Determination 247937
Denial of claim - flood exclusion (rural residence inundation)
Summary
The applicant's rural residence was inundated in January 2011 and the FSP denied the claim as flood. AFCA found the FSP had not proven flood caused the inundation, as local runoff was accepted, and ordered the claim not be denied, with interest if cash settled.
The insurer bears the onus of proving the flood exclusion, and its hydrology evidence did not establish on the balance of probabilities that flooding rather than local runoff caused the inundation.
Issues
- Claim denial primary · upheld
“The Panel determines that the FSP is not entitled to deny the Applicant's claim.”
- Inadequate claim investigation secondary · upheld
“the Panel is not satisfied the FSP has established, on the balance of probabilities, that flooding was the cause of the inundation.”
Subjects and remedies
home or building damagenatural disasterpay claimpay interest
Text of the determination
Case No: 247937 Determination Page 1 of 7
Case number: 247937
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim - Flood
30 May 2012
Background
1. The Applicant insured farm buildings, contents and liability on a rural property
with the FSP. In January 2011 the residence and a machinery shed on the
property were inundated.
2. The Applicant lodged a claim with the FSP which was subsequently denied on
the ground that the inundation was caused by a flood which is an exclusion
under the policy.
Summary of Applicant’s position
3. The flooding of the house and buildings was caused by storm; the water was
from a local catchment area which arrived overnight on 13-14 January 2011.
Evidence in support was ignored by the hydrologists working for the FSP.
4. The conclusions of the hydrologists were incorrect because of a lack of local
knowledge. Overland flows from the southern catchment did not arrive until 18
January. The riverine flooding did not arrive from the east; flooding of the river
was contained to a point 1½ kilometres east of his dwelling.
5. Steady rainfall over 4 days followed by a 50mm fall on 13 January – the day
before the inundation – caused extensive runoff from a large hill on the
western side of the house.
6. The only likely cause of the inundation was local overland flows from the west
from a rain event on 13 January/14 January 2011.
7. The local topography involves runoff towards the river on the eastern side of
the house. Flood water from the river would need to have flowed uphill to
reach the house.
Summary of FSP’s position
8. The hydrologists reported that the flooding after 9.00am on 14 January 2011
was not the result of stormwater; it was due to the flooding of the Loddon
River.
Determination
Case No: 247937 Determination Page 2 of 7
9. The bulk of the flood event on the property occurred more than 24 hours after
the local rainfall.
10. The hydrologists considered the advice from the engineer who supported the
Applicant‟s pos ition. They considered that the high rainfall contributed only
150mm to the inundation caused by the runoff.
11. The FSP relies on the following policy provisions:
“ What this insurance does not cover
Your house is not covered for Loss by:
Flood, as defined [elsewhere in the policy] and explained in ....- General
Exclusions of this policy unless we agree to cover Flood and it is noted in Your
Certificate;
...
Section .. – General Exclusions
There is no cover under any of the sections of your policy for any of the following:
...
5 Flood
There is no cover for any Loss or liability (sic) caused directly or indirectly in any
way by Flood (as defined in ... General definitions) under any of this policy (sic)
except Private/Business Motor.
General Definitions
The following definitions apply to the sections you have purchased in Your ... policy
unless the context requires otherwise. ....
Flood
Means the inundation of normally dry land by water overflowing the normal confines
of any natural or artificial water course, lake, reserve, canal, dam or pond. For
examples of some of the types of flood We do not cover please refer to [elsewhere in
the policy].”
Reasons for decision
12. Due to the nature of the dispute, it has been referred to the Panel for
Determination in accordance with the Operational Guidelines to the Financial
Ombudsman Service‟s Terms of Reference.
13. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
Case No: 247937 Determination Page 3 of 7
14. There has been an exchange of information between the parties and the
Panel is satisfied that each party has had an opportunity to address the issues
raised.
15. The Panel Chair Ombudsman and a Panel Member attended on site where
they met with the Applicant‟s son MN, and a representative of the hydrology
organisation engaged by the FSP, BT.
16. The Panel notes that BT had not previously attended on site and the onsite
attendance for the purposes of the original hydrology report dated 12 May
2011 was conducted by other members of the hydrology organisation. BT is
referred to as having conducted a “Senior Review” of the original report.
17. The Panel also notes that BT did not provide a further report following his
onsite attendance, but rather details and commentary were provided by L from
the same organisation, by way of an email dated 9 May 2012. The Service
has not been advised of the position or qualifications of L.
18. The Panel notes that BT appears not to have played a role in the second
hydrology report dated 15 September 2011. The Senior Review of that report
was conducted by another member of the hydrology organisation.
19. The Loss Adjuster commissioned by the FSP supplied a copy of BOM Daily
Weather Observations for January 2011 in Charlton, a locality quite some
distance from the Applicant‟s property. These figures are not relevant since
the hydrologists‟ reports provided figures for a locality much closer to the
Applicant‟s property.
20. The hydrologists reported, on the basis of rainfall data at Canary Island, which
is located approximately 8 km from the property, that the Loddon River
peaked on 16 January 2011 having been above its major flood level for
approximately 4 days.
21. Following discussions with the Applicant, the hydrologists concluded that the
flood event occurred more than 24 hours after the local rainfall which had
amounted to approximately 300mm in the previous week ; initially the
inundation “may” have been caused by local runoff ; the overflow from the
Loddon River, local creeks and irrigation channels was the cause of later
flooding.
22. The Applicant‟s submission was based on the opinion of an engineer with
experience of the local floodplain. This was to the effect that the water
inundation above the floor level of the dwelling on 14 January 2011 was from
a local catchment area from the west.
23. The FSP‟s hydrologists made a further revision to their reports in the light of
this submission made by the Applicant. The revised report pointed out
differences in the facts on which the two conclusions were based. These
differences concerned
The size of the catchment area;
Case No: 247937 Determination Page 4 of 7
Rainfall figures on 13 January/14 January;
The volume of local catchment run-off;
The dates on which a nearby lake and the Loddon River reached their
highest levels and when the water reached the Applicant‟s locality.
24. The conclusion in the revised report was that part of the initial inundation
resulted from local runoff to a depth of 150mm; beyond that depth was
attributed to flooding of the Loddon Ri ver. The revised report admitted that it
was not based on detailed modelling.
25. The Applicant‟s engineer considered that while the revised hydrologists‟ report
was good it suffered from a lack of local knowledge. In particular, the outer
western part of the floodplain does not react in a general manner. The
engineer did not develop his thesis. In particular he did not explain where the
report fell short.
26. When the Panel Chair Ombudsman and Panel Member attended on site, the
Applicant‟s son MN provided a photog raph taken at 4pm on 14 January 2011.
The photograph shows the Applicant‟s premises inundated by water. There is
no significant challenge to the accuracy of this photograph and thus it is
established that the Applicant‟s premises were inundated prior to 4p m on 14
January 2011.
27. MN also provided other photographs, one of which showed that the road to
the east of the Applicant‟s premises was dry notwithstanding the inundation of
the Applicant‟s premises and the area immediately around the Applicant‟s
premises.
28. MN contended that this photograph demonstrated that water had not come
from the Loddon River which is to the east of the property.
29. The relevant photographs have been provided to the FSP.
30. In addition to the photographs, MN also provided a document entitled
“Timeline for storm water at (Applicant‟s) property”, Leaghur.
31. A copy of this document has been provided to the FSP.
32. The effect of the document is to assert that the inundation which occurred at
the Applicant‟s property on 14 January 2011 was as a result of rain that fell in
the early hours of the morning of 14 January 2011. Further the effect of the
document was to assert that any water from the Loddon River, Lake Boort or
Lake Lyndger would only have arrived at the property on 15 January 2011 or
later, if at all.
33. Finally, MN provided a photocopy of a page from the Australian National
Meteorological Service which listed rainfall totals for Friday 14 January 2011
at Canary Island of 60mm.
Case No: 247937 Determination Page 5 of 7
34. In respect to the rainfall data MN asserted that that rainfall was s ufficient to
cause the inundation of the Applicant‟s home prior to 4pm on 14 January
2011.
35. The rainfall data referred to above was provided to the FSP.
36. The Panel Chair Ombudsman noted that at the site visit, BT the flood
engineer from the hydrology organisation engaged by the FSP, who attended
the site on behalf of the FSP, conceded that there would have been storm
water runoff on the property. However, he was unsure as to what else might
have influenced the ultimate level of inundation and he suggested tha t the
only way to understand what occurred was to carry out a full hydraulic
modelling based on the topography.
37. Subsequent to the site visit and the provision of the above mentioned
documentation to the FSP, the FSP provided a copy of an email from L, from
the office of the hydrology organisation engaged by the FSP.
38. The Panel is uncertain as to why the email is from L and not from BT who
attended the on site visit. However, the Panel notes that L makes reference to
BT having attended on site and the organisation being provided with
additional photographs and other material referred to above.
39. The above mentioned email dated 9 May 2012 concludes:
“ Therefore, our revised conclusions for (Applicant’s address), are that the
inundation was most likely caused on 14 January 2011 by the following
mechanisms:
Significant rainfall falling on the local catchment has contributed to
runoff and inundation at the site.
Flow from the Boort Lakes floodway may have also contributed to
inundation at the site (although the peak is likely to have arrived later
than 14 January).
Given the lack of data and uncertainty in timing, we cannot distinguish
between the relative impact that these two flooding mechanisms would
have, although further analysis through hydraulic modelling would be
able to reduce this uncertainty.”
40. Subsequent to the email from L, the FSP has made a further submission by
way of an email dated 10 May 2012. Within this further submission, the FSP
confirms the original submission that the likelihood of inundation to a depth of
400mm is low given the estimated area available of localised runoff.
41. The FSP contends that the further information provided does not contradict
the original submission as the FSP has not disputed that localised runoff
inundated the area.
42. The FS P maintains that it is “ highly likely ” that the continuing rainfall had
nowhere to go as local waterways were already in flood. In those
circumstances, the FSP contends that the above mentioned set of
Case No: 247937 Determination Page 6 of 7
circumstances is caught by the policy definition of „flood‟ and therefore
excluded from cover.
43. The Panel notes that the FSP seeks to rely upon a general exclusion under
the policy, that being in respect to loss caused by flood as defined by the
policy.
44. It is a matter of settled insurance law that in circumstances where the FSP
seeks to rely upon such an exclusion, the FSP bears the onus of proof in
respect to that exclusion.
45. The Panel regards the commentary from BT at the onsite meeting and the
commentary from L within the email of 9 May 2012 as instructive.
46. In the first instance, the hydrologist accepts that significant rainfall falling on
the local catchment has contributed to runoff and inundation at the site.
47. Secondly, the hydrologist concedes that peak water from the Boort Lakes
floodway is likely to have arrived later than 14 January 2011.
48. Thirdly, notwithstanding the submission of the Applicant and his son MN that
water from the Loddon River did not reach the subject property, the email from
L only suggests that the included time line may be slightly misleading. The
email does not elaborate on the manner in which it is misleading insofar as
the Loddon River is concerned and more particularly does not assert as to
when the waters from the Loddon River allegedly reached the subject
property; if at all.
49. Fina lly, L‟s email concludes that, given the lack of data and uncertainty in
timing, the hydrology organisation cannot distinguish between the relative
impacts that the two inundation mechanisms would have brought to bear.
50. As confirmed, the FSP bears the onus of proof in respect to these matters.
Given the above evidence and submissions, the Panel is not satisfied the FSP
has established, on the balance of probabilities, that flooding was the cause of
the inundation.
Determination
51. The Panel determines that the FSP is not entitled to deny the Applicant‟s
claim.
Case No: 247937 Determination Page 7 of 7
52. The Panel further determines that if any part of the claim is to be cash settled,
then the FSP is to pay interest at the rate specified by the Insurance Contracts
Act 1984 from the date of denial of the claim to the date of settlement.