Home / Financial Firm (Unknown - Insurer) / Determination 248903

Determination 248903

Denial of stormwater inundation claim for business premises

FirmFinancial Firm (Unknown - Insurer)
Decided2012-02-08
ProductGeneral Insurance · Business / commercial
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A furniture maker's business premises were inundated in January 2011 and the FSP declined the claim as flood, which the policy excludes. AFCA accepted the hydrology evidence that flood backflowed through the drains, found the schedule of insurance confusing, and held the FSP entitled to deny the claim.

Water that escapes a watercourse and backflows through drainage onto dry land is flood under the policy definition, which the policy expressly excludes.

Issues

Subjects and remedies

natural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 248903 Determination Page 1 of 10 Case number: 248903 General Insurance – Small Business Insurance - Commercial Property - FSP Decision - Denial of claim 8 February 2012 Background 1. For the purpose of this dispute, the Applicant is represented by his father. For clarity and convenience, both the Applicant and his representative will be referred to as „the Applicant‟ in this Determination. 2. The Applicant owns a business which makes custom furniture. He held a commercial business package insurance policy with the Financial Services Provider (FSP), arranged through his broker. 3. After his business premises were inundated on 12 January 2011 with water emanating from the stormwater inlet pit in front of the property, the Applicant lodged a claim with the FSP for the damage to his business property. 4. The FSP denied the claim, on the basis that the damage to the property was caused by flood, which is specifically excluded from cover under the policy. 5. The Applicant requested that the FSP review its decision; however, after review the FSP upheld its decision to deny liability for the damage. Summary of Applicant’s position 6. The Applicant says that the water which caused the damage to his business property was stormwater, surging up through the stormwater pipes. 7. His premises are close to a railway embankment, which abuts Stable Swamp Creek. The railway embankment formed an impediment for the water in the creek, which caused it to back up through the stormwater system and inundate his property. 8. This view is supported by the fact that there was no inundation on the other side of the railway embankment. 9. The issue of stormwater backing up through the drains has been acknowledged by the Lord Mayor of Brisbane, who has commenced a program to install back flow valves to problem drains. Determination Case No: 248903 Determination Page 2 of 10 10. The schedule of insurance provided by the FSP through his broker states that „Fire and Peril‟ cover is in place. However, the FSP‟s policy states that cover is provided for loss or damage from certain „defined events‟, and the term „peril‟ is not explained anywhere in the policy material. The language of the policy documentation is therefore misleading and contradictory. 11. It was rain that ultimately caused the inundation event and his claim should be paid under the defined event 7 of his policy‟s bu siness property insurance, which covers loss or damage by „storm, tempest, rainwat er, snow, sleet, hail, wind...‟ 12. He cannot understand how the FSP can deny that the water involved in the inundation was caused by the rain that fell. 13. The hydrologist engaged by the FSP inspected his property several weeks after the inundation when everything has dried out and he was not present during the inundation event itself. The report he produced is therefore unreliable and should not be used by the FSP to deny the Appli cant‟s claim. 14. The properties neighbouring his were also affected by the water inundation and the insurers of those properties have accepted the claims made for the damage. 15. In addition, his business was inundated in similar circumstances in 2001 and his then insurer paid his claim for damages, with no issues. 16. He also rejects the FSP‟s assertion that he is unqualified to offer expert opinion on such matters; he is qualified in building and construction, including hydrodynamics; he has 60 years practical experience in construction and civil engineering including dams and pumping stations; in addition he was seconded to the recovery team following the 1974 floods. 17. He sees no reason why his claim should not be paid. Summary of FSP’s position 18. The FSP says that the expert evidence provided by its hydrologist „W‟ confirms that the damage to the Applicant‟s property was caused by flood water from Stable Swamp Creek, which back flowed through the stormwater system. 19. The report by „W‟ has also eliminated the possibility that stormwater was involved in the inundation, saying that the amount of rain that fell in the vicinity on the day of the inundation was insignificant. 20. There is no need to define the word „perils‟ in the policy, as it includes a clear list of the perils covered. Case No: 248903 Determination Page 3 of 10 21. The policy clearly notifies the Applicant of the definition of „flood‟ and also clearly explains that flood is excluded from cover under the defined events of the Business Property Cover policy section. 22. In addition, the Applicant chose not to purchase the optional extension flood cover available under the policy. 23. The Applicant‟s argument that the railway embankment stopped the flow of water in Stable Swamp Creek is not logical and without geographical or topographical foundation. It is also irrele vant whether or not the opposite side of the embankment was inundated. 24. Even if the Applicant‟s assertion that the embankment stopped the flow of water within the Creek and this water was diverted to the Applicant‟s property as a result, this would still be deemed „flood‟. 25. Although the Applicant has assumed that the water that came up through the stormwater system was storm (rain) water, this assumption is not supported by the expert hydrological evidence, which clearly indicates that it was flood water. 26. The heavy rain in Queensland in January 2011 set in motion a chain of events that caused large scale damage to parts of the state; however , rain was not the proximate cause of the damage to the Applicant‟s property. As confirmed by the expert hydrological evidence, the proximate cause of the damage was flood. 27. The Applicant has indicated that the hydrology report by „W‟ is not credible; however, he has not provided any alternative expert evidence as rebuttal. As such, the conclusions of the report from „W‟, w hich were drawn by a duly qualified hydrological expert, should be accepted as evidence. 28. It would be inappropriate for the FSP to take into account the decisions of other insurers in relation to claims made against them, or previous claims made by the Applicant. Each claim turns on its facts and the policy coverage afforded. Issues 29. Whether the inundation which resulted in damage to the Applicant‟s business property was caused by flood. 30. Whether the policy documentation clearly explains that flood is excluded from cover. 31. Whether the FSP is required to indemnify the Applicant for the damage to his property. Case No: 248903 Determination Page 4 of 10 Reasons for decision 32. Due to the nature of the dispute, it has been referred to the Panel for Determination in accordance with the Operational Guidelines to the Financial Ombudsman Service‟s Terms of Reference. 33. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in insurance industry matters and a representative with extensive experience in consumer c laims. 34. There has been an exchange of information between the parties and the Panel is satisfied that each party has had an opportunity to address the issues raised. 35. There is no dispute that water inundated the Applicant‟s property on 12 January 2011 and that the water emanated from the stormwater inlet pit in the driveway of the property. Cause of the Inundation 36. The Applicant says that stormwater surged up through the stormwater pipes and inundated his property. 37. He argues that the railway embankment formed an impediment to the flow of water along Stable Swamp Creek and that water back-up up through the stormwater system. 38. He says that this is supported by the fact that no inundation occurred on the opposite side of the railway embankment from his property. 39. The FSP states that the hydrological evidence available from „W‟ indicates that:  It rained heavily in the days preceding the inundation of the Applicant‟s property.  The recorded rainfall on the day of the inundation (12 January 2011) was insignificant.  The timing of the inundation corresponds with the peak of the Brisbane River. 40. The report from „W‟ concludes that the water that inundated the Applicant‟s property was flood water from the Brisbane River, which back-flowed along Stable Swamp Creek and the piped drainage system. 41. The Panel has examined the submissions from both parties, including the hydrology report from „W‟, and the policy terms and conditions. 42. The Panel notes that the policy definition of „flood‟ is: Case No: 248903 Determination Page 5 of 10 “the inundation of normally dry land by water escaping or released from the normal confines of any natural watercourse or lake (whether or not they have been altered or modified) or from any dam, reservoir or canal‟. 43. After reviewing the evidence provided in the „W‟ report, the Panel is persuaded the Applicant‟s property was inundated by water which had backflowed from Stable Swamp Creek. Rainfall Around the Time of Inundation 44. The hydrology report by „W‟ shows that the rainfall after 6pm on 11 January 2011, in the vicinity of the Applicant‟s prope rty was insignificant. 45. It also shows that on the day of the inundation (12 January 2011), only 2 mm of rain was recorded at the official rain gauge nearest to the Applicant‟s property. 46. Further, the report states that peak stormwater run-off from the surrounding catchment would have occurred 10 – 30 minutes after the peak rainfall. 47. As such, the Panel is satisfied that stormwater run-off would not have affected the Applicant‟s property on 12 January 2011. Proximate Cause of Damage 48. The Applicant says that rai n was the source of the water that inundated his premises and resulted in the damage to his business property. 49. He has suggested that the rain which fell over other parts of south-east Queensland (including the Lockyer Valley, and the wider Brisbane catchment) in the lead up to the inundation, was the source of the water which inundated his property. 50. The FSP has stated that the proximate cause of the property damage was flood water and that although rain fell over the catchment in the lead up to the inundation, it entered the river system, then escaped the normal confines of that system. That, according to the policy definition, makes it flood. 51. The Panel has considered the definition of flood contained in the policy. The Panel also notes it is established law that once rain enters and then escapes the normal confines of a watercourse, it is considered to be floodwater. 52. It is also established law that water which escapes from a watercourse and backflows through a drainage system onto normally dry land is also p roperly considered to be floodwater. 53. Therefore, in this instance the Panel accepts that the proximate cause of the damage to the Applicant‟s property was flood and not the rain that fell over the Brisbane (and other) catchment areas in the preceding days. Case No: 248903 Determination Page 6 of 10 Reliability of Hydrology Report 54. The FSP has provided a report titled „Water Damage Assessment‟, produced by hydrologist „W‟, as evidence about the cause of the inundation. 55. The Applicant has said that the representative from „W‟ who wrote the report inspected his property several weeks after the inundation, when everything had dried out and the sun was shining. The Applicant has questioned the reliability of the findings of the report as a result. 56. The Panel has considered the Applicant‟s concerns in this reg ard, however, is satisfied that the timing of the inspection relative to the timing of the inundation would not have compromised the ability of the report‟s author to assess the cause of the inundation itself. 57. The FSP states that as the Applicant has not provided any expert hydrological evidence to counter the findings of the report by „W‟, that report should be accepted by the Panel as evidence as to the cause of inundation. 58. The Applicant (or at least his father, who represents him), has said that he has 60 years of practical experience in the construction and civil engineering industry, including dams and pumping stations, which gives him as much if not more experience as the FSP‟s hydrologist „W‟ to identify the difference between stormwater and flood. In support of his statement regarding his experience, the Applicant has provided a summary of his father‟s qualifications. 59. In addition, the Applicant has stated that his father has had some academic exposure to hydrodynamics and was seconded to the Lord Mayo r of Brisbane‟s recovery team following the 1974 floods. 60. The Panel accepts that the Applicant‟s father has, over the course of his career, gained a great deal of experience in the construction and civil engineering industry and has been accepted into various industry institutes and associations. 61. However, the Panel also accepts that „W‟ is an established hydrology firm in Australia, being one of three such hydrology firms jointly commissioned to produce a report examining the cause of the flooding in Brisbane and surrounds in January 2011, spanning five volumes. 62. The Panel notes that the report by „W‟ clearly sets out the rainfall and river level data and a summary of the version of events as provided by the Applicant, all of which were used in the drawing of the report‟s conclusions. 63. Importantly, the Applicant has not provided any evidence that directly challenges any of the data in the „W‟ report, or any other part of the report. 64. Although the Applicant has provided his opinion that the water which inundated his property was stormwater, he has not provided any data or other information to support this opinion. Case No: 248903 Determination Page 7 of 10 65. Accordingly, despite the Applicant‟s father‟s relevant experience and qualifications, the Panel is not persuaded that the hydrology report by „W‟ should be set aside, or its findings regarded as unreliable. Railway Embankment – Impediment to the Flow of Water 66. The Panel has examined the aerial photographs depicting the location of the Applicant‟s property, the railway embankment, and Stable Swamp Creek. 67. Wh ile acknowledging the Applicant‟s opinion that the railway embankment impeded the flow of water along Stable Swamp Creek and that this caused the water to back up through the stormwater system, the Panel was not persuaded by this argument. 68. Based on the evidence presented, the Panel is of the view that it would be highly unlikely for the railway embankment to impede or block the flow of water along the Creek. 69. However, even if the Panel were to accept the Applicant‟s argument on this matter, the Panel is satisfied that any water that was impeded from flowing along the creek and was forced outside the normal confines of the creek as a result, would be defined as „flood‟ under the policy. 70. This would be so regardless of whether the creek broke its banks and flowed overland to inundate properties, or surcharged through the stormwater system which under normal circumstances would serve to drain stormwater into the creek. 71. Further, the Panel is not convinced that inundation occurring on one side (ie: the Applicant‟s side) of the railway embankment, while the opposite side remains without any inundation, is of any relevance in establishing the cause of the inundation. Recognition of Storm water Backflow Issue 72. The Applicant has indicated that his view that it was stormwater that backflowed through the stormwater system to inundate his property is supported by the acknowledgement by the Lord Mayor of Brisbane of the issue. 73. He says that the Lord Mayor has initiated a program to install back flow valves on problem drains. 74. The FSP assumes that the Applicant is referring to comments made by the Lord Mayor of Brisbane in October 2011 following the release of a preliminary report titled „Brisbane Backflow Prevention Measures Investigation Pre Feasibility Study Volume 1 Report‟ („the Backflow Report‟). 75. The FSP says that it is important to take comments of the Lord Mayor in the context of the Backflow Report. It is also important to recognise, the FSP says, that the Backflow Report was intended to address the need for an Case No: 248903 Determination Page 8 of 10 investigation into the management of backflow inundation and that it is not a report into the cause of the January 2011 flood event. 76. Further, the FSP says that the Backflow Report actually supports its position regarding the dispute with the Applicant. 77. The FSP argues that the process of floodwater surcharging from the river/creek through the stormwater drainage system, which allowed this floodwater to inundate surrounding properties including the Applicant‟s, is demonstrated by the Backflow Report. 78. The Panel has reviewed the submissions of both parties on this matter and is not persuaded that either the Lord Mayor‟s comments, or the Backflow Report, support the Applicant‟s position that stormwater was the cause of the inundation. 79. The Panel is of the view that the Backflow Report explains how water escaped the normal confines of a watercourse (in this case Stable Swamp Creek) and supports the evidence provided by the FSP and the hydrologist „W‟. Applicant’s Previous Claim for Water Inundation 80. The Applicant says that he had a claim for damage to his business property in 2001, caused by inundation in similar circumstances to the claim in dispute. 81. The 2001 claim was accepted by the insurer as stormwater damage and therefore the FSP should accept his disputed claim, according to the Applicant. 82. The FSP has argued that it would not be appropriate for it to consider the acceptance or otherwise of the Applicant‟s 2001 claim when making its decision about the disputed claim. 83. The FSP says that each claim is considered against its individual circumstances and the terms and conditions of the policy in force. Further, it is not aware of the terms of the policy or the circumstances of cover held by the Applicant at that time. 84. The Panel agrees with the FSP on this point. The circ umstances of the two claims cannot be compared, the policy terms and conditions relevant to the two claims cannot be compared and the basis of the decision of the insurer for the 2001 claim is not known. 85. The Panel finds that the acceptance of the 2001 claim by the relevant insurer is not relevant to the decision regarding this dispute. Case No: 248903 Determination Page 9 of 10 Claims for Owners of Neighbouring Properties 86. The Applicant has indicated the claims made by owners of neighbouring properties, who were affected by the same inundation event and had similar policies, have been accepted by their insurers. 87. The Applicant says that this supports his view that the FSP should accept his claim. 88. The FSP argues that it would be inappropriate to have consideration for the claim decisions for neighbouring property owners when making a decision about the Applicant‟s claim. Although the circumstances of the claims may be similar, the policies cannot be compared and the bases for the claims‟ acceptances are not known. 89. The Panel agrees with the FSP on this point, and finds that the decisions of insurers of neighbouring properties, for claims made against them, are irrelevant to this dispute. Clarity of Policy Documentation and Wording 90. The Applicant referred to the use of the term „peril‟ on the schedule of insurance provided to him when describing the cover he purchased and says that this term is not explained anywhere in the policy wording he received. 91. The Applicant has also pointed out that the schedule of insurance does not show that flood cover is either „taken‟ or „not taken‟, in line with the format of the „Cover Summary‟ section of the schedule of insurance. 92. The FSP argues that there is no need to specifically explain the term peril, as there is a list of perils provided in the policy. 93. The Panel has reviewed the policy documentation, including the schedule of insurance and the policy wording. 94. The Panel finds that the policy definition for „flood‟ is clear. 95. It would seem that the various covers summarised on schedule of insurance correspond, for the most part, to sections within the policy wording which describe the terms and conditions relevant to those covers. 96. However, several covers listed on the schedule of insurance do not necessarily correspond to sections within the policy wording. 97. An example is „fire and peril‟ cover, which is listed as „taken‟ on the Applicant‟s schedule of insurance, but is not described under any section of the policy. Rather, the policy covers are noted under the heading “Defined events [cover]”. 98. Based on the Applicant‟s policy documentation, the Panel is of the view that a reasonable person would likely be confused as to what cover was in force. Case No: 248903 Determination Page 10 of 10 99. However, the Applicant has arranged his cover through a broker who operated as his agent for the purposes of this policy. As such, had the Applicant had any issues with the extent of scope of his cover, or if the covers provided had failed to meet his needs that is a matter between the Applicant and his broker. Further, the broker accepted the cover offered on the Applicant‟s behalf. 100. I n any event, the Applicant in his submission notes “1. The Applicant did chose (sic) not to take flood cover as a precedent was set by most insurers in 2001 stating that water backing up from the storm water drains was without doubt “storm water”.” 101. Having considered all of the evidence, the Panel determines that the proximate cause of the Applicant‟s loss was flood. 102. Further, the FSP is entitled to rely on its policy wording which specifically excludes flood. 103. The Panel therefore determines that the FSP was entitled to deny liability for the Applicant‟s claim. Determination 104. On the basis of the available information the Panel determines that the FSP is not required to indemnify the Applicant for the damage to his business property.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.