Home / Financial Firm (Unknown - Insurer) / Determination 248387
Determination 248387
Denial of flood damage claim (flash flood versus flood)
Summary
The applicant's Goodna home and contents were inundated in January 2011 and the FSP denied the claim as flood. AFCA found the inundation was flash flood caused by rain within 24 hours, so the FSP must indemnify the loss within the policy caps, with interest.
The heavy rain from 4am on 11 January caused the W4 release strategy and the property flooded within 24 hours, so the flash flood cover applies.
Issues
- Claim denial primary · upheld“the Panel determines that the FSP must indemnify the Applicant for his loss in accordance with the terms and conditions of the policy.”
- Failure to disclose secondary · not upheld“the Panel intends to adopt the rationale contained in case number 245470 in finding that the policy clearly informed the Applicant.”
Subjects and remedies
natural disasterpay claimpay interest
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 248387 Determination Page 1 of 11
Case number: 248387
General Insurance - Domestic Insurance - Home Contents - FSP Decision –
Denial of Claim - Flood
6 September 2012
Background
1. The Applicant insured his home and contents with the Financial Services
Provider (FSP). The relevant period of insurance operated for twelve months
beginning from 10 December 2010. During this period, the building was
insured up to a sum of $275,000 and the contents for $57,000.
2. The Applicant’s property in Goodna was inundated by water follo wing the
severe weather events in Queensland; on 17 January 2011, the Applicant
lodged a claim under the policy.
3. The FSP denied the claim on the basis the damage was due to “flood”. The
Applicant has disputed this.
4. The Applicant is represented and for the sake of simplicity reference to the
Applicant will include reference to his legal representatives.
5. Both the Applicant and the FSP have provided detailed submissions on the
relevant issues. For the sake of brevity, the Panel will only briefly summarise
these submissions given all of the material made available has been
exchanged with the other party.
Summary of Applicant’s position
6. The Applicant submits the following as alternative arguments in response to
the FSP’s decision:
a. The FSP’s policy failed to clearly inform him that “flood” was excluded
as required under Section 35 of the Insurance Contracts Act 1984 (the
Act).
b. The damage was due to “Flash flood and stormwater run - off”, which is
an insured event. But for the extreme rain which fell over the Wivenhoe
Dam catchment from 4.00am on 11 January 2011, the W4 strategy
would not have been invoked. Therefore the heavy rain on 11 January
2011 was the proximate cause of the inundation of the property.
c. The FSP has failed to discharge its onus in establishing the loss was
caused by “flood”.
Determination
Case No: 248387 Determination Page 2 of 11
7. The Applicant seeks to be indemnified for his claim.
Summary of FSP’s position
8. In response to the Applicant ’ s arguments, the FSP submits it has provided
evidence from an appropriately qualified individual to co rroborate that a PDS
was sent to the Applicant prior to the claim. Further, the policy structure and
layout in conjunction with this evidence enables it to rely on the exclusion
clause of “flood” pursuant to Section 35(2) of the Act.
9. The FSP relies on a number of hydrology reports authored by “SC” and the
following policy provisions to deny the Applicant’s claim :
The Certificate of Insurance (COI)
“ What optional covers are included and not included
Home Contents
...
Flood and storm surge not included not included...”
The PDS
“ Words / terms with special meanings
Word / term Meaning
...
Flood Rising water which enters your home as a result of it
running off or overflowing from any origin or cause.
This policy does not cover flood unless we have
agreed and it is shown on your certificate of insurance.
Flash flood and
stormwater run - off
A sudden flood caused by heavy rain that fell no more
than 24 hours prior to the flash flood or stormwater
run - off .
...
Storm A violent disturbance of the atmosphere associated
with strong winds including a cyclone, lightening,
heavy rain, hail or snow, but not continuous bad
weather by itself.
...”
“ Insured events you are covered for
Damage caused by weather...
What is covered What is not covered
Case No: 248387 Determination Page 3 of 11
Storm Loss or damage:
caused by rain, hail or snow
after it has reached the
ground...
...
Flash flood and stormwater run - off
A sudden flood caused by heavy rain
that fell no more than 24 hours prior to
the flash flood or stormwater run - off
Loss or damage caused:
by flood...
...”
“ Your home
The most we will pay you for home claims
What is covered What is not covered
Flash flood and stormwater run-off
We will pay up to 50% of your home sum
insured or $25,000, whichever is higher.
...
...”
“ Optional covers for extra peace of mind
The covers outlined in this section are optional and do not apply unless you
have asked for them and we agree to cover you. Additional premiums apply
for each cover. Your certificate of insurance will show which covers operate.
All optional covers are subject to the terms and conditions of this policy.”
“ Optional covers for extra peace of mind
What is covered What is not covered
Flood and storm surge
This policy does not cover flood unless
we have agreed and it is shown on your
certificate of insurance.
Home and/or contents cover
We cover you for loss of or damage to
your home or contents caused by flood
or storm surge which happens during the
period of insurance at the property
addre ss.
We will pay up to the:
home sum insured, if your home is
insured;
contents sum insured, if your
contents are insured for damage
We will not pay for loss or
damage to:
paths, driveways, paving,
retaining walls (whether or
not part of the home), tennis
courts or other playing
surfaces;
shade or sail cloth;
fabric awnings, swimming
pool or spa covers or liners
and the like;
glasshouse whether or not
constructed principally of
glass;
water in swimming pools or
spas...
Case No: 248387 Determination Page 4 of 11
caused by flood or storm surge,
We will pay for loss or damage in the
same way and in the same amounts as
we do under insured events cover.
...”
Issues
10. Whether the Applicant was “clearly informed” about what the policy did and
did not cover.
11. Whether the cause of the Applicant’s loss was covered under the policy.
Reasons for decision
12. Due to the nature of the dispute, the parties have been informed that the
matter has been referred to the Panel for Determination in line with the
Operational Guidelines to FOS’s Terms of Reference. This dispute has not
been the subject of a FOS Recommendation and has proceeded directly to
Determination.
13. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
14. Prior to arriving at a determination the Panel has read and considered all the
material submitted by the parties to FOS.
15. It is appropriate to consider the issues under the various headings.
Was the Applicant clearly informed of the Policy exclusions?
16. Section 35(2) of the Act states that when a claim is made under a
“prescribed contract” for a “prescribed event”, an insurer cannot refuse to
pay the claim unless it can establish that it clearly informed its insured in
writing that it would not cover this event. Section 34 of the Act has defined
the terms “prescribed contract” and “prescribed event” by referring to the
Insurance Contracts Regulations 1985.
17. There is no dispute that contracts of insurance covering a person’s home
and contents are a “prescribed contract” and damage due to flood is a
“prescribed event”.
18. The onus is therefore on the FSP to establish that it has clearly informed the
Applicant prior to the claim that it would not cover damage caused by “ flood”.
This is generally done by an insurer providing a copy of its policy to its
Case No: 248387 Determination Page 5 of 11
insured which is meant to set out completely the rights and obligations of
both parties under the insurance contract.
19. Further, the Courts have supported this and particularly, in the case of Marsh
v CGU Insurance Ltd [2004] NTCA 1 , Mildren J provided the following
comments that is particularly relevant to the operation of Section 35(2) of the
Act:
“In Hams & Anor v CGU Insurance Ltd(2002) 12 ANZ Insurance Cases 61 -
525, Einstein J held that the provisions of s 35(2) of the Insurance Contracts
Act 1984 (Cth) could be met if the insurer provided to the proposed insured a
document such as the proposed policy, which contained the relevant wording.
I agree. … Whether the policy w ording in fact "clearly informed" the insured
that there was no cover for flood is a question of fact to be determined by an
examination of the document in question. … Furthermore, the language of s
35(2) suggests that the proposed insured can be clearly informed merely by
providing the insured with a copy of the policy which shows the exclusion in
clear and unambiguous terms. … The answer to the question "is flood
covered" is easily ascertainable by any person of average intelligence
and education. ” (Panel emphasis)
20. The FSP has provided evidence explaining its processes of dispatching
documents and how it was applied in the Applicant’s case. The evidence and
detail provided by the FSP are consistent with the guidelines provided by the
Service in a Circular, edition 3 titled “Dispatch of Documents”.
21. Although the Applicant has stated he cannot recall receiving the policy
before paying the initial premium, the Panel is satisfied that, on balance, a
policy was sent to him before the claim occurred.
The policy structure
22. In relation to the policy structure itself, the Applicant has provided numerous
submissions to argue that the relevant terms relied upon by the FSP is
ambiguous. In particular, the Applicant has highlighted the fact the definition
of “flood” is so wide that it encompasses the definition of “Flash flood and
stormwater run- off”.
23. In addition, the Applicant has also stated the definitions of “Flash flood and
stormwater run- off”, “Flood” and “Storm” are overlapping and create
confusion and uncertainty.
24. The FSP has rebutted this with a number of arguments.
25. The Panel has considered the terms and structure of this policy at length in a
previous Determination, namely case number 245470. Pursuant to clause
8.2 of the Terms of Reference, the Panel intends to adopt the reasoning in
that Determination for the following:
It is contemporaneous;
It involves policy provisions that are essentially identical to the policy in
this dispute;
Case No: 248387 Determination Page 6 of 11
It considered arguments that are substantively similar to the Applicant’s
submissions. In addition, the Applicant in the previous Determination
also relied on a behavioural paper in arguing the policy did not satisfy
the requirements set out by Mildren ;
The reasoning and analysis contained in the previous Determination
has clear applicability to this dispute; and
The Applicant has not introduced any new substantive arguments that
would imply the Panel’s previous reasoning is incorrect either in law or
fact.
26. Given this, the Panel intends to adopt the rationale contained in case
number 245470 in finding that the policy clearly informed the Applicant that
he was not covered for “flood” pursuant to Section 35(2) of the Act.
Cause of the Water Inundation
The Evidence
27. The Applicant provides the following information:
It was raining heavily on Monday 10 January 2011 and the Applicant
did not go to work. It continued to rain heavily through the night and on
Tuesday morning.
Water began pooling on Mill Street and Parker Street in the morning of
11 January 2011.
The Applicant evacuated his property at 10.00am on 11 January 2011.
However, the Applicant’s next door neighbour (LD) stayed at his
property until he was rescued by kayak early morning on 13 January
2011. LD obse rved the inundation of the Applicant’s property.
According to LD, water was lapping at the doorstep of his house at
6.00 pm on 11 January 2011. LD’s house is on the same elevation as
the Applicant’s property.
By 8.30pm on 11 January 2011, the water was waist high in LD’s
home.
At 11.00am on Wednesday 12 January 2011 the Applicant saw footage
of his property, which was completely submerged. LD’s roof was above
water at this time.
The Applicant was unable to return to his property until 6.00am on 14
January 2011. While there was no water on his street at this time, water
remained on Mill Street.
28. While LD does not provide his own statement, this information is not
challenged and there is no reason not to accept the Applicant’s evidence
regarding the timing of the inundation.
Case No: 248387 Determination Page 7 of 11
29. The Panel has also considered the following relevant hydrology and
topographic information provided by SC. In part this states:
Woogaroo Creek is located approximately 100m from the Applicant’s
property, which is located 1.1km from the junction of the Brisbane River
and Woogaroo Creek.
The ground level of the property varies from 10.4m AHD at the front of
the property adjacent to Cox Crescent, to 11.1m AHD at the rear of the
property. The property is elevated from the road level by approximately
0.5m. The approximate bench mark level is therefore about 10.9m
AHD.
The water level in the property rose at a rate consistent with the rising
of the Brisbane River levels.
W4 releases at Wivenhoe Dam commenced at 8.00am on 11 January
2011.
The property is located 82.4km from the Wivenhoe Dam, measured
along the Brisbane River.
The effect of W4 releases would have reached the vicinity of the
property by 12.50pm on 11 January 2011.
The peak level of the Brisbane River in the vicinity of the Applicant’ s
property was 16.6m AHD.
The Brisbane River level at the vicinity of the Applicant’s property
reached its peak at approximately 4.56pm on Wednesday 12 January
2011.
Releases from Wivenhoe Dam & Proximate Cause
30. The Panel notes that the hydrology evidence is generally consistent with the
Applicant’s evidence regarding the timing of the inundation.
31. The central issue for Determination in this dispute is whether the inundation
of the Applicant ’ s home on 11 January 2011 was due to flash flood as
defined within the terms of the policy, that is whether rain that fell no more
than 24 hours prior to the inundation of the Applicant’s property was the
proximate cause of the inundation.
32. The Panel suspended issuing Determinations relating to this question after
the Queensland Flood Commission of Inquiry had been recalled to hear
further evidence from the Wivenhoe Dam flood engineers. Once the final
report was released, all relevant stakeholders were invited to put further
submissions to the Panel relating to the impact o f the heavy rainfall that
commenced falling over the Wivenhoe Dam around 4.00am on 11 January
2011 and in particular the impact this had on the decision to adopt the W4
release strategy.
33. On 21 May 2012 FOS issued a memorandum to all relevant stakeholders
advising that after considerable deliberation of all material available to it, the
Case No: 248387 Determination Page 8 of 11
Panel formed a view that the heavy rain occurring from approximately
4.00am on 11 January 2011 and in particular the heavy rain between
4.00am and 8.00am on 11 January 2011 was a proximate cause of the W4
strategy being invoked and therefore a proximate cause or trigger that led to
the flooding of many of the properties along the Brisbane River.
34. At that time, the Panel noted that in relation to the approach that each
dispute would depend upon the individual and unique factors relevant to the
dispute and in that regard the parties were invited to make further
submissions in relation to disputes before FOS.
35. In view of this, the FSP provided detailed further submissions to FOS on 12
June 2012 in relation to this dispute. Included with the submissions were the
following documents:
A Reference document for disputes relating to Queensland Floods (this
is a general reference document) relating to the various submissions
the FSP makes in relation to a number of issues. Not all issues raised
in the reference document appear in the current dispute;
Letter from the FSP’s hydrologist attaching a Key Conclusions sheet for
the Applicant ’ s property;
Hydrologist report “Investigations of January 2011 inundation event –
Brisbane” dated March 2011;
Statement from hydrologist dated 7 June 2012.
36. Subsequently, the FSP has updated the reference document with further
arguments.
37. The Panel has reviewed the reference documents. Insofar as the reference
documents relate to the current issues in dispute, those matters have been
considered.
38. In summary the FSP argues that the proximate cause of the inundation of
the properties, that is the real or effective cause of the damage caused to the
properties downstream of the dam, is not simply the rain that occurred from
4.00am on 11 January 2011. The FSP maintains that on any reasonable
view, the damage sustained to the downstream properties was the combined
effect of all of the rainfall and not just the rain that had fallen from 4.00am on
11 January 2011 leading to the implementation of the W4 strategy from
8.00am that day.
39. There is no dispute that heavy rain fell over the Wivenhoe Dam catchment
area and in fact parts of the Brisbane River from approximately 4.00am on
11 January 2011. It is not disputed that in addition to this there was heavy
rain over the Bremer River which influenced the level of the Brisbane River
and that rain commenced at approximately 6.00am on 11 January 2011 .
40. The FSP’s hydrologist has relied on data from SEQWater dated 2 March
2011 which confirms the rapid increase in releases from the Wivenhoe Dam
from 8.00am on 11 January 2011. Examination of the SEQWater report
Case No: 248387 Determination Page 9 of 11
identifies the rapid increase in the inflows to the Wivenhoe Dam
commencing from about 4.00am, 11 January 2011. The report confirms the
inflows into the dam had been decreasing from as early as 8.00am from 10
January 2011 with steady decreases from approximately 3.00pm on 10
January 2011 to 2.00am on 11 January 2011.
41. The Queensland Flood Commission of Inquiry (COI) report confirms that
prior to 4.00am on 11 January 2011 and in fact prior to 8.00am of 11
January 2011 the dam releases were being managed at the W3 strategy.
Whilst it is accepted that the W3 strategy had led to an increase in the levels
of the Brisbane River, the W3 strategy was designed to avoid where
possible inundation of the properties below the Wivenhoe Dam by flooding
from the Brisbane River.
42. There is no dispute that there were two significant rainfall spikes with rain
that fell from 9 to 10 January 2011 being considered the first spike and rain
that commenced falling from approximately 4.00am on 11 January 2011
being the second spike.
43. There is no dispute that following the second spike that the W4 strategy was
adopted. The FSP has argued that the switch to strategy to W4 was not the
natural and ordinary consequence of the rain that fell and in fact the move to
W4 strategy was not taken in accordance with the Wivenhoe Dam manual.
In the Panel’s view, the COI final report does not find the adoption of W4
strategy at 8.00am on 11 January 2011 was inconsistent with the manual.
Although there may be issues as to how the Wivenhoe Dam had been
managed prior to this time, there is nothing in the material that has been
provided to the Panel to suggest that the earlier management of the
Wivenhoe Dam influenced to any significant degree, the adoption of the W4
release strategy at 8.00am on 11 January 2011.
44. The I CA hydrology and the information provided by the FSP’s hydrologist
confirms that the increased releases from the Wivenhoe Dam after the
adoption of the W4 strategy led to the development of a flood wave that
ultimately caused the flooding of many properties downstream of the
Wivenhoe Dam.
45. The question arises as to what was the proximate cause of this inundation.
In determining the proximate cause of the inundation it is necessary to look
at the effective or dominant cause of the inundation. The Panel agrees with
the FSP’s general submission that the proximate cause is a cause
determined by common sense evaluation of the relevant facts. In the event
that there are two or more proximate causes, one within the policy and the
other excluded, the policy does not respond. The proximate cause is not
determined by identifying the last event or final trigger but by determining
what is the dominant, effective, direct or efficient cause of the loss.
46. The FSP has maintained that the impact on the Wivenhoe Dam from the
rainfall that fell in the early hours of 11 January 2011 was only 29% while
71% of the volume of the inflow came from the rain that fell on 9 and 10
January 2011 or earlier. The FSP maintains that to find the rainfall which had
Case No: 248387 Determination Page 10 of 11
fallen from 4.00am on 11 January 2011 is the proximate cause is without
foundation as such an approach produces an entirely artificial outcome.
47. With all respect to the FSP’s argument the Panel disagrees. Whilst the Panel
accepts there has been a significant impact on the levels of the Wivenhoe
Dam by the rainfall that commenced falling on or about 9 January 2011 or
earlier, the Panel is satisfied having regard to the information that has been
exchanged and the relevant legal principles, that the heavy rain that
commenced falling on or about 4.00am on 11 January 2011 was the
proximate or effective cause of the adoption of the W4 strategy.
48. The Panel is also satisfied that whilst the level of the Brisbane River may
have been increasing under the W3 strategy, it was the heavy rainfall from
approximately 4.00am on 11 January 2011 that caused the need to adopt
the W4 strategy at 8.00am on the same day.
Applicant’s Inundation
49. SC’s statement, particularly his updated Key Conclusions attachment,
indicates the effect of the W4 releases first reached the vicinity of the
Applicant’s property at 12.50pm on 11 January 2011. The approximate peak
height of water above the bench mark level at the Applicant’s property at
4.00am on 12 January 2011 was 3.6 metres.
50. The Panel notes that the ultimate inundation of the property was 5.7m above
the benchmark level. SC identified this peak inundation occurred at
approximately 4.56pm on Wednesday 12 January 2011.
51. The Panel accepts the possibility that these assessments may not be
entirely accurate.
52. The FSP hydrologist has further speculated that if the W3 strategy had been
maintained, then, according to the key conclusion statement, the Applicant ’ s
property would still have been inundated at approximately 7.20pm on 11
January 2011 and by 4am on 12 January 2011, would have been inundated
to a level of 2 metres above the benchmark level.
53. The Panel is concerned, however, that to reach such a conclusion it must be
speculated that the releases from the dam would have continued at the
same rate at the W3 level in the absence of any additional rainfall. The
report does not address the possibility of the inflow into the Wivenhoe Dam
decreasing.
54. The available information indicates the W3 strategy that was in place prior to
8.00am on 11 January 2011 had been successful in limiting the outflows and
flooding below the Wivenhoe Dam. Whether the outflows would have
continued at the same rate had the inflows continued to reduce is not known.
55. Instead, the Panel is satisfied that on the facts of what actually occurred on
11 January 2011, it was the heavy rainfall from approximately 4.00am on 11
Case No: 248387 Determination Page 11 of 11
January 2011 that caused the need to adopt the W4 strategy at 8.00am on
the same day. This led to the inundation of the Applicant ’ s property.
56. To this extent, the Panel is satisfied that the inundation of the Applicant ’ s
property to the level of 3.6 metres above benchmark was caused by flood
that occurred within 24 hours of the heavy rainfall.
Quantum
57. Base d on attachment D to SC’s statement dated 7 June 2012, the Panel
notes that by 4.00am on 12 January 2011, the water level at the property
had reached approximately 14.5m AHD, being 3.6m above benchmark level.
At this height, the property would have been completely submerged in water
and would be considered a total loss.
58. The Renewal Certificate of Insurance for the relevant period provides a sum
insured of $275,000 for the home with contents of $57,000. Pursuant to the
policy cap for the insured event of “Flash flood and stormwater runoff”, the
FSP is liable up to an amount equivalent to 50% of the sum insured, or
$25,000 whichever is the greater, for each of building and contents;
therefore in this instance, the caps applicable to the Applicant’s policy a re
$137,500 for the damage to the building and $28,500 for the contents.
59. The FSP has paid the Applicant a compassionate sum. The conditions of
payment of the compassionate sum do not fall within FOS’ s jurisdiction but
the Panel acknowledges that the FSP should it choose to do so, may take
into account this payment in determining its payment to the Applicant.
Determination
60. On the basis of the available information the Panel determines that the FSP
must indemnify the Applicant for his loss in accordance with the terms and
conditions of the policy as it relates to damage to the home and loss of
contents pursuant to the policy cover provisions for flash flood.
61. Insofar as the FSP is to cash settle the claim it is to pay interest from 26 July
2011 (being the date of IDR rejection of the claim) to date of payment of the
claim, in accordance with Section 57 of the Act.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.