Text of the determination
Case No: 248903 Determination Page 1 of 10
Case number: 248903
General Insurance – Small Business Insurance - Commercial Property - FSP
Decision - Denial of claim
8 February 2012
Background
1. For the purpose of this dispute, the Applicant is represented by his father.
For clarity and convenience, both the Applicant and his representative will be
referred to as „the Applicant‟ in this Determination.
2. The Applicant owns a business which makes custom furniture. He held a
commercial business package insurance policy with the Financial Services
Provider (FSP), arranged through his broker.
3. After his business premises were inundated on 12 January 2011 with water
emanating from the stormwater inlet pit in front of the property, the Applicant
lodged a claim with the FSP for the damage to his business property.
4. The FSP denied the claim, on the basis that the damage to the property was
caused by flood, which is specifically excluded from cover under the policy.
5. The Applicant requested that the FSP review its decision; however, after
review the FSP upheld its decision to deny liability for the damage.
Summary of Applicant’s position
6. The Applicant says that the water which caused the damage to his business
property was stormwater, surging up through the stormwater pipes.
7. His premises are close to a railway embankment, which abuts Stable
Swamp Creek. The railway embankment formed an impediment for the
water in the creek, which caused it to back up through the stormwater
system and inundate his property.
8. This view is supported by the fact that there was no inundation on the other
side of the railway embankment.
9. The issue of stormwater backing up through the drains has been
acknowledged by the Lord Mayor of Brisbane, who has commenced a
program to install back flow valves to problem drains.
Determination
Case No: 248903 Determination Page 2 of 10
10. The schedule of insurance provided by the FSP through his broker states
that „Fire and Peril‟ cover is in place. However, the FSP‟s policy states that
cover is provided for loss or damage from certain „defined events‟, and the
term „peril‟ is not explained anywhere in the policy material. The language of
the policy documentation is therefore misleading and contradictory.
11. It was rain that ultimately caused the inundation event and his claim should
be paid under the defined event 7 of his policy‟s bu siness property
insurance, which covers loss or damage by „storm, tempest, rainwat er,
snow, sleet, hail, wind...‟
12. He cannot understand how the FSP can deny that the water involved in the
inundation was caused by the rain that fell.
13. The hydrologist engaged by the FSP inspected his property several weeks
after the inundation when everything has dried out and he was not present
during the inundation event itself. The report he produced is therefore
unreliable and should not be used by the FSP to deny the Appli cant‟s claim.
14. The properties neighbouring his were also affected by the water inundation
and the insurers of those properties have accepted the claims made for the
damage.
15. In addition, his business was inundated in similar circumstances in 2001 and
his then insurer paid his claim for damages, with no issues.
16. He also rejects the FSP‟s assertion that he is unqualified to offer expert
opinion on such matters; he is qualified in building and construction,
including hydrodynamics; he has 60 years practical experience in
construction and civil engineering including dams and pumping stations; in
addition he was seconded to the recovery team following the 1974 floods.
17. He sees no reason why his claim should not be paid.
Summary of FSP’s position
18. The FSP says that the expert evidence provided by its hydrologist „W‟
confirms that the damage to the Applicant‟s property was caused by flood
water from Stable Swamp Creek, which back flowed through the stormwater
system.
19. The report by „W‟ has also eliminated the possibility that stormwater was
involved in the inundation, saying that the amount of rain that fell in the
vicinity on the day of the inundation was insignificant.
20. There is no need to define the word „perils‟ in the policy, as it includes a clear
list of the perils covered.
Case No: 248903 Determination Page 3 of 10
21. The policy clearly notifies the Applicant of the definition of „flood‟ and also
clearly explains that flood is excluded from cover under the defined events of
the Business Property Cover policy section.
22. In addition, the Applicant chose not to purchase the optional extension flood
cover available under the policy.
23. The Applicant‟s argument that the railway embankment stopped the flow of
water in Stable Swamp Creek is not logical and without geographical or
topographical foundation. It is also irrele vant whether or not the opposite
side of the embankment was inundated.
24. Even if the Applicant‟s assertion that the embankment stopped the flow of
water within the Creek and this water was diverted to the Applicant‟s
property as a result, this would still be deemed „flood‟.
25. Although the Applicant has assumed that the water that came up through the
stormwater system was storm (rain) water, this assumption is not supported
by the expert hydrological evidence, which clearly indicates that it was flood
water.
26. The heavy rain in Queensland in January 2011 set in motion a chain of
events that caused large scale damage to parts of the state; however , rain
was not the proximate cause of the damage to the Applicant‟s property. As
confirmed by the expert hydrological evidence, the proximate cause of the
damage was flood.
27. The Applicant has indicated that the hydrology report by „W‟ is not credible;
however, he has not provided any alternative expert evidence as rebuttal. As
such, the conclusions of the report from „W‟, w hich were drawn by a duly
qualified hydrological expert, should be accepted as evidence.
28. It would be inappropriate for the FSP to take into account the decisions of
other insurers in relation to claims made against them, or previous claims
made by the Applicant. Each claim turns on its facts and the policy coverage
afforded.
Issues
29. Whether the inundation which resulted in damage to the Applicant‟s
business property was caused by flood.
30. Whether the policy documentation clearly explains that flood is excluded
from cover.
31. Whether the FSP is required to indemnify the Applicant for the damage to his
property.
Case No: 248903 Determination Page 4 of 10
Reasons for decision
32. Due to the nature of the dispute, it has been referred to the Panel for
Determination in accordance with the Operational Guidelines to the Financial
Ombudsman Service‟s Terms of Reference.
33. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer c laims.
34. There has been an exchange of information between the parties and the
Panel is satisfied that each party has had an opportunity to address the
issues raised.
35. There is no dispute that water inundated the Applicant‟s property on 12
January 2011 and that the water emanated from the stormwater inlet pit in
the driveway of the property.
Cause of the Inundation
36. The Applicant says that stormwater surged up through the stormwater pipes
and inundated his property.
37. He argues that the railway embankment formed an impediment to the flow of
water along Stable Swamp Creek and that water back-up up through the
stormwater system.
38. He says that this is supported by the fact that no inundation occurred on the
opposite side of the railway embankment from his property.
39. The FSP states that the hydrological evidence available from „W‟ indicates
that:
It rained heavily in the days preceding the inundation of the Applicant‟s
property.
The recorded rainfall on the day of the inundation (12 January 2011)
was insignificant.
The timing of the inundation corresponds with the peak of the Brisbane
River.
40. The report from „W‟ concludes that the water that inundated the Applicant‟s
property was flood water from the Brisbane River, which back-flowed along
Stable Swamp Creek and the piped drainage system.
41. The Panel has examined the submissions from both parties, including the
hydrology report from „W‟, and the policy terms and conditions.
42. The Panel notes that the policy definition of „flood‟ is:
Case No: 248903 Determination Page 5 of 10
“the inundation of normally dry land by water escaping or released from the
normal confines of any natural watercourse or lake (whether or not they have
been altered or modified) or from any dam, reservoir or canal‟.
43. After reviewing the evidence provided in the „W‟ report, the Panel is
persuaded the Applicant‟s property was inundated by water which had
backflowed from Stable Swamp Creek.
Rainfall Around the Time of Inundation
44. The hydrology report by „W‟ shows that the rainfall after 6pm on 11 January
2011, in the vicinity of the Applicant‟s prope rty was insignificant.
45. It also shows that on the day of the inundation (12 January 2011), only 2 mm
of rain was recorded at the official rain gauge nearest to the Applicant‟s
property.
46. Further, the report states that peak stormwater run-off from the surrounding
catchment would have occurred 10 – 30 minutes after the peak rainfall.
47. As such, the Panel is satisfied that stormwater run-off would not have
affected the Applicant‟s property on 12 January 2011.
Proximate Cause of Damage
48. The Applicant says that rai n was the source of the water that inundated his
premises and resulted in the damage to his business property.
49. He has suggested that the rain which fell over other parts of south-east
Queensland (including the Lockyer Valley, and the wider Brisbane
catchment) in the lead up to the inundation, was the source of the water
which inundated his property.
50. The FSP has stated that the proximate cause of the property damage was
flood water and that although rain fell over the catchment in the lead up to
the inundation, it entered the river system, then escaped the normal confines
of that system. That, according to the policy definition, makes it flood.
51. The Panel has considered the definition of flood contained in the policy. The
Panel also notes it is established law that once rain enters and then escapes
the normal confines of a watercourse, it is considered to be floodwater.
52. It is also established law that water which escapes from a watercourse and
backflows through a drainage system onto normally dry land is also p roperly
considered to be floodwater.
53. Therefore, in this instance the Panel accepts that the proximate cause of the
damage to the Applicant‟s property was flood and not the rain that fell over
the Brisbane (and other) catchment areas in the preceding days.
Case No: 248903 Determination Page 6 of 10
Reliability of Hydrology Report
54. The FSP has provided a report titled „Water Damage Assessment‟, produced
by hydrologist „W‟, as evidence about the cause of the inundation.
55. The Applicant has said that the representative from „W‟ who wrote the report
inspected his property several weeks after the inundation, when everything
had dried out and the sun was shining. The Applicant has questioned the
reliability of the findings of the report as a result.
56. The Panel has considered the Applicant‟s concerns in this reg ard, however,
is satisfied that the timing of the inspection relative to the timing of the
inundation would not have compromised the ability of the report‟s author to
assess the cause of the inundation itself.
57. The FSP states that as the Applicant has not provided any expert
hydrological evidence to counter the findings of the report by „W‟, that report
should be accepted by the Panel as evidence as to the cause of inundation.
58. The Applicant (or at least his father, who represents him), has said that he
has 60 years of practical experience in the construction and civil engineering
industry, including dams and pumping stations, which gives him as much if
not more experience as the FSP‟s hydrologist „W‟ to identify the difference
between stormwater and flood. In support of his statement regarding his
experience, the Applicant has provided a summary of his father‟s
qualifications.
59. In addition, the Applicant has stated that his father has had some academic
exposure to hydrodynamics and was seconded to the Lord Mayo r of
Brisbane‟s recovery team following the 1974 floods.
60. The Panel accepts that the Applicant‟s father has, over the course of his
career, gained a great deal of experience in the construction and civil
engineering industry and has been accepted into various industry institutes
and associations.
61. However, the Panel also accepts that „W‟ is an established hydrology firm in
Australia, being one of three such hydrology firms jointly commissioned to
produce a report examining the cause of the flooding in Brisbane and
surrounds in January 2011, spanning five volumes.
62. The Panel notes that the report by „W‟ clearly sets out the rainfall and river
level data and a summary of the version of events as provided by the
Applicant, all of which were used in the drawing of the report‟s conclusions.
63. Importantly, the Applicant has not provided any evidence that directly
challenges any of the data in the „W‟ report, or any other part of the report.
64. Although the Applicant has provided his opinion that the water which
inundated his property was stormwater, he has not provided any data or
other information to support this opinion.
Case No: 248903 Determination Page 7 of 10
65. Accordingly, despite the Applicant‟s father‟s relevant experience and
qualifications, the Panel is not persuaded that the hydrology report by „W‟
should be set aside, or its findings regarded as unreliable.
Railway Embankment – Impediment to the Flow of Water
66. The Panel has examined the aerial photographs depicting the location of the
Applicant‟s property, the railway embankment, and Stable Swamp Creek.
67. Wh ile acknowledging the Applicant‟s opinion that the railway embankment
impeded the flow of water along Stable Swamp Creek and that this caused
the water to back up through the stormwater system, the Panel was not
persuaded by this argument.
68. Based on the evidence presented, the Panel is of the view that it would be
highly unlikely for the railway embankment to impede or block the flow of
water along the Creek.
69. However, even if the Panel were to accept the Applicant‟s argument on this
matter, the Panel is satisfied that any water that was impeded from flowing
along the creek and was forced outside the normal confines of the creek as
a result, would be defined as „flood‟ under the policy.
70. This would be so regardless of whether the creek broke its banks and flowed
overland to inundate properties, or surcharged through the stormwater
system which under normal circumstances would serve to drain stormwater
into the creek.
71. Further, the Panel is not convinced that inundation occurring on one side (ie:
the Applicant‟s side) of the railway embankment, while the opposite side
remains without any inundation, is of any relevance in establishing the cause
of the inundation.
Recognition of Storm water Backflow Issue
72. The Applicant has indicated that his view that it was stormwater that
backflowed through the stormwater system to inundate his property is
supported by the acknowledgement by the Lord Mayor of Brisbane of the
issue.
73. He says that the Lord Mayor has initiated a program to install back flow
valves on problem drains.
74. The FSP assumes that the Applicant is referring to comments made by the
Lord Mayor of Brisbane in October 2011 following the release of a
preliminary report titled „Brisbane Backflow Prevention Measures
Investigation Pre Feasibility Study Volume 1 Report‟ („the Backflow Report‟).
75. The FSP says that it is important to take comments of the Lord Mayor in the
context of the Backflow Report. It is also important to recognise, the FSP
says, that the Backflow Report was intended to address the need for an
Case No: 248903 Determination Page 8 of 10
investigation into the management of backflow inundation and that it is not a
report into the cause of the January 2011 flood event.
76. Further, the FSP says that the Backflow Report actually supports its position
regarding the dispute with the Applicant.
77. The FSP argues that the process of floodwater surcharging from the
river/creek through the stormwater drainage system, which allowed this
floodwater to inundate surrounding properties including the Applicant‟s, is
demonstrated by the Backflow Report.
78. The Panel has reviewed the submissions of both parties on this matter and
is not persuaded that either the Lord Mayor‟s comments, or the Backflow
Report, support the Applicant‟s position that stormwater was the cause of the
inundation.
79. The Panel is of the view that the Backflow Report explains how water
escaped the normal confines of a watercourse (in this case Stable Swamp
Creek) and supports the evidence provided by the FSP and the hydrologist
„W‟.
Applicant’s Previous Claim for Water Inundation
80. The Applicant says that he had a claim for damage to his business property
in 2001, caused by inundation in similar circumstances to the claim in
dispute.
81. The 2001 claim was accepted by the insurer as stormwater damage and
therefore the FSP should accept his disputed claim, according to the
Applicant.
82. The FSP has argued that it would not be appropriate for it to consider the
acceptance or otherwise of the Applicant‟s 2001 claim when making its
decision about the disputed claim.
83. The FSP says that each claim is considered against its individual
circumstances and the terms and conditions of the policy in force. Further, it
is not aware of the terms of the policy or the circumstances of cover held by
the Applicant at that time.
84. The Panel agrees with the FSP on this point. The circ umstances of the two
claims cannot be compared, the policy terms and conditions relevant to the
two claims cannot be compared and the basis of the decision of the insurer
for the 2001 claim is not known.
85. The Panel finds that the acceptance of the 2001 claim by the relevant insurer
is not relevant to the decision regarding this dispute.
Case No: 248903 Determination Page 9 of 10
Claims for Owners of Neighbouring Properties
86. The Applicant has indicated the claims made by owners of neighbouring
properties, who were affected by the same inundation event and had similar
policies, have been accepted by their insurers.
87. The Applicant says that this supports his view that the FSP should accept his
claim.
88. The FSP argues that it would be inappropriate to have consideration for the
claim decisions for neighbouring property owners when making a decision
about the Applicant‟s claim. Although the circumstances of the claims may
be similar, the policies cannot be compared and the bases for the claims‟
acceptances are not known.
89. The Panel agrees with the FSP on this point, and finds that the decisions of
insurers of neighbouring properties, for claims made against them, are
irrelevant to this dispute.
Clarity of Policy Documentation and Wording
90. The Applicant referred to the use of the term „peril‟ on the schedule of
insurance provided to him when describing the cover he purchased and says
that this term is not explained anywhere in the policy wording he received.
91. The Applicant has also pointed out that the schedule of insurance does not
show that flood cover is either „taken‟ or „not taken‟, in line with the format of
the „Cover Summary‟ section of the schedule of insurance.
92. The FSP argues that there is no need to specifically explain the term peril,
as there is a list of perils provided in the policy.
93. The Panel has reviewed the policy documentation, including the schedule of
insurance and the policy wording.
94. The Panel finds that the policy definition for „flood‟ is clear.
95. It would seem that the various covers summarised on schedule of insurance
correspond, for the most part, to sections within the policy wording which
describe the terms and conditions relevant to those covers.
96. However, several covers listed on the schedule of insurance do not
necessarily correspond to sections within the policy wording.
97. An example is „fire and peril‟ cover, which is listed as „taken‟ on the
Applicant‟s schedule of insurance, but is not described under any section of
the policy. Rather, the policy covers are noted under the heading “Defined
events [cover]”.
98. Based on the Applicant‟s policy documentation, the Panel is of the view that
a reasonable person would likely be confused as to what cover was in force.
Case No: 248903 Determination Page 10 of 10
99. However, the Applicant has arranged his cover through a broker who
operated as his agent for the purposes of this policy. As such, had the
Applicant had any issues with the extent of scope of his cover, or if the
covers provided had failed to meet his needs that is a matter between the
Applicant and his broker. Further, the broker accepted the cover offered on
the Applicant‟s behalf.
100. I n any event, the Applicant in his submission notes “1. The Applicant did
chose (sic) not to take flood cover as a precedent was set by most insurers
in 2001 stating that water backing up from the storm water drains was
without doubt “storm water”.”
101. Having considered all of the evidence, the Panel determines that the
proximate cause of the Applicant‟s loss was flood.
102. Further, the FSP is entitled to rely on its policy wording which specifically
excludes flood.
103. The Panel therefore determines that the FSP was entitled to deny liability for
the Applicant‟s claim.
Determination
104. On the basis of the available information the Panel determines that the FSP
is not required to indemnify the Applicant for the damage to his business
property.