Home building claim for Queensland flood inundation (Karalee) denied under general flood exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2012-09-10
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainants' Karalee home was inundated by Bremer River floodwater in January 2011 and the FSP denied the claim under the flood exclusion. AFCA found the policy clearly excluded flood, that the inundation was floodwater rather than stormwater, and that the FSP was entitled to deny the claim.

The policy's flood definition and general exclusion were clear under section 35 of the Insurance Contracts Act 1984, and site-specific hydrology established the inundation was floodwater.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 248940 Determination Page 1 of 9 Case number: 248940 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim (Flood) 6 September 2012 Background 1. The Applicants (KP and DP) insured their home and contents in Karalee with the Financial Services Provider (FSP). The relevant period of insurance operated for twelve months beginning from 27 November 2010. During this period, the building was insured for complete replacement and the contents for $87,200. 2. On 12 January 2011, KP lodged a claim under the policy due to extensive water inundation following severe weather events in Queensland. 3. The FSP denied the claim on the basis the damage was due to “flood”. The Applicants, through their solicitors, have disputed this. 4. For the sake of simplicity, reference to the Applicants will include their legal representatives. 5. Both the Applicants and the FSP have provided detailed submissions on the relevant issues. For the sake of brevity, the Panel will only briefly summarise these submissions given all of the material made available has been exchanged with the other party. Summary of Applicants’ position 6. The Applicants submit the following as alternative arguments in response to the FSP’s decision: a. The FSP’s policy failed to clearly inform them that “flood” was excluded as required under Section 35 of the Insurance Contracts Act 1984 (the Act). b. The damage was due to the insured events of “Storm and rainwater” or “Liquid escaping suddenly and unexpectedly”. c. The damage was due to water escaping from the stormwater drains near the property. d. The FSP is unable to discharge its onus in establishing the loss was caused by “flood”. Determination Case No: 248940 Determination Page 2 of 9 7. The Applicants seek to be indemnified for their claim. Summary of FSP’s position 8. The FSP submits that the policy structure and layout enables it to rely on the exclusion clause of “flood” pursuant to Section 35(2) of the Act. 9. The FSP relies upon the hydrology reports commissioned by the Insurance Council of Australia (ICA), two site specific hydrology reports, aerial flood mapping provided by the Queensland government and the following policy provisions in both the building and contents policies to deny the claim: “ What we cover – insured events This section described under the heading: Yes – the insured events you are covered for, No – the conditions and exclusions that specifically apply to particular insured events … Yes Storm and rainwater including stormwater run-off from areas surrounding the site, or water escaping from any water main, drain, pipe, street gutter, guttering or surface … No Damage or loss caused by flood . Flood means the inundation or covering of normally dry land by water which: escapes or overflows from, or cannot enter, because it is full or has overflowed, or is prevented from entering, because other water has already escaped or been released from it, the normal confines of any watercourse or lake, including any that may have been modified by human intervention, or reservoir, canal, dam or stormwater channel. Flood does not mean stormwater run-off from areas surrounding the site, or water escaping from any water main, drain, pipe, street gutter, guttering or surface.” Issues 10. Whether the policy clearly informed the Applicants that they were covered for flood. 11. Whether the FSP is entitled to deny the claim. Case No: 248940 Determination Page 3 of 9 Reasons for decision 12. Due to the nature of the dispute, the parties have been informed that the matter has been referred to the Panel for Determination in line with the Operational Guidelines to FOS’s Terms of Reference. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 13. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 14. It is appropriate to consider the issues under the various headings. Does the FSP’s policy clearly in form the Applicants flood is not covered? 15. Section 35(2) of the Act states that when a claim is made under a “prescribed contract” for a “prescribed event”, an insurer cannot refuse to pay the claim unless it can establish that it clearly informed its insured in writing that it would not cover this event. Section 34 of the Act has defined the terms “prescribed contract” and “prescribed event” by referring to the Insurance Contracts Regulations 1985. 16. There is no dispute that contracts of insurance covering a person’s home and contents are a “prescribed contract” and damage due to flood is a “prescribed event”. 17. The onus is therefore on the FSP to establish that it has clearly informed the Applicants prior to the claim that it would not cover damage caused by “flood”. This is generally done by an insurer providing a copy of its policy to its insured which is meant to set out completely the rights and obligations of both parties under the insurance contract. 18. Further, the Courts have supported this and particularly, in the case of Marsh v CGU Insurance Ltd [2004] NTCA 1, Mildren J provided the following comments that are particularly relevant to the operation of Section 35(2) of the Act: “In Hams & Anor v CGU Insurance Ltd(2002) 12 ANZ Insurance Cases 61 - 525, Einstein J held that the provisions of s 35(2) of the Insurance Contracts Act 1984 (Cth) could be met if the insurer provided to the proposed insured a document such as the proposed policy, which contained the relevant wording. I agree. … Whether the policy wording in fact "clearly informed" the insured that there was no cover for flood is a question of fact to be determined by an examination of the document in question. … Furthermore, the language of s 35(2) suggests that the proposed insured can be clearly informed merely by providing the insured with a copy of the policy which shows the exclusion in clear and unambiguous terms. … The answer to the question "is flood covered" is easily ascertainable by any person of average intelligence and education.” Case No: 248940 Determination Page 4 of 9 19. In their submissions the Applicants have not disputed receiving both policies. In KP’s statutory declaration, he simply stated the following in this regard: “We cannot recall receiving a PDS when we initially took out the insurance policy” 20. The Applicants are silent on whether the received PDSs at some other time and of particular note, they have not stated that they did not receive the PDSs. The statement above does not suggest that they were not issued with PDSs ’ either before the policies were incepted or sometime after the policies were incepted. 21. Given the Applicants’ submission contains no allegation that the PDSs were never received, the Panel accepts it is more probable than not that the Applicants did receive both policies before the claim arose. The policy structure 22. In relation to the policy structure itself, the Applicants have provided numerous submissions to argue that the relevant terms relied upon by the FSP is ambiguous. For the sake of brevity, the Panel does not propose to detail these arguments. 23. The Applicants’ insurance policies regarding the building and contents are set out in two different policy documents. However, the relevant terms and structure are essentially identical. 24. Upon reviewing the policies, the Panel accepts that a person of average intelligence and education would readily ascertain that “flood” is not covered given the following:  The policy contains an index on the front;  One of the headings contained in this index is “What we do not cover – general exclusions”, in which most p eople would expect to find any exclusions of cover;  Upon turning to the appropriate page, an insured would find that flood is excluded;  The definition of relevant terms is set out under the heading “What do we mean by that”, which is referred to in the ind ex and is where an insured would reasonably expect to find defined terms;  The FSP has also placed this exclusion with prominence alongside the insured event of “Storm and rainwater” given it is likely this exclusion would be most applicable under this insured event. 25. The Applicants have stated the actual definition of the term “flood” is confusing when its structure is considered: “ Flood means the inundation or covering of normally dry land by water which: escapes or overflows from, or cannot enter, because it is full or has overflowed, or Case No: 248940 Determination Page 5 of 9 is prevented from entering, because other water has already escaped or been released from it, the normal confines of any watercourse or lake, including any that may have been modified by human intervention, or reservoir, canal, dam or stormwater channel. 26. In reviewing this definition the Panel notes it begins by referring to the inundation or covering of normally dry land by water. This, in itself, is clear. 27. Following on from this, the definition refers to three different types of situations that leads to this outcome, namely:  Water that escapes or overflows from the normal confines of any watercourse …  Water that cannot enter (because it is full or has overflowed) the normal confines of any watercourse …  Water that is prevented from entering (because other water has already escaped or been released from it) the normal confines of any watercourse. 28. For the sake of clarity, the definition has only articulated the sentence “the normal confines of any watercourse…” once at the bott om of the three scenarios given it is consistently applied to all of them. 29. Based on the structure of this definition, it is clear there are three types of water inundation that fall within the term “flood”. In the Panel’s opinion, these are separate and d istinct given the use of the conjunctive “or”. Accordingly, even if the Panel was to accept that one of these situations was unclear or ambiguous, they can be severed from the contract and the others would still apply. 30. In relation to the first situation, the Panel considers this definition is clear as it reflects the common definition used by many insurers and consistent with the definition referred to by the Act. 31. In relation to the second and third aspects, the Panel considers the definitions are relatively clear. That is, if water is unable to drain into any watercourse, lake, reservoir, canal, dam or stormwater channel because it is full, has overflowed or other water has escaped or been released from it, it is deemed “flood”. This interpretation is cons istent with the ordinary and natural meanings of the words used within their context of this definition. 32. The Applicants have also referred to two previous Determinations issued by a Predecessor Scheme to the Service, namely 40607 and 41709. The FSP has responded with two more contemporaneous Determinations. In particular, the FSP referred to case number 245167 which, the Panel notes, reviewed the same policy terms and similar arguments. 33. The Panel accepts that given its current reasoning and having regard to the more contemporaneous and analogous Determination 245167, it accepts the “flood” definition is clear for the purposes of Section 35 of the Act. It Case No: 248940 Determination Page 6 of 9 therefore follows the FSP is entitled to rely on same, provided it is able to establish its applicability to the circumstances of this case. Water Inundation The Evidence 34. The FSP has relied substantially on two site specific hydrology reports. The first report contained the following relevant remarks:  The property is located approximately 240m from the Bremer River. Runoff from around the property would drain to the Bremer River within a few minutes via the north eastern corner of the property and the open drains running parallel to the W Highway.  There is an external catchment of approximately 5.6 ha draining from the west to the property.  Rainfall data was obtained from Bundamba (Hanlon Street) Alert station, which is located approximately 1.5km south-west of the property. A total of 123mm of rainfall was recorded between 0000 hours on 9 January 2011 to 1800 hours on 11 January 2011. No significant rainfall was recorded after approximately 1400 hours on 11 January 2011.  The peak hourly rainfall intensity of 16.3mm/hr was recorded at this station in the hour to 14:00 on 11 January 2011. The peak stormwater runoff at the property would have occurred within 15 minutes of this peak intense rainfall.  For durations of up to 24 hours, the recorded rainfalls had an Average Recurrence Interval (ARI) of less than 1 year.  Recorded levels of Bundamba Creek were obtained from the Bundamba (Hanlon Street) Alert. Bundamba Creek peaked at a level of about 19.39 mADH at 3.00pm 12 January 2011.  The ground levels of the property range from approximately 14.2 mAHD at the north eastern corner to 15 mAHD at the southern corner. Based on this and the measured creek levels, the initial inundation would have occurred at approximately 8.00pm on 11 January 2011. 35. Based on the above, the hydrologist concluded as follows: “… Initial inundation of the subject property by water from the river would have occurred at about 2000 hours on 11 th January, about 2 hours after rainfall in the area had ceased. Any water that entered the property after about 1800 hours on 11 January could not have been stormwater runoff because rainfall ceased at about t his time.” 36. KP provided a statutory declaration that set out the events of 11 January 2011. In particular, this declaration set out the following leading up to the Applicants’ evacuation of the property: Case No: 248940 Determination Page 7 of 9 “At around 5pm on 11 January, we noticed that the cat tle being kept on the property neighbouring us had all started moving to higher ground in an effort to get away from the heavy flow of stormwater runoff building up beneath them. A short time later we received a call from our daughter asking us to leave the house as soon as possible as they were expecting our area to have problems. We decided it would be safer to leave.” 37. Following this description, KP’s declaration also provided an explanation about why he considered it is possible that the water which inundated the home had escaped from the drains located nearby. 38. However, following receipt of this information, the FSP obtained a second site specific hydrology report. This second report providing the following information with respect to this issue:  Although there is an external stormwater catchment of approximately 5.6 ha draining from the west towards the property, only a small portion of this area (1.6 ha) drains directly towards the house.  Based on information provided by the loss adjuster, including a photograph of the home, the floor level of the house is elevated approximately 1 metre above ground level. Accordingly, any stormwater runoff from the local catchment could not have reached sufficient depth to inundate the home.  The stormwater pipes referred to by the Applicants could not physically inundate the property. The reason being is that water from the drains would follow the fall of the land and drain to the east, which is away from the property. 39. Based on the above, the hydrologist concluded as fo llows: “The peak rainfall intensity and peak stormwater runoff occurred prior to 3pm on 11 January. The insured did not evacuate the property until after 5pm on 11 January and the property was not inundated above floor level at this time. The recorded rainfall on 11 January was not exceptional and the floor level of the house is elevated about 1 metre above floor level. For these reasons the subject property could not have been inundated above floor level by stormwater runoff. Based on ground levels in the vicinity of the subject property, it is not physically possible that water overflowing from the stormwater drains referred to in the [L] submission and the insured’s Statutory Declaration could have inundated the subject property above floor level. Water overflowing from these drains would have followed the fall of the land and drained away to the east. The initial and peak inundation of the subject property above floor level was caused by floodwater from the Bremer River.” 40. Although the FSP has also relied upon the ICA hydrology reports and the aerial flood mapping, the Panel considers the site specific reports to be of probative value for the reasons to follow. Case No: 248940 Determination Page 8 of 9 Analysis 41. The Panel finds it prefers the site specific hydrology reports regarding the method of inundation given the following:  According to the Applicants’ own evidence, the property had not been inundated by 5.00pm on 11 January 2011.  Stormwater runoff inundation is normally contemporaneous to peak intense rainfall, which in this case occurred more than three hours prior to the Applicants’ evacuation. Further, minimal rainfall fell after their evacuation. Given this and the fact the floor level of the Applicants’ property is approximately 1m above ground level, it is unlikely stormwater runoff inundation would have occurred after the Applicants evacuated.  The hydrologists relied upon data that is proximate to the location of the property and are also appropriately qualified to examine and report on the likely cause of water inundation.  The Applicants ’ argument about water surcharging from drains is based on speculation as there is no eyewitness evidence to support this. In addition, this mechanism relies on factors which are inconsistent with the topography of the land.  The estimated time of initial i nundation and the hydrologists’ overall conclusions are consistent with the Applicants’ evidence and the relevant data. 42. The Panel therefore accepts that on the balance of probabilities, water escaped the confines of the Bremer River to travel over normally dry land and inundate the Applicants’ property. This falls within the policy’s definition of flood. 43. Further, the Panel does not accept that this water surcharged through the drains to initially inundate the property as it is inconsistent to the fall of the land and is not supported by any eyewitness evidence. Accordingly, the Panel does not accept the circumstances of the Applicants’ claim falls within the exception to the flood exclusion. 44. The Applicants have argued that this loss could fall within two insured events, namely “Storm and rainwater” and “Liquid escaping suddenly and unexpectedly”. However, the FSP’s exclusion of “Flood” is a general exclusion, meaning it can be relied on regardless of which insured event the Applicants are seeking to claim from. 45. As a result, the FSP is still entitled to rely on the exclusion to deny the claim regardless if the circumstances could arguably fall within either insured event. Case No: 248940 Determination Page 9 of 9 Determination 46. On the basis of the available information the Panel determines the FSP is entitled to deny the claim on the basis it was due to “Flood”.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.