Home / Financial Firm (Unknown - Insurer) / Determination 248895

Determination 248895

Flood damage claim declined; dispute over whether water was stormwater runoff or flood

FirmFinancial Firm (Unknown - Insurer)
Decided2013-01-29
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The Applicants' Charlton home and sheds were flooded in January 2011 and the FSP declined the claim as flood. AFCA found the early stormwater runoff inundating the sheds was covered, and ordered indemnity for 200mm of shed loss, but water from an overflowing drain that entered the house was flood and excluded, with interest if cash settled.

Water escaping a modified natural watercourse falls within the policy definition of flood, while the earlier stormwater runoff to the sheds was covered.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 248895 Determination Page 1 of 8 Case number: 248895 General Insurance – Domestic Insurance – Home Building – FSP Decision – Denial of claim (Flood) 27 November 2012 Background 1. The Applicants held an insurance policy with the Financial Services Provider (FSP) for their home and contents. The relevant period of insurance operated for twelve months beginning on 19 March 2010. 2. The property was inundated by water on or about 14 January 2011 following extreme weather events in western Victoria. The Applicants lodged a claim under the policy for the damage sustained. 3. The FSP denied the claim on the basis it was due to flood as defined by its policy. The Applicants have disputed this. 4. Both the Applicants and the FSP have provided detailed and lengthy submissions on the relevant issues. For the sake of brevity, the Panel will summarise these submissions given all of the material made available has been exchanged with the other party. Summary of Applicants ’ position 5. The Applicants have argued the following in disputing the FSP’s decision:  The water that entered their property occurred during the early morning on 14 January 2011 and was clear. The water originated from the paddocks south of the township and reached a height of approximately 60cm. As such, this was stormwater runoff. They have provided aerial photographs of the paddocks taken at approximately 6.30pm on 14 January 2011 to corroborate this submission.  River water did not enter the property until late that evening, at around 8.00pm, when it created a surge. This water was dirty, came from Avoca River and contained sewerage.  They have identified various discrepancies in the FSP’s hydrologist’s report based on both their observations and experience of the area. The latter is due to the fact they have resided in the township for Determination Case No: 248895 Determination Page 2 of 8 approximately 50 years and have experienced a number of other floods. 6. The Applicants therefore seek to be indemnified for their losses. Summary of FSP’s position 7. The FSP substantively relies upon the hydrologist’s evidence it has procured and the following policy provisions to deny the Applicants’ claim: “ Words with special meaning There are some words in the Policy that have a special meaning. These words and their meanings are listed below. … “Flood” means the inundation of normally dry land by water escaping, or being released from, the normal confines of a reservoir, natural watercourse or lake (whether or not they have been altered or modified). Flood also includes water discharge from any sewerage or waste water systems due to pressure induced by flood water. … Section A – Home Cover All Subsections What you are not insured for Under Section A – Home Cover we will not pay for: … 2. Loss of or damage to your property caused by: a. Flood” Issue 8. Whether the FSP is entitled to deny the Applicants’ claim on the basis it was due to flood. Reasons for decision 9. Due to the nature of the dispute, FOS has considered it appropriate to refer the dispute directly to the Panel in accordance with clause 8.6 of the FOS Terms of Reference. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 10. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 11. The Panel Chair Ombudsman and a Panel member met on site with the Applicants and a representative of the FSP. Case No: 248895 Determination Page 3 of 8 12. The Applicants have indicated that they did not recall observing the latest copy of the FSP’s policy. However, the Panel notes that the Applicants:  have never stated they did not receive any policy, and  they state that they were aware they were not covered for river flooding. 13. Instead, the Applicants maintain their claim should be payable because it was due to stormwater runoff inundation. 14. Accordingly, the substantive issue in dispute is whether the water which entered the Applicants’ property was stormwater runoff or “Flood” as defined by the policy. Water Inundation 15. The FSP has provided two hydrology reports, one that was focused on the town in general and another tha t considered the Applicants’ property specifically. The latter report was dated 28 November 2011 and incorporated the comments contained in the initial report. This report contained the following relevant remarks:  The property is located along J Street and is approximately 1km east of Avoca River and 1.2km west of Yeungroon Creek.  Although no site inspection was conducted, the following factors were taken into consideration:  Flooding began on the morning of 14 January and receded by 15 to 16 January  The property was flooded by clear water  During the September 2010 flood event, J Street was last to be affected but in the January event, it was the first  The dam, being the feedlot to the south of J Street, broke through its embankments  Water was travelling very quickly from the south western end of J Street to north eastern (sic)  Heavy rainfall was experienced in Charlton between 10 and 14 January 2011 based on the daily rainfall station in the township. The rainfall data indicates the township received its largest total on 13 January 2011 with 66mm collected by 9.00am on 14 January 2011. The township’s most intense rainfall was experienced in the morning of 11 January 2011 and early morning on 13 January 2011.  The peak flood level of 8.05m AHD was reached early morning on 15 January 2011, at least two days after the most intense rainfall.  Given the timing of the flooding at the eastern edge of town is similar to that of the gauged readings, it is suggested the Yeungroon Creek and Avoca River flows merged south of the town to become one system. Case No: 248895 Determination Page 4 of 8  Any flooding that occurred after lunchtime [13 January 2011] can be directly attributed to Avoca River and/or Yeungroon Creek flooding.  The flow coming from the south west of Charlton and affecting the property has originated from water overflowing the normal confines of Yeungroon Creek south-west of the township. 16. An email dated 17 October 2011 was also provided by the author of the first report who stated the following: “… and constructed a full hydraulic model of the catc hment and township. This model confirms our opinion and shows that: Preliminary hydraulic modelling confirms the flow mechanism that occurred during the event. The Yeungroon Creek catchment responded more quickly to the rainfall on the Thursday and Friday. At around 8 am [14 January 2011] the peak extent of Yeungroon Creek was reached … It is noted that at this time, most of the town remained out of the main flood extent with some local runoff pooling at shallow depths throughout the town. The flow depths in Yeungroon Creek are not expected to have impacted anywhere west of [K] Street. Waters from Yeungroon Creek in the area to the east of [K] Street would have been up to 150mm deep on the east side of [K] Street and between 0.5m and 1m deep further the east, between there and [BSA] Road. After this, flows in Yeungroon Creek began to subside and the Avoca River increased. From around 5pm, local reports say the river began to rise rapidly. This is consistent with the gauge data and model. From around 6pm houses in the township were inundated with the river peaking in the early hours of Saturday morning.” 17. Based on this, the hydrologist in the second report concluded the following: “Flood damage at [number] J Street occurred as a direct result of flood flows spi lling from Yeungroon Creek.” 18. The Applicants have strongly disputed the hydrologist’s findings, particularly based on the following:  The water that initially inundated the property was clear as it was stormwater runoff coming from the paddocks south of the township. Further, these paddocks take days to drain, hence the stormwater runoff and pooling they observed.  In their experience, Yeungroon Creek has never merged with the Avoca River south of the township. Instead, this occurs well past Charlton at a place commonly known as the Sheepwash.  They have witnessed several floods having farmed south of the township for over 50 years and often having to anticipate potential rainfall and water flows. Accordingly, they have clear local knowledge of where the water would come from and from which direction at the time of the inundation.  The FSP paid a nearby neighbour’s claim for damage to stored goods in a shed which was constructed on a slab similar to their home. Case No: 248895 Determination Page 5 of 8  The male Applicant and the Applicants’ grandson had driven along BSA Road around 2.00pm on 14 January 2011 to determine where the water was coming from. This road runs south to the property and they drove for 5km before being blocked by a dam which had overflowed. 19. In relation to a claim paid for a nearby neighbour, the Panel cannot accept this evidence. Without being privy to the particular facts and circumstances relevant to that case, such as the terms of the insurance contract, the location of the shed and the timing of the inundation, the Panel has little probative basis to accept this as persuasive evidence for the FSP to pay for this claim. Accordingly, the Panel will limit its review to the facts and circumstances particular to this dispute. 20. The Panel accepts the FSP’s argument that the Applicants’ kn owledge and experience of the local area does not infer that they have ability to provide a hydrological opinion. Pursuant to established rules of evidence, a person’s opinion is generally inadmissible unless it is wholly or substantively based on specialised knowledge acquired through training, study or experience. 21. Although the Panel accepts the Applicants have a long standing familiarity with the local geography and previous flooding events, the Panel does not accept this in itself provides them with the necessary training, study or experience to provide an expert opinion as to the potential water flows during the extreme weather events. Such expertise would require substantive training and experience as rainfall, river flows and weather events would differ each time. Further, an appropriately qualified expert would be required to have the necessary skills and training to carefully analyse and interpret all of the rainfall data, topography and drainage characteristics before reasonably being able to reconstruct how and where the water came from in a flood. 22. Given this, the Panel considers the Applicants’ admissible evidence would be limited to their actual observations of the day. Further, the Panel accepts that a hydrologist is appropriately qualified and has the necessary specialised knowledge to examine and report on the likely cause of the water inundation following severe weather events. It therefore follows that his opinion in this regard would be admissible and taken into consideration. 23. It does not necessarily follow though that his opinion should be accepted on face value. Other factors will need to be considered, such as whether the reasoning and logic leading to the conclusion is consistent to the various facts and circumstances. 24. The Applicants have stated they observed water initially inundating their property from the paddocks south of the township at around 8.00am on 14 January 2011. Further, these waters were clear. 25. The Panel Chair Ombudsman and Panel Member met with the Applicants on site in order to gain a more complete understanding of the circumstances of the inundation. They advised that there was water on their property at about 8.00am on 14 January 2011. Water came into the shed on the property at Case No: 248895 Determination Page 6 of 8 about 1.00pm on 14 January 2011 and water came into the house at about 4.00pm on 14 January 2011. 26. The Applicants describe the water coming from the rear or north of the property but originating from the paddock south of the township. 27. The Applicants have also indicated that at around 2.00 -3.00pm on 14 January 2011, the male Applicant and the Applicants’ grandson were able to drive along BSA Road, which is south of their property, for approximately 5km before being blocked by water that overflowed. 28. The Applicants are unable to clarify specifically where the water came from during the initial inundation. Although they observed water coming from the south of the township through the paddocks, their evidence does not specifically address whether this water path could have originated all the way to the Yeungroon Creek further south. Their evidence is limited to the fact that it came south of the township. 29. The evidence from the hydrologist is that the Charlton township received its largest total of rainfall on the Thursday with 66mm collected on the Friday 14 January 2011 morning at 9.00am. Thus, there was evidence of heavy rain on the morning of 14 January 2011. 30. The uncontested onsite evidence of the Applicants is that there was water on the property at 8.00am, water in the shed at 1.00pm and water in the ho use at 4.00pm. 31. Given all the evidence presented, the Panel is satisfied on the balance of probabilities that the water on the property at 8.00am and the water in the shed at 1.00pm was rainfall and/or storm water run-off. The Panel is satisfied that the loss arising from this inundation is covered by the terms of the policy. 32. With respect to the inundation that occurred in the evening of 14 January 2011, both parties accept this water came from the Avoca River breaking its banks. Accordingly, it is clear this water falls within the policy definition of “Flood”. 33. The Applicants have provided uncontradicted evidence that water did not enter the house until 4.00pm. The Panel needs to consider the origin of this water. 34. During the course of the onsite visit, the Applicants described how they went to the rear of the property and observed that the stormwater drain, situated behind (to the north of) their property, was unable to cope with the flow of the water which overflowed the banks and flowed into the rear of the Applicants’ property and that this was the water that entered the house at approximately 4.00pm. Case No: 248895 Determination Page 7 of 8 35. The Applicants advised that water had come from the paddocks to the south of the town and proceeded along this stormwater drain and came on to the Applicants’ property. 36. The Panel has considered whether this water can properly be regarded as flood within the terms of the policy. 37. The Panel notes that to comply with the definition as detailed under the policy, in order to be regarded as flood, the water must escape or be released from the normal confines of a reservoir, natural watercourse or lake (whether or not they have been altered or modified). 38. The FSP has not addressed this issue within the submissions to the Service. 39. The Panel Chair Ombudsman and the Panel Member had the opportunity to observe the storm water drain when they attended on site. 40. The storm water drain is a man made construction which the Applicants say is to drain water to a dam to the north east of the town. 41. The Panel Chair Ombudsman observed that the drain to the rear of the Applicants ’ property is a defined channel and has banks. The drain runs approximately west to east where culverts direct water under High Street. 42. The Panel has also given consideration to Figure 7.1 from the FSP’s hydrology report, 28 November 2011. This figure shows the historical flow of flood water during previous floods. The depiction of the flow of water from the south, south/west of town is consistent with the evidence of the Applicants. 43. The Panel also notes that the water flow is along the same course as the stormwater drain that runs to the rear of the Applicants ’ property. 44. The Panel is satisfied that these consistencies support its position that the stormwater drain is a modified natural watercourse. 45. Having viewed the storm water drain and considered the terms of the policy, the Panel is satisfied that the storm water drain is a modified natural water course (whether or not it has been altered or modified) as defined by the terms of the policy and water escaping from that drain would properly be described as flood. 46. During the course of the on site visit, the Applicants gave clear eyewitness evidence to the Panel Chair Ombudsman and Panel Member to the effect that they observed this storm water drain, to the rear of their property, being unable to cope with the flow of water. They further observed water overflowing the banks of this storm water drain and flowing on to their property. 47. As such and given the evidence of the Applicants, the Panel is satisfied that the water which inundated the Applicants’ home at 4.00pm on 14 January Case No: 248895 Determination Page 8 of 8 2011 is property categorised as flood water as it came from a modified natural watercourse. 48. The Panel has looked at a number of properties in the Charlton area following the January 2011 storm events. In each case, the Panel has been heavily influenced by the eyewitness testimony, when available, of the individual circumstances applicable to each property. 49. In this matter, the Applicants have described to the Panel, in some detail, the actual course of events, whereby during the afternoon, water came from the rear of the property as a result of the storm water drain which is located immediately behind their property being unable to cope with the heavy flow of water. 50. In the Panel’s view, the descrip tion given by the Applicants is caught by the specific flood exclusion contained within the policy. 51. The result is that the Panel is satisfied that the FSP must indemnify the Applicants for the initial stormwater inundation to the sheds but is not required to indemnity for the loss arising from the inundation of the house. 52. The Applicants described and the Panel Chair Ombudsman and Panel Member observed the house to be on a slab perhaps 100mm above ground level with the sheds perhaps 200mm lower. 53. Exercising its mandate to do what is fair in all the circumstances, the Panel determines that the FSP is to indemnify the Applicants for their loss arising from 200mm of inundation within the sheds. 54. The Panel encourages the parties to work together to achieve a satisfactory outcome within the terms of this Determination. Determination 55. On the basis of the available information the Panel determines that the FSP is to compensate the Applicants for their loss arising from the inundation of the shed to 200mm on 14 January 2011. 56. The Panel determines that the FSP is not required to compensate the Applicants for further loss. 57. The Panel determines that if any of this claim is to be cash settled, then the FSP is to pay interest at the rate specified by the Insurance Contracts Act from the date of denial of the claim to the date of settlement.