Home / Financial Firm (Unknown - Insurer) / Determination 249702

Determination 249702

Contents water damage claim declined under flood exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2012-06-04
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The Applicant's home contents were damaged in the January 2011 Brisbane flood event and the FSP declined the claim under the flood exclusion. AFCA accepted that about 20mm of stormwater run-off entered before riverine flooding, so the FSP must pay only for contents damaged by that stormwater, with the extent to be agreed or remitted to the Panel.

Riverine flood damage falls within the flood exclusion, but stormwater inundation before the flood is not excluded and is covered to the extent of the contents it damaged.

Issues

Subjects and remedies

natural disasterpay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 249702 Determination Page 1 of 9 Case number: 249702 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim-Exclusion/ condition 18 May 2012 Background 1. The Applicant holds a Home Contents Policy of Insurance with the Financial Services Provider (FSP). The policy covers the Applicant‟s contents for up to $64,533 subject to an excess of $100. 2. On 11- 12 January 2011 the Applicant‟s residence in Jindalee Queensland was inundated by water causing damage to contents. The Applicant subsequently lodged a claim. 3. The FSP declined the claim on the basis the water inundation arose from flood which is an excluded cause of loss under the policy. 4. The Applicant disputes the declinature on the basis storm water runoff caused the water inundation. Further, the FSP misrepresented the cover and failed to properly inform her of the policy cover. Summary of Applicant’s position 5. The Applicant states the policy was incepted over the telephone in September 2006. The Product Disclosure Statement (PDS) was received subsequent to making the initial payment under the policy. As the flood exclusion was not received until after the insurance policy was in place, the FSP cannot argue that it drew her attention to this prior to the policy inception. The Applicant disputes that verbally informing her of the flood exclusion at the end of the telephone conversation incepting the policy and after confirming cover, constituted properly informing the Applicant of the exclusion. 6. During the telephone conversation to incept the policy the Applicant was informed that she would have the same cover as her previous insurance policy. The Applicant believed she was covered for flood as a result and relied on this representation when incepting the policy. As a result of these representations, the Applicant believed that any inundation would be covered, be it run-off or flooding. 7. The Applicant had a further telephone conversation between 11am and 2pm on 11 January 2011 with the FSP. The FSP‟s employee informed her she Determination Case No: 249702 Determination Page 2 of 9 was not covered for flood but did have cover for stormwater run-off. Despite requests, a recording of this conversation has not been provided. The Applicant submits that the representations made at this time led her to develop a reasonable expectation that her policy would protect her from water inundation damage caused by run-off. 8. The Applicant disputes the hydrologist‟s report on the basis there is no supporting evidence for the opinion formed. The report has little evidentiary value in proving the water that first entered the property is excluded under the policy. The Applicant expects the rainfall was high, considering the rainfall in the locale and the photographs showing water ponding. Further, the hydrologist did not inspect the property until 10 weeks after the initial flood. 9. The Applicant states the damage to the property first occurred from sudden, excessive runoff of water as a direct result of the storm and is therefore covered under the policy event of storm. The property was only subsequently inundated by backwater flooding from the Brisbane River. 10. The Applicant recalls that she went to work on 11 January 2011 and received a telephone call from her children stating there was water near the home. The Applicant returned home around 12pm-1.30pm and saw a significant amount of water flowing from next door to the east. The water came into the front eastern corner of her yard and towards the back of the house. The water was inches from the back door. 11. The Applicant states that by 2.30pm-3.30pm the water runoff began entering through the back door into the kitchen. The water from the river was still 5-6 metres below the house at this stage. This led the Applicant and her children to gather some personal items and arrange for three carloads of items to go to a friend‟s home. 12. The Applicant‟s neighbour has informed her that by 10pm there was a foot of water through his home. The Applicant did not return to the property until 14 January 2011. 13. In relation to the assessor‟s report, the Applicant notes she returned home between 5-5.30pm and did not have sufficient time to move all the furniture and contents. Further, as she was not at the property she could not provide any specific time as to when water entered the property. In addition to this, the second hydrology report indicates 20mm of stormwater run-off may have entered the home prior to riverine flooding - which corroborates her claim. 14. In support of her claim, the Applicant has provided a number of photographs taken from inside her home, standing at the back and side doors. The Applicant maintains this shows storm water runoff from a recent storm. The Applicant believes the storm water runoff on 11 January 2011 would have been far greater. 15. The Applicant was dissatisfied with the service provided by a FSP employee “G”. The Applicant contends that the treatment by G breached 2.4.1 of the General Insurance Code of Conduct. In particular the Applicant claims: Case No: 249702 Determination Page 3 of 9  G was intimidating through the claims process  G failed to listen to the Applicant during the claims process  When informed of the water coming from the neighbouring property, G asked if the neighbour had left the garden hose running. The Applicant considered such a remark offensive.  G was reluctant to provide information regarding the claim to the Applicant. 16. The Applicant seeks an apology and/or compensation for the stress suffered. Summary of FSP’s position 17. The FSP submits that it has complied with section 35 of the Act by providing a copy of the relevant insurance documents including the PDS within 14 days of the contract being entered into as allowed by section 69 of the Act. Further, the PDS was sent to the Applicant on 5 September 2006, being one day after policy inception. Additionally the Applicant was informed of the flood exclusion verbally before providing confirmation she would proceed. The policy however did not commence until 26 September 2006 so the Applicant was informed of the policy exclusion well before the contract was entered into. 18. The FSP disputes that it misrepresented the extent of cover as it informed the Applicant she was not covered for flood at the time of inception. The Applicant further acknowledges this information was provided. 19. The FSP further did not misrepresent cover on 11 January 2011. Whilst it could not locate a call recording, it notes the Applicant was told flood was not covered but stormwater run-off was. 20. The FSP relies on an assessor report dated 26 January 2011 from which the Panel notes the following:  The property is a single story property.  The entry point of the water was a side fence area.  The water built up gradually and entered the property mid-afternoon on Tuesday (11 January 2011).  The water had some dirt in it and came from the creek at the rear of the property.  The Applicant was forced to evacuate by police and left the property around 4.00pm.  The Applicant could do very little to protect the property from damage. The report states “ALL THINGS RAISED UP OFF THE GROUND AND THE WHOLE HOUSE WENT UNDER WATER” 21. The FSP relies on a site specific hydrology report dated 29 March 2011. The Panel notes the following from this document: Case No: 249702 Determination Page 4 of 9  The Applicant‟s residence is 150m south of the main river channel and is located within the Brisbane River floodplain.  The property elevations range from 9.5mAHD-10mAHD. The highest elevation being along the eastern corner of the property.  The property is surrounded by higher ground towards the south and is directly linked to the Brisbane River by a section of low ground that lies to the north of the property. The low ground starts at a low point along the river where a small drainage channel enters the stream.  The nearest river gauge is 500m from the Applicant‟s property. The gauge information indicates that the Brisbane River was first affected by catchment inflows as early as Sunday 9 January 2011. The ri ver steadily rose until about midday on Tuesday 11 January 2011. At this time the gauge indicates a steady rise until its eventual flood peak of about 12.8m at 8pm on Wednesday 12 January 2011.  The hydrologist has obtained the following information from the Applicant:  At 3.30pm on Tuesday 11 January 2011 the drainage channel located north of the property appeared to be filling up but was still 4-5m below the ground level of the property.  During the day, the claimant noticed water flowing from the neighbour‟ s property – the depth of which was about 500mm almost reaching her door. At 6pm the oval near the school was flooded which made the Applicant evacuate the premises.  After the water receded there was 100mm of smelly silt in the house and debris on the lawn.  The flood peak experienced at the property was 2.8m and the estimated level of inundation was 12.3mAHD.  The rainfall was approximately 35mm between 9am and 4pm which does not correspond to the timing of severe flooding in the area.  It is highly unlikely that there was sufficient local stormwater runoff for this to be a contributing factor to the severe inundation of the area that occurred.  The inundation of the property was caused by flood water escaping from the normal confines of the Brisbane River and „backing up‟ into the local drainage system. 22. The FSP has enclosed a memorandum dated 13 January 2012 from the hydrologist. The Panel notes the following from same:  The hydrologist arranged for a property survey which revealed the property is situated on a high point and slopes to the south (front of the property) and north (back of the property). The property is situated on a minor ridge that is bounded by the residential street itself and a drainage channel to the north. Case No: 249702 Determination Page 5 of 9  There is a low area to the rear of the property, generally along the extent of the concrete slab at the north-eastern corner of the main dwelling.  The hydrologist estimates the dwelling may have been initially inundated to a depth of 20mm. 23. The FSP relies on the ICA Hydrology Reports. In particular the Panel notes that any inundation after 6.00pm on 11 January 2011 is attributed to backwater flooding from the Brisbane River. 24. Based on the expert evidence, the FSP submits the Applicant has not established an insured event has occurred. No inundation had occurred by 6pm on Tuesday 11 January 2011 when the Applicant left the property. The FSP contends that the water inundation arose from flood and the timing of the inundation corroborates this. 25. The FSP further notes the Applicant has provided contradictory information regarding the timing of the inundation and where the water came from. In particular the Applicant informed the assessor the water came from the creek but then disputes this and provides contrary evidence on whether she witnessed the i nundation. The FSP submits the Applicant‟s memory is not reliable and the expert reports should be relied upon. The FSP further contends that as at 5.30pm the Applicant does not suggest the contents were damaged. 26. The FSP maintains its expert reports should be accepted over the Applicant‟s unsubstantiated allegations that it was stormwater run -off. This is particularly given the Jindalee weather station only recorded rainfalls of <1 to 1ARI. 27. The FSP submits it is not liable as the policy does not cover loss caused by flood. The FSP further notes that even if the Service was minded to accept 20mm inundation that it is implausible that the contents were damaged by this amount given the Applicant‟s statement she moved her contents up to avoid damage. The contents would more probably be damaged by the flood waters which reached 2.8m inundation. The FSP relies on the case of Elilade Pty Ltd v Nonpareil Pty Ltd [202] FCA 909 in regard to apportioning loss in the event of multiple inundations. 28. The FSP disputes that there was a significant delay in the assessment of the property or the hydrologist‟s attendance. This is particularly so in light of the volume of claims and demand for these services. 29. The conduct of G falls outside of 2.4.1 of the General Insurance Code of Conduct as G was not selling products. The FSP disputes that G acted in an inappropriate or derogatory manner and the Applicant did not complain about G at the time. The FSP further disputes G told the Applicant she would not receive the hydrology report given this was in fact provided to the Applicant. However, the FSP does apologise to the Applicant if she felt G‟s service did not meet her expectations. Case No: 249702 Determination Page 6 of 9 30. The FSP notes the photographs provided by the Applicant show shallow pooling of water. However these photographs are unclear in relation to water flow. Issues 31. Whether the FSP is entitled to rely on the policy terms and conditions. 32. Whether the FSP is entitled to decline the claim. 33. Whether the FSP has breached the General Insurance Code of Practice, acted inappropriately or delayed claim assessment substantially. Reasons for decision 34. There has been an exchange of material between each party and the Panel is satisfied each party has had an opportunity to reply to the issues raised. 35. The Panel has read each p arty‟s submissions and materials and will only refer to the relevant submissions and materials raised. 36. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in insurance industry matters and a representative with extensive experience in consumer claims. 37. The Panel considers that there are three discrete issues (listed above) which will be dealt with separately below. Whether the FSP is entitled to rely on the policy terms and conditions 38. The Panel has considered the allegation that the FSP has failed to inform the Applicant of the flood exclusion prior to entering the contract. 39. The parties do not dispute that the FSP informed the Applicant verbally that flood was excluded by the policy. 40. The Panel has listened to the recording and notes the FSP confirmed there was no flood cover, explained that there would be a document sent out explaining what was and was not covered and then requested whether she would like more information regarding the details in the documents or to proceed. The Applicant elected to proceed and in doing so chose to receive the information in the written format of the PDS rather than verbally. The FSP then arranged for the contract of insurance to proceed. The Panel further notes that reading the entire policy to the Applicant would not have been practicable for the purposes of sections 35 and 69 of the Act. 41. The Applicant does not dispute that the PDS was sent out to her or that the contract of insurance commenced on 26 September 2006, so me 21 days after the telephone call to incept the policy. Case No: 249702 Determination Page 7 of 9 42. The Panel accepts that under sections 35, 69 and 77 of the Act the FSP is entitled to post the policy documentation to the Applicant. 43. The Panel considers that the FSP has provided both verbal and written notice of the flood exclusion in accordance with the Act. 44. The Panel further notes a reasonable person in the Applicant‟s position would have been aware the policy was not exactly the same as the previous one. This is particularly in light of alterations to it to reduce the premium and statements of the lack of flood cover. Based on the evidence before it, the Panel does not accept that misrepresentation occurred during the policy inception phase or that the FSP failed to inform the Applicant of the flood exclusion. 45. The Panel further notes the allegation of misrepresentation on 11 January 2011 but notes that the Applicant was told that stormwater run-off is covered but flood is not. This would appear to be an accurate summation of the cover and as such does not constitute a misrepresentation. Whether the FSP was entitled to decline the claim for water inundation 46. The parties do not dispute that flood water (as defined by the policy) inundated the property. However, the Applicant states that stormwater run- off inundated the property causing damage prior to the riverine flooding. 47. As outlined by the FSP‟s submissions, there are significant variations in the Applicant‟s inundation versions, including the timing source and whether she witnessed the inundation. 48. The Panel therefore considers it would be more appropriate to rely on the data records incorporated into the hydrologist‟s report and opinion. The Panel does not accept the Applicant‟s contention that the hydrologist has no evidence to support the opinion provided, given the river gauge, rain gauge and land data measurements which were relied upon in forming the hydrology report. 49. The hydrologist has provided an opinion that the stormwater run-off may have inundated the property prior to riverine flooding. Such an inundation would only have been up to a height of 20mm. 50. The Panel further notes that there is photographic evidence of ponding water at the time of the weather event. This supports the hydrologist‟s opinion that water would have ponded up to 100mm at this location prior to dwelling inundation of up to 20mm. 51. Based on expert opinion the Panel accepts that the property received stormwater inundation up to 20mm prior to the riverine flooding inundation. 52. The Panel agrees with the FSP‟s summation of th e principles of the Elilade case. The Panel accepts the Applicant may only claim for damage to contents which would have been damaged by the initial 20mm stormwater run-off inundation. Case No: 249702 Determination Page 8 of 9 53. The Panel notes the Applicant took 3 carloads of items to a friend‟s h ome and allegedly stated to the assessor that all things were raised up off the ground. However, the Applicant also reasonably states she was unable to raise up some contents items, such as a treadmill. There is no definitive list of items likely to have been damaged by the 20mm stormwater inundation and accordingly the Panel cannot make specific orders in this Determination as to the extent of any loss suffered by such inundation. Whether the FSP has breached the General Insurance Code of Practice, acted inappropriately or delayed claim assessment substantially. Whether there has been a breach of the General Insurance Code of Practice or whether the FSP acted inappropriately 54. The Applicant has submitted that G has breached clause 2.4.1 of the General Insur ance Code of Practice (“the Code”). This clause refers to the buying of insurance and the employee selling the product. 55. At the time the Applicant‟s complaint arose, the policy was in place and G was handling the claim. Accordingly, the Panel cannot find that G breached this clause of the Code as it does not relate to claims handling. 56. The Panel notes 3.6.1 of the code relates to standards for insurer employees handling claims. In particular the employees will conduct their services in an honest, efficient, fair and transparent manner. 57. The Applicant states G refused to provide hydrology reports, acted in an intimidating manner and made inappropriate remarks suggesting the inundation was caused by the neighbour leaving the garden hose running. The FSP refutes all of these allegations noting the hydrology reports were provided and that G‟s behaviour was appropriate. The FSP however did apologise if G‟s behaviour did not reach the standards the Applicant expected. 58. The Panel notes that the production of hydrolog y reports would be contrary to G‟s statements the hydrology reports would not be provided. 59. There is no detail regarding why the Applicant found G particularly intimidating or bullying. Accordingly, the Panel has insufficient evidence to consider such a complaint. 60. The Panel has noted the disputed remark regarding the garden hose. There is no corroborating evidence from either party in the form of contemporaneous file notes and it appears the recording of this conversation is not available. Given this, the P anel has no basis to prefer one party‟s evidence over the other and deems the FSP‟s previous apology as adequate to address this concern. Case No: 249702 Determination Page 9 of 9 Delay 61. The Panel has considered the time frames involving the assessment of the flood claim. The dates of the reports suggest that the assessment and hydrology reports were completed by 28 March 2011. 62. The Panel does not consider this a substantial delay, considering the fact this flood event was a major incident affecting substantial numbers of people. This is perhaps best demonstrated by the Insurance Council of Australia moving to deem this event a catastrophe. 63. Any delay was quite clearly caused by the multiple claims and limited availability of resources such as assessors or hydrologists. 64. The Panel notes that in all the circumstances, to the extent there might be considered to have been a delay, that it was reasonable. Determination 65. Whilst the Panel understands the Applicant‟s frustration, on the basis of the available information the Panel determines the FSP is entitled to rely on the policy terms and conditions. 66. The Panel determines the FSP is liable to make payment for only those contents items damaged by the initial 20mm stormwater inundation. The parties are asked to work cooperatively to determine the extent of the loss. Should they not be able to agree on a monetary settlement, the matter can be remitted to the Panel for a Supplementary Determination. 67. The Panel determines the FSP did not breach the Code or act inappropriately or unnecessarily delay the processing of the claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.