Text of the determination
Case No: 248452 Determination Page 1 of 11
Case number: 248452
General Insurance - Domestic Insurance - Home Building - FSP Decision –
Flood - Denial of claim-Exclusion/ condition – Clearly Inform - Section 35
Insurance Contracts Act 1984
17 April 2012
Background
1. The Applicant held a Home Insurance Policy (the policy) with the Financial
Services Provider (FSP) issued through the FSP‟s agents “N”.
2. The insured property suffered damage consequent upon the Queensland
extreme weather events in early 2011 arising from water inundation on 11
January 2011.
3. The FSP declined the Applicant‟s claim on the basis that the inundation of
the property was due to the event “Flood”, which is specifically excluded
under the policy.
4. The Applicant remains dissatisfied with the FSP‟s decisio n to decline the
claim and is seeking complete indemnity under the policy.
Summary of Applicant’s position
5. In disputing the FSP‟s decision to decline the claim, the Applicant has sought
legal representation by “L”. For the purpose of this determination bot h these
parties will be referred to as the “Applicant”.
6. On 11 January 2011 the Applicant‟s property, located in a rural area, was
affected by severe storms in the area. The property was quickly inundated
after the occurrence of these storms. The insured property, including other
neighbouring properties, had been affected in a similar manner previously in
2008, and for which their claims (including the Applicant‟s by the FSP) were
accepted as storm damage.
7. The FSP has not considered the Applicant‟s submissio n and therefore she
remains dissatisfied with its response submitted to the Service. The
Applicant continues to rely on the following arguments:
The Applicant was induced by her financial institution (N) and agent of
the FSP, to take out the policy with the FSP.
Determination
Case No: 248452 Determination Page 2 of 11
The damage to the insured property was caused by stormwater and
rain. These are included events under the policy.
The Unnamed Gully “UG” referred to by the FSP does not have defined
banks, bed nor regularly conveys water from one place to another.
Accordingly, it is not a watercourse, lake or lagoon whether altered or
modified, or any reservoir, canal or lake as defined within the policy.
The FSP, through previous decisions, caused the Applicant to assume
that she held the appropriate cover under the policy and that this
damage caused to her property would be covered.
The insured property was inundated at approximately 8.30am with peak
inundation levels occurring at approximately 2.00pm. There were two
major bursts of rain over the area between 8.00am-9.30am and
12.00pm-3.00pm on 11 January 2011.
Water that cannot escape because it was impeded by the railway line is
not considered flood, only where it cannot escape into a watercourse
because such watercourse is in flood.
The water responsible for the inundation of the property came from the
north and down the hill and surrounding elevated properties before
flowing away to the west.
In relying on generic reports the FSP has not adequately investigated
her claim.
The FSP has failed to discharge its obligations under Section 35 of the
Insurance Contracts Act 1984 (the Act). The Service has previously
determined the definition of flood relied upon by the FSP to be unusual
and very wide. The Service, in the interests of consistency should find
in the Appli cant‟s favour in line with determination 40607.
Summary of FSP’s position
8. Water can escape the „normal confines‟ of a natural watercourse when there
is not normally water in that watercourse such as „dry bed creeks‟. In relation
to the backwater flooding at the railway crossing, in this case the railway
bridge abutments are the modified banks of UG.
9. The FSP did not maintain that rain only fell within the urban area, rather, it
was “W‟s” opinion that this is what it considers the “urban stormwater
catchment‟ whereby run-off from this catchment must be channelled and
piped to the gullies.
10. The FSP acknowledges and concurs with the Applicant‟s position that it was
the run- off from the wider catchments of O‟Shea Gully “OG” and UG that
caused the flood damage at the property.
11. The fact that the Applicant observed overflow from other houses to the north
enter her property is not inconsistent with the FSP‟s understanding of the
Case No: 248452 Determination Page 3 of 11
events. This water from the north would predominantly have been breakout
flows from OG heading through the residential areas towards UG.
12. The FSP in addition to relying upon its commissioned hydrologist W‟s
opinion has investigated data from the Australian Geosciences Organisation.
Accordingly, it maintains as opposed to the Applicant‟s positio n, both OG
and UG are watercourses; that is they are what a reasonable person would
identify as areas where water would concentrate and flow after running off
land.
13. Both OG and UG have defined beds and banks, so much so that, Main
Roads Queensland Department has constructed crossings over both gullies
and also named the crossings. Queensland (Qld) Rail has also built bridges
crossing over both gullies.
14. The FSP refutes the Applicant‟s allegations in respect to the conduct of its
agent N, at the time the home loan was arranged and the policy was
purchased by the Applicant. The FSP has submitted a statutory declaration
from the appropriate representative addressing this issue and confirming
there is no obligation within the home loan acceptance procedure requiring a
customer to have to purchase the FSP‟s insurance products (or any other).
Rather, it is only a case of N‟s representatives, as part of their responsibility,
informing customers of the need to protect their property and investments.
15. The FSP notes there is no dispute that the Applicant was not provided with
the relevant policy documentation at inception and subsequently each
renewal period (prior to the loss), which clearly informs that loss or damage
arising from flood is not covered under the policy.
16. The FSP does not accept the Applicant‟s contention that the policy wording
is unclear and/or too broad in respect to the flood exclusion. It is the FSP‟s
position that the wording is clear and the onus lies with the Applicant to read
the policy to ensure that it meets her needs. In the instance that she found
the policy to be unsuitable she was provided with the benefit of a „Cooling off
period‟ and/or could have cancelled the policy at any time between inception
of the policy in 2005 and before the date of loss in 2011.
17. The FSP maintains that it has based its decision to decline the claim on the
evidence made available by its commissioned hydrologist and report
submitted by the loss adjusters “C”. Further, that the claim in 2008 was
accepted on the basis of the report submitted by the then appointed
consultants “G” who determined there were no flood issues involved in the
inundation of the insured property.
18. The FSP relies on the following policy provisions:
“Words with special meanings
….
“ flood ” means the inundation of normally dry land by water that has escaped
or has been released from the normal confines of any natural watercourse,
Case No: 248452 Determination Page 4 of 11
lake or lagoon whether or not altered or modified or of any reservoir, canal or
dam.
[Note: this policy does not cover loss, liability, injury or damage caused
by or arising from flood to buildings and/or contents].
...
“ rainwater ” means rain falling naturally from the sky onto buildings and/or
ground.
...
“ run-off ” means rainwater that has collected on or has f lowed across
normally dry ground or has overflowed from swimming pools or spas.
…
Insured events we will pay
...
9. Storm rainwater or run-off
…
We will pay for loss or damage caused by storm, rainwater or run-off.
“ storm ” means violent wind (including cyclones and tornados),
thunderstorms and hail which may be accompanied by rain or snow.
„ rainwater’ means rain falling naturally from the sky onto buildings
and/or ground.
“ run-off ” means rainwater that has collected on or has flowed
across normally dry ground or has overflowed from swimming pools or
spas.
…
We will not pay for loss or damage;
a caused by;
flood, or
flood water combined with run-off and/or
rainwater.
“ flood ” means the inundation of normally dry land by water that has
escaped or has been released from the normal confines of any natural
watercourse, lake or lagoon whether or not altered or modified or of
any reservoir, canal or dam.
...
When we will not pay a claim under your policy
...
2. Unless we state differently in your policy, we will not pay for:
a. flood as defined on page 5;”
Case No: 248452 Determination Page 5 of 11
Issues
19. Whether the policy issued to the Applicant expressed the relevant cover and
exclusion in a clear, concise and effective manner; and
20. Whether the water inundation to the Applicant‟s home was flood water as
defined by the policy or rainwater run-off.
Reasons for decision
21. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the complex nature of the issues. This dispute
has not been the subject of a FOS Recommendation and has proceeded
directly to Determination.
22. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
23. There has been an exchange of material between the parties. Each party
therefore is aware of the issues and has had the opportunity to comment. In
these circumstances the details contained in the relevant hydrological
reports will not be recited in this Determination except where considered
relevant.
24. Prior to arriving at a determination the Panel has read and considered all the
material submitted by the parties to FOS.
25. The Panel notes the parties do not dispute the following:
The Applicant held an active Home Insurance Policy with the FSP at
the time of loss.
The FSP provided and the Applicant received the required policy
documentation i.e. Certificate of Insurance (COI), Renewal Certificates
(RC) and Product Disclosure Statement (PDS), at inception and
subsequent renewal periods (2006-2010) leading up to the date of loss.
The insured property sustained damage arising from water inundation
of the property on 11 January 2011.
The period of inundation resulting in the damage claimed occurred very
quickly and was over in a very short period of approximately 15
minutes.
The Applicant and other neighbours in the area were present at the
time of the event and accordingly are eyewitnesses to the
circumstances leading up to and resulting in the inundation of their
properties.
Case No: 248452 Determination Page 6 of 11
The insured area, located in the rural areas of Qld, does not have the
benefit of a well planned and established stormwater drainage
infrastructure.
Taking into consideration the levels of the Bremer River in the vicinity of
the property and the property height at approximately 42m AHD which
is well above the peak recorded gauge levels of Bremer River, it is not
considered a factor in the inundation of the site.
Inception of the policy through FSP’s agent N
26. The Applicant maintains at the time of arranging the mortgage for the
insured property through N and arising from the conduct of its
representative, she felt there was no other option available to her but to
insure her home under the FSP‟s policy.
27. The FSP has rejected the Applicant‟s allegation in this regard and has
submitted a Statutory Declaration by the Key Account Manager “D”
responsible for overseeing the training of N‟s staff to sell the FSP‟s general
insurance product/s.
28. D maintains that N has no mandate and does not make the home loan
approval subject to the acceptance of the FSP‟s general insurance product
as part of the home loan process. N may discuss with customers, as part of
its responsibility, the need to protect their assets and income; however
customers are not required to purchase the FSP‟s general insurance
product.
29. The Panel acknowledges the evidence made available by D; having
considered similar matters in the past, it is satisfied that processes followed
by N are in line with both the reasonable and accepted industry practices.
30. As there is no clear evidence as to the extent of the conversation that
occurred or whether or not misleading information was provided to the
Applicant by N nor is there any evidence to establish any actual prejudice
suffered by the Applicant, the Panel is not satisfied that it has been
established that the Applicant was misled and or pressured into purchasing
the FSP‟s insurance product.
31. It is also noted that the policy was purchased in 2005 with the date of loss
occurring in 2011. This allowed the Applicant close to six years to, not only
read and consider whether the policy was appropriate to her needs, but to
also arrange alternative cover in the instance she was not happy with the
scope of cover available under the policy.
Clearly inform and Policy Wording
32. The Applicant has argued the structure and presentation of the FSP‟s policy
wording is in breach of Section 35 of the Act, in that it does not adequately
inform the consumer of the presence of the flood exclusion. It is the FSP‟s
Case No: 248452 Determination Page 7 of 11
responsibility to ensure the policy documents are clear, concise and
effective.
33. The Panel has examined the FSP‟s PDS and Policy document. The
document consists of 59 pages. A “Table of Contents” is found on the
opening page and page 1 of the document (PDS) provides a number of
emboldened sub headings each with a sequence of headings relevant to that
sub heading.
34. A similar index is found for the cover provided “If you have buildings cover”
and “If you have contents cover” sections of the document.
35. One such sub heading is titled “Insured events we will pay” followed by a
range of specified events. Included in the range of specified events is the
event “Storm, rainwater or run - off” with the page number indicating where
this event is found.
36. The Panel having reviewed the event “Storm, rainwater or run - off” in the
PDS notes that it provides the definitions of relevant terms i.e. Storm,
rainwater, run-off and following these definitions is the statement that flood is
not covered immediately followed by the definition of flood with the word
“flood” in bold.
37. The index also provides the sub heading “When we will not pay a claim
under your policy” referring the reader to page 43 of the docum ent. Included
at point 2 in this section is the wording which excludes flood as defined and
refers to the page number (page 5) where the definition is found.
38. After analysis of the document the Panel is satisfied that the policy is clearly
indexed and the exclusion from cover loss or damage caused by flood is
clearly expressed.
39. The Panel acknowledges the Applicant‟s reference to a previous
determination issued by the Service in respect to the definition of the event
„flood‟ of similar wording to that relied upon by the FSP in his instance. It
must be noted that each dispute is determined independent from any other
and does not serve as a precedent for future matters. Further, the Panel
notes that there have been other determinations (e.g. 235302) issued by t he
Service since the determination relied upon by the Applicants, which have
taken a different view.
40. The Applicant does not dispute having received the PDS and Policy
documents. Accordingly, the Panel considers the FSP is entitled to rely on
the terms of the policy. In light of the matters discussed and acknowledged
above, the Panel is satisfied the FSP has fulfilled the obligations placed
upon it under Section 35 of the Act.
Cause of the damage
41. The Applicant in disputing the FSP‟s decision to decline the claim maintains
that the inundation of her home resulting in the claim loss was due to
Case No: 248452 Determination Page 8 of 11
stormwater run- off and does not accept the FSP‟s position that the loss is
due to floodwater damage.
42. As noted above the Applicant submits that the water responsible for the brief
inundation of her property arrived from the north due to run-off from the hills
and elevated properties to the north of the insured property. She rejects the
FSP‟s notion and maintains no water that inundated the property arrived
from the east i.e. UG.
43. In support of her contention that the event giving rise to her loss constituted
stormwater run-off and was identical to that which occurred in 2008, the
Applicant has made available several statements submitted by other
residents living on and ar ound the Applicant‟s street.
44. The FSP although accepting certain aspects of the Applicant‟s recollection of
the event resulting in the loss claimed, maintains that the proximate cause
for the loss was floodwater inundation due to the breaking of the banks o f
OG and backflow inundation from UG on 11 January 2011. In maintaining
this position, the FSP relies upon reports submitted by consultants it
appointed to the claim.
45. The Panel has considered these reports and notes that they have been
exchanged between the parties. Therefore, in the interest of brevity, the
Panel will only refer to that information within the reports it finds relevant to
this Determination.
C’s Report dated 1 February 2011
During the period 11 January – 15 January, several river systems in
South East Qld including Bremer River and Brisbane River, broke their
banks resulting in wide spread flooding in the Ipswich and Brisbane
areas. This claim arises from this event.
The Applicant advised that on the morning of 11 January water started
flowing down the driveway and inundated the home.
The date and time of heaviest rainfall in the area was 8.00am on 11
January. The time of inundation of the insured property was around
8.30am.
The peak inundation water level within the property occurred at
approximately 2.00pm on 11 January.
At the time of peak inundation the water level within the property was
approximately 15-20cm and 50cm outside the home.
The flow direction of the water resulting in the inundation was from the
South and North West, this being of a dirty colour.
W’s Report ‘Individual Site Flood Assessment Report” dated 31 May 2011
W undertook an assessment of Thagoona, Qld on 19 January 2011
and a site specific assessment of the Applicant‟s property on 14 April
2011.
Case No: 248452 Determination Page 9 of 11
The insured property is located approximately 1.2km east of OG and
270m west of UG. These two watercourses join with the upper reaches
of the Bremer River approximately 3km south east of the site.
Pictures made available by a witness show the flow of water south of
the property and travelling west to east.
The Applicant advised the first wave happened on the morning of 11
January with the water flowing down the railway reserve at the back of
the property in an eastward direction.
The peak inundation within the home occurred at approximately
1.45pm which last about 15 minutes and up to the depth of
approximately 10cm.
The Applicant evacuated the property at about 1.50pm.
The nearest rainfall gauges are the Walloon and Rosewood Gauges.
Walloon recorded totals for the period 8 January – 14 January 2011 as
reaching approximately 230mm, this ranges between a 1 year - 20 year
ARI event, with short duration intervals of two hours estimated to be
less than a five year ARI.
The Rosewood Gauge recorded nearly 330mm over the same period
and the intensities correspond to a 5 year – 100 year ARI event for
storm durations of 0.5 hour – 10 hour, with short duration intensities to
be less than a 20 year ARI event.
Both records confirm that there were two heavy bursts of rainfall on 11
January 2011, in the morning at around 8.00am – 9.30am and in the
afternoon between 12.00pm – 3.00pm.
There were two main causes for the inundation of the property i.e.
breakout flows from OG and backwater flows from UG.
The property level at the site is approximately 42m AHD, which
indicates that the site is well above the peak recorded gauge levels in
the Bremer River in the vicinity of the site. The Bremer River is
therefore not considered a factor in the inundation of the site.
The Thagoona area is very flat and has no formal urban drainage
system, tending to rely on a rural type system of bund diversions,
swales and localised culverts under the road crossings.
In order to consider stormwater as the cause for the inundation of the
site, in W‟s opinion, it must have oc curred without mixing with breakout
watercourse flows from OG and UG, or arrived before these breakout
flows occurred.
Given rainfall intensities were intense but not extreme, in W‟s opinion,
the breakout flows from OG as well as backwater from UG would ha ve
been the principle cause of inundation at the site and it is unlikely that
stormwater alone would have been of sufficient volume and flow rate to
cause the inundation of the site.
Case No: 248452 Determination Page 10 of 11
46. The Panel has considered the consultants‟ reports submitted by the FSP a nd
notes that there is a plethora of information made available within these
reports. However, the Panel notes that:
The evidence does not establish the widths, depth, bank heights of the
alleged watercourses and in this respect provide a comparison of the
approximate water levels prior to, during and after the significant rainfall
periods. Therefore, although it is alleged OG and UG broke their banks
causing the escape of floodwaters, no substantiating evidence has
been made available by the consultants to establish such.
There is an absence of evidence supporting the appropriate
consideration of the impact of the two significant rainfall periods
relevant to this matter. The Panel having reviewed many expert reports
concerning water inundation affected area , notes W has referred to
periods between 8-14 January 2011 and storm durations of 0.5h hours
– 10 hours, which are significantly different timeframes considered in
other reports. These considerations would seem to expand the
timeframes and calculation focused on, as opposed to focusing on the
impact of the two short periods of intense rainfall experienced in the
area,
The data concerning the Rosewood Rainfall Gauge which indicates that
between “9.00am on 11 January and 9.00am 12 January”, does not
also factor in the intense rainfall said to have occurred between
8.00am – 9.00am on 11 January; albeit the report is accepting there
were two intense rainfall periods, which totalled approximately 227mm.
The Panel is of the opinion that this intense rainfall falls within the
higher (extreme) end of W‟s quoted 5 year – 100 year ARI event.
Further, the Panel notes it is not in dispute that the inundation of the
property occurred almost contemporaneously with these significant
rainfall periods and ended and with it subsiding within a very short
period of time, approximately 15 minutes. This again is consistent with
the patterns and affects of stormwater run-off inundation as opposed to
floodwater inundation which increases gradually and remains in place
for longer than 15 minutes.
The parties do not dispute that the rising water levels of the Bremer
River had no effect in the vicinity of the property and accordingly it is
reasonable to conclude that the flooding of the Bremer River did not
affect the (unestablished) water levels of the alleged watercourses OG
and UG and/or prevent them from draining into Bremer River at the
time of loss.
The evidence submitted by the Applicant and other residents who
remained at their properties and actually witnessed the unfolding of the
event (supported by statutory declarations) cannot be ignored.
The FSP and or its commissioned consultants have not made available
any topographical evidence in relation to the obvious slope from north
to south of the wider catchment area in the vicinity of the insured
property. In the Panel‟s opinion insufficient consideration has been
given or shown to be given to the obvious contribution to local
Case No: 248452 Determination Page 11 of 11
stormwater run-off by further run-off waters generated 2-3km north of
the property in the Mount Marrow area. This corresponds with the view
of the numerous eyewitnesses, including the Applicant that the water
that was responsible for the inundation of their properties arrived from
the north.
47. The Panel is satisfied the Applicant has established a prima facie claim
based on the circumstances surrounding the loss, sufficient to establish on
the balance of probabilities, the inundation of the Applicant‟s property was
due to stormwater run-off. The Panel is not satisfied the evidence presented
in this dispute by the FSP is sufficient to establish the operation of the
exclusion clause.
Determination
48. On the basis of the available information the Panel determines the FSP is
obliged to provide indemnity to the Applicant under the claim.
49. The FSP is to pay interest to the Applicant at the statutory rate from 5 July
2011 (date of FSP‟s final decision) to the date of final settlement of the claim.