Text of the determination
Case No: 248450 Determination Page 1 of 9
Case number: 248450
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim (Flood)
27 November 2012
Background
1. The Applicant entered into an insurance contract with the Financial Services
Provider (FSP) to cover his investment property in North Booval. The
relevant period of insurance subject to this dispute operated for 12 months
beginning from 23 July 2010. During this period, the building was insured up
to a sum of $175,000 and claims were subject to a basic excess of $100.
2. The Applicant lodged a claim under this policy due to extensive water
inundation damage following extreme weather events in Queensland.
3. The FSP denied the claim on the basis the damage was due to “river flood”.
The Applicant, through his solicitors, has disputed this.
4. For the sake of simplicity, reference to the Applicant will include his legal
representatives.
5. Both the Applicant and the FSP have provided detailed submissions on the
relevant issues. For the sake of brevity, the Panel will only briefly summarise
these submissions given all of the material made available has been
exchanged with the other party.
Summary of Applicant ’ s position
6. The Applicant submits the following as alternative arguments in response to
the FSP’s decision:
a. The FSP’s policy failed to clearly inform him that “river flood” was
excluded as required under Sections 35 and 37 of the Insurance
Contracts Act 1984 (the Act).
b. The FSP breached its duty of utmost good faith as it allowed the
Applicant to arrange a policy clearly unsuitable to his needs.
c. The damage was solely due to stormwater run-off.
d. The damage is covered under the insured event of “Water or Other
Liquid”.
Determination
Case No: 248450 Determination Page 2 of 9
e. The FSP is unable to discharge its onus in establishing the loss was
caused by “river flood”.
7. The Applicant therefore seeks to be indemnified for his loss.
Summary of FSP’s position
8. In response to the Applicant ’s arguments, the FSP submits the following:
a. The policy structure and layout in conjunction with this evidence
enables it to rely on the exclusion clause of “river flood” pursuant to
Section 35(2) of the Act.
b. Section 37 of the Act is not applicable as the contract of insurance in
question is a “prescribed contract”.
c. The duty of utmost good faith does not extend to an obligation to
ensure a policy is suitable to the Applicant’s needs.
9. The FSP therefore relies on the following policy provisions, a site specific
hydrology report and the reports commissioned by the Insurance Council of
Australia (ICA) to substantiate its position:
“ Definitions (The Meaning Of Some Words)
…
“ flash flood ” means what occurs when there are heavy, inten se bursts of
rainfall, usually during thunderstorms where so much water falls in a very
short time that it cannot get away quickly enough and collects and flows into
your building .
but does not include when rainwater on the site :
cannot run-off into a water catchment system , because it is overflowing
in flood; and
mixes with the flood water coming from the water catchment system and
then flows into your building .
…
“ rain ” means water that has fallen from the sky on to your building and the
site but not water from flash flood .
“ river flood ” means when water that is normally contained in a water
catchment system increases because of rainfall or snow melt (whether in
the immediate region or elsewhere) or is deliberately released by an authority,
and the water overflows onto land that is not normally covered by water into
your home
For example water may be deliberately released by an authority from
a dam or reservoir.
…
“ storm ” means violent weather and high winds, sometimes accompanied by
rain, hail or snow including a cyclone, tornado or willy willy.
…
Case No: 248450 Determination Page 3 of 9
“ water catchment system ” means:
a river, creek, other natural watercourse or lake, whether they are in their
original state or have been modified, are named or unnamed, or normally
dry land that only run during periods of rain;
a dam, reservoir, storm water channel or canal.
…
1.7 Water Or Other Liquid
You are insured for damage to your building caused when water or another
liquid suddenly escapes from:
you or your neighbours;
- plumbing system
…
the
- road guttering or curbing,
- water main or pipe
…
1.12 Storm, Rain or Flash Flood
You are insured for damage to your building caused by storm , rain or flash
flood .
…
We will not pay for damage caused by:
…
river flood ;”
Issues
10. Whether the FSP breached its duty of utmost good faith in allowing the
Applicant to incept this type of policy.
11. Whether the FSP has complied with the requirements under Section 35 of
the Act to rely on the policy exclusion of “river flood”.
12. Whether the FSP is able to establish the Applicant ’s loss was caused by
“river flood”.
13. Whether the FSP is able to rely on the “river flood” exclusion to deny the
claim.
Reasons for decision
14. Due to the nature of the dispute, the parties have been informed that the
matter has been referred to the Panel for Determination in line with the
Case No: 248450 Determination Page 4 of 9
Operational Guidelines to the Service’s Terms of Reference. This dispute
has not been the subject of a FOS Recommendation and has proceeded
directly to Determination.
15. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
16. It is appropriate to consider the issues under the various headings.
Clearly Inform
17. Section 35(2) of the Act states that when a claim is made under a
“prescribed contract” for a “prescribed event”, an insurer cannot refuse to
pay the claim unless it can establish that it clearly informed its insured in
writing that it would not cover this event. Section 34 of the Act has defined
the terms “prescribed contract” and “prescribed event” by referring to the
Insurance Contracts Regulations 1985.
18. There is no dispute that a contract of insurance covering a residential
building is a “prescribed contract” and damage due to flood is a “prescribed
event”.
19. The onus is therefore on the FSP to establish that it has clearly informed the
Applicant prior to the claim that it would not cover damage caused by “river
flood”. This is generally done by an insurer providing a copy of its policy to its
insured which is meant to set out completely the rights and obligations of
both parties under the insurance contract.
20. Further, the Courts have supported this and particularly, in the case of Marsh
v CGU Insurance Ltd [2004] NTCA 1, Mildren J provided the following
comments that is particularly relevant to the operation of Section 35(2) of the
Act:
“In Hams & Anor v CGU Insurance Ltd(2002) 12 ANZ Insurance Cases 61 -
525, Einstein J held that the provisions of s 35(2) of the Insurance Contracts
Act 1984 (Cth) could be met if the insurer provided to the proposed insured a
document such as the proposed policy, which contained the relevant wording.
I agree. … Whether the policy wording in fact "clearly informed" the insured
that there was no cover for flood is a question of fact to be determined by an
examination of the document in question. … Furthermore, the language of s
35(2) suggests that the proposed insured can be clearly informed merely by
providing the insured with a copy of the policy which shows the exclusion in
clear and unambiguous terms. … The answer to the question "is flood
covered" is easily ascertainable by any person of average intelligence
and education. ” (Panel emphasis)
21. In this regard, the Applicant has not disputed receiving the policy/PDS.
Instead, he has provided numerous submissions arguing that the terms and
conditions in the policy are confusing, complex and unclear. In particular, the
Applicant has referred to the defined terms of “storm”, “flash flood”, “rain”
Case No: 248450 Determination Page 5 of 9
and “river flood” to argue that the distinctions are ambiguous, unclear and
confusing and therefore should not be relied upon.
22. These specific issues and arguments have been raised by the Applicant ’s
solicitors in another dispute, case number 254731, involving a very similar
policy with almost identical definitions. These arguments were reviewed at
length by the Panel in that case. In particular, paragraphs 28 to 38 sets out
that Panel’s rationale in finding that the definitions of “rain”, “storm”, “flash
flood” and “river flood” being used in that policy was clear and unambiguous.
23. Pursuant to clause 8.2 of the Terms of Reference, the Panel intends to adopt
the reasoning in that Determination for the following reasons:
It is contemporaneous,
It involves policy provisions that are essentially identical to the policy in
this dispute,
It considered arguments that are substantively similar to the Applicant’s
submissions,
The reasoning and analysis contained in the previous Determination
has clear applicability to this dispute, in particular paragraphs 28 to 38,
and
The Applicant has not introduced any new substantive arguments that
would imply the Panel’s previous reasoning is incorrect either in law or
fact.
24. Given this, the Panel intends to adopt the rationale contained in case
number 254731 in finding that the policy clearly informed the Applicant that
he was not covered for “river flood” pursuant to Section 35(2) of the Act.
25. The Applicant has also argued the FSP failed to inform him of the changes
to the policy in November 2010. The FSP has responded indicating the
policy it has relied on is the 2007 version which was included in its materials
and not disputed by the Applicant as being the policy he received.
26. Accordingly, the Panel does not accept the Applicant’s argument in this
regard.
27. The Applicant has also referred to Section 37 of the Act. However, as the
FSP correctly pointed out, this has no operation with respect to a “prescribed
contract” as evident by the following wording:
“An insurer may not rely on a provision included in a contract of insurance
( not being a prescribed contract ) …” (Panel emphasis)
Utmost Good Faith
28. The Applicant has alleged the FSP breached its duty of utmost good faith by
failing to ensure the policy provided adequate coverage or was suitable to
his needs.
Case No: 248450 Determination Page 6 of 9
29. The Panel considers the Applicant ’s arguments regarding the duty of utmost
good faith are misconceived. There is no legal principle that supports the
Applicant ’s argument that an insurer’s duty of utmost go od faith extends to
enquiring and ensuring its policy is appropriate to the insured’s needs. Such
a duty is generally associated with insurance brokers or other authorised
parties where case law makes it clear these professionals have a duty to
ensure the policy they procure is suitable to their client’s needs.
30. Further the FSP’s policy document, which the Panel has found the Applicant
received at the time the policy commenced:
Is a standard landlord insurance policy that is available to the general
public as opposed to being tailored to the Applicant’s specific needs,
and
Had a 21 day cooling off period which provided the Applicant ample
opportunity to review the contract and obtain advice on it to ensure it
was suitable to his needs.
31. Given this, the Panel does not accept the FSP breached its duty of utmost
good faith with respect to offering its standard home insurance policy to the
Applicant.
Water Inundation
32. The FSP has relied on a site specific hydrology report for the property which
contained the following relevant information:
The property is located approximately 150m from the Bundamba Creek
and there is virtually no external catchment that directs stormwater
runoff to the property. Runoff from the property would drain to the
Bundamba Creek within a few minutes.
The ground levels of the property range from approximately 14.6m
AHD at the north-eastern corner to 15.6m AHD at the south-eastern
corner. The floor level of the house is approximately 15.5m AHD.
Rainfall totals were obtained from Bundamba (Ha nlon St) Alert, which
is located approximately 1.3km north-west of the property. A total of
123mm of rainfall was recorded in the period between 0000 hours on 9
January 2011 and 1800 hours on 11 January 2011. No significant
rainfall was recorded after 1400 hours on 11 January 2011.
The peak hourly rainfall intensity of 16.3mm/hr occurred in the hour to
1400 hours. Peak stormwater runoff would have occurred within 15
minutes of the peak rainfall intensity. Recorded rainfall intensities for
storm durations of up to 24 hours had an average recurrence interval
(ARI) of less than 1 year.
Recorded water levels of the Bundamba Creek were obtained from the
Bundamba (Hanlon St) Alert. The level peaked at 19.39m AHD. The
peak water level marks and topographical data indicate the peak water
level at the property was 18.7m AHD. This was confirmed by the
Ipswich City Council.
Case No: 248450 Determination Page 7 of 9
It is possible that the subject property was initially inundated above
floor level by floodwater from Bundamba Creek which had flowed back
up along the underground pipe stormwater drainage network. However,
this inundation would have occurred almost simultaneously with the
arrival of direct overland flow of Bundamba Creek floodwater.
33. The hydrologist therefore concluded the following:
“The initial an d peak inundation of the subject property above floor level was
caused by floodwaters from the Bremer River backing up along Bundamba
Creek. The initial above floor inundation of the subject property by floodwater
from Bundamba Creek would have occurred at about 0000 hours on 12 th
January, about 10 hours after the peak rainfall in the area occurred. Local
rainfall intensities during the January 2011 event were not exceptional and
hence the subject property would not have been inundated above floor level
by stormwater runoff. Rainfall in the area had ceased approximately 7 hours
before the subject property was initially inundated above floor level.”
34. The ICA hydrology report relied upon by the FSP is titled “Flooding in the
Brisbane River Catchment January 2011, Volume 3 – Flooding in Ipswich
City LGA”. The following information is available within the sub - heading “9.3
Releases from Wivenhoe Dam”:
Large releases were made from Wivenhoe Dam over the period from
0600 hours, possibly as early as 0300 hours on 11 January 2011, until
around 0300 hours on 12 January 2011.
Releases from Wivenhoe Dam caused a flood wave in the Brisbane
River. As the flood wave moved downstream, backwater flooding
occurred along the lower reaches of the Bremer River and its
tributaries.
Floodwaters moving down the Brisbane River were made up of dam
release floodwaters from Wivenhoe and floodwaters from Lockyer
Creek and the Bremer River.
It was concluded that the dam release flood from Wivenhoe Dam was
the immediate cause of flooding along the reaches of the Brisbane
River downstream of the dam and along tributaries through the Ipswich
City LGA.
35. The Applicant has not provided any hydrological evidence.
36. The Panel has reviewed the site specific hydrology report and prefers the
hydrologist’s findings contained therein based on the following:
It relies on rainfall data recorded from a station proximate to the
Applicant’s property which would therefore, on balance, be reflective of
the local rainfall characteristics affecting the property.
His reasoning about why the rainfall recorded was not s ufficient enough
to inundate the property is reasonable on the face of it given the fact
the ARI was less than 1 year.
Case No: 248450 Determination Page 8 of 9
His estimated time of inundation is consistent with the elevated levels
of the Bundamba Creek, which is located approximately 150m from the
property.
His opinion about the elevated waters of the Bundamba Creek being
due to waters from the Bremer River backing up into it, is corroborated
both by the ICA report and general public knowledge of the events that
occurred in the region around that time.
His findings are not inconsistent with any eyewitness evidence
presented. Although the loss assessor’s report appeared to indicate the
Applicant stated the inundation occurred at 7am, the Applicant refuted
this in a subsequent statutory declaration. Instead, he maintained he
was not at the property and therefore could not identify when the
inundation first occurred.
He is appropriately qualified to examine and report on the likely source
of inundation.
37. Given this, the Panel accepts that the water which inundated the property
escaped from the Bundamba Creek and was not due to stormwater runoff.
38. The Applicant has attempted to argue that even if this is the case, this water
could have escaped from a stormwater drain or road gutter, thus falling
within t he insured event of “Water or Other Liquid”. In this regard, he has
provided a copy of the Ipswich City Council Key Map that shows the
stormwater infrastructure proximate to the property.
39. The Panel notes the hydrologist conceded it was possible that water from
the drains may have surcharged with floodwater and inundated the property.
However, the hydrologist also assumed any such water would have reached
the property at the same time as overland floodwater.
40. The Panel does not accept the evidence establishes this insured event is
satisfied for the following reasons:
a. There is no eyewitness evidence to support the Applicant’s theory.
Instead, his submissions about this method of inundation are
speculative.
b. The hydrologist’s comments were based on this being a possibility
rather than an actual finding corroborated by the rainfall, terrain and the
levels of the creek. In contrast, the hydrologist accepted overland flow
did occur and this water inundated the property.
c. The presence of stormwater infrastructure is not, of itself, evidence that
water surcharged from drains and inundated the property.
41. Given this the Panel cannot be satisfied, on the balance of probabilities that
the Applicant’s loss falls within the insured event of “Water or Other Liquid”.
42. The Panel therefore finds the following with respect to the water inundation
to the property:
The damage was due to “river flood”, and
Case No: 248450 Determination Page 9 of 9
The circumstances of the loss do not fall within the insured event of
“Water or Other Liquid”.
43. The FSP is therefore entitled to den y liability with respect to the Applicant’s
claim.
Determination
44. On the basis of the available information the Panel determines the FSP is
entitled to deny the Applicant’s claim.