The applicants' home and contents were inundated in January 2011 and the FSP declined the claim as flood, which is excluded. AFCA found the inundation was flash flood caused by heavy rain within 24 hours, which is covered, and ordered the FSP to indemnify the loss subject to policy limits.

Flash flood is a specific covered type of flood to which the general flood exclusion does not apply, and the dominant cause was heavy rain over the dam within 24 hours of the inundation.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 249162 Determination Page 1 of 11 Case number: 249162 General Insurance - Domestic Insurance - Home Contents - FSP Decision - Denial of claim 23 August 2012 Background 1. The Applicants‟ home (located in Barellan Point, Queensland) and contents were insured with the Financial Services Provider (FSP) under a household policy. 2. They claimed for loss/damage to their home and contents as a result of water inundating the home in January 2011. 3. The FSP declined liability, contending that the loss/damage was caused by flood which the policy excludes. 4. The Applicants believe their home was inundated by stormwater and not flood. Summary of Applicants’ position 5. Their property is surrounded by 3 zoned council stormwater easements. 6. Stormwater runoff was a “contributing factor” in the inundation of their home. 7. Stormwater runoff “can only go so far before it starts to back up”. 8. The Brisbane River is 600m away from their home. Properties which were right on the river were not inundated whereas theirs was. 9. They believe their home was inundated by stormwater, not flood as stated by the FSP. Summary of FSP’s position 10. The Applicants have not shown that their property was damaged by flash flood and stormwater run-off. 11. Their property was damaged by “flood” as defined in the policy. Determination Case No: 249162 Determination Page 2 of 11 12. If the damage to the Applicants‟ property was caused by flash flood, it must also be accepted that the damage was caused by flood. This means the whole loss is excluded on the basis of the Wayne Tank principle. 13. Evidence provided by its hydrologist as well as information contained in the ICA hydrology report shows that the loss was caused by the rising level of the Brisbane River due to rain that fell more than 24 hours earlier. In particular, the hydrological evidence shows:  A substantial amount of rain fell in the Brisbane River catchment above Wivenhoe Dam both before, but particularly over the period from 9.00am on 9 January 2011 to 11 January 2011.  These rains caused significant inflows into the dam whose level peaked in the late evening of 11 January 2011.  There were significant discharges of water from the dam into the river, which worked its way down to Brisbane.  There was also substantial rainfall over the Bremer River catchment from around 6.00am on 11 January 2011 which travelled down towards the confluence between the Bremer and Brisbane rivers.  The Bremer River is likely to have contributed less than 15% to 25% of the Brisbane River‟s peak flow. This was because th ere was some attenuation of the peak flow rate in the lower reaches of the Bremer River due to high Brisbane River tailwater levels.  A small proportion of the Brisbane River‟s overall depth prior to 6.00am on 12 January 2011 may be attributable to the rains that fell in the Bremer River catchment on 11 January 2011. However, it was the rains that fell over the Wivenhoe Dam catchment and the subsequent dam releases which had an overwhelming influence on the Brisbane River flooding.  The Brisbane River continued to rise after 6.00am on 12 January 2011 and peaked at 4.45m (Brisbane City gauge) at approximately 4.00am on 13 January 2011. 14. Its hydrologist also provided the following information specific to the Applicants‟ location:  The nature of the terrain surrou nding the Applicants‟ home makes it unlikely that it would experience significant stormwater or local run-off.  Rainfall at about the time their home was inundated was insufficient to cause stormwater or local run-off.  The timing of the rise of the Brisbane River is consistent with the Applicants‟ reported time of inundation. 15. The FSP relies on the following provision in the Certificate of Insurance: “What optional covers are included and not included Case No: 249162 Determination Page 3 of 11 Home Contents … Flood and storm surge Not included Not included 16. The FSP relies on the following provisions in the PDS “ Words / terms with special meanings Word / term Meaning … Flood Rising water which enters your home as a result of it running off or overflowing from any origin or cause. This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance Flash flood and stormwater run - off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run - off. … Storm A violent disturbance of the atmosphere associated with strong winds including a cyclone, lightning, heavy rain, hail or snow but not continuous bad weather by itself. … Insured events you are covered for Damage caused by the weather …. What is covered W hat is not covered Storm … … Flash flood and stormwater run-off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run - off Loss or damage caused:  by flood; … … Your home … The most we will pay for home claims Case No: 249162 Determination Page 4 of 11 What is covered What is not covered Flash flood and stormwater run - off We will pay up to 50% of your home sum insured or $25,000, whichever is higher. … … Your contents … The most we will pay for contents claims What is covered What is not covered … Flash flood and stormwater run-off We will pay up to 50% of your home sum insured or $25,000, whichever is higher. … Optional covers for extra peace of mind The covers outlined in this section are optional and do not apply unless you asked for them and we agree to cover you. Additional premiums apply for each cover. Your certificate of insurance will show which covers operate. All optional covers are subject to the terms and conditions of this policy. What is covered What is not covere d Flood and storm surge This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance. Home and/or contents cover: We cover you for loss or damage to your home or contents caused by flood or storm surge which happens during the period of insurance at the property address … …” Issue 17. Whether the Applicants‟ property was damaged by stormwater, flash flood and/or flood. Case No: 249162 Determination Page 5 of 11 Reasons for decision Preliminaries 18. Due to the nature and complexity of the dispute, it has been directly referred to the Panel for Determination in accordance with the Operational Guidelines to the Financial Ombudsman Service‟s (FOS) Terms of Reference. 19. The Panel consists of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 20. The Panel is satisfied that the material has been exchanged and the parties have had the opportunity to respond to the issues raised. Flash flood is also flood 21. The FSP‟s suggested ap plication of the Wayne Tank principle (such that even if „flash flood‟ caused the inundation, its application would be obviated by the presence of the policy excluded event of „flood‟) would only be applicable where there are two or more concurrent causes of loss. In the instance where the cause of loss was flash flood, the Wayne Tank principle cannot apply. 22. Insofar as the FSP is suggesting that where the cause of loss is flash flood, then it is excluded because “flash flood” is also “flood” (which is exclu ded from the policy) then that would also render a number of the FSP‟s promises of cover under the policy seemingly misleading, if not meaningless altogether. 23. According to the FSP‟s policy a “flash flood” is a form of a “flood”, and the policy provides cover for loss or damage arising from this particular form of flood. To then suggest that cover for “flash flood” would be excluded because it is also “flood” would be to make the promise of cover for “flash flood” illusory. This could also be considered to b e misleading conduct and at the very least, is inconsistent with an obligation to act with utmost good faith. 24. It should also be borne in mind that the FSP‟s definition of “flood” is unusually wide. The policy says flooding caused by water from “any origin or cause” is a “flood”. If the FSP‟s suggested application of Wayne Tank was sustainable, then claims arising from flooding caused by heavy rains, stormwater run-off or from bursting, leaking or overflowing pipes etc. may never be payable; since they could be caught by such an application of the term “flood”. 25. However, the Panel has carefully considered the policy wording and is of the view that given its structure, even though the policy excludes “flood”, “flash flood” is a specific type of flood for which cover is granted and to which the flood exclusion does not apply. Case No: 249162 Determination Page 6 of 11 Initial inundation 26. Turning to the substantive aspect of the dispute, the Applicants argue that their home was first inundated by stormwater runoff because:  Their home is surrounded by 3 zoned council stormwater easements and this was a “contributing factor” to the inundation.  Properties which are right on the Brisbane River (theirs is further away) were not inundated. 27. The material shows:  The Applicants‟ area received some 79mm of rain on 11 January 2011 and the most intense rainfall apparently occurred at 11.00am on that day.  The Applicants‟ property is elevated between approximately 10m to 14.5m (and perhaps 15.9m) AHD.  Based on the river height modelling subsequently prepared by the FSP‟ s hydrologist, the Brisbane River was estimated to have reached a height sufficient to clear the minimum level of the Applicants‟ home at about 8.38pm on 11 January 2011. 28. Although these facts appear to support a possibility that the home could have been first inundated solely by stormwater runoff, the Panel has reservations concluding as such for the following reasons:  The Applicants say stormwater runoff was a “contributing factor” in the inundation which suggests that the initial inundation may have been a mixture of stormwater runoff and possibly flood water. The fact the Applicants made mention of water backing up appears to support such a view.  The Applicants reportedly informed the hydrologist that: o Water was running down the easement at 10.00am on 11 January 2011. o Rising water had reached their swimming pool at 6.00pm on that day. o They evacuated at 6.00pm on that day. The Applicants have not denied making such statements which suggests that the initial inundation had likely occurred sometime after 6.00pm on 11 January 2011. 29. Accordingly, the Panel finds, on the balance of probabilities it is inconclusive as to whether the Applicants‟ home was first inundated solely by stormwater runoff and as such, a prima facie claim on the basis of stormwater runoff has not been established. 30. Although their property may be surrounded by 3 stormwater lines, it does not necessarily follow that water escaping or back flowing from such lines was solely stormwater runoff. Furthermore, case law supports the view that water Case No: 249162 Determination Page 7 of 11 backflow from such lines may actually be designated as flood water from an insurance perspective. 31. Also, the Applicants‟ contentions concerning events that may or may not have occurred to those properties right on the Brisbane River, does not assist in determining what occurred in and around the Applicants‟ home. 32. However, the Panel has also considered whether the Applicants‟ home was likely to have been first damaged by a “flash flood”. 33. The policy covers flash flood and storm water runoff; however, to avoid confusion in light of the Panel‟s conclusions above, the Panel will consider this issue from the perspective of „flash flood‟. In order for a claim to fall under the insured event of flash flood, the following elements must be established: a. there was a sudden flood; b. there was a heavy rain that occurred within 24 hours prior to that flood; c. the sudden flood was caused by that heavy rain. 34. FOS has determined in other disputes, following consideration of all material exchanged, that the heavy rainfall commencing around 4.00am on 11 January 2011 was the proximate or effective cause of the inundation of the properties downstream from the Wivenhoe Dam. 35. Given the wording of the FSP‟s policy in respect to flash flo od, the Panel has determined that the inundation in these early Determinations is properly categorised as flash flood. 36. Subsequent to issuing those Determinations, the evidence of the engineers operating the Wivenhoe Dam was brought into question, necessitating the recall of the Queensland Flood Commission of Inquiry (CoI). The Service suspended issuing further Determinations on this issue until the CoI ‟s evidence had been completed and the parties given the opportunity of addressing the issues that arose from its deliberations. Specifically if the Panel should prospectively reconsider its „flash flood‟ findings. 37. The FSP has since provided further submissions to FOS including a reference document, two additional hydrology reports and a statement from its hydrologist. Only those parts of the additional material relevant to the current dispute need be considered. 38. Having considered the further evidence and submissions presented to the CoI and the additional material provided by the FSP, the Panel is not satisfied that the evidence which led to the earlier determinations, in respect of „flash flood‟ has been significantly challenged in any material way. 39. The Panel is satisfied that the evidence supports the view that a substantial portion of the flooding downstream of the Wivenhoe Dam is attributable to the particularly intense rainfall over the dam between 4.00am and 8.00am on Case No: 249162 Determination Page 8 of 11 11 January 2011. The Panel is also satisfied that this rainfall event caused a sharp rise in the dam‟s levels ; ultimately leading the dam‟s operating engineers to move from a W3 release strategy (which had been working well up to then) and to adopt a W4 release strategy from 8.00am on 11 January 2011. 40. Whilst some aspects of the evidence presented by the dam‟s operating engineers were challenged at the further hearings of the Co I, the Panel is satisfied that the particular evidence pertinent to this issue of „flash flood‟ has not been challenged. In particular, the Panel notes the following.  Inflows into the dam continued to decrease until approximately 2.00am on 11 January 2011.  However, intense rain began to fall in the dam catchment between 4.00am and 8.00am again.  The intensity of the rainfall was not captured by the rain gauges, but the operating engineers realised that heavy rains must be falling because the dam‟s level continued to rise.  A reverse process of hydraulic modelling was carried out and concluded that indeed heavy rain was falling. It was estimated some 700mm of rain had fallen into the dam; it was further concluded this downpour was occurring directly over the dam itself; hence why the rain gauges situated in the surrounding catchment had failed to register.  Dam inflow estimates increased sharply to 8,060 cubic metres per second by 8.00am.  At 7.00am, two of the operating engineers received advice from the Bureau of Meteorology that heavy rains in the dam catchment would continue. 41. These events led the operating engineers to conclude that the dam level could no longer be contained by a W3 release strategy, so a decision to move to a W4 release strategy was made at 8.00am. 42. The flood gates were open to 6 metres by 12noon. All five gates were opened to 7 metres by 1.00pm, 7.5 metres by 2.00pm and 8.5 metres by 3.00pm. The increase continued with the gates being open up to 12 metres from 7.00pm to 9.00pm. 43. The information provided by the dam‟s operating engineers is generally consistent with the Insurance Council of Australia (ICA) hydrology findings in volume 3 of its report entitled “Flooding in the Brisbane River Catchment”. The sali ent points of the ICA‟s findings with respect to the Wivenhoe Dam releases were as follows.  Large releases were made from Wivenhoe Dam over the period from 6.00am, possibly as early as 3.00am on 11 January, until around 3.00am on 12 January 2011.  Releases from Wivenhoe Dam caused a flood wave in the Brisbane River. Water levels in the lower reaches of the Bremer River and its Case No: 249162 Determination Page 9 of 11 tributaries draining Ipswich LGA were affected by backwater flooding and backwater effects from the Brisbane River.  The Wivenhoe Dam release was the immediate cause of flooding along the reaches of the Brisbane River downstream of the dam and along its tributaries through the Ipswich LGA. 44. The information before the Panel satisfies it that the dominant cause of the flooding of the Applic ants‟ property was, on the balance of probabilities the heavy rainfall over the dam and its catchment between 4.00am and 8.00am on 11 January 2011. 45. Whilst the Panel acknowledges that it had been raining in the dam catchment on the days leading up to 11 January 2011, the evidence shows that a W3 release strategy was working well up until the heavy rains that fell between 4.00am and 8.00am on 11 January 2011. It was this particular rain period that led to a decision to invoke the W4 strategy, which was ultimately the dominant cause of the flooding downstream of the dam. 46. The Panel is mindful of the further submissions of the hydrologist on the part of the FSP to the effect that “I do not think it is accurate to say that it was only the rain which fell on 11 January 2011 which led to the increase in releases from Wivenhoe Dam.” 47. Having considered all of the evidence, the Panel does not agree with the effect of the statement made by the FSP‟s hydrologist. 48. In considering the proximate or effective causes, it is necessary to consider the facts of the situation alongside the terms of the relevant policy term. In this context the Panel accepts the word „caused‟ within the flash flood/storm water runoff definition in the policy means in the insurance context „proximate or dominant cause‟. 49. It is well established principle of insurance law that the proximate cause of the loss is not the first, or the last, or the sole cause of the loss but the effective or dominant or operative cause. It is a question of fact to be considered in each case. It has been said by the FSP and the Panel agrees that in determining „proximate cause‟ one must be guided by a common sense evaluation of the relevant facts; the cause which would be attributed by „the man in the street‟ would reasonably be the one determined as the cause of the loss. The Panel also agrees that if there are two or more proximate causes, one within the policy and another excluded, then the policy does not respond. 50. The Panel is satisfied on the balance of probabilities that notwithstanding the rain which had fallen prior to 11 January 2011, it was the rain which fell over the Wivenhoe Dam between 4.00am and 8.00am on 11 January 2011 which led to the decision to change the release strategy from W3 to W4 and as such, it was this rain which fell over the dam between 4.00am and 8.00am on 11 January 2011 which led to the flooding downstream of the Wivenhoe Dam. Case No: 249162 Determination Page 10 of 11 51. As an alternative argument the FSP contends that the switch of strategy to the W4 release was not a natural or ordinary consequence of the rain that fell on the morning of 11 January 2011 and that the cause of the W3 to W4 switch was not the rain, but the dam‟s operating engineers‟ previous failure to correctly apply the manual in that regard. 52. The Panel has reviewed the evidence presented to the CoI and whilst the Panel notes that there are a number of findings (including the Co I referring some aspects of their testimony preparation to the Crime and Misconduct Commission) made against the dam‟s operating engineers in respect to the use of the manual, the Panel is not aware of any suggestion that given the circumstances of 11 January 2011, it was not appropriate to change the strategy to W4 as actually occurred. 53. The Panel is also satisfied that the change of strategy was not a departure from the manual (notwithstanding the technical arguments as to whether it should have occurred earlier) but a necessary consequence of the rain which had fallen on the morning of 11 January 2011 between 4.00am and 8.00am. 54. The Panel notes that th e further evidence presented by the FSP‟s hydrologist is consistent with the evidence previously given by the Applicants in respect to the inundation of the Applicants‟ property. 55. The Applicants‟ evidence is that the initial inundation is likely to have occurred sometime after 6.00pm on 11 January 2011 and this is consistent with the FSP‟s hydrologist‟s view that the approximate time the Brisbane River reached the approximate benchmark level of the Applicants‟ home as 8.38pm on Tuesday, 11 January 2011. 56. The Panel also notes the FSP‟s hydrologist‟s estimation that at 4.00am on 12 January 2011, the Brisbane River levels would have been 2.9 metres above the lowest point of the structure of the house on the land (the bench mark level). 57. Given these circumstances, the Panel is satisfied that the Applicants‟ property was inundated within 24 hours of the heavy rainfall that fell over the Wivenhoe Dam and that, as such, the inundation of the Applicants‟ property falls within the terms of the policy under the heading flash flood. 58. In the Panel‟s opinion, the inundation level of 2.9 metres above the lowest point of the structure of the house on the land (the bench mark level) would cause the totality of the losses suffered by the Applicant. 59. The Panel notes the coverage under the policy in respect to flash flood is 50% of the home sum insured or $25,000 whichever is higher and that this coverage applies both in respect to damage to the home and damage to the contents. 60. Finally, the FSP argues that the W4 releases of water from the Wivenhoe Dam had little material impact on the extent of the damage to the Applicants‟ Case No: 249162 Determination Page 11 of 11 property as that damage would have resulted from releases of water under the W3 strategy which applied before the W4 strategy was implemented. 61. The FSP‟s hydrologis t has estimated that had the release from the Wivenhoe Dam continued at the W3 rate of discharge which applied prior to 8.00am on 11 January 2011; the river level would have first inundated the benchmark level at the Applicants‟ property at approximately 6 .38am on Wednesday, 12 January 2011. 62. The Panel notes that this is not what happened but what the FSP‟s hydrologist speculates would have happened had the release strategy not been altered. However, the fact of the matter is that the release strategy was altered from W3 to W4 and the amount of water released from the dam increased dramatically and as a result of that change in release strategy. This is also consistent with the relevant policy wording which requires fulfilment of two limbs in order to be enlivened: firstly, heavy rain – satisfied by the evidence presented above; secondly, flash flooding of the risk address within 24 hours of said heavy rain. 63. The Panel is satisfied that it is appropriate to deal with the facts as they stand rather than to engage in futile speculation on what might have happened in differing circumstances. 64. The conclusion is that the Panel does not accept the FSP‟s argument in this regard. 65. The final conclusion is that the Panel is satisfied that the FSP is required to meet the App licants‟ claim under the terms of the policy in respect of inundation arising from flash flood. Determination 66. The Panel determines that the FSP is required to indemnify the Applicants for their loss subject to applicable policy limits for loss/damage caused by “flash flood”. 67. In the event the FSP elects to settle any portion of the claim in cash, it is required to pay interest on such amount at the statutory rate from 14 April 2011, the date it first declined the claim, until the claim is settled.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.