inundation damage which was accepted and subsequently settled. 4. On 14 January 2011, the Applicants lodged a claim under the policy for water inundation damage. 5. The FSP denied the claim on the basis the damage was d ue to “flood” which is an excluded event under the policy. The Applicants dispute this and state the damage was caused by an insured event. 6. Both the Applicants and the FSP have provided detailed submissions on the relevant issues. For the sake of brevity, the Panel will only briefly summarise these submissions given all of the material made available has been exchanged with the other party. Summary of Applicants ’ position 7. The water came through the street in which the insured property was situated. The body of water which inundated their property was approximately 500 metres long and 100 metres wide in the suburb. 8. The water was from the rain runoff together with water that rose up through the drainage pits in the local street. At no time did the river break its banks and directly flood via overland flow. 9. The Applicants contend that the first and second inundations were due to similar mechanisms, being flash flood. 10. The Applicants have reviewed the FSP‟s material and respond as follows: Determination Case No: 249997 Determination Page 2 of 11  There was only one inspection of the property shortly after 12 January 2011 water damage.  The assessment report is misleading as it was compiled after clean-up had occurred.  The Applicants were informed they should take photographs of all items put out for council collection after the first water claim and this was done, although some items went missing in the second inundation.  The Applicants note that there was also looting after the clean up.  The hydrology report is based on incomplete data and the aerial photographs do not provide a proper representation. The property received less coverage in the hydrology report than actually occurred. 11. The Applicants seek indemnity for their claim for damage arising from inundation on 12 January 2011. Summary of FSP’s position 12. The FSP submits the Applicants have not discharged their onus of proving that the cause of loss was by flash flood and stormwater run-off. Even if flash flood was the proximate cause, which the FSP denies, then flood was also a proximate cause of the loss and, by application of the Wayne Tank principle, the policy does not respond. 13. The FSP relies on a number of hydrology reports authored by SC. The Panel notes the following from the information provided by SC:  The level of the subject property varies between 1.6m AHD and 2.3m AHD. The minimum habitable floor level was not available. The FloodWise summary also indicates that the interim Residential flood level was 2.6m. (However the Panel also notes that from a range of 1.9m-2.5m the source of inundation is listed a s “storm tide”). The property is in an overland flow path which means that during high rainfall excess run-off will travel overland to low lying drainage paths. This commonly occurs when underground drainage exceeds its capacity.  SC has attached topography mapping to his report. This indicates the Applicants‟ property is in a low -lying area and in close proximity to a number of drainage channels.  There was no evidence that rainfall at the relevant time was sufficient to cause inundation. The rainfall over 9-10 January 2011 was 145mm with a further fall of 54mm on 11 January 2011. The most intense rainfall on 11 January 2011 fell between 5.00pm-6.00pm. There was no rainfall on 12 January 2011.  SC notes the terrain information does not suggest that the Applicants ‟ property is particularly vulnerable to stormwater or other local run-off Case No: 249997 Determination Page 3 of 11 during intensities experienced on 11 January 2011 and 12 January 2011.  The timing of the rise of the Brisbane River was consistent with the date of the inundation reported by the Applicants. SC notes the subject property would have been inundated at approximately 2 .00pm on 11 January 2011 associated with the high tide of the Brisbane River at that time. SC does not think the house on the property would have been inundated prior to the level falling. The river level would then have risen at 1.00am on 12 January and the minimum level of the property would have been inundated again. This would have occurred around the time the river near the property was reaching the level of 1.6m AHD. The water level then continued to rise between 1 .00am 12 January 2011 and 14 January 2011. It would be during this level of continuous inundation that the house on the property was inundated.  SC notes the backflow described by the Applicants is consistent with the rising river levels. As the river level rises, this leads to water travelling back up the storm pipes. If there is an area of higher ground between the watercourse and given property it is possible for the property to be inundated by the rising level of the river, even though the water has not travelled directly from the banks of the river to the site of the property because of the obstruction posed by higher ground.  The Brisbane River was elevated prior to the releases on 11 January 2011.  The Bremer River contributed in the order of 15-25% to the Brisbane River‟s peak flow.  A small proportion of the overall depth of the Brisbane River prior to 6am on 12 January 2011 may be partially attributable to the rain that fell in the Bremer River catchment on 11 January 2011. However, the overwhelming influence on the flooding of the Brisbane River was the rain that fell days earlier over the Wivenhoe Dam catchment and subsequent releases from the dam.  The normal Brisbane River level is 1.5m AHD and the minimum land level is 1.6m AHD. The maximum land level is stated as 2.3m AHD and the approximate bench level is 1.9m AHD. The benchmark level is also described as „elevated (possible storage areas)‟.  SC opines that the time the Brisbane River reached the approximate benchmark level was 11.04am on Wednesday 12 January 2011.  The time the effect of the W4 releases first reached the vicinity of the property was 4.10pm on Tuesday 11 January 2011.  The approximate contribution of W4 releases at the time of the benchmark level inundation was 0.7m and the approximate contribution of W4 releases to the Brisbane River level pre 4.00am on Wednesday 12 January 2011 was 0.3m. The peak contribution of the W4 releases was 1m. Case No: 249997 Determination Page 4 of 11  SC considers that assuming the releases from the Wivenhoe continued at the W3 rates of discharge which applied prior to 8.00am on 11 January 2011; the river level would not have inundated the benchmark level. On this assumption the river level at 4.00am on 12 January 2011 would have been approximately 1.5m which is 0.4m below the benchmark level. With W4 releases, the river level at 4.00am on 12 January 2011 would have been at approximately 1.8m, which is 0.1m below the benchmark level.  The peak of the Brisbane River was 2.6m (0.7m above the benchmark level) at 3.52am on Thursday 13 January 2011. 14. The FSP has enclosed an assessor‟s report which suggests the property is insured up to $400,000 for the building and $150,000 for the contents. The reserve set on the damage is $100,000 for contents and building. It should be noted this may have merged the two claims. A later progress report suggests $23,700 was paid for contents and $6,701.52 for building items in the first claim. The building damage is described as partially damaged „moderate‟. (The Panel notes t he type of loss is described as storm relating to rainwater but then it is stated as being caused by flood-river.) 15. The FSP submits that the inundation of the insured property to or above the benchmark level did not occur until after 8.00am on 12 January 2011. This would mean that the inundation occurred 24 hours after the release of waters from the Wivenhoe Dam as a result of the W4 strategy. 16. The FSP contends that the rainfall on 9 and 10 January 2011 was more significant than the rainfall on 11 January 2011 and this rainfall occurred over 24 hours prior to the inundation. The W4 releases could not have caused the inundation because the property was inundated before those increased releases reached the home. Alternatively, even if the W4 releases were the sole cause of the loss, the event is not a „flash flood and stormwater run- off‟ event as the Wivenhoe Dam operators are an intervening cause. 17. The FSP relies on the following policy p rovisions to deny the Applicants‟ claim: Page 3 of the Certificate of Insurance (COI) “ What optional covers are included and not included Home Contents ... Flood and storm surge not included not included...” Pages 10-12 of the PDS “ Words / terms with special meanings Case No: 249997 Determination Page 5 of 11 Word / term Meaning ... Flood Rising water which enters your home as a result of it running off or overflowing from any origin or cause. This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance. Flash flood and stormwater run - off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run - off . ... Storm A violent disturbance of the atmosphere associated with strong winds including a cyclone, lightening, heavy rain, hail or snow, but not continuous bad weather by itself. ...” Pages 17-18 of the PDS “ Insured events you are covered for Damage caused by weather... What is covered What is not covered Storm Loss or damage:  caused by rain, hail or snow after it has reached the ground... ... Flash flood and stormwater run-off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run - off Loss or damage caused:  by flood... ...” Page 27 of the PDS “ Your home The most we will pay you for home claims What is covered What is not covered Flash flood and stormwater run-off We will pay up to 50% of your home sum insured or $25,000, whichever is higher. ... Case No: 249997 Determination Page 6 of 11 ...” Page 48 of the PDS “ Optional covers for extra peace of mind The covers outlined in this section are optional and do not apply unless you have asked for them and we agree to cover you. Additional premiums apply for each cover. Your certificate of insurance will show which covers operate. All optional covers are subject to the terms and conditions of this policy.” Page 53 of the PDS “ Optional covers for extra peace of mind What is covered What is not covered Flood and storm surge This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance. Home and/or contents cover We cover you for loss of or damage to your home or contents caused by flood or storm surge which happens during the period of insurance at the property address. We will pay up to the:  home sum insured, if your home is insured;  contents sum insured, if your contents are insured for damage caused by flood or storm surge, We will pay for loss or damage in the same way and in the same amounts as we do under insured events cover. We will not pay for loss or damage to:  paths, driveways, paving, retaining walls (whether or not part of the home), tennis courts or other playing surfaces;  shade or sail cloth;  fabric awnings, swimming pool or spa covers or liners and the like;  glasshouse whether or not constructed principally of glass;  water in swimming pools or spas... ...” Issues 18. Whether the cause of the Applicants‟ loss was covered under the policy. Reasons for decision 19. Due to the nature of the dispute, the parties have been informed that the matter has been referred to the Panel for Determination in line with the Operational Guidelines to FOS‟s Terms of Reference. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. Case No: 249997 Determination Page 7 of 11 20. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 21. It is appropriate to consider the issues under the various headings. Water Inundation 22. The FSP has relied upon material provided by their appointed hydrologist SC. 23. The material relied upon by the FSP includes the statement from SC dated 2 September 2011 and a further statement dated 7 June 2012 together with a document entitled Attachment A Key Conclusions. 24. When the Panel Chair Ombudsman met with the representative of the FSP and the FSP‟s hydrologist SC on site on 19 Septemb er 2012, the Panel Chair Ombudsman asked SC as to whether he had had been to the site previously. Initially SC said yes. 25. The Panel Chair Ombudsman then said “so you have been here” to which SC replied “I have driven past”. 26. The Panel Chair Ombudsman then asked SC as to how he determined the benchmark level. SC advised that he used the photograph entitled Attachment B, which was provided with the abovementioned Key Conclusions document. 27. The photograph being Attachment B is an aerial photograph allegedly of the area in which the Applicants ‟ property is located. The photograph includes the various topography height levels known as Australian Height Datum, which are marked on the photograph. 28. SC within his letter of 7 June 2012 says “utilising available aerial pho tography, (Name of SC‟s company) located the house structure within that land and, by reference to topographical data, estimated the AHD level of the lowest point of the structure of the house (or other relevant structure) on the land. 29. SC confirmed to the Panel Chair Ombudsman that this is the procedure he adopted to determine the benchmark level at the Applicants‟ property. 30. When the Panel Chair Ombudsman showed the Applicants the photograph being referred to by SC, the Applicants confirmed that the property having been marked by SC was not in fact their property but was a completely different property. 31. SC re-examined the photograph and confirmed that indeed the property marked was not the correct property. Case No: 249997 Determination Page 8 of 11 32. The FSP has subsequently made a further submission attaching an updated report from SC. The FSP submits that the error was not a failure to consider the correct property, but rather an error in marking the correct property on the attached document. Further, it contends that none of the relevant conclusions have changed. It therefore submits that the error in the marking of the property should not have an impact on FOS‟s consideration of the matter. 33. The Panel has considered these comments and also reviewed the Key Conclusions sheet which it notes, are consistent with its previous submissions. 34. The Panel notes that this is a defined events policy and thus the Applicants bear the onus of proof in establishing a prima facie case. 35. The Panel also notes that the policy provides coverage for flash flood and stormwater runoff. 36. The evidence of the Applicants is that when they evacuated the premises at 8am on 11 January 2011, water had already pooled to the extent of 5 or 6 inches at the rear of the house. 37. The Panel Chair Ombudsman observed a swimming pool at the rear of the property and there were two steps up to the swimming pool and each step is two bricks high. The Applicants described the situation whereby when they evacuated at 8.00am on 11 January 2011, water had pooled up to the height of the swimming pool. 38. The Panel Chair Ombudsman also noted that the property slopes downwards from the front to the rear and the road at the front of the property is above the ground level of the property. The Panel Chair Ombudsman formed the view that there was likely to be stormwater runoff from the road and the front of the property travelling through the property. 39. The rainfall record for the Bulimba rainfall gauge shows that 140mm of rain fell over the period 9 January 2011 to 10 January 2011. A further approximately 54mm fell during the course of the day on 11 January 2011. The most intense rainfall fell between 5pm and 6pm on 11 January 2011. 40. Given this evidence, the Panel is satisfied that the Applicants have demonstrated a prima facie case in respect of flash flood and stormwater runoff, that being, a sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater runoff. 41. The FSP has relied upon the exception being in regard to flood, and specifically, that by 4.00am on 12 January 2011 (that is 24 hours after the rainfall from 4.00am on 11 January 2011) the property was not inundated at the level of the bench mark, rather that the level of inundation was estimated to be 0.1m below the bench mark. Case No: 249997 Determination Page 9 of 11 42. However, as indicated above, in the Pane l‟s view it is more likely than not that stormwater runoff would have traversed the property, and given the height of the pooling of water at 8,00am on 11 January, it is likely that water would have risen above the benchmark on the property at that time. Given the finding that a prima facie claim has been established, the onus is on the FSP to prove that the flood exclusion applies to defeat the claim. 43. Having carefully considered all of the evidence submitted by the FSP, the Panel is not persuaded that it has met that onus. The evidence provided, and particularly the recent evidence is focussed on the level of ‟24 hour flash flood‟ inundation at 4.00am on 12 January 2011, . 44. The result is that the FSP has failed to prove the exception for flood in respect of the initial inundation relating to overland stormwater run-off and the FSP must provide coverage under the heading flash flood and stormwater runoff. 45. In this regard the Applicants advised the Panel Chair Ombudsman that the inundation on 11 and 12 January 2011 was to the level of about 5 or 6 inches below the floor level of the house and thus it was the ground level of the house which was impacted and not the floor level of the house. 46. The evidence from SC indicates that the inundation would be to a level of approximately 0.7 m from the bench mark on the ground .In this instance, despite the previous errors in SC‟s reporting, the Panel is inclined to accept this estimate 47. However, it is not known to what height stormwater runoff would have initially affected the property. Given the only evidence available are the estimates from the Applicants and SC with respect to the ultimate level of inundation, the Panel will rely on its mandate to do what is fair in all the circumstances. 48. In the Panel‟s view, and given the surrounding topography, on the balance of probabilities it determines stormwater runoff reached a height of 0.5m above the ground. The Panel therefore determines that liability in respect of the initial inundation will be to a height of 500mm above the benchmark level that is the lowest level of the home structure on the ground. 49. The policy provides limitations on the coverage for flash flood and stormwater runoff. Under the policy the FSP is required to pay up to 50% of the sum insured or $25,000 whichever is higher both in respect to the home sum insured and the contents sum insured. 50. The Applicants do not dispute receiving the product disclosure statement (PDS) advising of the policy details nor do the Applicants challenge the details of the policy coverage. 51. The Panel has considered these issues on previous occasions and the Panel is satisfied that the policy limitations are easily understood and are applicable to claims arising from the weather events in Brisbane in 2011. Case No: 249997 Determination Page 10 of 11 52. In the absence of there being any allegation or evidence that the Applicants did not receive the PDS, the Panel determines that the limitations applicable to the coverage for flash flood and stormwater runoff apply in this case. Interest 53. The FSP has argued that interest is only payable from the date from which it was unreasonable to withhold payment. The FSP maintains that it is entitled to a reasonable period to investigate and determine its position, and given the complex nature of the flood disputes, the delays are not unreasonable. Further complex situations require substantial periods of time for independent bodies such as the Queensland Flood Commission of Inquiry and FOS, to make conclusions on the issues in dispute. 54. The FSP maintains that it did not act unreasonably in this dispute and therefore interest is not payable. Alternatively if some period of interest is to be awarded if should be reduced to account for the substantial delays through the course of the process which were not the FSP‟s fault. 55. Section 57 of the Insurance Contracts Act requires interest be paid when it becomes “unreasonable for the insurer to have withheld payment”. An examination of relevant case law indicates that most probably, interest will be awarded from either when an insurer first emphatically denied liability or disputed a matter, or from when in the normal course of events the claim should have been paid if liability had not been disputed. 56. In this dispute the Panel accepts that the FSP was entitled to withhold payment of the settlement monies until such time as it had properly investigated the dispute and made its decision as to liability. 57. The FSP made its original decision to deny the claim after receiving relevant assessment reports, hydrology reports and other information. The FSP was aware of the terms of its policy and aware of the relevant provisions under which liability might arise and chose to deny the claim having reviewed those relevant provisions and the evidence available to it. 58. In the Panel‟s view, at that point the FSP has made its decision on the claim and it is appropriate that from that time interest be paid unless it can be established that the Applicants had withheld information from the FSP that would have led to an alteration of its decision. Quantum 59. The Renewal Certificate of Insurance for the relevant period provides a sum insured of $352,000 for the home with contents of $104,000. Pursuant to the policy cap for the insured event of “Flash flood and stormwater r unoff”, the FSP is liable up to an amount of $176,000 for the damage to the building and $52,000 for the contents. 60. Given the time since the loss was sustained and the assessment report dealing with both claims, the Panel accepts that the parties may be unable to Case No: 249997 Determination Page 11 of 11 provide an exact estimate of the total loss sustained, or a breakdown of that loss for the claim arising from 12 January 2011. 61. The Applicants and the FSP are asked to work cooperatively together to establish the extent of the loss sustained to the first level of the property and to reach an agreement as to cost of repairs of the first level on replacement of the various contents lost. Insofar as the FSP may have made payment of a compassionate sum to the Applicants, FOS does not have jurisdiction to deal with this payment but acknowledges that the FSP, given the terms on which the compassionate payment was made, may be entitled to deduct this payment from any settlement sum. Determination 62. The FSP is to meet the cost of repairs incurred by the Applicants and the cost of the replacement of items damaged as a result of the inundation of the property to a level of 0.5m from the bench mark level, and in accordance with the terms of the policy under the heading Flash Flood and Stormwater Runoff. 63. Insofar as the FSP is to cash settle the claim, the FSP is to pay interest from 5 July 2011(being the date of rejection of the claim) to date of payment of the claim, in accordance with Section 57 of the Act.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.