The applicants' home was flooded in January 2011 and the FSP declined the claim as excluded river flood, with the applicants claiming about $70,000 after a $12,500 compassionate payment. AFCA found the inundation to 150mm above the lower floor was flash flood covered by the policy, ordered coverage to that level subject to policy caps, and ordered interest on any cash settlement.

The flash flood cover applies to sudden flooding caused by heavy rain within 24 hours, and on the evidence the early inundation fell within that window while the later river flood did not.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 249688 Determination Page 1 of 18 Case number: 249688 General Insurance - Domestic Insurance - Home Building - FSP Decision – Flood – Section 35 Insurance Contracts Act 1984 - Denial of claim-Exclusion/ condition 23 August 2011 Background 1. The Applicants held a Home Building and Contents Insurance policy (the policy) with the Financial Services Provider (FSP). 2. A claim was lodged against the policy seeking indemnity for damage to the insured property arising from the significant weather events experienced in the Brisbane area in January 2011. 3. The FSP declined the claim on the basis that the claimed damage was due to the event “Flood” and as such is excluded from cover under the policy. 4. The Applicants remain dissatisfied with FSP‟s declinature of the claim and maintain that the damage was due to the event “Flash flood and stormwater run- off” and should be covered under the policy. Summary of Applicants’ Position 5. The Applicants maintain that in disputing the FSP‟s position they can only state what they witnessed; which is stormwater first breached the lower level floor at the insured property. 6. The fact that the FSP had reversed its decision on 270 or so claims in Ipswich is a good example of the possibility that the FSP may have come to the incorrect decision in respect to their claim. 7. The FSP has provided a blanket response to their concerns in relation to the property‟s geographic features not being considered, as part of its assessment of their claim. 8. Although the FSP‟s appointed hydrologist (SC) in paragraph 16 of his statement maintains he took further steps to identify whether the cause of the loss was due to stormwater, there is no indication what these alleged steps were. There is no evidence of any council reports addressing the fact that the stormwater drain and road in front of the insured property were underwater several times leading up to the eventual flood event. Each time as debris Determination Case No: 249688 Determination Page 2 of 18 flowed down to this low point, the water took longer to drain away, ranging from a couple of hours to several hours. 9. The stormwater drain ran from the grate at the street, underground to the larger open drain, to then be able to flow to the river. As the drain was blocked, the stormwater could not flow anywhere. The larger drain that flows to the river is lower than where the stormwater drain outlet is, however, the land above is much higher creating a dam. This dam continued to fill, until it breached the lower level floor of the house. Within an hour or so the river had breached its banks and flowed back down the channel of the drain and eventually flowed overland, adjoining the stormwater that had filled up the basin, which is unfortunately where the property is situated. 10. The Applicants question whether SC‟s report takes into account the water in the acres of sodden ground surrounding the property, as it was sodden and could no longer soak up any water. Eventually, it all ended up at the lowest point, the location of the insured property. 11. The Applicants maintain the time of the rainfall is not as important as the fact of where all the rainwater ended up. The Applicants witnessed the vast volumes of rainwater empty down to where their property is located and which continued to rise even hours after the rainfall stopped. 12. A Brisbane City Council (BCC) engineer visited the Applicants and acknowledged this; however he advised that nothing could be done to clear the way for the draining of this water, until the sodden ground had dried. This was due to their inability to bring in the required heavy machinery across the parks, without the risk of the machinery sinking and/or damaging the area. 13. The Applicants dispute SC‟s position that the property is higher than the surrounding land. They maintain that if one was to stand at the front of the property, all the land 360 degrees around, is higher, with the property being at the lowest point. 14. The Applicants advise that there are three full size cricket fields ten metres from the property‟s boundary, all at a higher level than the Applicants‟ property. All the drainage from the high points i n Ashby Street and Turner Street flows down William Parade, to the lowest point, their property. 15. The gauge used by SC to measure rainfall is 3.6kms away from the insured property and as such is a long way from the Applicants‟ home. Their rain gauge was continually full every couple of days leading up to the flood. As the ground was sodden, even a minute‟s rainfall made an impact, as the bowl they live in filled up with rainwater. 16. In the week preceding 9-11 January 2011, the rainfall had laid the foundation for the later events of the river breaking its banks and further compounding the stormwater that had already inundated their property. Several times in the preceding week the Applicants had to park their vehicle in Ashby Street and walk through neighbours‟ yards to access their home as the water in front of the property was too high to drive through. Case No: 249688 Determination Page 3 of 18 17. The Applicants do not question SC‟s rainfall research; however they maintain, the fact of the matter is if SC had made any inquiries with the neighbours (first hand witnesses) during the site visit, they would have confirmed the events in the week leading up to the eventual floods. The concerns of the neighbourhood prompted them to arrange a meeting with the local councillor, that didn‟t occur due to the arrival of the floods. 18. The arrival of the floodwater was within an hour of the stormwater breaching the lower level floor of the property, an event the Applicants witnessed and lived through on that terrible day. 19. The Applicants are confident the date of the loss was 12 January 2011 and in all their confusion they may have referred to it on the morning of 12 January 2011, as 11 January 2011, because it was still dark and they may have confused it with the night before. 20. The flood peak remained in place past 13 January 2011 and it was a week before the water levels dropped and allowed the Applicants to enter their home. This is significant as floodwater drained down to a few hundred millimetres in all adjoining properties in only a day or two. The Applicants‟ propert y was the only one not to drain away due to the bowl like nature of it being present at the bottom of the hill. 21. SC concludes that it was the rising level of the Brisbane River (the river) that inundated the property. However, he fails to mention where the water level was in the home at this time. The floodwater inundation occurred when there was already four inches of water through the lower level floor. 22. SC neglects to mention (or may not be aware of) that the four large outlets that go to the river have one way doors; also the road, (the Corso), that runs over these outlets, had collapsed at some point prior to the floods. The floodwater actually came over the road (as far as they know) as no water could flow through any of the four large pipes as they were not functioning. Since the floods the council has dug up and re -laid the pipes so flow would not be impeded if such an event were to occur again. The Applicants maintain it beggars belief that neither SC nor the FSP made contact with the local council to obtain reports on the state of these significant issues. 23. BCC acknowledges the drain (south of the property) was blocked prior to the inundation and did cause a major problem during the flood and subsequent drainage after the event. It took several days and a number of different trucks and excavating equipment to repair the blocked drain. 24. SC maintains that even if the event occurred in the manner claimed by the Applicants, he doesn‟t think it would have led to the inundation. The Applicants maintain that SC only thinks but does not know, which should not be the case seeing he is the expert in these matters; nor is this sufficient to dispose of the Applicants‟ assertions and eye witness accounts. SC has completely ignored the accounts from the Applicants‟ neig hbours and the BCC. The Applicants witnessed what occurred and as such provide what actually occurred as opposed to what may have occurred. Case No: 249688 Determination Page 4 of 18 25. The Applicants refute SC‟s opinion that the pooling of the rainwater at the front of the property would not be suffi cient to inundate their home and note it‟s not based on any first hand evidence and/or observation of the property at the time of the loss. SC talks about the area as a whole and the Applicants do not dispute the accuracy of such information. However, their issue/concerns revolve around the unique location and geographic features of their property. 26. There was no backflow through any drains and the flood occurred on 12 January 2011 with the peak occurring on 13 January 2011. The Applicants are sure it was in the morning as they were awake and saw the water rise from about 2.00am until 4.00 - 5.00am, when it breached the lower level of the home. Within the next couple of hours the water then rose rapidly by a further two metres. 27. The Applicants never qualified for government assistance and were long time customers of the FSP at the time of loss. The Applicants know what actually occurred and are seeking a favourable outcome as they have nothing left and are approximately ten years behind (financially) from where they were prior to the floods. They purchased insurance cover from the FSP in good faith and although they were aware they were not covered for river flood, they knew they were covered for stormwater damage. 28. The FSP has also informed them that it was no lo nger prepared to insure them as they are too high a risk. The Applicants wish the FSP had established this before the floods and as such allowed them to obtain insurance cover from another FSP that would have covered them for their loss. 29. The Applicants find it interesting that the FSP is unable to locate the recording of the telephone conversation between the Applicants and its representative after the date of loss, where they were read the terms of the policy and advised that they would be covered. Further, the Applicants do not recall being offered the option to take out flood cover under the policy at the time of inception. Although, they recall being asked whether the property was situated in a flood area. 30. The Applicants require the FSP to cover them for their loss, estimated to be in the vicinity of $70,000. They acknowledge receiving $12,500 from the FSP‟s compassionate fund. Summary of FSP’s Position 31. The Applicants bear the onus to establish that the loss claimed was caused by an event covered under the policy. If a loss is so proven as prima facie within the policy, then the FSP bears the onus of proving that an exclusion applies. 32. The FSP submits there is no obligation to provide or offer specific types of insurance to customers during the policy incepting phone calls and that if the Applicants had at any time wished to apply for flood insurance, they were able to apply for it. Case No: 249688 Determination Page 5 of 18 33. In any event records of the policy inception phone call indicate that the Applicants were offered the option to include flood cover, however, the offer was declined. 34. In relation to the Applicants‟ allegation of being provided with misleading information by a representative of the FSP regarding being covered for flood damage, the FSP maintains no evidence has been made available to establish this allegation. The vagueness of the allegations makes it impossible for the FSP to locate and make available records to contradict the allegation. 35. If such a statement was made by a representative of the FSP (which is denied), the FSP maintains that this was not relied on by the Applicants and did not cause or contribute to any loss. 36. The PDS and Certificate of Insurance (COI) clearly informed the Applicants that cover for loss or damage arising from “Flood or Storm surge” is not include d under the policy for both building and contents. 37. Therefore, the FSP maintains that the Applicants were “clearly informed” about the scope of the policy in terms of flood cover in line with Section 35 of the Insurance Contracts Act 1984 (the Act). 38. On read ing the definitions of “Flood” and “Flash flood and stormwater run - off”, the difference between the two events is clear. Flash flood and stormwater run- off is a particular category of flood, namely a sudden flood caused by rain that fell no more than 24 hours earlier. The policy makes it clear that this is the only type of flood which is covered under the standard policy and any other type of flood is not covered. The FSP notes the Service in previous determinations has accepted the FSP‟s policy document is sufficient to “clearly inform” insureds of the limitations of the policy. 39. The Applicants do not dispute receiving the PDS and COI, as such the FSP does not believe it is required to establish proof of dispatch in this instance. 40. In respect to the cause of the loss, the FSP maintains it conducted its own hydrological investigations into the flooding of Brisbane. It is these investigations the FSP seeks to rely upon in making its decision, as opposed to reliance on the Insurance Council of Australia (ICA) Hydrology reports. 41. The FSP relies on the reports submitted by SC, an expert who specialises in hydrologic and hydraulic engineering and notes the conclusions reached by SC are consistent with the findings of the ICA reports. 42. The evidence of SC confirms that t he Applicants‟ property does not appear to have been inundated by stormwater run-off or other local run-off. SC is of the view that:  The situation described by the Applicants is consistent with the inundation of the property occurring due to the rising level of the river causing water from the river to backflow into the stormwater drainage system and travel towards the Applicants‟ property. Case No: 249688 Determination Page 6 of 18  Even if the drain closest to the insured property was blocked, this would not mean that the inundation of the house on the subject property was caused by storm water run-off from recent rainfall. 43. In respect to the site specific issues, SC indicates the property did not experience stormwater flooding because:  The terrain information does not suggest that the property is particularly vulnerable to stormwater or other local run-off.  The rainfall around the time of inundation of the Applicants‟ property was not sufficient to cause inundation by stormwater run-off.  The timing of the rise of the river is consistent with the time of inundation of the property in line with the Applicants‟ version of events. 44. The evidence suggests that the proximate cause of the loss was rain that fell in the Wivenhoe and Brisbane River catchments from 9 January 2011 (and earlier), which had the effect of raising the level of the river. Therefore, the rainfall fell more than 24 hours prior to the inundation of the property and does not fall within the scope of cover provided under the policy for flash flood and stormwater run-off. 45. The FSP maintains the Applicants‟ concerns in relation to the situation and the property‟s geographic features have been sufficiently addressed by SC in his statements made available for review. Further, the evidence and findings have not been substantially refuted by the Applicants and as such the FSP maintains it is reasonable for it to rely upon the consultant‟s evidence and findings in determining the outcome of the Applicants‟ claim. 46. The FSP relies on the following policy provision contained in the Certificate of Insurance: “ What optional covers are included and not included Home Contents … Flood and storm surge not included not included”. 47. The FSP also relies on the following policy provisions contained in the PDS. Pages 10, 11 and 12 of the PDS: “ Words / terms with special meanings … Flood Rising water which enters your home as a result of it running off or overflowing from any origin or cause. This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance. … Flash flood and A sudden flood caused by heavy rain that fell no more than Case No: 249688 Determination Page 7 of 18 stormwater run-off 24 hours prior to the flash flood or stormwater run-off. … Storm A violent disturbance of the atmosphere associated with strong winds including a cyclone, lightning, heavy rain, hail or snow, but not continuous bad weather by itself.” Pages 17 and 18 of the PDS: “ Insured events you are covered for Damage caused by weather… What is covered What is not covered Storm … … Flash flood and Loss or damage caused by: Stormwater run-off x by flood A sudden flood caused by … heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run-off … Page 27 of the PDS “Your home The most we will pay you for home claims What is covered What is not covered Flash flood and stormwater run-off We will pay up to 50% of your home sum insured or $25,000 whichever is higher.” … Pages 48 and 53 of the PDS Optional covers for extra peace of mind The covers outlined in this section are optional and do not apply unless you have asked for them and we agree to cover you. Additional premiums apply for each cover. Your certificate of insurance will show which covers operate. All optional covers are subject to the terms and conditions of this policy. … What is covered What is not covered Flood and storm surge … This policy does not cover flood unless we have agreed and it is Case No: 249688 Determination Page 8 of 18 shown on your certificate of insurance” Issues 48. Whether the Applicants were clearly informed of the relevant policy provisions. 49. Whether the damage to the insured property was caused by flood or flash flood and stormwater run-off. Reasons for Decision 50. As advised to the parties, FOS has considered it appropriate to elevate the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the complex nature of the issues. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 51. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in insurance industry matters and a representative with extensive experience in consumer claims. 52. There has been an exchange of material between the parties. Each party therefore is aware of the issues and has had the opportunity to comment. In these circumstances the details contained in the relevant hydrological reports will not be recited in this determination except where considered relevant. 53. Prior to arriving at a determination the Panel has read and considered all the material submitted by the parties to FOS. 54. The Panel Chair Ombudsman attended on site to meet with the Applicants and a representative of the FSP. 55. The Panel having considered the available evidence is satisfied the following is not in dispute:  The Applicants at the time of loss held a policy which included cover for loss or damage arising from flash flood and stormwater run-off. However, excluded from cover were losses arising from flood outside the 24 hour window of „flash - flood‟ opportunity.  The Applicants were provided with the relevant policy documentation (e.g. PDS and COI) at inception of the policy.  The inundation of the property commenced in the early hours of 12 January 2011.  The Applicants‟ property is located at the botto m of a hill, which falls within an overland water flow path. Case No: 249688 Determination Page 9 of 18  The Applicants witnessed the initial inundation of the lower level of the property.  The road, under which the four major drainage pipes lay, had collapsed prior to or during the flood event, resulting in the blockage of water draining out to the river. Clearly inform 56. Section 35 of the Act provides that, where a claim is made under a prescribed contract and the event giving rise to the claim is a prescribed event in relation to the contract, an insurer may not refuse to pay an amount equal to the minimum amount of cover set out in the regulations made pursuant to the Act unless it can prove that before the contract was entered into, the insurer clearly informed the insured in writing of the relevant provisions of the contract, or that the insured knew or a reasonable person in the circumstances could be expected to have known of such provision. 57. In addition to the Applicants‟ concerns in respect to the cause of the loss, they have also alleged that although asked whether the property was located in a flood area, they do not recall being offered cover for loss or damage arising from flood. 58. The FSP refutes the Applicants‟ allegation and maintains that at inception of the policy, its representative did inform the Applicants that the policy did not cover loss or damage arising from flood and further asked if they wished to include flood cover upon the policy, an offer declined at the time. 59. The FSP has made available a recording and transcript of the policy inception call as evidence that not only were the Applicants informed the policy did not include flood cover but that they were also offered the option to include such cover to their policy. The Panel has reviewed the available evidence and notes the following from this phone call between the parties: “[FSP]: The policy automatically covers for flash flood and stormwater runoff. If you’d like a more comprehensive cover against flood damage you need to apply for it separately. [Applicant]: No … [FSP]: Okay. [inaudible] there as well. Alright so that’s all done for you. I’ll just go through the details of the policy with you. [Applicant]: Umhm [FSP]: Now um your new policy number is [policy number] P for policy and J for Juliette [Applicant]: Yep [FSP ]: The building is insured for $350,000 and the contents for $50,000 [Applicant ]: Yep [FSP ]: On the policy there’s no flood cover [Applicant ]: Umhm Case No: 249688 Determination Page 10 of 18 [FSP ]: No pet cover; no advanced cover but you have motor burn out [Applicant]: Yep [FSP]: And there’s no items covered away from the home [Applicant]: Umhm” 60. The Panel having considered the available evidence is satisfied the Applicants were made aware that the FSP‟s standard policy did not include flood cover and offered the Applicants the opportunity to apply for such cover, which was declined. The Panel notes that it is not in dispute the FSP sent and the Applicants received the relevant policy documentation i.e. PDS and COI. In order to comply with Section 35 of the Act the FSP must establish it clearly informed the Applicants in writing of the existence of the exclusion clause, otherwise pursuant to Section 35(1) of the Act, the FSP may not rely upon that clause to not pay the claim. 61. The Panel having reviewed the policy documentation determines that the FSP has satisfied the legal obligation placed upon it to clearly inform the Applicants of the limitations of the policy relevant to this dispute. As such, the Panel is persuaded that the FSP, in line with its obligations under the Act, clearly informed the Applicants that they were not covered for loss or damage arising from the event of flood. Cause of the loss 62. The Applicants maintain that the initial inundation of the lower level of their home, up to approximately four inches, occurred as a result of pooling of stormwater run-off within 24 hours of the storm on 11 January 2011. Further, that it was within an hour or two of this inundation that the floodwaters arrived and in combination with the present stormwater, increased the peak level of the inundation by another couple of metres within the home. 63. The FSP, relying upon evidence made available by its appointed consultant SC, maintains that the inundation of their property is consistent with the rise in water levels and subsequent breaking of the banks of the Brisbane River. Therefore, in light of the fact th at the Applicants‟ policy does not cover loss or damage arising from flood it is entitled to decline indemnity for the claimed loss. 64. The Panel notes the FSP has sought to rely on evidence it obtained during the course of its investigations into the cause o f the flooding in Brisbane; in so doing it has not relied upon reports commissioned by the ICA. Although, not relied upon by the parties the Panel is satisfied that consideration of the ICA hydrology report will assist in providing a complete and fair dete rmination in respect to this matter. 65. The ICA hydrology report entitled “FLOODING IN THE BRISBANE RIVER CATCHMENT JANUARY 2011 VOLUME 2 FLOODING IN BRISBANE CITY LGA” contains the following information:  there were three generally distinct and significant rainfall periods between 9 – 11 January 2011 across the Brisbane City Local Case No: 249688 Determination Page 11 of 18 Government Area (Brisbane LGA). The first event occurred over the period from around 9:00am to 9:00pm on Sunday, 9 January 2011. The second event occurred from around 6:00am to 10:00am on Monday 10 January 2011. The third event occurred from 6:00am to 4:00pm on Tuesday, 11 January 2011. (see 7.2.3)  the most significant rainfall across the Brisbane LGA occurred from approximately 6:00am to 4:00pm on 11 January 2011; (see 9.1)  after about 6:00pm on 11 January 2011, there was little or no rainfall across the Brisbane LGA; (see 9.1)  the Brisbane River water levels through the city peaked about 24 -30 hours after rainfall had ceased, that is, from the late hours of Wednesday, 12 January 2011 to the early hours of Thursday, 13 January 2011; (see 9.1)  any area that was inundated after 6:00pm on 11 January 2011 will have been water flow inundation from the Brisbane River and its tributary creeks. The inundation along the tributaries was associated with backwater flooding from the Brisbane River, which in turn was principally caused by the dam release flood from the Wivenhoe Dam; (see Summary of Findings)  overland flow inundation is generally associated with intense rainfalls of short duration. In general, such rainfalls did not occur across the Brisbane City LGA in January 2011. It is expected that overland flow inundation would generally not have occurred in the Brisbane City LGA; (see 9.2)  uncertainties exist on whether properties flooded by water flows also suffered initial inundation from overland flow flooding. Investigation of local factors such as local topography and the area and characteristics of overland flow, hydrologic/hydraulic modelling of the storm event and local stormwater drainage system is required to resolve this issue. (see 9.5) FSP’s Expert Evidence – Statement dated 25 August 2011 66. The FSP has submitted a “Statement” by SC dated 25 August 2011. According to SC, he is a “specialist flooding engineer” with “key areas of expertise” in hydrologic and hydraulic engineering, flood plan management and flood warning. 67. SC gave the following “Regional Conclusions – Brisbane”.  On 9 – 11 January 2011, commencing at approximately 9:00am on 9 January 2011, a substantial amount of rain fell in the Brisbane River catchment above Wivenhoe Dam. This rain caused significant inflows into the Wivenhoe Dam which peaked in late evening of 11 January 2011. Case No: 249688 Determination Page 12 of 18 Significant discharges of the water from the Wivenhoe Dam then flowed into the Brisbane River which then worked its way towards Brisbane.  From 9:00am of 11 January 2011, a substantial amount of rain fell also in the Bremer River catchment. This rain travelled down the Bremer River towards the junction of the Bremer River and the Brisbane River. The Bremer River contributed in the order of 15% to 25% of the Brisbane River‟s peak flow.  A small proportion of the overall depth of the Brisbane River prior to 6:00am on 12 January 2011 may be partially attributable to the rain that fell in the Brisbane River catchment on 11 January 2011.  However, the rain which fell some days earlier over the Wivenhoe Dam catchment and its subsequent release from that dam had the overwhelming influence on the flooding of the Brisbane River. 68. SC said that he “ undertook further steps to identify whether the cause of the inundation to the subject property may have been storm water ”. Accordingly:  In considering “terrain data”, SC considered whether the insured property is higher than surrounding areas as this “would suggest a lower likelihood of stormwater and/or flash flood issues (and the converse also applies)”.  SC referred to a copy of the Brisbane City Council Flood wise data for the insured property. He says that this “shows that the level of the insured property varies from approximately RL 2.6m AHD at the south of the property to RL 6.5m AHD at the north of the property. There is stormwater infrastructure on William Parade, including curb and channelling. There are also stormwater pits leading to the stormwater pipe that runs along the southern side of the property. The house on the property is elevated above ground level by over one metre.  The surface area collecting rainfall that would drain into the property is not very large. Ashby Street to the north of the property is a local high point, and local run-off from Ashby Street would drain down under Turner Avenue to the east of the property and down William Parade itself.  The terrain information does not suggest that the property is particularly vulnerable to stormwater or other local run-off during the rainfall intensities experienced during the January 2011 flood event.  Inundation resulting from stormwater or local run-off generally requires intense levels of rain (i.e. sufficient to overcome the stormwater drainage system) and will generally occur at the same time as that intense rainfall or immediately after it.  The intensity analysis undertaken for the period 9-13 January 2011 shows the rainfall was of very low intensity. In SC‟s opinion it is unlikely that rainfall of this magnitude would cause stormwater or other run-off inundation of the insured property.  The terrain data can also be compared with the time of inundation reported by the Applicants to show that the time of inundation coincides with the timing of the rise of the Brisbane River. Case No: 249688 Determination Page 13 of 18  The minimum level of the property would have been exceeded at approximately 11.00am on 11 January 2011. The lower floor level would have been exceeded at approximately 2.00am on 12 January 2011. This is consistent with the Applicants‟ comments and the evidence also shows that the water rose a further 2.4m approximately during the course of that day which is broadly consistent with the Applicants‟ comments. SC maintains that this further supports his conclusion that the property was inundated by the rising level of the Brisbane River.  The situation described by the Applicants is consistent with the inundation of the property being caused by the rising level of the Brisbane River causing water to backflow towards the property through the stormwater drainage paths that lead from the property, through a drain at the south of Williams Parade to the large stormwater drain, which ultimately drains into the Brisbane River.  SC maintains that even if the drain at the south of William Parade was blocked it would not have led to inundation of the house on the insured property by stormwater run-off. This is due to the fact that any blockage in the drain would probably have been overcome by around midday on 11 January 2011. The pressure of the backflow from the river, which acts in reverse, would tend to clear or push out any localised blockage. Even if this was not the case the backflow water would have travelled directly to the property from the large stormwater drain which runs from Hyde Road to the river. Second, there was minimal rainfall around this time. Even if the drain was blocked, the rainfall would not, in SC‟s opinion, be sufficient to inundate the house on the property. FSP’s Expert Evidence – Statement dated 14 October 2011 69. SC submitted an additional statement dated 14 October 2011 in response to concerns raised by the Applicants on receiving his original statement discussed above. The additional statement has been summarised below:  Taking into consideration the Applicants‟ reference to the construction of their home as per 100 year flood level and the lower floor level is at RL 7m AHD. SC acknowledges that previously this was set at RL 5m AHD and as such he had to modify his calculations accordingly. Based on the new lower floor level, the level of the Brisbane River in the vicinity of the property would have been sufficient to inundate the lower floor level around 1.00pm on 12 January 2011.  The catchment area relevant to the property is approximately four hectares. The catchment area of the cricket fields and parks is 138 hectares and the catchment to the west is approximately 74 hectares. In terms of the quantity of water involved, it is important to keep in mind that the catchment of the Wivenhoe Dam and Brisbane River would be estimated to be 1,323,700 hectares and as such, is massive in comparison.  The relevant issue is not whether the inundation of the property was within a particular time of rainfall, rather whether that inundation was Case No: 249688 Determination Page 14 of 18 caused by rainfall within a particular time. Although there may have been some rainfall within 24 hours of the inundation of the property, SC is of the view that the cause of the inundation was the rising level of the Brisbane River due to the substantial volume of rainfall over the Brisbane River catchment between 9 to 11 January 2011 and subsequent releases from Wivenhoe Dam.  SC acknowledges there could be local ponding in the area around the property due to high rainfall intensities, blockage of the stormwater pipe/drain or a combination of both. However, such pooling and or inundation caused by this would not exceed more than approximately RL 3m AHD or slightly higher. Above this level, run-off would drain directly (overland) to the stormwater drain to the west of the property. This is not a drain pipe rather is a channel, and so would not have been affected by blockage of the stormwater drain immediately to the south of the property.  Even if the backflow devices on the outlet mentioned in SC‟s original statement were 100% effective in preventing backflow (which they rarely are), and even if the collapse of the Brisbane Corso completely blocked the stormwater drains flowing under it, from around 1.15am on 12 January 2011, there was direct connection of water from the Brisbane River (level of RL 5.25m AHD) to the property, and this occurred before the level of water was sufficient to inundate the lower floor level (RL 7m AHD) of the house.  At 2.00am on 12 January 2011 the level of the Brisbane River was approximately RL 5.4m AHD, a level which was more than sufficient to exceed certain low points leading to the stormwater system and as such the level of water in the local stormwater system would have been dominated by the level of Brisbane River. At that time, the vast majority of the ground underneath the house on the property would have been inundated by the level of Brisbane River. Only a small portion of the north eastern corner of the block that the property is on, is over RL 5.4m AHD.  SC notes at this time the water level was still more than 1 metre below what the Applicants claim is the lower floor level of the house at RL 7m AHD. The Brisbane River would have reached RL 7m AHD at approximately midday on 12 January 2011.  There are some aspects of the Applicants‟ version of events which remain difficult to reconcile with the available data. However, SC is confident about the cause of the inundation of the house being the Brisbane River. 70. The Panel has given consideration to whether there is coverage under the policy for flash flood and/or stormwater runoff. Case No: 249688 Determination Page 15 of 18 71. On the basis of the evidence presented and in particular the rainfall details, the Panel is satisfied that stormwater runoff was not responsible for the inundation occurring to the Applicants‟ property. 72. The policy also covers flash flood. In order for a claim to fall under the insured event of flash flood, the following elements must be established: a) There was a sudden flood; b) There was heavy rain that fell within 24 hours prior to that flood; c) The sudden flood was caused by that heavy rain. 73. The Panel is satisfied that the evidence confirms that inflows into the Wivenhoe Dam were decreasing in the early hours of 11 January 2011 and that there was heavy rain over the Wivenhoe Dam between 4.00am and 8.00am on 11 January 2011. 74. The Panel is satisfied that as a consequence of the heavy rain and the resultant increasing inflows into the Wivenhoe Dam, the operating engineers made the decision at 8.00am on 11 January 2011 to increase the release strategy from W3 to W4. 75. Whilst the Queensland Flood Commission of Inquiry (CoI) has challenged some of the evidence presented by the dam‟s operating engineers, the Panel is satisfied that the evidence in this regard has not been challenged. 76. The Panel notes the evidence of the FSP‟s hydrologist to the effect that the cause of the inundation to the properties below the Wivenhoe Dam was the rising level of the Brisbane River due to releases from the Wivenhoe Dam. 77. Given all the circumstances, the Panel is satisfied that the proximate cause of the inundation was the rain which fell over the dam between 4.00am and 8.00am on 11 January 2011, leading to the change in the release strategy from W3 to W4. 78. In reaching this conclusion, the Panel is mindful of the fact that considerable rain had fallen in the catchment areas from 9 January 2011 and earlier. However, given the decreasing inflows into the dam and the extent of the rain which fell between 4.00am and 8.00am on 11 January 2011, the Panel is satisfied that the rain which fell at that time was the proximate or dominant cause of the inundation. 79. The Panel also acknowledges that when considering the proximate or effective causes, it is necessary to consider the facts of the situation along with the relevant terms of the policy and that it is a well established principle of insurance law that the proximate cause of the loss is not the first, or the last, or the sole cause of the loss, but the effective, or dominant, or operative cause and that it is a question of fact to be considered in each case. Having considered these principles and the evidence as presented, the Panel confirms its view that the rain which fell between 4.00am and 8.00am on 11 January Case No: 249688 Determination Page 16 of 18 2011 was the proximate or dominant cause of the inundation to the properties below the Wivenhoe Dam, including the Applicants‟ property. 80. The question for the Panel is whether or not the inundation of the Applicants‟ property occurred within 24 hours of this heavy rainfall over the Wivenhoe Dam. 81. The FSP‟s hydrologist has provided a recent report to the effect that at 4.00am on 12 January 2011 the Brisbane River level was 1.2m below the benchmark level of the Applicants‟ property. 82. The FSP‟s hydrologist states that the benchmark level is the lowest point of the structure of the house on the land. However, the FSP‟s hydrologist concedes that he did not independently determine the benchmark level but rather that the benchmark level was based on comments by the Applicants to the Service. 83. The FSP‟s hydrologist records the minimum land level at RL2.6m AHD, the maximum land level at RL6.5m AHD and the bench mark level as RL 7m AHD. The Panel Chair Ombudsman when attending on site noted that the ground floor level is at least 2m above the ground level itself and the ground slopes upwards from the front to the back of the property. 84. The commentary from the FSP‟s hydrologist in his most recent report appears to be inconsistent with the earlier report of 25 August 2011. In that earlier report, the FSP‟s hydrologist presented a graph which was alleged to show that the lower floor level would have been exceeded at approximately 2.00am on Wednesday 12 January 2011. 85. The Panel notes the comments from the Applicants in submissions to the Service; “ ...we saw the water rise from about 2.00am until 4 or 5 when it reached the bottom level. Then within the next two hours the water rose rapidly another 2m.” 86. In a further submission the Applicants said: “ the day before the flood peak of the river the water had already risen and breached the lower level of the property. It was between 2.00am and about 4.00am; this storm water rose and flooded the lower level and underneath the house. After that between about 5.00am and 7.00am the river rose and the volume of water came back along the huge storm drain and increased the volume and level of the water by another 1.5 to 2.0m.” 87. When the Panel Chair Ombudsman attended on site, the Applicants advised the Panel Chair Ombudsman that at about 2.00am or 3.00am on 12 January 2011, the water was up to about 1m on the block. Between then and 6.00am on 12 January 2011, water reached the bottom floor and was 6 inches (150mm) above the bottom floor. The Applicants say that from then a wave of water came from the direction of the Brisbane River. 88. The Panel is satisfied that the information provided by the FSP‟s hydrologist in both the earlier and subsequent material, is an estimation of events. Case No: 249688 Determination Page 17 of 18 89. The Panel is also satisfied that the evidence provided by the Applicants (particularly the male Applicant) may not be precisely correct as to time, as no doubt he was concerned by the events he was faced with and is unlikely to have been looking at his watch to note down the precise time that each particular event took place. 90. As such and given the imprecise nature of the evidence provided by both the FSP‟s hydrologist and the Applicants, the Panel is satisfied that it is necessary to allow a certain amount of latitude for time. 91. However, having said that, it would ap pear that the FSP‟s hydrologist most recent material is in stark contrast to both his earlier reports and the eye witness evidence of the Applicants. 92. The FSP‟s hydrologist‟s most recent material indicates that the approximate time the Brisbane River reached the bench mark level of the house was at about 11.58am on Wednesday 12 January 2011 and that the Brisbane River height was 1.2m below the bench mark level at 4.00am on 12 January 2011. As has been said, this is in stark contrast to the FSP‟s hydrol ogist earlier commentary and the eye witness evidence of the Applicants. 93. Given the inconsistency in the evidence presented by the FSP‟s hydrologist, and the fact he concedes that he did not independently determine the bench mark level, the Panel determines to accept the commentary of the Applicants and assess, based on the balance of probabilities, that between 2.00am and 4.00am on 12 January 2011 the Applicants‟ home was inundated to a level of approximately 6 inches (150mm) above the lower floor level. Ha ving considered all of the evidence, the Panel is satisfied that this result is fair in all the circumstances. 94. The result is that the policy provides coverage for the Applicants under the heading flash flood to the level of 150mm above the lower floor level of the home. 95. In this regard, the Panel acknowledges that the coverage for flash flood is to 50% for each of the home and contents sums insured or $25,000 for each, whichever is higher. 96. The FSP has specifically argued that the Applicants‟ property was dam aged after 8.00am on 12 January 2011. The result of the above mentioned analysis is that the Panel does not accept this argument, but the Panel does accept that any damage caused by inundation after 4.00am on 11 January 2011 is excluded under the terms of the policy as it falls outside the 24 hour window contemplated by the terms of the policy and in particular, flash flood. 97. The FSP has also argued that the Wivenhoe Dam‟s operating engineers‟ decision to move to the W4 release strategy represented an intervening cause and was therefore not covered by the terms of the policy. The Panel does not agree. Case No: 249688 Determination Page 18 of 18 98. There is nothing in the evidence presented to the CoI to the effect that the decision made by the dam‟s operating engineers on the morning of 11 January 2011, changing the release strategy to W4 was anything but appropriate and in accordance with the manual, given the circumstances facing the operating engineers at that time. 99. Finally, the FSP has argued that as two proximate causes have led to the loss suffered and one cause provides coverage under the policy but the other does not, then the FSP is entitled to deny the claim. The FSP seeks to apply the rule under the decision of Wayne Tank. 100. The Panel has previously dealt with this issue and regards the issue of flash flood as being an exception provided by the policy to the otherwise excluded event of flood. The Panel regards flash flood as being a unique type of flood. In those circumstances, the Panel is not satisfied that there are two proximate causes, but rather one cause, that being flash flood. 101. The FSP has already paid the Applicant $12,500 from a compassionate fund set up by the FSP. Payment from the compassionate fund is not subject to FOS jurisdiction but the Panel accepts the FSP is entitled to take into account this amount when determining the sum payable to the Applicant. Determination 102. The Panel determines that the FSP is to provide coverage under the heading “flash flood” for the Applicants to the level of inundation of 150mm above the lower floor le vel of the Applicants‟ home. 103. The parties will need to work together to establish the extent of coverage provided by this level of inundation. 104. The coverage provided by the policy is also within the terms and conditions of the policy including the limitations and caps which includes a limitation of 50% of the home and contents sums insured or $25,000, whichever is the higher. 105. Should the FSP wish to cash settle any part of the Applicants‟ claim, then the FSP shall pay interest on that part of the claim which is cash settled, pursuant to the Insurance Contracts Act 1984, from the date of denial of the claim to the date of cash settlement.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.