Home / Financial Firm (Unknown - Insurer) / Determination 248450

Determination 248450

Denial of water inundation claim under river flood exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2012-11-28
ProductGeneral Insurance · Landlord
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant's North Booval investment property was inundated in January 2011 and the FSP denied the claim as river flood. AFCA found the policy clearly excluded river flood and the damage was river flood, not stormwater.

The site hydrology showed Bundamba Creek floodwater backing up into the property, which the clearly worded river flood exclusion captures under section 35(2) of the Insurance Contracts Act.

Issues

Subjects and remedies

natural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 248450 Determination Page 1 of 9 Case number: 248450 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim (Flood) 27 November 2012 Background 1. The Applicant entered into an insurance contract with the Financial Services Provider (FSP) to cover his investment property in North Booval. The relevant period of insurance subject to this dispute operated for 12 months beginning from 23 July 2010. During this period, the building was insured up to a sum of $175,000 and claims were subject to a basic excess of $100. 2. The Applicant lodged a claim under this policy due to extensive water inundation damage following extreme weather events in Queensland. 3. The FSP denied the claim on the basis the damage was due to “river flood”. The Applicant, through his solicitors, has disputed this. 4. For the sake of simplicity, reference to the Applicant will include his legal representatives. 5. Both the Applicant and the FSP have provided detailed submissions on the relevant issues. For the sake of brevity, the Panel will only briefly summarise these submissions given all of the material made available has been exchanged with the other party. Summary of Applicant ’ s position 6. The Applicant submits the following as alternative arguments in response to the FSP’s decision: a. The FSP’s policy failed to clearly inform him that “river flood” was excluded as required under Sections 35 and 37 of the Insurance Contracts Act 1984 (the Act). b. The FSP breached its duty of utmost good faith as it allowed the Applicant to arrange a policy clearly unsuitable to his needs. c. The damage was solely due to stormwater run-off. d. The damage is covered under the insured event of “Water or Other Liquid”. Determination Case No: 248450 Determination Page 2 of 9 e. The FSP is unable to discharge its onus in establishing the loss was caused by “river flood”. 7. The Applicant therefore seeks to be indemnified for his loss. Summary of FSP’s position 8. In response to the Applicant ’s arguments, the FSP submits the following: a. The policy structure and layout in conjunction with this evidence enables it to rely on the exclusion clause of “river flood” pursuant to Section 35(2) of the Act. b. Section 37 of the Act is not applicable as the contract of insurance in question is a “prescribed contract”. c. The duty of utmost good faith does not extend to an obligation to ensure a policy is suitable to the Applicant’s needs. 9. The FSP therefore relies on the following policy provisions, a site specific hydrology report and the reports commissioned by the Insurance Council of Australia (ICA) to substantiate its position: “ Definitions (The Meaning Of Some Words) … “ flash flood ” means what occurs when there are heavy, inten se bursts of rainfall, usually during thunderstorms where so much water falls in a very short time that it cannot get away quickly enough and collects and flows into your building . but does not include when rainwater on the site :  cannot run-off into a water catchment system , because it is overflowing in flood; and  mixes with the flood water coming from the water catchment system and then flows into your building . … “ rain ” means water that has fallen from the sky on to your building and the site but not water from flash flood . “ river flood ” means when water that is normally contained in a water catchment system increases because of rainfall or snow melt (whether in the immediate region or elsewhere) or is deliberately released by an authority, and the water overflows onto land that is not normally covered by water into your home For example water may be deliberately released by an authority from a dam or reservoir. … “ storm ” means violent weather and high winds, sometimes accompanied by rain, hail or snow including a cyclone, tornado or willy willy. … Case No: 248450 Determination Page 3 of 9 “ water catchment system ” means:  a river, creek, other natural watercourse or lake, whether they are in their original state or have been modified, are named or unnamed, or normally dry land that only run during periods of rain;  a dam, reservoir, storm water channel or canal. … 1.7 Water Or Other Liquid You are insured for damage to your building caused when water or another liquid suddenly escapes from:  you or your neighbours; - plumbing system …  the - road guttering or curbing, - water main or pipe … 1.12 Storm, Rain or Flash Flood You are insured for damage to your building caused by storm , rain or flash flood . … We will not pay for damage caused by:  …  river flood ;” Issues 10. Whether the FSP breached its duty of utmost good faith in allowing the Applicant to incept this type of policy. 11. Whether the FSP has complied with the requirements under Section 35 of the Act to rely on the policy exclusion of “river flood”. 12. Whether the FSP is able to establish the Applicant ’s loss was caused by “river flood”. 13. Whether the FSP is able to rely on the “river flood” exclusion to deny the claim. Reasons for decision 14. Due to the nature of the dispute, the parties have been informed that the matter has been referred to the Panel for Determination in line with the Case No: 248450 Determination Page 4 of 9 Operational Guidelines to the Service’s Terms of Reference. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 15. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 16. It is appropriate to consider the issues under the various headings. Clearly Inform 17. Section 35(2) of the Act states that when a claim is made under a “prescribed contract” for a “prescribed event”, an insurer cannot refuse to pay the claim unless it can establish that it clearly informed its insured in writing that it would not cover this event. Section 34 of the Act has defined the terms “prescribed contract” and “prescribed event” by referring to the Insurance Contracts Regulations 1985. 18. There is no dispute that a contract of insurance covering a residential building is a “prescribed contract” and damage due to flood is a “prescribed event”. 19. The onus is therefore on the FSP to establish that it has clearly informed the Applicant prior to the claim that it would not cover damage caused by “river flood”. This is generally done by an insurer providing a copy of its policy to its insured which is meant to set out completely the rights and obligations of both parties under the insurance contract. 20. Further, the Courts have supported this and particularly, in the case of Marsh v CGU Insurance Ltd [2004] NTCA 1, Mildren J provided the following comments that is particularly relevant to the operation of Section 35(2) of the Act: “In Hams & Anor v CGU Insurance Ltd(2002) 12 ANZ Insurance Cases 61 - 525, Einstein J held that the provisions of s 35(2) of the Insurance Contracts Act 1984 (Cth) could be met if the insurer provided to the proposed insured a document such as the proposed policy, which contained the relevant wording. I agree. … Whether the policy wording in fact "clearly informed" the insured that there was no cover for flood is a question of fact to be determined by an examination of the document in question. … Furthermore, the language of s 35(2) suggests that the proposed insured can be clearly informed merely by providing the insured with a copy of the policy which shows the exclusion in clear and unambiguous terms. … The answer to the question "is flood covered" is easily ascertainable by any person of average intelligence and education. ” (Panel emphasis) 21. In this regard, the Applicant has not disputed receiving the policy/PDS. Instead, he has provided numerous submissions arguing that the terms and conditions in the policy are confusing, complex and unclear. In particular, the Applicant has referred to the defined terms of “storm”, “flash flood”, “rain” Case No: 248450 Determination Page 5 of 9 and “river flood” to argue that the distinctions are ambiguous, unclear and confusing and therefore should not be relied upon. 22. These specific issues and arguments have been raised by the Applicant ’s solicitors in another dispute, case number 254731, involving a very similar policy with almost identical definitions. These arguments were reviewed at length by the Panel in that case. In particular, paragraphs 28 to 38 sets out that Panel’s rationale in finding that the definitions of “rain”, “storm”, “flash flood” and “river flood” being used in that policy was clear and unambiguous. 23. Pursuant to clause 8.2 of the Terms of Reference, the Panel intends to adopt the reasoning in that Determination for the following reasons:  It is contemporaneous,  It involves policy provisions that are essentially identical to the policy in this dispute,  It considered arguments that are substantively similar to the Applicant’s submissions,  The reasoning and analysis contained in the previous Determination has clear applicability to this dispute, in particular paragraphs 28 to 38, and  The Applicant has not introduced any new substantive arguments that would imply the Panel’s previous reasoning is incorrect either in law or fact. 24. Given this, the Panel intends to adopt the rationale contained in case number 254731 in finding that the policy clearly informed the Applicant that he was not covered for “river flood” pursuant to Section 35(2) of the Act. 25. The Applicant has also argued the FSP failed to inform him of the changes to the policy in November 2010. The FSP has responded indicating the policy it has relied on is the 2007 version which was included in its materials and not disputed by the Applicant as being the policy he received. 26. Accordingly, the Panel does not accept the Applicant’s argument in this regard. 27. The Applicant has also referred to Section 37 of the Act. However, as the FSP correctly pointed out, this has no operation with respect to a “prescribed contract” as evident by the following wording: “An insurer may not rely on a provision included in a contract of insurance ( not being a prescribed contract ) …” (Panel emphasis) Utmost Good Faith 28. The Applicant has alleged the FSP breached its duty of utmost good faith by failing to ensure the policy provided adequate coverage or was suitable to his needs. Case No: 248450 Determination Page 6 of 9 29. The Panel considers the Applicant ’s arguments regarding the duty of utmost good faith are misconceived. There is no legal principle that supports the Applicant ’s argument that an insurer’s duty of utmost go od faith extends to enquiring and ensuring its policy is appropriate to the insured’s needs. Such a duty is generally associated with insurance brokers or other authorised parties where case law makes it clear these professionals have a duty to ensure the policy they procure is suitable to their client’s needs. 30. Further the FSP’s policy document, which the Panel has found the Applicant received at the time the policy commenced:  Is a standard landlord insurance policy that is available to the general public as opposed to being tailored to the Applicant’s specific needs, and  Had a 21 day cooling off period which provided the Applicant ample opportunity to review the contract and obtain advice on it to ensure it was suitable to his needs. 31. Given this, the Panel does not accept the FSP breached its duty of utmost good faith with respect to offering its standard home insurance policy to the Applicant. Water Inundation 32. The FSP has relied on a site specific hydrology report for the property which contained the following relevant information:  The property is located approximately 150m from the Bundamba Creek and there is virtually no external catchment that directs stormwater runoff to the property. Runoff from the property would drain to the Bundamba Creek within a few minutes.  The ground levels of the property range from approximately 14.6m AHD at the north-eastern corner to 15.6m AHD at the south-eastern corner. The floor level of the house is approximately 15.5m AHD.  Rainfall totals were obtained from Bundamba (Ha nlon St) Alert, which is located approximately 1.3km north-west of the property. A total of 123mm of rainfall was recorded in the period between 0000 hours on 9 January 2011 and 1800 hours on 11 January 2011. No significant rainfall was recorded after 1400 hours on 11 January 2011.  The peak hourly rainfall intensity of 16.3mm/hr occurred in the hour to 1400 hours. Peak stormwater runoff would have occurred within 15 minutes of the peak rainfall intensity. Recorded rainfall intensities for storm durations of up to 24 hours had an average recurrence interval (ARI) of less than 1 year.  Recorded water levels of the Bundamba Creek were obtained from the Bundamba (Hanlon St) Alert. The level peaked at 19.39m AHD. The peak water level marks and topographical data indicate the peak water level at the property was 18.7m AHD. This was confirmed by the Ipswich City Council. Case No: 248450 Determination Page 7 of 9  It is possible that the subject property was initially inundated above floor level by floodwater from Bundamba Creek which had flowed back up along the underground pipe stormwater drainage network. However, this inundation would have occurred almost simultaneously with the arrival of direct overland flow of Bundamba Creek floodwater. 33. The hydrologist therefore concluded the following: “The initial an d peak inundation of the subject property above floor level was caused by floodwaters from the Bremer River backing up along Bundamba Creek. The initial above floor inundation of the subject property by floodwater from Bundamba Creek would have occurred at about 0000 hours on 12 th January, about 10 hours after the peak rainfall in the area occurred. Local rainfall intensities during the January 2011 event were not exceptional and hence the subject property would not have been inundated above floor level by stormwater runoff. Rainfall in the area had ceased approximately 7 hours before the subject property was initially inundated above floor level.” 34. The ICA hydrology report relied upon by the FSP is titled “Flooding in the Brisbane River Catchment January 2011, Volume 3 – Flooding in Ipswich City LGA”. The following information is available within the sub - heading “9.3 Releases from Wivenhoe Dam”:  Large releases were made from Wivenhoe Dam over the period from 0600 hours, possibly as early as 0300 hours on 11 January 2011, until around 0300 hours on 12 January 2011.  Releases from Wivenhoe Dam caused a flood wave in the Brisbane River. As the flood wave moved downstream, backwater flooding occurred along the lower reaches of the Bremer River and its tributaries.  Floodwaters moving down the Brisbane River were made up of dam release floodwaters from Wivenhoe and floodwaters from Lockyer Creek and the Bremer River.  It was concluded that the dam release flood from Wivenhoe Dam was the immediate cause of flooding along the reaches of the Brisbane River downstream of the dam and along tributaries through the Ipswich City LGA. 35. The Applicant has not provided any hydrological evidence. 36. The Panel has reviewed the site specific hydrology report and prefers the hydrologist’s findings contained therein based on the following:  It relies on rainfall data recorded from a station proximate to the Applicant’s property which would therefore, on balance, be reflective of the local rainfall characteristics affecting the property.  His reasoning about why the rainfall recorded was not s ufficient enough to inundate the property is reasonable on the face of it given the fact the ARI was less than 1 year. Case No: 248450 Determination Page 8 of 9  His estimated time of inundation is consistent with the elevated levels of the Bundamba Creek, which is located approximately 150m from the property.  His opinion about the elevated waters of the Bundamba Creek being due to waters from the Bremer River backing up into it, is corroborated both by the ICA report and general public knowledge of the events that occurred in the region around that time.  His findings are not inconsistent with any eyewitness evidence presented. Although the loss assessor’s report appeared to indicate the Applicant stated the inundation occurred at 7am, the Applicant refuted this in a subsequent statutory declaration. Instead, he maintained he was not at the property and therefore could not identify when the inundation first occurred.  He is appropriately qualified to examine and report on the likely source of inundation. 37. Given this, the Panel accepts that the water which inundated the property escaped from the Bundamba Creek and was not due to stormwater runoff. 38. The Applicant has attempted to argue that even if this is the case, this water could have escaped from a stormwater drain or road gutter, thus falling within t he insured event of “Water or Other Liquid”. In this regard, he has provided a copy of the Ipswich City Council Key Map that shows the stormwater infrastructure proximate to the property. 39. The Panel notes the hydrologist conceded it was possible that water from the drains may have surcharged with floodwater and inundated the property. However, the hydrologist also assumed any such water would have reached the property at the same time as overland floodwater. 40. The Panel does not accept the evidence establishes this insured event is satisfied for the following reasons: a. There is no eyewitness evidence to support the Applicant’s theory. Instead, his submissions about this method of inundation are speculative. b. The hydrologist’s comments were based on this being a possibility rather than an actual finding corroborated by the rainfall, terrain and the levels of the creek. In contrast, the hydrologist accepted overland flow did occur and this water inundated the property. c. The presence of stormwater infrastructure is not, of itself, evidence that water surcharged from drains and inundated the property. 41. Given this the Panel cannot be satisfied, on the balance of probabilities that the Applicant’s loss falls within the insured event of “Water or Other Liquid”. 42. The Panel therefore finds the following with respect to the water inundation to the property:  The damage was due to “river flood”, and Case No: 248450 Determination Page 9 of 9  The circumstances of the loss do not fall within the insured event of “Water or Other Liquid”. 43. The FSP is therefore entitled to den y liability with respect to the Applicant’s claim. Determination 44. On the basis of the available information the Panel determines the FSP is entitled to deny the Applicant’s claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.