Home / Financial Firm (Unknown - Insurer) / Determination 247713

Determination 247713

Contents claim declined as flood, not flash flood and stormwater run-off, after Brisbane River inundation

FirmFinancial Firm (Unknown - Insurer)
Decided2012-10-11
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed$50,000
SourceAFCA PDF

Summary

The complainant's retirement village unit contents were damaged by floodwater from the Brisbane River. The FSP declined the $50,000 claim as flood; AFCA found flash flood cover applied, required payment subject to the cap, and ordered interest from the denial date.

Under the proximate cause test, the heavy rain from about 4.00am on 11 January 2011 caused the W4 strategy, so the inundation was caused by flash flood within 24 hours.

Issues

Subjects and remedies

natural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 247713 Determination Page 1 of 13 Case Number: 247713 General Insurance - Home Contents Insurance – Flash flood or stormwater runoff – Policy exclusion – Flood – Insurance Contracts Act 1984 S 57 24 September 2012 Background 1. The Applicant insured her home contents under a Home Contents Insurance Policy for $108,000 with a $300 policy excess. The policy was current for the period 28 February 2010 to 28 February 2011. 2. On or about 12 January 2011, the Applicant’s property was inundated by water and she submitted a claim to the Financial Services Provider (FSP) for $50,000 for the damage suffered to her contents. 3. In early January 2011, a severe weather event brought widespread rain to South East Queensland. These heavy rains, together with massive releases of water from the Wivenhoe Dam, caused levels of the Brisbane River to rise rapidly over the period 10 to 13 January 2011. 4. The river level peaked on the afternoon of 13 January 2011. The rising water of the Brisbane River caused severe flooding in the Brisbane CBD and surrounding suburbs. 5. The Applicant’s property is located within a Retirement Village at Taringa which is situated approximately five kilometres south of Brisbane. Her unit is approximately 500 metres from the Brisbane River. 6. The FSP rejected the Applicant’ s claim on the ground the damage to her property was caused by flood water escaping from the Brisbane River. 7. The Applicant disputes the FSP’s decision. Summary of Applicant’s Position 8. The Applicant contends that she did not receive any denial letters from the FSP other than a letter stating that it had paid $2,500 from its compassionate fund. 9. The Applicant suffered loss and damage to her contents to the amount of $50,000. Determination Case No: 247713 Determination Page 2 of 13 Summary of FSP’s Position 10. Although the Applicant has stated that she did not receive any letters from the FSP informing her that her claim had been denied, the FSP contends that it sent a letter dated 15 March 2011 advising the Applicant that her claim had been declined and informing her that she was eligible for a $2,500 payment from the F SP’s compassionate fund. 11. Another letter providing more details in relation to the compassionate payment was sent to the Applicant on 29 March 2011. It was not until after the receipt of the letter dated 29 March 2011 that the Applicant accepted the compassionate payment. 12. Further, the FSP sent a letter dated 15 July 2011 from its Internal Dispute Resolution Manager confirming that her claim had been denied. Obligation to clearly inform 13. The FSP contends that the Applicant was clearly informed about the scope of the policy’s cover when the Applicant received a copy of the PDS. 14. The Applicant has not disputed that she received a copy of the PDS. 15. In the PDS under the heading ‘What is covered’, the term ‘flash flood and stormwater run- off’ appears along with the d efinition of that term. Immediately adjacent to this, under the heading “What is not covered’, the term ‘flood’ is listed. 16. The FSP states that throughout its PDS it clearly defines ‘flood’ and clearly informs that flood is not covered unless the FSP has agreed and it is shown on the Certificate of Insurance. 17. Further, the section in the PDS dealing with optional cover also makes clear that ‘flood’ is not an event which is included in the standard policy. 18. The FSP submits that when the definitions of ‘Flood’ and ‘Flash flood and stormwater run- off’ are read together, the difference between the two is clear. 19. The policy makes it clear that ‘Flash flood and stormwater run - off’ is a particular category of flood where a sudden flood caused by rain that fell no more than 24 hours earlier. The policy makes it clear that this is the only type of flood which is covered and that any other kind of flood is not covered as part of the standard cover. 20. Further, the Applicant’s Certificate of Insurance confirms that ‘Flood and storm surge’ is not included under the policy. Cause of Applicant’s Loss 21. On 2 February 2011, the FSP appointed a hydrologist to investigate the cause of inundation in various areas including Brisbane. The FSP has relied upon the findings of the hydrologist in making its decision. Case No: 247713 Determination Page 3 of 13 22. The hydrologist reported: A substantial amount of rain fell in the Brisbane River catchment above Wivenhoe Dam both before, but particularly over the period 9, 10, and 11 January 2011 commencing at 9.00am on 9 January 2011. The rain caused significant flows into the Wivenhoe Dam, the level of which peaked late in the evening on 11 January 2011. There were significant discharges of this water from the Wivenhoe Dam which flowed into the Brisbane River. This water worked its way down the Brisbane River towards Brisbane. A small proportion of the overall depth of the Brisbane River prior to 6.00am on 12 January 2011 may be partially attributable to the rain that fell in the Bremer River catchment on 11 January 2011. However, the overwhelming influence on the flooding of the Brisbane River was the rain which fell some days earlier over the Wivenhoe Dam catchment and its subsequent release from Wivenhoe Dam. 23. The FSP also relies upon an Insurance Council of Australia (ICA) hydrologists’ r eport. In the report’s Summary of Findings section it states: ‘ There were three generally distinct and significant periods of rainfall between 9 January and 13 January 2011: the first rainfall event occurred over the period from about 1400 hours to 2100 hours on Sunday 9 January, the second event over the period from about 0900 hours to 1200 hours on Monday 10 January 2011, and the third event from about 2100 hours on Monday 10 January to 1500 hours on Tuesday 11 January. The third rainfall event delivered the heaviest falls. The first and third of these rainfall events caused two major floods in the upper Brisbane River catchment draining directly into Wivenhoe and Somerset Dams. ... Floodwaters moving down the Brisbane River over the period 9 to 14 January were made up of releases from Wivenhoe Dam and floodwaters from Lockyer Creek and the Bremer River. The water level response to these normal flood events in lower Lockyer Creek, in the lower Bremer River and in the lower Brisbane River was dwarfed by the subsequent water level rise associated with releases from Wivenhoe Dam over the period 0600 hours on Tuesday 11 January to 0300 hours on the morning of Wednesday 12 January 2011. 24. The hydrologist’s report confirms that the Applicant’s property does not appe ar to have been inundated by stormwater run-off or other local run-off. 25. The hydrologist’s reasons for this opinion are: The terrain information suggests that it would be unlikely that the Applicant’s property would experience significant stormwater problem s from stormwater or other local run-off during rainfall intensities experienced during the January 2011 flood event; Case No: 247713 Determination Page 4 of 13 The rainfall around the time of the inundation of the Applicant’s property was not sufficient to cause inundation by stormwater run-off or other run- off. 26. The FSP contends the evidence that the proximate cause (or at the very least a proximate cause) of the loss was rain which fell over the whole of the Brisbane River catchment (including Wivenhoe Dam catchment) from 9 January 2011 (and earlier) which had the effect of raising the level of the Brisbane River. That rain fell more than 24 hours prior to the inundation of the Applicant’s property. 27. Therefore, the inundation does not meet the definition of ‘Flash flood and stormwater run- off’. Conclusion the Applicant was informed about the declinature of the Applicant’s claim; the Applicant was clearly informed about the scope of the policy’s flood cover; the Applicant’s loss was not caused by ‘Flash flood and stormwater run - off’ as defined in the policy; the Applicant’s loss was caused by ‘Flood’ as defined in the policy; and the FSP’s original claim decision should be upheld. 28. The FSP relies on the following policy/contract provisions: ‘Words/terms with special meanings Word/term Meaning Flood Rising water which enters your home as a result of It running off or overflowing from any origin or cause. This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance. Flash flood and A sudden flood caused by heavy rain that fell no Stormwater run-off more than 24 hours prior to the flash flood or stormwater run-off. ... Storm A violent disturbance of the atmosphere associated with strong winds including a cyclone, lightning, heavy rain, hail or snow, but not continuous bad weather by itself. ... Insured events you are covered for Damage caused by weather... What is covered What is not covered Case No: 247713 Determination Page 5 of 13 Storm Loss or damage: × caused by rain, hail or snow after it has reached the ground; × caused by rain or wind entering the home unless It enters through an opening in the windows, walls Roof made by a storm; ... Flash flood and Loss or damage caused: Stormwater run-off × by flood; ... Your contents The most we will pay for contents claims What is covered ... Flash flood and stormwater run-off We will pay up to 50% of your contents sum Insured or $25,000, whichever is higher, but not exceeding your contents sum insured. ... Optional covers for extra peace of mind The covers outlined in this section are optional and do not apply unless you have asked for them and we agree to cover you. Additional premiums apply for each cover. Your certificate of insurance will show which covers operate. All optional covers are subject to the terms and conditions of this policy. What is covered ... Flood and storm surge This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance. Home and/or contents cover We cover you for loss of or damage to your home or contents caused by flood or storm surge which happens during the period of insurance at the property address. We will pay up to the: home sum insured, if your home is insured; Contents sum insured, if your contents are insured for damage caused by flood or storm surge. We will pay for loss or damage in the same way and in the same amounts as we do under Insured Contents cover.’ ‘Renewal - Certificate of Insurance Case No: 247713 Determination Page 6 of 13 Contents Insurance ... What optional covers are included and not included ... Flood and storm surge not included Please refer to your Product Disclosure Statement (PDS) and any Supplementary Product Disclosure Statement (SPDS) for full details of the optional covers available.” Issues 29. Whether the Ap plicant’s property was inundated by flash flood or stormwater run-off as defined by the policy on or about 12 January 2011 so as to fall within the scope of cover. 30. Whether the FSP has correctly denied the claim on the ground that the damage was caused by flood which is excluded under the policy. Reasons for Decision 31. The onus of proof is on the Applicant to establish, on the balance of probabilities, that she has suffered a loss caused by a risk insured against. Once the Applicant has established that the loss was prima facie caused by a risk insured against, the onus shifts to the FSP to show, on the balance of probabilities, that the loss falls within an exclusion in the contract of insurance. 32. Due to the nature of the dispute, it has been referred to the Panel for Determination in accordance with the Operational Guidelines to the Financial Ombudsman Service’s Terms of Reference. 33. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in insurance industry matters and a representative with extensive experience in consumer claims. 34. There has been an exchange of material which the parties rely on. Each party has had access to the material on which the other party bases its case. The Panel has had regard to the material exchanged and the detailed submissions made on behalf of the parties. 35. Whilst the FSP has dealt with the issue of whether the Applicant was informed that flood was not covered under the policy and there is limited coverage for flash flood and stormwater runoff, the Applicant does not deny receiving the PDS. Consideration of “Flood” Definition in PDS 36. It is established law that in order to satisfy the requirement to clearly inform, the language of Section 35(2) allows for a proposed insured to be clearly informed Case No: 247713 Determination Page 7 of 13 by providing the relevant documentation in writing and that the relevant exclusion and/or limitation in this case is clear and unambiguous and in a manner which a person of average intelligence and education is likely to have little difficulty in finding and understanding if that person reads the policy in question. 37. The Panel has reviewed the FSP’s policy on a number of occasions. The policy is indexed with relevant sections covering the insured events. The policy sets out the definitions of storm and flash flood and stormwater runoff. The policy clearly identifies that flood and storm surge is an optional cover but otherwise flood is excluded from cover. The Certificate of Insurance also clearly identifies that with respect to the Applicant’s policy, flood and storm surge is not covered. Having considered the Applicant’s submissions and the FSP’s policy documents, the Panel is satisfied that the FSP has met its obligations to clearly inform the Applicant of the extent of the exclusions and limitations in accordance with the requirements of the Act. 38. A FOS Case Manager contacted the Manager of the Retirement Village (village) in which the Applicant resided to confirm the events leading up to the inundation of the Applicant’s unit. 39. The Manager stated: Flood water began to flow into the park adjacent to the village and between the Brisbane River and the village on 11 January 2011; During the day of 11 January 2011, the manager became aware of water flowing out of the stormwater system in Heroes Avenue which is approximately 200 metres closer to the river than the village. During the night of 11 January 2011, the manager continued to monitor the movement of the flood waters as they flowed closer to the village. In view of the increasing danger from the rising flood water, the manager had evacuated all of the residents of the village by about 5.00am on 12 January 2011. By that time the flood waters had started to inundate the village property. Water inundation Releases from Wivenhoe Dam & Proximate Cause 40. The central issue for Determination in this dispute is whether the inundation of the Applicant’s home on 12 January 2011 was due to flash flood as defined within the terms of the policy, that is whether rain that fell no more than 24 hours prior to the inundation of the Applicant’s property was the proximate cause of the inundation. 41. The Panel suspended issuing Determinations relating to this question after the Queensland Flood Commission of Inquiry had been recalled to hear further evidence from the Wivenhoe Dam’s operating engineers. Once the final report was released, all relevant stakeholders were invited to put further submissions to the Panel relating to the impact of the heavy rainfall that commenced falling Case No: 247713 Determination Page 8 of 13 over the Wivenhoe Dam around 4.00am on 11 January 2011 and in particular the impact this had on the decision to adopt the W4 release strategy. 42. On 21 May 2012 FOS issued a memorandum to all relevant stakeholders advising that after considerable deliberation of all material available to it, the Panel formed a view that the heavy rain occurring from approximately 4.00am on 11 January 2011 and in particular the heavy rain between 4.00am and 8.00am on 11 January 2011 was a proximate cause of the W4 strategy being invoked and therefore a proximate cause or trigger that led to the flooding of many of the properties along the Brisbane River. 43. At that time, the Panel noted that in relation to the approach that each dispute would depend upon the individual and unique factors relevant to the dispute and in that regard, the parties were invited to make further submissions in relation to disputes before FOS. 44. In view of this, the FSP provided detailed further submissions to FOS on 12 June 2012 in relation to this dispute. Included with the submissions were the following documents: A Reference document for disputes relating to Queensland Floods (this is a general reference document) relating to the various submissions the FSP makes in relation to a number of issues. Not all issues raised in the reference document appear in the current dispute. The Panel notes that the FSP has updated this Reference document; Letter from the FSP’s hydrologist attaching a key information sheet for the Applicant’s property; Hydrologist report “Investigations of January 2011 inundati on event – Brisbane” dated March 2011; Statement from hydrologist dated 7 June 2012. 45. The Panel has reviewed the Reference documents. Insofar as the Reference documents relates to the current issues in dispute, those matters have been considered. 46. In summary, the FSP argues that the proximate cause of the inundation of the properties, that is the real or effective cause of the damage caused to the properties downstream of the dam, is not simply the rain that occurred from 4.00am on 11 January 2011. The FSP maintains that on any reasonable view, the damage sustained to the downstream properties was the combined effect of all of the rainfall and not just the rain that had fallen from 4.00am on 11 January 2011 leading to the implementation of the W4 strategy from 8.00am that day. 47. There is no dispute that heavy rain fell over the Wivenhoe Dam catchment area and in fact parts of the Brisbane River from approximately 4.00am on 11 January 2011. 48. The FSP’s hydrologist has relied on data from SEQWater dated 2 Marc h 2011 which confirms the rapid increase in releases from the Wivenhoe Dam from 8.00am on 11 January 2011. Examination of the SEQWater report identifies the Case No: 247713 Determination Page 9 of 13 rapid increase in the inflows to the Wivenhoe Dam commencing from about 4.00am on 11 January 2011. The report confirms the inflows into the dam had been decreasing from as early as 8.00am from 10 January 2011 with steady decreases from approximately 3.00pm on 10 January 2011 to 2.00am on 11 January 2011. 49. The Queensland Flood Commission of Inquiry report confirms that prior to 4.00am on 11 January 2011 and in fact prior to 8.00am of 11 January 2011 the dam releases were being managed at the W3 strategy. Whilst it is accepted the W3 strategy had led to an increase in the levels of the Brisbane River, the W3 strategy was designed to avoid where possible inundation of the properties below the Wivenhoe Dam by flooding from the Brisbane River. 50. There is no dispute that there were two significant rainfall spikes, with rain that fell from 9 to 10 January 2011 being considered the first spike and rain that commenced falling from approximately 4.00am on 11 January 2011 being the second spike. 51. There is no dispute that following the second spike, the W4 strategy was adopted. The FSP has argued that the switch to strategy W4 was not the natural and ordinary consequence of the rain that fell and in fact the move to the W4 strategy was not taken in accordance with the Wivenhoe Dam manual. In the Panel’s view, the Queensland Flood Commission of Inquiry’s final report does not find the adoption of W4 strategy at 8.00am on 11 January 2011 was inconsistent with the manual. Although there may be issues as to how the Wivenhoe Dam had been managed prior to this time, there is nothing in the material that has been provided to the Panel to suggest that the earlier management of the Wivenhoe Dam influenced to any significant degree, the adoption of the W4 release strategy at 8.00am on 11 January 2011. 52. The ICA hydrology and the information provided by the FSP’s hydrologist confirms that the increased releases from the Wivenhoe Dam after the adoption of the W4 strategy led to the development of a flood wave that ultimately caused the flooding of many properties downstream of the Wivenhoe Dam. 53. The question arises as to what was the proximate cause of this inundation. In determining the proximate cause of the inundation it is necessary to look at the effective or dominant cause of the inundation. The Panel agrees with the FSP’s general submission that the proximate cause is a cause determined by common sense evaluation of the relevant facts. In the event that there are two or more proximate causes, one within the policy and the other excluded, the policy does not respond. The proximate cause is not determined by identifying the last event or final trigger but by determining what is the dominant, effective, direct or efficient cause of the loss. 54. The FSP has maintained that the impact on the Wivenhoe Dam from the rainfall that fell in the early hours of 11 January 2011 was only 29% while 71% of the volume of the inflow came from the rain that fell on 9 and 10 January 2011 or earlier. The FSP maintains that to find the rainfall which had fallen from 4.00am on 11 January 2011 is the proximate cause is without foundation as such an approach produces an entirely artificial outcome. Case No: 247713 Determination Page 10 of 13 55. With due respect to the FSP’s argument the Panel disagrees. Whilst the Panel accepts there has been a significant impact on the levels of the Wivenhoe Dam by the rainfall that commenced falling on or about 9 January 2011 or earlier, the Panel is satisfied having regard to the information that has been exchanged and the relevant legal principles, that the heavy rain that commencing falling on or about 4.00am on 11 January 2011 was the proximate or effective cause of the adoption of the W4 strategy. 56. The Panel is also satisfied that whilst the level of the Brisbane River may have been increasing under the W3 strategy, it was the heavy rainfall from approximately 4.00am on 11 January 2011 that caused the need to adopt the W4 strategy at 8.00am on the same day. The Applicant’s Inundation 57. As previously revealed a FOS Case Manager contacted the manager of the Retirement Village (village) in which the Applicant resided to confirm the events leading up the inundation of the Applicant’ s unit. 58. The manager stated: Flood water began to flow into the park adjacent to the village and between the Brisbane River and the village on 11 January 2011; During the day of 11 January 2011, the manager became aware of water flowing out of the stormwater system in Heroes Avenue which is approximately 200 metres closer to the river than the village. During the night of 11 January, the manager continued to monitor the movement of the flood waters as they flowed closer to the village. In view of the increasing danger from the rising flood water, the manager had evacuated all of the residents of the village by about 5.00am on 12 January 2011. By that time the flood waters had started to inundate the village property. 59. The Panel is of the view that the evidence of the manager of the Retirement Village is unlikely to be exact as given the circumstances of assisting elderly people to leave the retirement village, the manager is unlikely to have been paying precise attention to the time. 60. SC’s statement indicates th e effect of the W4 releases first reached the vicinity of the Applicant’s property at 3.08pm on Tuesday 11 January 2011. He estimated that the property was first inundated by the Brisbane River at 3.29am on Wednesday 12 January 2011 and by 4.00am on 12 January 2011 the property was inundated up to 0.1m above the relevant benchmark level. 61. The relevant benchmark level was SC’s estimate of the lowest point of the house. This evidence has not been refuted by the Applicant in any manner. 62. The Panel notes that the ultimate inundation of the property was 1.9m above the benchmark level. SC identified this peak inundation occurred at approximately 2.57am on Thursday 13 January 2011. Case No: 247713 Determination Page 11 of 13 63. The Panel accepts the possibility that these assessments may not be entirely accurate. 64. The Panel notes that the FSP has been provided with the details of the evidence from the manager of the Retirement Village. The FSP seeks to rely upon the evidence of SC. The Panel agrees that in the circumstances of this case, the evidence of SC is likely to be more reliable. 65. The FSP’s hydrologist has also speculated that if the W3 strategy had been maintained, then, according to his key conclusion statement, the Applicant’s property would still have been inundated by approximately 11.13am on Wednesday 12 January 2011 and by 4.00am would have been inundated to a level of 0.5m below the benchmark level. 66. The Panel is concerned however that to reach such a conclusion, it must be speculated that the releases from the dam would have continued at the same rate at the W3 level in the absence of any additional rainfall. The report does not address the possibility of the inflow into the Wivenhoe Dam decreasing. 67. The available information indicates the W3 strategy, that was in place prior to 8.00am on 11 January 2011, had been successful in limiting the outflows and flooding below the Wivenhoe Dam. Whether the outflows would have continued at the same rate had the inflows continued to reduce is not known. 68. Instead, the Panel is satisfied that on the facts of what actually occurred on 11 January 2011, it was the heavy rainfall from approximately 4.00am on 11 January 2011 that caused the need to adopt the W4 strategy at 8.00am on the same day. This led to the inundation of the Applicant’s property. 69. To this extent, the Pane l is satisfied that the inundation of the Applicant’s property to the level of 0.1m above the benchmark was caused by flood that occurred within 24 hours of the heavy rainfall. Quantum 70. The Renewal Certificate of Insurance for the relevant period provides a sum insured of $108,000 for the contents. Pursuant to the policy cap for the insured event of “Flash flood and stormwater runoff”, the FSP is liable up to an amount of $54,000 for the contents. 71. Given the time since the loss was sustained, the Panel accepts that the parties may be unable to provide an exact estimate of the total loss sustained, or a breakdown of that loss. 72. The Applicant and the FSP are asked to work cooperatively together to establish the extent of the loss sustained to the contents within the first level of the property. Insofar as the FSP may have made payment of a compassionate sum to the Applicant, FOS does not have jurisdiction to deal with this payment but acknowledges that the FSP, given the terms on which the compassionate payment was made, may be entitled to deduct this payment from any settlement sum. Case No: 247713 Determination Page 12 of 13 Interest 73. The FSP has argued that interest is only payable from the date from which it was unreasonable to withhold payment. The FSP maintains that it is entitled to a reasonable period to investigate and determine its position, and given the complex nature of the flood disputes, the delays are not unreasonable. Further complex situations require substantial periods of time for independent bodies such as the Queensland Flood Commission of Inquiry and FOS, to make conclusions on the issues in dispute. 74. The FSP maintains that it did not act unreasonably in this dispute and therefore interest is not payable. Alternatively, if some period of interest is to be awarded it should be reduced to account for the substantial delays through the course of the process which were not the FSP’s fault. 75. Section 57 of the Insurance Contracts Act requires interest be paid when it becomes “unreasonable for the insurer to have withheld payment”. An examination of relevant case law indicates that most probably, interest will be awarded from either when an insurer first emphatically denied liability or disputed a matter, or from when in the normal course of events, the claim should have been paid if liability had not been disputed. 76. In this dispute, the Panel accepts that the FSP was entitled to withhold payment of the settlement monies until such time as it had properly investigated the dispute and made its decision as to liability. 77. The FSP made its original decision on 5 March 2011 to deny the claim after receiving relevant assessment reports, hydrology reports and other information. The FSP was aware of the terms of its policy and aware of the relevant provisions under which liability might arise and chose to deny the claim having reviewed those relevant provisions and the evidence available to it. 78. In the Panel’s view, at that point the FSP has made its decision on the claim and it is appropriate that from that time, interest be paid unless it can be established that the Applicant had withheld information from the FSP that would have led to an alteration of its decision. 79. Accordingly, the Panel determines that it is appropriate that the FSP in this dispute pay interest from the day the FSP determined to deny liability of the Applicant’s claim, until payment of the claim. Determination 80. The FSP is to meet the cost of the replacement of items damaged as a result of the inundation of the property. Any payment is subject to the limitations expressed in paragraph 70 of this Determination. Case No: 247713 Determination Page 13 of 13 81. Insofar as the FSP is to cash settle the claim, the FSP is to pay interest from 5 March 2011 (being the date of rejection of the claim) to date of payment of the claim, in accordance with Section 57 of the Act.