Home / Financial Firm (Unknown - Insurer) / Determination 249702
Determination 249702
Contents water damage claim declined under flood exclusion
Summary
The Applicant's home contents were damaged in the January 2011 Brisbane flood event and the FSP declined the claim under the flood exclusion. AFCA accepted that about 20mm of stormwater run-off entered before riverine flooding, so the FSP must pay only for contents damaged by that stormwater, with the extent to be agreed or remitted to the Panel.
Riverine flood damage falls within the flood exclusion, but stormwater inundation before the flood is not excluded and is covered to the extent of the contents it damaged.
Issues
- Claim denial primary · upheld
“The FSP is liable to make payment for only those contents items damaged by the initial 20mm stormwater inundation.”
- Delay secondary · not upheld
“Any delay was clearly caused by the multiple claims and limited availability of assessors or hydrologists, and was reasonable.”
- Failure to disclose secondary · not upheld
“The Panel considers that the FSP has provided both verbal and written notice of the flood exclusion in accordance with the Act.”
- Misleading conduct secondary · not upheld
“Telling the Applicant stormwater run-off is covered but flood is not would appear to be an accurate summation of the cover.”
- Offensive or intimidating behaviour secondary · not upheld
“There is no corroborating evidence of the garden hose remark; the FSP's previous apology is adequate to address this concern.”
Subjects and remedies
natural disasterpay claim
Text of the determination
Case No: 249702 Determination Page 1 of 9
Case number: 249702
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim-Exclusion/ condition
18 May 2012
Background
1. The Applicant holds a Home Contents Policy of Insurance with the Financial
Services Provider (FSP). The policy covers the Applicant‟s contents for up to
$64,533 subject to an excess of $100.
2. On 11- 12 January 2011 the Applicant‟s residence in Jindalee Queensland
was inundated by water causing damage to contents. The Applicant
subsequently lodged a claim.
3. The FSP declined the claim on the basis the water inundation arose from
flood which is an excluded cause of loss under the policy.
4. The Applicant disputes the declinature on the basis storm water runoff
caused the water inundation. Further, the FSP misrepresented the cover and
failed to properly inform her of the policy cover.
Summary of Applicant’s position
5. The Applicant states the policy was incepted over the telephone in
September 2006. The Product Disclosure Statement (PDS) was received
subsequent to making the initial payment under the policy. As the flood
exclusion was not received until after the insurance policy was in place, the
FSP cannot argue that it drew her attention to this prior to the policy
inception. The Applicant disputes that verbally informing her of the flood
exclusion at the end of the telephone conversation incepting the policy and
after confirming cover, constituted properly informing the Applicant of the
exclusion.
6. During the telephone conversation to incept the policy the Applicant was
informed that she would have the same cover as her previous insurance
policy. The Applicant believed she was covered for flood as a result and
relied on this representation when incepting the policy. As a result of these
representations, the Applicant believed that any inundation would be
covered, be it run-off or flooding.
7. The Applicant had a further telephone conversation between 11am and 2pm
on 11 January 2011 with the FSP. The FSP‟s employee informed her she
Determination
Case No: 249702 Determination Page 2 of 9
was not covered for flood but did have cover for stormwater run-off. Despite
requests, a recording of this conversation has not been provided. The
Applicant submits that the representations made at this time led her to
develop a reasonable expectation that her policy would protect her from
water inundation damage caused by run-off.
8. The Applicant disputes the hydrologist‟s report on the basis there is no
supporting evidence for the opinion formed. The report has little evidentiary
value in proving the water that first entered the property is excluded under
the policy. The Applicant expects the rainfall was high, considering the
rainfall in the locale and the photographs showing water ponding. Further,
the hydrologist did not inspect the property until 10 weeks after the initial
flood.
9. The Applicant states the damage to the property first occurred from sudden,
excessive runoff of water as a direct result of the storm and is therefore
covered under the policy event of storm. The property was only
subsequently inundated by backwater flooding from the Brisbane River.
10. The Applicant recalls that she went to work on 11 January 2011 and
received a telephone call from her children stating there was water near the
home. The Applicant returned home around 12pm-1.30pm and saw a
significant amount of water flowing from next door to the east. The water
came into the front eastern corner of her yard and towards the back of the
house. The water was inches from the back door.
11. The Applicant states that by 2.30pm-3.30pm the water runoff began entering
through the back door into the kitchen. The water from the river was still 5-6
metres below the house at this stage. This led the Applicant and her children
to gather some personal items and arrange for three carloads of items to go
to a friend‟s home.
12. The Applicant‟s neighbour has informed her that by 10pm there was a foot of
water through his home. The Applicant did not return to the property until 14
January 2011.
13. In relation to the assessor‟s report, the Applicant notes she returned home
between 5-5.30pm and did not have sufficient time to move all the furniture
and contents. Further, as she was not at the property she could not provide
any specific time as to when water entered the property. In addition to this,
the second hydrology report indicates 20mm of stormwater run-off may have
entered the home prior to riverine flooding - which corroborates her claim.
14. In support of her claim, the Applicant has provided a number of photographs
taken from inside her home, standing at the back and side doors. The
Applicant maintains this shows storm water runoff from a recent storm. The
Applicant believes the storm water runoff on 11 January 2011 would have
been far greater.
15. The Applicant was dissatisfied with the service provided by a FSP employee
“G”. The Applicant contends that the treatment by G breached 2.4.1 of the
General Insurance Code of Conduct. In particular the Applicant claims:
Case No: 249702 Determination Page 3 of 9
G was intimidating through the claims process
G failed to listen to the Applicant during the claims process
When informed of the water coming from the neighbouring property, G
asked if the neighbour had left the garden hose running. The Applicant
considered such a remark offensive.
G was reluctant to provide information regarding the claim to the
Applicant.
16. The Applicant seeks an apology and/or compensation for the stress suffered.
Summary of FSP’s position
17. The FSP submits that it has complied with section 35 of the Act by providing
a copy of the relevant insurance documents including the PDS within 14
days of the contract being entered into as allowed by section 69 of the Act.
Further, the PDS was sent to the Applicant on 5 September 2006, being one
day after policy inception. Additionally the Applicant was informed of the
flood exclusion verbally before providing confirmation she would proceed.
The policy however did not commence until 26 September 2006 so the
Applicant was informed of the policy exclusion well before the contract was
entered into.
18. The FSP disputes that it misrepresented the extent of cover as it informed
the Applicant she was not covered for flood at the time of inception. The
Applicant further acknowledges this information was provided.
19. The FSP further did not misrepresent cover on 11 January 2011. Whilst it
could not locate a call recording, it notes the Applicant was told flood was not
covered but stormwater run-off was.
20. The FSP relies on an assessor report dated 26 January 2011 from which the
Panel notes the following:
The property is a single story property.
The entry point of the water was a side fence area.
The water built up gradually and entered the property mid-afternoon on
Tuesday (11 January 2011).
The water had some dirt in it and came from the creek at the rear of the
property.
The Applicant was forced to evacuate by police and left the property
around 4.00pm.
The Applicant could do very little to protect the property from damage.
The report states “ALL THINGS RAISED UP OFF THE GROUND AND
THE WHOLE HOUSE WENT UNDER WATER”
21. The FSP relies on a site specific hydrology report dated 29 March 2011. The
Panel notes the following from this document:
Case No: 249702 Determination Page 4 of 9
The Applicant‟s residence is 150m south of the main river channel and
is located within the Brisbane River floodplain.
The property elevations range from 9.5mAHD-10mAHD. The highest
elevation being along the eastern corner of the property.
The property is surrounded by higher ground towards the south and is
directly linked to the Brisbane River by a section of low ground that lies
to the north of the property. The low ground starts at a low point along
the river where a small drainage channel enters the stream.
The nearest river gauge is 500m from the Applicant‟s property. The
gauge information indicates that the Brisbane River was first affected
by catchment inflows as early as Sunday 9 January 2011. The ri ver
steadily rose until about midday on Tuesday 11 January 2011. At this
time the gauge indicates a steady rise until its eventual flood peak of
about 12.8m at 8pm on Wednesday 12 January 2011.
The hydrologist has obtained the following information from the
Applicant:
At 3.30pm on Tuesday 11 January 2011 the drainage channel
located north of the property appeared to be filling up but was still
4-5m below the ground level of the property.
During the day, the claimant noticed water flowing from the
neighbour‟ s property – the depth of which was about 500mm
almost reaching her door. At 6pm the oval near the school was
flooded which made the Applicant evacuate the premises.
After the water receded there was 100mm of smelly silt in the
house and debris on the lawn.
The flood peak experienced at the property was 2.8m and the
estimated level of inundation was 12.3mAHD.
The rainfall was approximately 35mm between 9am and 4pm which
does not correspond to the timing of severe flooding in the area.
It is highly unlikely that there was sufficient local stormwater runoff for
this to be a contributing factor to the severe inundation of the area that
occurred.
The inundation of the property was caused by flood water escaping
from the normal confines of the Brisbane River and „backing up‟ into the
local drainage system.
22. The FSP has enclosed a memorandum dated 13 January 2012 from the
hydrologist. The Panel notes the following from same:
The hydrologist arranged for a property survey which revealed the
property is situated on a high point and slopes to the south (front of the
property) and north (back of the property). The property is situated on a
minor ridge that is bounded by the residential street itself and a
drainage channel to the north.
Case No: 249702 Determination Page 5 of 9
There is a low area to the rear of the property, generally along the
extent of the concrete slab at the north-eastern corner of the main
dwelling.
The hydrologist estimates the dwelling may have been initially
inundated to a depth of 20mm.
23. The FSP relies on the ICA Hydrology Reports. In particular the Panel notes
that any inundation after 6.00pm on 11 January 2011 is attributed to
backwater flooding from the Brisbane River.
24. Based on the expert evidence, the FSP submits the Applicant has not
established an insured event has occurred. No inundation had occurred by
6pm on Tuesday 11 January 2011 when the Applicant left the property. The
FSP contends that the water inundation arose from flood and the timing of
the inundation corroborates this.
25. The FSP further notes the Applicant has provided contradictory information
regarding the timing of the inundation and where the water came from. In
particular the Applicant informed the assessor the water came from the
creek but then disputes this and provides contrary evidence on whether she
witnessed the i nundation. The FSP submits the Applicant‟s memory is not
reliable and the expert reports should be relied upon. The FSP further
contends that as at 5.30pm the Applicant does not suggest the contents
were damaged.
26. The FSP maintains its expert reports should be accepted over the
Applicant‟s unsubstantiated allegations that it was stormwater run -off. This is
particularly given the Jindalee weather station only recorded rainfalls of <1 to
1ARI.
27. The FSP submits it is not liable as the policy does not cover loss caused by
flood. The FSP further notes that even if the Service was minded to accept
20mm inundation that it is implausible that the contents were damaged by
this amount given the Applicant‟s statement she moved her contents up to
avoid damage. The contents would more probably be damaged by the flood
waters which reached 2.8m inundation. The FSP relies on the case of
Elilade Pty Ltd v Nonpareil Pty Ltd [202] FCA 909 in regard to apportioning
loss in the event of multiple inundations.
28. The FSP disputes that there was a significant delay in the assessment of the
property or the hydrologist‟s attendance. This is particularly so in light of the
volume of claims and demand for these services.
29. The conduct of G falls outside of 2.4.1 of the General Insurance Code of
Conduct as G was not selling products. The FSP disputes that G acted in an
inappropriate or derogatory manner and the Applicant did not complain
about G at the time. The FSP further disputes G told the Applicant she would
not receive the hydrology report given this was in fact provided to the
Applicant. However, the FSP does apologise to the Applicant if she felt G‟s
service did not meet her expectations.
Case No: 249702 Determination Page 6 of 9
30. The FSP notes the photographs provided by the Applicant show shallow
pooling of water. However these photographs are unclear in relation to water
flow.
Issues
31. Whether the FSP is entitled to rely on the policy terms and conditions.
32. Whether the FSP is entitled to decline the claim.
33. Whether the FSP has breached the General Insurance Code of Practice,
acted inappropriately or delayed claim assessment substantially.
Reasons for decision
34. There has been an exchange of material between each party and the Panel
is satisfied each party has had an opportunity to reply to the issues raised.
35. The Panel has read each p arty‟s submissions and materials and will only
refer to the relevant submissions and materials raised.
36. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
37. The Panel considers that there are three discrete issues (listed above) which
will be dealt with separately below.
Whether the FSP is entitled to rely on the policy terms and conditions
38. The Panel has considered the allegation that the FSP has failed to inform
the Applicant of the flood exclusion prior to entering the contract.
39. The parties do not dispute that the FSP informed the Applicant verbally that
flood was excluded by the policy.
40. The Panel has listened to the recording and notes the FSP confirmed there
was no flood cover, explained that there would be a document sent out
explaining what was and was not covered and then requested whether she
would like more information regarding the details in the documents or to
proceed. The Applicant elected to proceed and in doing so chose to receive
the information in the written format of the PDS rather than verbally. The
FSP then arranged for the contract of insurance to proceed. The Panel
further notes that reading the entire policy to the Applicant would not have
been practicable for the purposes of sections 35 and 69 of the Act.
41. The Applicant does not dispute that the PDS was sent out to her or that the
contract of insurance commenced on 26 September 2006, so me 21 days
after the telephone call to incept the policy.
Case No: 249702 Determination Page 7 of 9
42. The Panel accepts that under sections 35, 69 and 77 of the Act the FSP is
entitled to post the policy documentation to the Applicant.
43. The Panel considers that the FSP has provided both verbal and written
notice of the flood exclusion in accordance with the Act.
44. The Panel further notes a reasonable person in the Applicant‟s position
would have been aware the policy was not exactly the same as the previous
one. This is particularly in light of alterations to it to reduce the premium and
statements of the lack of flood cover. Based on the evidence before it, the
Panel does not accept that misrepresentation occurred during the policy
inception phase or that the FSP failed to inform the Applicant of the flood
exclusion.
45. The Panel further notes the allegation of misrepresentation on 11 January
2011 but notes that the Applicant was told that stormwater run-off is covered
but flood is not. This would appear to be an accurate summation of the cover
and as such does not constitute a misrepresentation.
Whether the FSP was entitled to decline the claim for water inundation
46. The parties do not dispute that flood water (as defined by the policy)
inundated the property. However, the Applicant states that stormwater run-
off inundated the property causing damage prior to the riverine flooding.
47. As outlined by the FSP‟s submissions, there are significant variations in the
Applicant‟s inundation versions, including the timing source and whether she
witnessed the inundation.
48. The Panel therefore considers it would be more appropriate to rely on the
data records incorporated into the hydrologist‟s report and opinion. The
Panel does not accept the Applicant‟s contention that the hydrologist has no
evidence to support the opinion provided, given the river gauge, rain gauge
and land data measurements which were relied upon in forming the
hydrology report.
49. The hydrologist has provided an opinion that the stormwater run-off may
have inundated the property prior to riverine flooding. Such an inundation
would only have been up to a height of 20mm.
50. The Panel further notes that there is photographic evidence of ponding water
at the time of the weather event. This supports the hydrologist‟s opinion that
water would have ponded up to 100mm at this location prior to dwelling
inundation of up to 20mm.
51. Based on expert opinion the Panel accepts that the property received
stormwater inundation up to 20mm prior to the riverine flooding inundation.
52. The Panel agrees with the FSP‟s summation of th e principles of the Elilade
case. The Panel accepts the Applicant may only claim for damage to
contents which would have been damaged by the initial 20mm stormwater
run-off inundation.
Case No: 249702 Determination Page 8 of 9
53. The Panel notes the Applicant took 3 carloads of items to a friend‟s h ome
and allegedly stated to the assessor that all things were raised up off the
ground. However, the Applicant also reasonably states she was unable to
raise up some contents items, such as a treadmill. There is no definitive list
of items likely to have been damaged by the 20mm stormwater inundation
and accordingly the Panel cannot make specific orders in this Determination
as to the extent of any loss suffered by such inundation.
Whether the FSP has breached the General Insurance Code of Practice, acted
inappropriately or delayed claim assessment substantially.
Whether there has been a breach of the General Insurance Code of Practice or
whether the FSP acted inappropriately
54. The Applicant has submitted that G has breached clause 2.4.1 of the
General Insur ance Code of Practice (“the Code”). This clause refers to the
buying of insurance and the employee selling the product.
55. At the time the Applicant‟s complaint arose, the policy was in place and G
was handling the claim. Accordingly, the Panel cannot find that G breached
this clause of the Code as it does not relate to claims handling.
56. The Panel notes 3.6.1 of the code relates to standards for insurer employees
handling claims. In particular the employees will conduct their services in an
honest, efficient, fair and transparent manner.
57. The Applicant states G refused to provide hydrology reports, acted in an
intimidating manner and made inappropriate remarks suggesting the
inundation was caused by the neighbour leaving the garden hose running.
The FSP refutes all of these allegations noting the hydrology reports were
provided and that G‟s behaviour was appropriate. The FSP however did
apologise if G‟s behaviour did not reach the standards the Applicant
expected.
58. The Panel notes that the production of hydrolog y reports would be contrary
to G‟s statements the hydrology reports would not be provided.
59. There is no detail regarding why the Applicant found G particularly
intimidating or bullying. Accordingly, the Panel has insufficient evidence to
consider such a complaint.
60. The Panel has noted the disputed remark regarding the garden hose. There
is no corroborating evidence from either party in the form of
contemporaneous file notes and it appears the recording of this conversation
is not available. Given this, the P anel has no basis to prefer one party‟s
evidence over the other and deems the FSP‟s previous apology as adequate
to address this concern.
Case No: 249702 Determination Page 9 of 9
Delay
61. The Panel has considered the time frames involving the assessment of the
flood claim. The dates of the reports suggest that the assessment and
hydrology reports were completed by 28 March 2011.
62. The Panel does not consider this a substantial delay, considering the fact
this flood event was a major incident affecting substantial numbers of
people. This is perhaps best demonstrated by the Insurance Council of
Australia moving to deem this event a catastrophe.
63. Any delay was quite clearly caused by the multiple claims and limited
availability of resources such as assessors or hydrologists.
64. The Panel notes that in all the circumstances, to the extent there might be
considered to have been a delay, that it was reasonable.
Determination
65. Whilst the Panel understands the Applicant‟s frustration, on the basis of the
available information the Panel determines the FSP is entitled to rely on the
policy terms and conditions.
66. The Panel determines the FSP is liable to make payment for only those
contents items damaged by the initial 20mm stormwater inundation. The
parties are asked to work cooperatively to determine the extent of the loss.
Should they not be able to agree on a monetary settlement, the matter can
be remitted to the Panel for a Supplementary Determination.
67. The Panel determines the FSP did not breach the Code or act
inappropriately or unnecessarily delay the processing of the claim.