Text of the determination
Case No: 248075 Determination Page 1 of 13
Case number: 248075
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim – Exclusion/condition
28 May 2013
Background
1. The Applicants held a home and contents insurance policy with the Financial
Services Provider (FSP). The policy provided defined events cover and was
current at the time of the loss.
2. After their home in Middle Park, Queensland was inundated with water in
January 2011, they lodged a claim with the FSP for the resultant damage.
3. The FSP denied the claim on the basis that the damage was caused by river
flood, which was excluded from cover under the policy.
4. The Applicants disagree with the decision and want the FSP to pay their
claim.
Summary of Applicants ’ position
5. The Applicants are represented and for convenience and simplicity,
throughout the remainder of this Determination the Applicants and their
representative will be referred to as “the Applicants”.
6. The Applicants say that when they contacted the FSP by phone in
December 2010 and asked if the policy provided cover for flood, they were
advised that it did. They say that flood coverage was an important
consideration for their choice of policy and the FSP did not bring to their
attention that the policy was unsuitable to their needs.
7. They say that the FSP did not send a copy of the Product Disclosure
Statement (PDS) to them after their phone contact in December 2010 and
they had no way to confirm whether flood cover was included in their policy.
8. The Applicants say that the policy wording is unclear and ambiguous, the
overall framework of the provisions is complex and confusing and a person
of average intelligence and education would have great difficulty
understanding what types of damage would be covered. As a result, the FSP
Determination
Case No: 248075 Determination Page 2 of 13
has failed to meet its obligations under section 35 of the Insurance Contracts
Act 1984 (the Act) to clearly inform them of the river flood exclusion and
therefore standard cover should apply.
9. They say that there are several stormwater drains in the street at the front of
their home. There is also an easement adjacent to their property and to the
rear of their property, there is a very large stormwater outlet leading to an
open stormwater drain.
10. They believe that the inundation of their home was the result of a se vere
storm and of stormwater which flowed through their property to the nearby
golf course.
Summary of FSP’s position
11. The FSP says that even if the Applicants called in December 2010 —
although there is no evidence that this was so — they have provided no
evidence that any of its representatives told them that the policy covered
flood.
12. It says that it had no obligation to recommend to the Applicants that they
should obtain cover for flood.
13. The FSP says that the policy was incepted in 2008 and the Applicants were
provided with a PDS and policy wording at that time. At subsequent
renewals, the Applicants were provided with renewal schedules which
referred them back to the PDS it supplied previously.
14. It says that its policy wording is clear and unambiguous i n explaining that
river flood is not covered and it rejects the Applicants‟ allegation that it has
not clearly informed them pursuant to its obligations under section 35 of the
Act.
15. It has obtained a site specific hydrology report regarding the inundation of
the Applicants‟ home. This evidence shows that the cause of the damage
was water from the Brisbane River which back -flowed up the Mt Ommaney
Creek and inundated the surrounding land.
16. The evidence also shows that the inundation occurred a considerable time
after the rain had ceased so flash flood, as defined in the policy, could not
have been the cause of the damage.
17. It does not accept the Applicants‟ contention that the water which inundated
their home flowed out of the stormwater drains.
18. The FSP says t hat the cause of the damage to the Applicants‟ home was
river flood as defined and excluded from cover under the policy and it is
therefore not liable for the damage.
19. The FSP relies on the following policy provisions:
Case No: 248075 Determination Page 3 of 13
“ This document contains important information to help you understand this
insurance. It is up to you to choose the cover you need. Any advice in this
document is of a general nature only and has not considered your objectives,
financial situation or needs. You should carefully consider the information
provided having regard to your personal circumstances and decide if this
insurance is right for you.
...
What you are not covered for
There are certain times when this insurance may not provide cover.
Some events we may not cover include:
Damage cause by the seas or river flood (see Section 1.12).
...
Definitions (The Meaning of Some Words)
Some words and expressions in this policy h ave a specific meaning which is
given below. Each word is printed in bold where it appears.
…
“flash flood” means what occurs when there are heavy, intense
bursts of rainfall, usually during thunderstorms where so much water
falls in a very short time that it cannot get away quickly enough and
collects and flows into your home .
but does not include when rainwat er on the site :
cannot runoff into a water catchment system, because it is overflowing in
flood; and
mixes with flood water coming from the water catchment system and
then flows into your home.
…
“rain” means water that has fallen from the sky on to your building and the
site but not water from flash flood .
...
“river flood” means when water that is normally contained in a water
catchment system increases because of rainfall or snow melt (whether in
the immediate region or elsewhere) or is deliberately released by an
authority, and the water overflows onto land that is not normally covered by
water into your home.
For example water may be deliber ately released by an authority from a dam
or reservoir.
...
“storm” means violent weather and high winds, sometimes accompanied by
rain, hail or snow including a cyclone, tornado or willy willy.
...
“water catchment system” means:
Case No: 248075 Determination Page 4 of 13
a river, creek, or other natural watercourse or lake, whether or not they
are in their original state or have been modified, are named or
unnamed, or normally dry that only run during periods of rain;
a dam, reservoir, stormwater channel or canal.
…
1.12 Storm, Rain or Flash flo od
You are insured for damage to your building and/or your contents
caused by storm, rain or flash flood .
We will not pay for water damage to your building caused by storm or rain
seeping or otherwise entering your building unless the water entered
through an opening in the wall or roof that had been made directly by the
storm or rain or as a direct result of it.
...
We will not pay for damage caused by:
the seas or tidal wave;
river flood;
erosion or earth movement .”
20. The FSP relies on the following contract provisions:
“ Your Home Cover Insurance Renewal Notice & Tax invoice ...
Your Home Cover insurance is shortly due to expire and your Renewal
Notice is enclosed.
For more information please refer to your Home Cover Insurance Product
Disclosure Statement and Policy Wordings (PDS & Policy) previously
provided. If you need another copy, please let us know.
...
BEFORE YOU RENEW THIS INSURANCE
IMPORTANT NOTICE
You should refer to the Product Disclosure Statement and Insurance Policy
Wording (PDS and Policy) previously issued to you and this renewal notice
to consider whether the terms, cover and conditions of this policy continue
to be relevant and suitable to your needs and circumstances. If you do not
have a copy of the PDS and Policy please call us on the number detailed on
the front of this notice and we will send to you at no cost to you.”
Issues
21. Whether the FSP clearly informed the Applicants of the exclusion of river
flood from cover.
22. Whether the FSP misrepresented the policy cover when the Applicants
contacted it in December 2010.
Case No: 248075 Determination Page 5 of 13
23. Whether the damage to the Applicants‟ home was caused by river flood, as
defined under the policy, or by an event to which the policy responds.
Reasons for decision
24. Due to the nature of the dispute, it has been referred to the Panel for
Determination in accordance with the Operational Guidelines to the Financial
Ombudsman Service‟s Terms of Reference.
25. This decision has been made by a Panel of three decision makers including
an Ombudsman and two decision makers with extensive experience in
insurance industry matters and in consumer claims.
26. There has been an exchange of information between the parties and the
Panel is satisfied that each party has had an opportunity to address the
issues raised.
27. The Applicants have raised a variety of issues throughout the course of this
dispute and the Panel will only address those matters which it considers
relevant to the claim and the dispute.
Did the FSP clearly inform the Applicants of the river flood exclusion?
28. Section 35(2) of the Act states that when a claim is made under a
“prescribed contract” for a “prescribed event”, an insurer cannot refuse to
pay the claim unless it can establish that it clearly informed its insured in
writing that it would not cover this event. Section 34 of the Act has defined
the terms “prescribed contract” and “prescribed event” by referring to the
Insurance Contracts Regulations 1985.
29. There is no dispute that contracts of insurance covering a person‟s home
building or contents ar e “prescribed contracts” and damage due to flood is a
“prescribed event”.
30. The onus is therefore on the FSP to establish that it has clearly informed the
Applicants prior to the claim that it would not cover damage caused by “river
flood”. This is generall y done by an insurer providing a copy of its policy to its
insured which is meant to set out completely the rights and obligations of
both parties under the insurance contract.
Provision of policy wording
31. The Applicants say that they made a call to the FSP in December 2010
about the policy and that they did not receive a copy of the PDS after this
phone call until after their loss.
32. The FSP says that the policy was incepted in 2008 and at that time, the
Applicants were provided with a New Business Pack including a copy of the
Case No: 248075 Determination Page 6 of 13
PDS and policy wording for their policy. The FSP notes that the Applicants
have themselves confirmed receipt of this pack including the PDS.
33. In 2009 and 2010, it sent the Applicants renewal schedules which made
reference to the PDS it sent to them in 2008.
34. There does not appear to be any dispute that at the time of policy inception
in 2008, the Applicants were provided with a copy of the PDS for the policy.
In their submission of 25 May 2011, the Applicants admit to receiving one
PDS but state that they:
“...did no more than scan it and missed reading about the complex exclusions
relating to water damage.”
35. Section 11(10) of the Act provides that where an insurer has provided
information to an insured as required under section 35 at or before a renewal
or contract of insurance was entered into, their obligations under section 35
are taken to be satisfied at each renewal.
36. The Panel is satisfied that the FSP has provided a copy of the policy wording
the Applicants at inception and there was no requirement to provide another
copy of the PDS at each renewal. The onus was on the Applicants to read
the terms and conditions of their policy wording and decide whether the
policy was suitable to their circumstances.
Clarity of policy wording
37. The Applicants maintain that:
The exclusion of flood is made up of a definition of a term „river flood‟
as well as the non- inclusion defined under the insured event of „flash
flood‟. This seeks to convert an included event into an exclusion.
The „river flood‟ exclusion is buried deep within the policy document,
and is in a different part of the policy and there is inadequate cross
referencing.
38. They say that the river flood exclusion is for practical purposes an unusual
term and the FSP should have drawn their attention to the river flood
exclusion on page 30 and its definition on page 20 of the PDS.
39. The Applicants say that the policy wording relied upon by the FSP contains
language that is unclear and ambiguous and the overall framework of the
provisions is complex and confusing. They say that a person of average
intelligence and education would have great difficulty in understanding
whether damage caused by wet weather conditions would be covered under
the policy.
40. The Applicants say that as a result, the FSP has not discharged its obligation
under section 35 of the Act to clearly inform them of the policy exclusion,
upon which it relies to deny their claim, and standard cover should therefore
apply.
Case No: 248075 Determination Page 7 of 13
41. The FSP does not agree with the Applicants‟ assertion with regard to the
clarity of the policy wording and maintains that:
The contents page of the PDS clearly sets of the various elements of the
document in an orderly and uncluttered manner.
Page 5 provides an outline of the exclusions of the policy, and draws the
reader‟s attention to certain events which may not be covered under the
policy, including damage caused by „river flood‟ — and refers the reader
to section 1.12 for more details on this exclusion.
Section 1.12 on page 30 (which explains the coverage of the insured
event of „storm, rain or flash flood‟) clearly states that the policy does not
cover damage caused by „river flood‟.
A definition for what is meant by „river flood‟ appears on page 20.
The policy index on page 63 includes an entry for „Flood, R iver (when
not insured)‟.
42. The Panel has reviewed the submissions from both parties on the matter,
and has examined the policy wording.
43. The Panel accepts that the policy definition of „flash flood‟ is clear and
unambiguous, and does not accept the Applicant s‟ argument that the terms
„usually‟ and „short time‟ within the definition are ambiguous and unclear.
44. Further, in the Panel‟s view, the statement within the definition that „flash
flood‟ does not include when rainwater on the site:
Cannot run off into a water catchment system because it is overflowing
in flood; and
Mixes with flood water coming from the water catchment system and
then flows into (your) home
is consistent with established law authorities on these matters, and
appropriately clarifies what i s meant by „flash flood‟.
45. The Panel accepts that the policy definition of „river flood‟ is clear and
unambiguous, and is satisfied that „river flood‟ is excluded from coverage
under the insured event of „storm, rain or flash flood‟.
46. Accordingly, the Panel finds that the FSP has fulfilled its obligation under
section 35 of the Act to clearly inform the Applicants of the exclusion of river
flood from cover.
Did the FSP misrepresent the cover provided under the policy?
47. The Service has been provided with a Statutory Declaration dated 3
November 2012 from the male Applicant who states that:
“I made a phone call to arrange our insurance with [FSP] on 21 December
2010.
Case No: 248075 Determination Page 8 of 13
During this phone call, I signed up for and paid for the insurance. At no stage
during the phone call was I informed of any exclusions from our insurance
coverage. I asked for comprehensive cover and understood that was what I
was receiving.”
48. In a submission dated 5 December 2012, the Applicants acknowledged that
the policy was incepted in 2008 and clarified that the 21 December 2010 call
was made seeking comprehensive coverage on renewal of the policy. They
say that during this phone call the FSP was asked “Am I covered for the 2
big, namely fire and flood?” (sic).
49. According to the Applicants, the FSP representative answered “Yes”.
50. The FSP says that there is no evidence that the Applicants called on 21
December 2010. It accepts that the absence of evidence on its records of
the call does not necessarily invalidate the Applicants‟ claim that the call took
place. It has provided copies of the relevant policy records and an email from
compliance specialist “GC” which it says suppor ts its position on this point.
51. It also says that the Applicants have not provided any independent evidence
which might verify the details of the phone conversation or even confirm that
it took place. Further, there is no evidence that the Applicants checked the
alleged representation against the PDS or that they relied upon any such
representation.
52. The Panel has considered the arguments from both parties on this matter.
53. In support of their statement that they called the FSP on 21 December 2010,
the Applicants have provided two credit card statements which show that the
monthly premium instalments for the policy increased from $68.95 in
November 2010 to $80.70 in December 2010.
54. The Applicants have not explained in their submission exactly how this credit
card information supports their claim that a call was made to the FSP. That
said, the Panel is prepared to accept that the monthly instalment premium
change from one month to the next resulted in the Applicants calling the FSP
on 21 December 2010 to query the increase.
55. Based on the evidence presented however, the Panel is not satisfied that
when they called in December 2010 the Applicants queried the FSP about
the coverage of the policy or if they did, that the FSP‟s representative
informed them that the policy covered flood.
56. Furthermore, as outlined earlier in this Determination, the Panel accepts that
the FSP provided the Applicants with a copy of the PDS for the policy; that
this PDS clearly explained that the policy did not cover river flood and that
the onus was on the Applicants to read and understand the terms and
conditions of the policy.
Case No: 248075 Determination Page 9 of 13
57. Accordingly, the Panel finds that there is no evidence to support the
contention that the FSP misrepresented the cover provided by the policy.
Cause of the damage
58. It is an accepted principle of general insurance law that an insured bears the
onus to show that they have suffered a loss cause by an event to which the
policy responds. This is known as a prima facie claim. Once so established,
the onus shifts to the insurer to prove that a policy exclusion applies if it
seeks to deny or limit its liability for the claim.
59. There is no disput e that the Applicants‟ home was damaged by water
inundation. In their 27 May 2011 submission, the Applicants include the
following in their description of the events leading up to the inundation:
“Our backyard was sodden following weeks of rain.
...
The weather was severe to the point that I cancelled a plan to go to
Indooroopilly (10 minute drive) to take my 8 year old niece to the movies.
[Male Applicant] did not go to work as he was due to work and afternoon shift
but did not go because of the weather an d the warnings.”
60. The Panel is satisfied that the Applicants have established a prima facie
claim under the defined event of “storm, rain or flash flood”. The onus now
shifts to the FSP to prove that an exclusion — in this case “river flood” — in
order to deny the claim.
61. The FSP obtained a report from hydrologist “W” titled “Site Specific
Inundation Assessment”, which was produced after an inspection of the
Applicants‟ property on 2 October 2012 and a review of the rainfall and
drainage data and the local topography.
62. The report by W includes the following about the nature of the damage to the
Applicants‟ home:
The property is constructed on moderately sloping land which falls
away to the rear and backs onto a nature reserve.
The rear section of the home is raised with a floor level of
approximately 1.0 m above ground level at the rear boundary.
During the January 2011 event, the property was inundated to a
maximum depth of about 0.75 m above floor level in the rear section of
the yard and house.
63. W included the following about the drainage of the area:
The nature reserve adjacent to the Applicants‟ property contains a
small watercourse and links with a golf course approximately 0.22 km
north-east of the property.
Case No: 248075 Determination Page 10 of 13
Mt Ommaney Creek flows through the golf course and through culverts
in Westlake Drive to discharge to the Brisbane River about 1.2 km to
the north of the property.
The catchment of Mt Ommaney Creek extends about 1.4 km east and
south of the property and has a total area of about 485 ha to the
Brisbane River.
The local stormwater catchment draining to S Street near the property
is approximately 3.0 ha in the area.
Two stormwater inlet pits are located in S Street to the immediate
north-west of the driveway to the property. It is likely that these inlet pits
drain into a stormwater pipe which traverses the easement to the
immediate north of the property before joining with the small
watercourse located in the nature reserve.
64. W examined the rainfall data from the Jindalee Alert rainfall station, located
2.3 km north of the property and provided the following in its report:
Daily rainfall totals at the Jindalee Alert to 9am on 10, 11 and 12
January 2011 were 73.9 mm, 27.1 mm and 46.8 mm respectively.
Rainfall for durations up to 24 hours was not particularly intense with
Average Recurrence Intervals (ARIs) of less than 1 year. Durations of
48 hours and 72 hours were between 1 and 2 year ARI events.
The peak 1 hour rainfall intensity of 20.6 mm per hour occurred at
11am on 11 January 2011 and no rainfall was recorded at the Jindalee
Alert after 8pm on 11 January 2011.
65. With respect to the water levels of the Brisbane River, W reported the
following:
The peak water level at the Jindalee Alert gauge during the event was
12.89 mAHD, recorded at 8pm on 12 January 2011.
Information from the Brisbane City Council shows that the peak water
level in the vicinity of the property was about 13.3 mAHD.
Based on the peak water level and depth of inundation, the floor level of
the rear section of the property is estimated to be at 12.55 mAHD.
The minimum overflow level of Westlake Drive at Mt Ommaney Creek
crossing is about 9 mAHD, which is 3.5 mAHD below the floor level of the
rear section of the property.
Based on an interpolation of water level information from the Jindalee
Alert and the Moggill Alert gauges, the estimated time of above floor level
inundation of the rear section of the house by floodwater from the
Brisbane River is 11am on 12 January 2011.
Rainfall has ceased nearly 15 hours before the estimated time of the
above floor level inundation of the home.
66. W recounted the version of events provided to it by the Applicants:
Case No: 248075 Determination Page 11 of 13
On the afternoon of 11 January 2011, they went for a drive and saw
that the Brisbane River was swollen and flowing exceptionally fast.
At about 11pm on 11 January 2011, they went to the edge of the golf
course and saw the playing areas were completely covered with water
which has risen to the edge of the adjacent bushland.
At about 0300 hours on 12 January 2011, they saw that the bushland to
the rear of their property had become inundated, however there was no
water in their yard at that time.
They left their property at about lunchtime of 12 January 2011, at which
time water had started to seep under the fence line of their back yard.
Water has receded from the property at about 10am on 13 January
2011.
67. W noted that the Applicants‟ version of events regarding the timing of the
rainfall event was consistent with the available data.
68. W stated that peak stormwater runoff from the surrounding catchment would
have occurred within 30 minutes of the peak rainfall. Given the low intensity
rainfall recorded in the vicinity of the property and the fact that the property
was not inundated until approximately midday on 12 January 2011 (well after
the cessation of rainfall), the Applicants‟ property could not have been
inundated by stormwater runoff from the local catchment.
69. W stated that the initial and maximum above floor inundation of the
Applicants‟ home was cause by floodwaters from the Brisbane River which
flowed back up Mt Ommaney Creek and the small watercourse located in
the nature reserve to the immediate east of the Applicants‟ property.
70. The Applicants have challenged the findings of the report by W, saying that
the nature reserve to which W refers is in fact a stormwater easement and
they have provide a statement by surveyor “E” to support their position.
71. The Applicants have also pointed to an open stormwater drain which exits
subterranean ground in close proximity to their property. They say that the
external open catchment area flows from this outlet above ground, through
stormwater channels and passing very close to the rear of their property.
72. The Applicants say that the exit onto open ground from the stormwater outlet
is approximately the size of a car and have provided photographs to support
this statement. They say that during rain events, water flows out of this
stormwater outlet, along open channels through woodland and onto and
underneath the golf course which acts as a stormwater catchment from the
surrounding suburbs. They also point to the “stormwater pipes” uphill and to
the rear of their property that flow past their property to the golf course.
73. According to the Applicants, their property was damaged by stormwater
caused by rain falling on ground already sodden after six weeks of constant
rain. They say that a significant amount of the stormwater runoff which
reaches the golf course flows through/past their property.
Case No: 248075 Determination Page 12 of 13
74. The Panel has considered all the material provided by the parties, including
the hydrology report by W, the photographs by E and the photographs
provided by the Applicants.
75. The Panel is satisfied that the cause of the damage to the Applicants‟ home
was water overflowing from the Brisbane River which back flowed along Mt
Ommaney Creek and the small watercourse which runs through an area of
vacant land behind the Applicants‟ property (which W has referred to as a
“nature reserve” and the Applicants refer to as a “stormwater easement”.)
76. From the evidence presented, it is clear that rainfall in the vicinity has
ceased a considerable time before the time that the home was inundated
and the Panel accepts that stormwater runoff — or “flash flood” as it is
defined in the policy — on its own could not have been the cause of the
inundation.
77. In the view of the Panel, the material provided by the Applicants does not
assist them. The statement by E confirms that the area behind the
Applicants‟ property serves as a waterway corridor and is fed by several
stormwater drains from the surrounding areas. There is nothing in the
statement by E which suggests that stormwater flowed through the
Applicants‟ property during the inundation event.
78. The photographs provided show that the stormwater outlet at the rear of their
property is indeed large but it is just that; a stormwater outlet. Water which
exits this outlet would flow to the nearby small watercourse on its way to Mt
Ommaney Creek and the Brisbane River.
79. The Panel has considered the possibility that water which exited this large
stormwater outle t contributed to the inundation of the Applicants‟ property.
However the only circumstances where could occur would be if the nearby
small watercourse was already overflowing and in such circumstances, the
mixture of the exiting stormwater and water from the small watercourse
would be regarded as “river flood” as defined in the policy.
80. For these reasons, the Panel is satisfied that on the balance of probabilities,
the cause of the damage to the Applicants‟ home was “river flood” as defined
under the policy.
Is damage covered under other defined events under the policy?
81. The Applicants has argued that in the alternative, it would appear that the
property was impacted by overflowing stormwater drains following severe
storms which were preceded by drenching rain over the previous 24 hours.
82. They say that the stormwater drain is a „pipe, water main or part of the road
gutter and kerbing‟ and therefore a stormwater drain falls within the definition
of damage by „Water or other liquid”, which is covered under sectio n 1.7 of
the policy.
Case No: 248075 Determination Page 13 of 13
83. The FSP says that there is no evidence that the water which inundated the
Applicants ‟ property overflowed from the nearby stormwater drains. Based
on the material provided, there is no evidence that the inundation was
caused by water overflowing from any of the local stormwater drains. While it
is possible water overflowing from the stormwater drains, road gutter or
curbing contributed to the inundation the Panel is satisfied that this would
have mixed with the “river flood”. Such concu rrent inundation would correctly
be described as flood and excluded under the policy.
84. The Panel is therefore not satisfied that the Applicants have established a
prima facie claim under the policy defined event of “Water or other liquid”.
Determination
85. On the basis of the available information the Panel determines that:
The FSP clearly informed the Applicants of the exclusion of river flood
from cover under the policy.
The FSP did not misrepresent the extent of cover afforded by the policy
during a phone conversation with the Applicants.
The cause of the damage to the Applicants‟ home was river flood as
defined under the policy.
The FSP is not liable for the damage to the Applicants‟ home.