Home / Financial Firm (Unknown - Insurer) / Determination 249553

Determination 249553

Claim denial - flood exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2012-04-24
ProductGeneral Insurance · Business / commercial
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The trustee of a trust that owns a Lowood storage facility claimed for water inundation in January 2011, which the FSP declined as flood damage excluded under the business policy. The Panel found on hydrology evidence that the damage was caused by flood from the Brisbane River rather than stormwater run-off, and ordered no payment.

On the hydrological evidence, inundation occurred after the rain had ceased and river levels had peaked, so the flood exclusion applied.

Issues

Subjects and remedies

natural disastersmall businessno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 249553 Determination Page 1 of 5 Case number: 249553 General Insurance - Small Business/Farm Insurance - Commercial Property - FSP Decision - Denial of claim-Exclusion/ condition 23 April 2012 Background 1. The Applicant is a trustee of a trust property (located in Lowood, Queensland) insured with the Financial Services Provider (FSP) under a business insurance policy. 2. He claimed for damage occasioned to the property as a result of water inundation on/about 12 January 2011. 3. The FSP declined the claim on the basis the damage was caused by flood which is excluded under the policy. 4. The Applicant maintains that the damage was caused by stormwater run-off. Summary of Applicant’s position 5. The property was first inundated by stormwater run-off and this likely occurred on the morning of 12 January 2011 because:  The property agent (“MS”) was able to make many visits to the property on 11 January 2011. He was only unable to reach the property on the morning of 12 January 2011.  The Applicant received a call from an unidentified customer on the evening of 11 January saying that “everything was in order at the facility”.  Video surveillance footage shows that the property had not yet been inundated as at 9am on 12 January 2011. 6. Neither the FSP nor its assessor and hydrologist were interested in the video footage although the footage would provide critical insight as to what had occurred. Determination Case No: 249553 Determination Page 2 of 5 Summary of FSP’s position 7. Its hydrological evidence shows that the initial inundation was caused by flood (as defined in the policy). 8. The evidences of the Applicant‟s witnesses are consistent with its hydrologist‟s findings. 9. Its assessor has viewed the video footage and found it inconclusive as to when the initial inundation occurred. 10. If the Applicant believes he has specific footage that it assists his case, it invites the Applicant to provide it with an opportunity to view such footage. 11. The FSP relies on the following policy provisions: “ Flood means the escape or release of water from the normal confines of a pond, lake, reservoir, canal, dam or uncovered watercourse. … The events You are insured against This policy insures You for physical loss of or physical damage to:  a Building, if „Buildings‟ is shown on the certificate of insurance … This policy only insures You if the loss or damage is directly caused by an event listed below and occurs during the Period of Insurance and in the case of:  Buildings, Stock and Other Property, occurs at the Business Premises … 6 wind, rain, hail, snow or escape of liquid but not for:  los s or damage directly caused by Flood” Issue 12. Whether the damage to the insured property was caused by stormwater run- off and/or flood as defined in the policy. Reasons for decision Preliminaries 13. Due to the nature and urgency of the dispute, it has been directly referred to the Panel for Determination in accordance with the Operational Guidelines to the Financial Ombudsman Service‟s (FOS) Terms of Reference. Case No: 249553 Determination Page 3 of 5 14. The Panel is comprised of an Ombudsman, an insurance representative appointed by the Financial Ombudsman Service Board, and a consumer representative appointed by the Financial Ombudsman Service Board. 15. The Panel is satisfied that the relevant material has been exchanged and the parties have had the opportunity to respond to the issues raised. Proximate cause of inundation 16. The Panel has reviewed the material exchanged. In addition the Panel Ombudsman Chair attended on site where he met with the Applicant and representatives of the FSP. 17. The property is situated in a relatively open industrial court. There is a stormwater drain at the front of the property and stormwater run-off from the court would flow to this spot. The storage facility is built on a concrete slab and it is likely if there was stormwater run-off on the property, there would be some inundation of the facility. 18. According to the Applicant, he believed the run-off came from the direction of the local golf course, 500 to 750 metres west of the property. 19. The FSP‟s hydrologist has referred to an unnamed tributary as being the source of the flooding. The Panel notes this has been variously referred to as a depression and an unnamed tributary. The Panel Chair took the opportunity to view this feature and having considered the information exchanged, the Panel is of the view this feature would most likely be properly described as a watercourse. 20. However, in the Panel‟s view the key issue i n this dispute is the timing of the period of heavy rain and the timing of the inundation and the implications of that evidence. 21. The submissions note that although there were heavy rains on 11 January 2011 (and in the preceding days), and many eyewitnesses have recalled observing a significant amount of water coming from the west of the insured property (i.e. from the direction of the golf course) on 11 January 2011, it is the Applicant‟s case that the insured property was not inundated until the morning of 12 January 2011. 22. In view of this, the Panel Chair Ombudsman raised this issue for clarification whilst on site. The Applicant reiterated his view that the property had not been inundated at 9.00am on 12 January 2011 and it was not until after that time on 12 January 2011 that the inundation occurred. 23. In this respect, he essentially relies on the following evidence:  The insured‟s property agent (“MS”) was able to make m any visits to the property on 11 January 2011. He was only unable to reach the property on the morning of 12 January 2011. Case No: 249553 Determination Page 4 of 5  The Applicant received a call from an unidentified customer on the evening of 11 January who said something to the effect that “every thing was in order at the facility”.  Video surveillance footage (which has not been provided) which apparently shows that the property had not yet been inundated as at 9.00am on 12 January 2011. 24. The Panel has carefully considered all of the evidence provided by the Applicant. It is unnecessary to restate the Applicant‟s material in any detail here, however the Panel finds his suggestion with respect to the timing of the inundation to be irreconcilable with clear hydrology evidence establishing:  The relevant section of the Brisbane River had peaked to a height of 45.91m at about 12am on 12 January 2011.  There was little to no rain in the area from 3pm onwards on 11 January 2011. 25. In view of this data, the Panel is not persuaded that the property could have escaped inundation at the time the river reached its peak yet become inundated sometime after 9.00am on 12 January 2011. 26. Although the Applicant has challenged the accuracy of the hydrologist estimation of the property‟s elevation in relation to the river, he has not provided any evidence (expert or otherwise) to show that the hydrologist‟s estimation was in fact inaccurate (or for that matter, that the property stood at a higher elevation than the peak river height). 27. Even if the Panel is inclined to accept a suggestion that the property was at a higher elevation than the peak river height (which it does not), it still has difficulty accepting that the property was inundated by stormwater run-off. 28. There was little to no rain in the area after 3pm on 11 January 2011 as evidenced by the BoM data included in the hydrologist‟s report. This is plainly borne out by hourly rainfall data recorded at the Lowood Pump Station Alert. It is also noteworthy that most of the witness statements provided by the Applicant were consistent in that the heaviest rains occurred prior to 3pm on 11 January 2011. 29. In the Panel‟s view, it is unlikely that the property could be first inundated by stormwater run-off some 18 or more hours after the heaviest rains occurred and importantly, when the river levels have already begun to recede. 30. Having carefully considered the material at hand, the Panel is more inclined to accept that the property was likely to be inundated sometime between MS‟s last visit to the property on 11 January 2011 or the Applicant‟s receipt of the call from the unidentified customer, and 12am on 12 January 2011 (when the relevant section of the Brisbane River reached its peak height). 31. Given that the Applicant has confirmed the property had not been inundated on 11 January 2011 this would support a view that was rainwater run-off would not have inundated the property. What is clear from the material is Case No: 249553 Determination Page 5 of 5 that there was little to no rain in the area between 3pm on 11 January 2011 and 12am on 12 January 2011. It is a well-established hydrological principle that inundation by stormwater run-off usually occurs in close temporal proximity to peak rainfall. 32. Therefore on the evidence available, the Panel is of the view that on the balance of probabilities it is unlikely that the insured property was first inundated by stormwater run-off, but is more likely to have been inundated by floodwaters from the Brisbane River which back flowed along its unnamed tributary to the west of the Applicant ‟s property. Determination 33. In light of the above analysis, the Panel determines that the FSP is entitled to decline liability in response to the claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.