Home / Financial Firm (Unknown - Insurer) / Determination 248895
Determination 248895
Flood damage claim declined; dispute over whether water was stormwater runoff or flood
Summary
The Applicants' Charlton home and sheds were flooded in January 2011 and the FSP declined the claim as flood. AFCA found the early stormwater runoff inundating the sheds was covered, and ordered indemnity for 200mm of shed loss, but water from an overflowing drain that entered the house was flood and excluded, with interest if cash settled.
Water escaping a modified natural watercourse falls within the policy definition of flood, while the earlier stormwater runoff to the sheds was covered.
Issues
- Claim denial primary · upheld
“the FSP must indemnify the Applicants for the initial stormwater inundation to the sheds but is not required to indemnity for the loss arising from the inundation of the house”
- Product terms interpretation secondary · upheld
“the storm water drain is a modified natural water course ... and water escaping from that drain would properly be described as flood”
Subjects and remedies
home or building damagenatural disasterpay claimpay interest
Text of the determination
Case No: 248895 Determination Page 1 of 8
Case number: 248895
General Insurance – Domestic Insurance – Home Building – FSP Decision –
Denial of claim (Flood)
27 November 2012
Background
1. The Applicants held an insurance policy with the Financial Services Provider
(FSP) for their home and contents. The relevant period of insurance
operated for twelve months beginning on 19 March 2010.
2. The property was inundated by water on or about 14 January 2011 following
extreme weather events in western Victoria. The Applicants lodged a claim
under the policy for the damage sustained.
3. The FSP denied the claim on the basis it was due to flood as defined by its
policy. The Applicants have disputed this.
4. Both the Applicants and the FSP have provided detailed and lengthy
submissions on the relevant issues. For the sake of brevity, the Panel will
summarise these submissions given all of the material made available has
been exchanged with the other party.
Summary of Applicants ’ position
5. The Applicants have argued the following in disputing the FSP’s decision:
The water that entered their property occurred during the early morning
on 14 January 2011 and was clear. The water originated from the
paddocks south of the township and reached a height of approximately
60cm. As such, this was stormwater runoff. They have provided aerial
photographs of the paddocks taken at approximately 6.30pm on 14
January 2011 to corroborate this submission.
River water did not enter the property until late that evening, at around
8.00pm, when it created a surge. This water was dirty, came from
Avoca River and contained sewerage.
They have identified various discrepancies in the FSP’s hydrologist’s
report based on both their observations and experience of the area.
The latter is due to the fact they have resided in the township for
Determination
Case No: 248895 Determination Page 2 of 8
approximately 50 years and have experienced a number of other
floods.
6. The Applicants therefore seek to be indemnified for their losses.
Summary of FSP’s position
7. The FSP substantively relies upon the hydrologist’s evidence it has procured
and the following policy provisions to deny the Applicants’ claim:
“ Words with special meaning
There are some words in the Policy that have a special meaning. These
words and their meanings are listed below. …
“Flood” means the inundation of normally dry land by water escaping, or being
released from, the normal confines of a reservoir, natural watercourse or lake
(whether or not they have been altered or modified). Flood also includes water
discharge from any sewerage or waste water systems due to pressure
induced by flood water.
…
Section A – Home Cover
All Subsections
What you are not insured for
Under Section A – Home Cover we will not pay for: …
2. Loss of or damage to your property caused by:
a. Flood”
Issue
8. Whether the FSP is entitled to deny the Applicants’ claim on the basis it was
due to flood.
Reasons for decision
9. Due to the nature of the dispute, FOS has considered it appropriate to refer
the dispute directly to the Panel in accordance with clause 8.6 of the FOS
Terms of Reference. This dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
10. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
11. The Panel Chair Ombudsman and a Panel member met on site with the
Applicants and a representative of the FSP.
Case No: 248895 Determination Page 3 of 8
12. The Applicants have indicated that they did not recall observing the latest
copy of the FSP’s policy. However, the Panel notes that the Applicants:
have never stated they did not receive any policy, and
they state that they were aware they were not covered for river
flooding.
13. Instead, the Applicants maintain their claim should be payable because it
was due to stormwater runoff inundation.
14. Accordingly, the substantive issue in dispute is whether the water which
entered the Applicants’ property was stormwater runoff or “Flood” as defined
by the policy.
Water Inundation
15. The FSP has provided two hydrology reports, one that was focused on the
town in general and another tha t considered the Applicants’ property
specifically. The latter report was dated 28 November 2011 and incorporated
the comments contained in the initial report. This report contained the
following relevant remarks:
The property is located along J Street and is approximately 1km east of
Avoca River and 1.2km west of Yeungroon Creek.
Although no site inspection was conducted, the following factors were
taken into consideration:
Flooding began on the morning of 14 January and receded by 15
to 16 January
The property was flooded by clear water
During the September 2010 flood event, J Street was last to be
affected but in the January event, it was the first
The dam, being the feedlot to the south of J Street, broke through
its embankments
Water was travelling very quickly from the south western end of J
Street to north eastern (sic)
Heavy rainfall was experienced in Charlton between 10 and 14 January
2011 based on the daily rainfall station in the township. The rainfall
data indicates the township received its largest total on 13 January
2011 with 66mm collected by 9.00am on 14 January 2011. The
township’s most intense rainfall was experienced in the morning of 11
January 2011 and early morning on 13 January 2011.
The peak flood level of 8.05m AHD was reached early morning on 15
January 2011, at least two days after the most intense rainfall.
Given the timing of the flooding at the eastern edge of town is similar to
that of the gauged readings, it is suggested the Yeungroon Creek and
Avoca River flows merged south of the town to become one system.
Case No: 248895 Determination Page 4 of 8
Any flooding that occurred after lunchtime [13 January 2011] can be
directly attributed to Avoca River and/or Yeungroon Creek flooding.
The flow coming from the south west of Charlton and affecting the
property has originated from water overflowing the normal confines of
Yeungroon Creek south-west of the township.
16. An email dated 17 October 2011 was also provided by the author of the first
report who stated the following:
“… and constructed a full hydraulic model of the catc hment and township.
This model confirms our opinion and shows that:
Preliminary hydraulic modelling confirms the flow mechanism that occurred
during the event. The Yeungroon Creek catchment responded more quickly to
the rainfall on the Thursday and Friday. At around 8 am [14 January 2011] the
peak extent of Yeungroon Creek was reached …
It is noted that at this time, most of the town remained out of the main flood
extent with some local runoff pooling at shallow depths throughout the town.
The flow depths in Yeungroon Creek are not expected to have impacted
anywhere west of [K] Street. Waters from Yeungroon Creek in the area to the
east of [K] Street would have been up to 150mm deep on the east side of [K]
Street and between 0.5m and 1m deep further the east, between there and
[BSA] Road.
After this, flows in Yeungroon Creek began to subside and the Avoca River
increased. From around 5pm, local reports say the river began to rise rapidly.
This is consistent with the gauge data and model. From around 6pm houses
in the township were inundated with the river peaking in the early hours of
Saturday morning.”
17. Based on this, the hydrologist in the second report concluded the following:
“Flood damage at [number] J Street occurred as a direct result of flood flows
spi lling from Yeungroon Creek.”
18. The Applicants have strongly disputed the hydrologist’s findings, particularly
based on the following:
The water that initially inundated the property was clear as it was
stormwater runoff coming from the paddocks south of the township.
Further, these paddocks take days to drain, hence the stormwater
runoff and pooling they observed.
In their experience, Yeungroon Creek has never merged with the
Avoca River south of the township. Instead, this occurs well past
Charlton at a place commonly known as the Sheepwash.
They have witnessed several floods having farmed south of the
township for over 50 years and often having to anticipate potential
rainfall and water flows. Accordingly, they have clear local knowledge
of where the water would come from and from which direction at the
time of the inundation.
The FSP paid a nearby neighbour’s claim for damage to stored goods
in a shed which was constructed on a slab similar to their home.
Case No: 248895 Determination Page 5 of 8
The male Applicant and the Applicants’ grandson had driven along BSA
Road around 2.00pm on 14 January 2011 to determine where the
water was coming from. This road runs south to the property and they
drove for 5km before being blocked by a dam which had overflowed.
19. In relation to a claim paid for a nearby neighbour, the Panel cannot accept
this evidence. Without being privy to the particular facts and circumstances
relevant to that case, such as the terms of the insurance contract, the
location of the shed and the timing of the inundation, the Panel has little
probative basis to accept this as persuasive evidence for the FSP to pay for
this claim. Accordingly, the Panel will limit its review to the facts and
circumstances particular to this dispute.
20. The Panel accepts the FSP’s argument that the Applicants’ kn owledge and
experience of the local area does not infer that they have ability to provide a
hydrological opinion. Pursuant to established rules of evidence, a person’s
opinion is generally inadmissible unless it is wholly or substantively based on
specialised knowledge acquired through training, study or experience.
21. Although the Panel accepts the Applicants have a long standing familiarity
with the local geography and previous flooding events, the Panel does not
accept this in itself provides them with the necessary training, study or
experience to provide an expert opinion as to the potential water flows during
the extreme weather events. Such expertise would require substantive
training and experience as rainfall, river flows and weather events would
differ each time. Further, an appropriately qualified expert would be required
to have the necessary skills and training to carefully analyse and interpret all
of the rainfall data, topography and drainage characteristics before
reasonably being able to reconstruct how and where the water came from in
a flood.
22. Given this, the Panel considers the Applicants’ admissible evidence would
be limited to their actual observations of the day. Further, the Panel accepts
that a hydrologist is appropriately qualified and has the necessary
specialised knowledge to examine and report on the likely cause of the water
inundation following severe weather events. It therefore follows that his
opinion in this regard would be admissible and taken into consideration.
23. It does not necessarily follow though that his opinion should be accepted on
face value. Other factors will need to be considered, such as whether the
reasoning and logic leading to the conclusion is consistent to the various
facts and circumstances.
24. The Applicants have stated they observed water initially inundating their
property from the paddocks south of the township at around 8.00am on 14
January 2011. Further, these waters were clear.
25. The Panel Chair Ombudsman and Panel Member met with the Applicants on
site in order to gain a more complete understanding of the circumstances of
the inundation. They advised that there was water on their property at about
8.00am on 14 January 2011. Water came into the shed on the property at
Case No: 248895 Determination Page 6 of 8
about 1.00pm on 14 January 2011 and water came into the house at about
4.00pm on 14 January 2011.
26. The Applicants describe the water coming from the rear or north of the
property but originating from the paddock south of the township.
27. The Applicants have also indicated that at around 2.00 -3.00pm on 14
January 2011, the male Applicant and the Applicants’ grandson were able to
drive along BSA Road, which is south of their property, for approximately
5km before being blocked by water that overflowed.
28. The Applicants are unable to clarify specifically where the water came from
during the initial inundation. Although they observed water coming from the
south of the township through the paddocks, their evidence does not
specifically address whether this water path could have originated all the
way to the Yeungroon Creek further south. Their evidence is limited to the
fact that it came south of the township.
29. The evidence from the hydrologist is that the Charlton township received its
largest total of rainfall on the Thursday with 66mm collected on the Friday 14
January 2011 morning at 9.00am. Thus, there was evidence of heavy rain on
the morning of 14 January 2011.
30. The uncontested onsite evidence of the Applicants is that there was water on
the property at 8.00am, water in the shed at 1.00pm and water in the ho use
at 4.00pm.
31. Given all the evidence presented, the Panel is satisfied on the balance of
probabilities that the water on the property at 8.00am and the water in the
shed at 1.00pm was rainfall and/or storm water run-off. The Panel is satisfied
that the loss arising from this inundation is covered by the terms of the
policy.
32. With respect to the inundation that occurred in the evening of 14 January
2011, both parties accept this water came from the Avoca River breaking its
banks. Accordingly, it is clear this water falls within the policy definition of
“Flood”.
33. The Applicants have provided uncontradicted evidence that water did not
enter the house until 4.00pm. The Panel needs to consider the origin of this
water.
34. During the course of the onsite visit, the Applicants described how they went
to the rear of the property and observed that the stormwater drain, situated
behind (to the north of) their property, was unable to cope with the flow of the
water which overflowed the banks and flowed into the rear of the Applicants’
property and that this was the water that entered the house at approximately
4.00pm.
Case No: 248895 Determination Page 7 of 8
35. The Applicants advised that water had come from the paddocks to the south
of the town and proceeded along this stormwater drain and came on to the
Applicants’ property.
36. The Panel has considered whether this water can properly be regarded as
flood within the terms of the policy.
37. The Panel notes that to comply with the definition as detailed under the
policy, in order to be regarded as flood, the water must escape or be
released from the normal confines of a reservoir, natural watercourse or lake
(whether or not they have been altered or modified).
38. The FSP has not addressed this issue within the submissions to the Service.
39. The Panel Chair Ombudsman and the Panel Member had the opportunity to
observe the storm water drain when they attended on site.
40. The storm water drain is a man made construction which the Applicants say
is to drain water to a dam to the north east of the town.
41. The Panel Chair Ombudsman observed that the drain to the rear of the
Applicants ’ property is a defined channel and has banks. The drain runs
approximately west to east where culverts direct water under High Street.
42. The Panel has also given consideration to Figure 7.1 from the FSP’s
hydrology report, 28 November 2011. This figure shows the historical flow of
flood water during previous floods. The depiction of the flow of water from
the south, south/west of town is consistent with the evidence of the
Applicants.
43. The Panel also notes that the water flow is along the same course as the
stormwater drain that runs to the rear of the Applicants ’ property.
44. The Panel is satisfied that these consistencies support its position that the
stormwater drain is a modified natural watercourse.
45. Having viewed the storm water drain and considered the terms of the policy,
the Panel is satisfied that the storm water drain is a modified natural water
course (whether or not it has been altered or modified) as defined by the
terms of the policy and water escaping from that drain would properly be
described as flood.
46. During the course of the on site visit, the Applicants gave clear eyewitness
evidence to the Panel Chair Ombudsman and Panel Member to the effect
that they observed this storm water drain, to the rear of their property, being
unable to cope with the flow of water. They further observed water
overflowing the banks of this storm water drain and flowing on to their
property.
47. As such and given the evidence of the Applicants, the Panel is satisfied that
the water which inundated the Applicants’ home at 4.00pm on 14 January
Case No: 248895 Determination Page 8 of 8
2011 is property categorised as flood water as it came from a modified
natural watercourse.
48. The Panel has looked at a number of properties in the Charlton area
following the January 2011 storm events. In each case, the Panel has been
heavily influenced by the eyewitness testimony, when available, of the
individual circumstances applicable to each property.
49. In this matter, the Applicants have described to the Panel, in some detail, the
actual course of events, whereby during the afternoon, water came from the
rear of the property as a result of the storm water drain which is located
immediately behind their property being unable to cope with the heavy flow
of water.
50. In the Panel’s view, the descrip tion given by the Applicants is caught by the
specific flood exclusion contained within the policy.
51. The result is that the Panel is satisfied that the FSP must indemnify the
Applicants for the initial stormwater inundation to the sheds but is not
required to indemnity for the loss arising from the inundation of the house.
52. The Applicants described and the Panel Chair Ombudsman and Panel
Member observed the house to be on a slab perhaps 100mm above ground
level with the sheds perhaps 200mm lower.
53. Exercising its mandate to do what is fair in all the circumstances, the Panel
determines that the FSP is to indemnify the Applicants for their loss arising
from 200mm of inundation within the sheds.
54. The Panel encourages the parties to work together to achieve a satisfactory
outcome within the terms of this Determination.
Determination
55. On the basis of the available information the Panel determines that the FSP
is to compensate the Applicants for their loss arising from the inundation of
the shed to 200mm on 14 January 2011.
56. The Panel determines that the FSP is not required to compensate the
Applicants for further loss.
57. The Panel determines that if any of this claim is to be cash settled, then the
FSP is to pay interest at the rate specified by the Insurance Contracts Act
from the date of denial of the claim to the date of settlement.