Denial of home contents flood claim as inundation fell outside flash flood 24-hour window

FirmFinancial Firm (Unknown - Insurer)
Decided2012-09-27
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Applicant's home contents claim for the January 2011 Brisbane floods was declined because inundation occurred after the 24-hour window following the start of heavy rain. AFCA accepted the hydrology evidence that water reached the benchmark level at about 7.41am on 12 January 2011 and found the denial correct.

Flash flood cover requires the sudden flood to be caused by rain falling no more than 24 hours before, and the inundation here occurred outside that period.

Issues

Subjects and remedies

natural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 248067 Determination Page 1 of 6 Case number: 248067 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim- Exclusion/Condition 27 September 2012 Background 1. The Applicant insured his (and his wife‟s) contents in their residence in Fig Tree Pocket with the Financial Services Provider (FSP). The relevant period of insurance operated for 12 months beginning from 29 December 2010. During this period, the contents were insured for $171,000, with $4,000 of cover for contents away from home. 2. On 20 January 2011, the Applicant lodged a claim under the policy due to extensive water inundation following severe weather events in Queensland. 3. Both the Applicant and the FSP have provided detailed submissions on the relevant issues. For the sake of brevity, the Panel will only briefly summarise these submissions given all of the material made available has been exchanged with the other party. Summary of Applicant’s position 4. For the sake of simplicity, reference to the Applicant will include his legal representatives. 5. The Applicant submit s that the damage was due to “Flash flood and stormwater run- off”, which is an insured event. In particular, the proximate cause of the inundation was the rainfall event that occurred between 4.00am and 8.00am on 11 January 2011, 6. The Applicant seeks to be indemnified for his claim plus interest. Summary of FSP’s position 7. The FSP relies on a number hydrology reports authored by SC and the follow ing policy provisions to deny the Applicant‟s claim : Page 3 of the Certificate of Insurance (COI) “ What optional covers are included and not included Determination Case No: 248067 Determination Page 2 of 6 Contents ... Flood and storm surge not included” Pages 10-12 of the PDS “ Words / terms with special meanings Word / term Meaning ... Flood Rising water which enters your home as a result of it running off or overflowing from any origin or cause. This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance. Flash flood and stormwater run - off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run - off. ... Storm A violent disturbance of the atmosphere associated with strong winds including a cyclone, lightning, heavy rain, hail or snow, but not continuous bad weather by itself. ...” Pages 17-18 of the PDS “ Insured events you are covered for Damage caused by weather... What is covered What is not covered Storm Loss or damage:  caused by rain, hail or snow after it has reached the ground... ... Flash flood and stormwater run-off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run - off Loss or damage caused:  by flood... ...” Page 32 of the PDS “ Your contents The most we will pay you for contents claims Case No: 248067 Determination Page 3 of 6 What is covered What is not covered ... ... Flash flood and stormwater run - off We will pay up to 50% of your contents sum insured or $25,000, whichever is higher, but not exceeding your contents sum insured. ... ...” ...” Issue 8. Whether the cause of the Applicant‟s loss was covered under the policy. Reasons for decision 9. Due to the nature of the dispute, the parties have been informed that the matter has been referred to the Panel for Determination in line with the Operational Guidelines to Financial Ombudsman Service‟s (FOS‟s) Terms of Reference. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 10. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 11. There is no dispute that the Applicant received the policy documents, comprising the COI and the Product Disclosure Statement (PDS) containing the policy wording. 12. The Applicant‟s COI clearly shows that for the relevant policy period, the optional „Flood and storm surge‟ cover did not apply. 13. The Panel accepts that the FSP‟s policy does not extend cover to circumstances where a loss is caused by a flood. The policy also distinguishes between flood, flash flood and stormwater run-off (the latter two of which are covered). It extends cover to damage from sudden flood events “caused by heavy rain that fell no more than 24 hours prior” to the flash flood. Proximate cause of damage 14. The Applicant says he evacuated his home just before 12.00am on 12 January 2011 and at that time, water was backing up through the stormwater drains surrounding his property. Case No: 248067 Determination Page 4 of 6 15. The material exchanged shows the FSP‟s hydrologist SC in a report dated 4 November 2011 concluded:  According to rainfall records taken from the Corinda High Alert (about 1.8 kilometres from the Applicant‟s property):  Some 37mm of rai n fell in the area between 9.00am on 11 January 2011 and 9.00am on 12 January 2011.  The majority of the rain on 11 January 2011 fell between 10am and 11am.  Between 6.00pm on 11 January 2011 and 15 January 2011 only 2mm of rain was recorded.  The Applicant‟s property is elevated between 8.2m AHD (Australian Height Datum) and 10.8m AHD.  The terrain underneath the house on the Subject Property is at a level of approximately 9.25m AHD.  Interpolating the Brisbane River levels at the Jindalee and Moggill Creek Mou th Alert Gauges, the FSP‟s hydrologist estimates the Brisbane River was likely to have reached a height equivalent to:  8.2m AHD at about 2.45am on 12 January 2011 which would have been sufficient to inundate the minimum level of the Subject Property (RL8.2m AHD).  9.25m AHD at about 7.30am on 12 January 2011.  The FSP‟s hydrologist says stormwater or local run -off generally requires intense levels of rain and would generally occur at the same time or immediately after it (which he says would be “within 1 hour for localised stormwater inundation”). 16. Considering these matters on the balance of probabilities, the Panel is more inclined to accept that the Applicant‟s home was not initially inundated by overland stormwater run-off. 17. Although on balance the Applicant‟ s loss was not caused by overland stormwater run-off the Panel notes that the policy provides limited cover for “flash flood”. 18. In order for the Applicant to be entitled to this limited cover, the following elements must be established:  there was a sudden flood;  there was a heavy rain that occurred within 24 hours prior to that flood;  the sudden flood was caused by that heavy rain. 19. FOS has determined in other disputes, following consideration of all material exchanged, that the heavy rainfall commencing aro und 4.00am on 11 January 2011, was a proximate or effective cause of the adoption of the W4 release strategy in respect of the Wivenhoe Dam. The Panel has previously Case No: 248067 Determination Page 5 of 6 determined that this combined with the heavy rain over the Brisbane River from about 4.00am that day and the heavy rain that commenced falling over the Bremer River was the proximate cause of inundation of many properties downstream of the Wivenhoe Dam. 20. Given the wording of the FSP‟s policy in respect to flash flood, the Panel has determined that the inundation in these earlier Determinations is properly categorised as flash flood providing the inundation occurs within 24 hours of the commencement of the heavy rainfall. 21. The Panel has considered the further e vidence, submissions and the additional material provided by the FSP in this dispute. The Panel is satisfied that the evidence provided in this dispute is consistent with the evidence which led to the earlier determinations, in respect of „flash flood‟ 22. The Panel is satisfied on the balance of probabilities that notwithstanding the rain which had fallen prior to 11 January 2011, it was the rain which fell over the Wivenhoe Dam between 4.00am and 8.00am on 11 January 2011, which led to the decision by the dam‟s operating flood engineers to change the release strategy from W3 to W4. This combined with the heavy rain that fell over the Brisbane River from that time and the heavy rain that commenced falling over the Bremer River was in the Panel‟s view the proximate or effective cause of the inundat ion of the Applicant‟s property. 23. For the Applicant‟s claim to succeed and fall within the definition of “flash flood” within the terms of the policy, it is necessary for the Applicant to establish the property was inundated within 24 hours of this heavy rainfall. As the Panel accepts the heavy rainfall commenced at approximately 4.00am on 11 January 2011, the inundation would have to occur prior to 4.00am on 12 January 2011. 24. The parties disagree on the actual time of inundation. The Applicant maintains water was backing up near his property at approximately midnight on 12 January 2011, or shortly afterwards. The Key Conclusions Statement attached to the hydrologist ‟s report of 7 June 2012, identifies the approximate Benchmark level of the property (represented by Slab on Ground) as RL 9.3m AHD and that at 4.00am on 12 January 2011, the river, with the addition of the W4 wave, as rising to 8.5m AHD which is 0.8m below the benchmark level. These conclusions are broadly consistent with SC‟s earlier conclusions of 4 November 2011, noted above, specifically by reference to the key marker, namely the house‟s „Benchmark level‟. 25. The Panel has carefully considered the Applicant‟s material as summarised in their submission dated 22 December 2011. This relevantly states: “The Complainants observed stormwater run -off gradually encroaching on the subject property at approximately 8pm and again just before midnight on Tuesday, 11 January 2011(„the relevant observation period‟); the Complainants observed stormwater run-off backing up and overflowing from the nearby stormwater drains during the relevant observation period. They also observed at this time from their property, nearby parklands becoming Case No: 248067 Determination Page 6 of 6 saturated and full of water; the Complainants were forced to flee their property shortly after midnight to avoid the encroaching water.” 26. Unfortunately nothing from this account directly addresses the key issue; namely, at what approximate time on the night of 11 January 2011, into the early hours of 12 January, did water enter the a pplicant‟s house. There is no eye witness evidence. 27. In the Applicant ‟ s later submission he maintains the inundation occurred prior to 8.00am 12 January 2011. In a further submission they refer to the FSP‟s evidence of inundation at 7.30am on 12 January 201 1 and maintain this is within the relevant 24 hour period. 28. The Key Conclusions Statement identifies the water reached benchmark level at about 7.41am on 12 January 2011. This is consistent with earlier hydrology and not disputed by the applicants. In the circumstances and in the absence of any alternative evidence as to the time of inundation the Panel accepts inundation above benchmark level did not occur until 7.41am on 12 January 2011. 29. To be covered under the policy the sudden flood must be caused by rai n that fell no more than 24 hours prior to the flash flood. As the heavy rain commenced around 4.00am on the 11 January 2011 and inundation did not occur until 7.30am to 8.00am on the 12 January 2011, then the inundation occurred outside the relevant 24 hour period to attract cover under the terms of the policy. 30. Accordingly the Panel is satisfied the policy does not extend to cover the loss. Determination 31. On the basis of the available information the Panel determines that the FSP is entitled to deny liability for the damage to the Applicant‟s home contents.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.