Text of the determination
Case No: 247517 Determination Page 1 of 9
Case number: 247517
General Insurance – Small Business/Farm Insurance – Commercial Property -
FSP Decision - Denial of claim-Exclusion/ condition
11 May 2012
Background
1. The Applicant owns a strata-titled commercial unit in a building containing
four such units. A commercial strata insurance policy covering the building
was held by the body corporate for the building with the Financial Services
Provider (FSP).
2. The FSP distributes its policies through an intermediary and specialist
underwriter, and for convenience, throughout this Determination the FSP
and its distributor will be referred to collectively as the FSP.
3. The policy was arranged through a broker by a strata manager for the body
corporate for the building. The Applicant, who is a beneficiary under the
policy, is represented, and for convenience throughout this Determination
the Applicant, his representative, the strata manager and the broker will be
referred to collectively as the Applicant.
4. In January 2011, after the A pplicant‟s unit was inundated with water, he
lodged claim for the damage with the FSP.
5. The FSP denied the claim on the basis that the damage was caused by
flood, which is specifically excluded under the policy. The FSP also denied a
secondary claim for glass damage, which occurred during an incident shortly
after the inundation event, on the basis that the proximate cause of that
damage was also flood.
6. The Applicant requested a review of the decisions, but after the FSP
considered the matter it decided to maintain its original decision to deny the
claims.
Summary of Applicant’s position
7. The Applicant says the FSP‟s hydrology report fails to take into account a
number of factors, including the saturated ground conditions, the impact of
debris and heavy rainfall on the ability of the drains to cope with the amount
Determination
Case No: 247517 Determination Page 2 of 9
of storm water, and the ferocity of the storm which swept through the
township on the day of the inundation, and as a result, the report is
unreliable.
8. The FSP‟s hydrologist report, upon which it relies to deny the claim for
damage to the building, leaves open the possibility that some damage was
caused by storm water runoff.
9. Video footage of the inundation event shows water flowing past and around
his unit, towards the drainage channel to the west, indicating that this water
was storm water.
10. With respect to the second claim for glass damage, the Applicant says that
army and emergency personnel helping with the cleanup drove trucks along
the road near his unit, and caused debris and rubbish to push up against the
glass shop front windows, causing them to break.
11. He says that the cause of the damage to the windows was not the flood, but
the debris and the actions of the person driving the truck.
Summary of FSP’s position
12. The FSP says that the evidence available shows that the township flooded
and that the Applicant‟s unit was inundated by flood water up to 1.4m. As
flood is excluded from cover, th e Applicant‟s claim for the inundation damage
was denied.
13. The site-specific hydrology report it obtained states that based on the
topography and size of the local catchment, the peak level inundation could
not have been caused by local stormwater alone.
14. The FSP also says that video footage of the event supports its position that
flood water was the cause of the damage to the Applicant‟s unit.
15. The Applicant‟s subsequent claim for damage to the shop front windows is
also denied. The proximate cause of the damage was flood, because if the
flood waters were not present in the street, the truck could not have caused
the debris to be pushed into the windows and break the glass.
16. The FSP relies on the following policy provisions:
“ DEFINITIONS
Flood means:
The inundation of normally dry land by water escaping or being released from
the normal confines of a:
1. Canal;
2. Dam;
3. Natural water course or lake (whether or not altered or modified); or
4. Reservoir.
Case No: 247517 Determination Page 3 of 9
...
SECTION 1 – BUILDINGS
WHAT’S COVERED
Your Buildings that are at the Location. They are covered against accidental
loss or damage.
WHAT‟S NOT COVERED
...
6. Loss or damage that arises from:
...
c) Flood ; the sea other than tsunami. ”
Issues
17. Whether the initial damage to the Applicant‟s unit was caused by
stormwater.
18. Whether the proximate cause of damage to the Applicant‟s unit‟s shop front
windows was flood.
Reasons for decision
19. Due to the nature of the dispute, it has been referred to the Panel for
Determination in accordance with the Operational Guidelines to the Financial
Ombudsman Service‟s Terms of Reference.
20. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
21. There has been an exchange of information between the parties and the
Panel is satisfied that each party has had an opportunity to address the
issues raised.
22. In addition, the Ombudsman Panel Chair attended on site together with the
Applicant, representatives of the body corporate, real estate management,
hydrologist and the FSP.
23. The Panel has reviewed the policy wording, and is satisfied that it describes
flood in clear and unambiguous terms, and explains that flood is not covered.
24. There are two claims involved in this dispute, and they will be addressed
separately.
Case No: 247517 Determination Page 4 of 9
Claim 1 – Building Damage from Water Inundation
25. It is a principle of general insurance law that the insured bears the onus to
establish, on the face of the facts, that they have suffered a loss caused by
an incident or event which is covered by the policy; this is known as a prima
facie claim.
26. Once so established, the onus shifts to the insurer to prove that a policy
exclusion applies.
27. In this case, the policy is covers accidental damage to the Applicant‟s
building. The Panel notes that the policy does not include a definition of
„accidental‟, so the Panel accepts the common or ordinary meaning of the
word. According to the Macquarie Dictionary, accidental means “ happening
by chance or accident , or unexpectedly” .
28. There is no dispute that the Applicant‟s unit was damaged by water
inundation, and the Panel accepts that this event was unexpected and
unintended from the Applicant‟s perspective.
29. As such, the Panel finds that the Applicant has established a prima facie
claim under the policy, and the onus shifts to the FSP to prove that an
exclusion applies; in this case, the flood exclusion.
30. It is not clear from the evidence what time the inundation commenced.
However based on information provided t o the FSP‟s hydrologist, a volunteer
worker at the opportunity shop which is run from the unit closed the shop for
the day in the afternoon of Monday 10 January 2011, and could not access
the shop the following day.
31. Also, during the site meeting, the real estate agent recalled being present on
the day of the flood and observing water running down [P] Lane and [W]
Street; this water came from the hills behind the town.
32. As such, the Panel accepts that the initial inundation of the unit could have
occurred anytime during the evening of 10 January 2011, but could also
have commenced as late as the morning of 11 January 2011.
33. The Panel notes that the report produced by hydrologist „W‟ which examined
the cause of the damage to the Applicant‟s unit, states the following with
regard to the situation of the building:
“...
The subject property is located on the western side of [P] Street at the
intersection of [W] Street. It is approximately 240m south of the railway
crossing at Laidley.
The floor level of each tenancy is similar to the adjacent ground level. [W]
Street slopes downwards in a westerly direction so that the floor level of
the church ops shop is approximately 200mm lower than the floor level of
the other tenancies.”
Case No: 247517 Determination Page 5 of 9
34. The hydrology report by W also states the following about the drainage
characteristics of the land surrounding the building:
“...
There is a stormwater catchment of less than 0.1km 2 that drains to the
subject property.
Laidley Creek flows in a northerly direction approximately 700m west of
the Laidley town centre. Laidley Creek has a large catchment area to the
township of Laidley and would be considered a watercourse (sic).
A floodplain drainage channel drains through the township of Laidley and
discharges into Laidley Creek north-east of Forest Hill. Through Laidley,
the channel is highly modified, however upstream and downstream of the
town, the channel appears to be in a more natural state. The drainage
channel has a catchment of approximately 22 km 2 to the railway crossing
in Laidle y.”
35. With respect to the rainfall that occurred in the vicinity of the Applicant‟s
building, the report by W states the following:
“...
The Showground Weir Alert station is the closest rainfall station with
pluviograph data. The peak rainfall intensity of 42.4mm/hour occurred at
7:00am on Tuesday, 11 January 2011. Short duration rainfalls (between
1 and 3 hours) were not particularly intense, with an Average Recurrence
Interval (ARI) of between 2 and 5 year events. For the 6 hour storm, the
ARI was around the 20 year event and the 24 to 72 hours storms were
between the 50 and 100 year events. The 12 hours storm has an ARI
greater than the 100 year event.”
36. The report by W includes a graph, showing water level information for the
Laidley Creek, as well as 1 hour interval rainfall readings, as recorded at the
Showground Weir Alert, which is 1.2km south west of the Applicant‟s
property.
37. In the conclusions of its report, W states the following:
“...
Based on the site topography and size of the local catchment, the peak
level of inundation (a maximum of 1.4m above floor level) could not have
been caused by local stormwater runoff alone.
The peak level inundation at the subject property was caused by
floodwaters overflowing from [L] Creek which flowed along the drainage
channel through the town.
Given that the floor level of the subject property is close to ground level, it
is possible that the property was initially inundated above floor level by
stormwater prior to the arrival of the floodwaters.”
38. In further discussions at the site meeting, the hydrologist confirmed that her
modelling was able to determine the peak level but not the initial inundation.
However she confirmed her view that inundation could not have been as a
result of storm water alone.
Case No: 247517 Determination Page 6 of 9
39. The Applicant has challenged the findings of the report by W, saying that is
unreliable because if fails to take into account certain factors, and it does not
determine the date of inundation beyond a wide window of Monday evening
to Wednesday morning. He also says that although the report by W draws
conclusion based on the site topography, there are no topographical maps or
data included with the report.
40. In addition, the Applicant says that the report by W suggests that the
floodwaters would be flowing in predominantly northerly direction through the
township of Laidley. However he points to video footage provided by local
residents and available on Youtube which shows at the time of the
inundation, floodwaters were flowing in a strongly westerly direction along
[W] Street.
41. The FSP accepts that water was flowing in a westerly direction along [W]
Street at about 10am on 11 January 2011. However the FSP‟s argues that
this is likely to have originated from the drainage channel some 200m north-
west of the Applicant‟s unit building (and has in fact introduced the same
video footage in support of its case).
42. The Panel also accepts that at about 10am on 11 January 2011, water was
recorded as flowing past the Applicant‟s unit building along [W] Street in a
westerly direction.
43. The Panel notes that the hydrology report by W states that:
“...floodwaters overflowed from Laidley Creek to the floodplain drainage
channel upstream of Laidley.”
44. The Panel also notes that the FSP has pointed out that the drainage channel
takes a meandering path through Laidley, and although it runs in a northerly
direction for the majority of the length, at one point it changes direction to run
towards the west, before changing back to its northerly direction.
45. The Panel does not agree with the FSP ‟s explanation of the origin of the
water shown in the video flowing along [W] Street, and finds it unlikely that
this water came from the north- west of the Applicant‟s property.
46. The Panel accepts that the water which flowed through Laidley escaped
from Laidley Creek south of the township, and travelled along the floodplain
drainage channel.
47. In the Panel‟s view, in all likelihood the floodwater escaped the drainage
channel at the point where the channel turns west, then continued in a
generally northerly direction through the Laidley township, before eventually
flowing back towards the drainage channel down [W] Street near the
Applicant‟s property.
48. However there remains the issue of the initial inundation. The hydrology
report by W indicates the stormwater may have inundated the Applicant‟s
property prior to the arrival of the floodwaters, although the Panel observes
Case No: 247517 Determination Page 7 of 9
that the report allows for the possibility of stormwater inundation, rather than
confirmation that it occurred.
49. Nevertheless, the cover provid ed by the policy is for „accidental damage‟ and
given that the Panel has accepted a prima facie claim has been established,
the onus is on the FSO to prove its exclusion, that is, to prove that the initial
inundation was a result of flood, not stormwater.
50. This onus is absolute, and given the hydrologist is unable to rule out initial
stormwater, the FSP‟s exclusion is not proven.
51. However, after reviewing the rainfall and water level data provided by in the
hydrology report by W, the Panel is satisfied that at 10am on 11 January
2011, Laidley Creek had — for a second time less than 24 hours — reached
its peak of about 106.25m GH, and it remained at or around this level until
about 3am on 12 January 2011.
52. The Panel notes that at the time when peak rainfall was recorded at the
Showgrounds Weir Alert (at about 7am on 11 January 2011), Laidley Creek
was had reached nearly 106m GH, and was less than 0.5m from its peak.
53. The Panel also observes that the hydrology report by W states that the short
duration rainfalls (between 1 and 3 hours) were not particularly intense, with
an ARI of between 2 and 5 year events.
54. The Panel is of the view that on the balance of probabilities, and in the
absence of evidence to the contrary, following a low level initial inundation by
stormwater runoff, this runoff would have dissipated or mixed with the
floodwater which had already escaped from Laidley Creek and the drainage
channel running through the Laidley township.
55. The Panel recognises established case law which provides that if there are
two concurrent causes of a loss where one is subject to cover and the other
is not, an insurer is not liable for the loss (refer to Wayne Tank and Pump Co
Ltd v Employers Liability Assurance Corp Ltd [1974] QB 57).
56. The Panel notes the FSP‟s reliance on the Wayne Tank principle, and
particularly its submission “Where an insured cause (rainwater) is
overwhelmed by an excluded cause (flood) the whole of the damage is
excluded under the case law…”
57. This application is misconceived; application of the Wayne Tank principle
allows that where rainwater and floodwater damage occur concurrently then
the principle allows the exclusion to prevail, however where rainwater is
subsequently overwhelmed by floodwater then such events are not
concurrent but sequential and the FSP would be liable for the damage
caused prior to the floodwater damage.
58. The Panel therefore determines that the FSP is to indemnify the Applicant
for the initial low level inundation which occurred prior to the floodwater.
There is no conclusive evidence to determine the exact height of the initial
Case No: 247517 Determination Page 8 of 9
inundation, therefore the Panel will rely on its mandate to do what it
considers is fair and reasonable in all the circumstance.
59. Having considered the evidence and noted the information gathered on site,
the Panel determines that rainwater runoff is likely to have inundated the
property to a height of 150mm prior to the subsequent inundation by
floodwater. Any damage above that height would be excluded from cover.
Claim 2 – Damage to Glass Windows
60. The Applicant says that army and emergency personnel, driving trucks along
the main road on the way to Grantham, pushed debris towards the unit‟s
shop front windows, and this caused them to break.
61. He says that it was the action of the personnel driving the trucks which was
the cause of the damage to the windows, not the flood.
62. In addition, he says the window damage occurred the day after the flood had
receded.
63. Furthermore, the Applicant says that the truck which pushed the debris into
the Applicant‟s unit‟s wind ow was being driven pursuant to an exercise of
power under The Disaster Management Act 2003 (Qld) (the DM Act).
64. He says that section 130 of the DM Act provides for an extension of
coverage under an insurance policy, where damage is caused to property
because of the exercise of power by a person under the DM Act, and that as
such the Applicant‟s policy should cover him for the damage to his unit‟s
windows.
65. The FSP says that it has confirmed with the body corporate manager that
the damage was caused by army trucks on rescue work at the height of the
floods, and does not agree with the Applicant‟s assertion that the damage
occurred after the flood waters had receded.
66. It says that the proximate cause of the damage to the Applicant‟s windows
was flood; if it were n‟t for the flood water in the streets, the damage would
not have occurred.
67. It also argues that the DM Act does not apply in this case. It says that where
coverage for a peril is provided under a policy, and the actions of the
emergency services cause damage while dealing with the peril (event), then
cover is extended as if the peril had caused the damage.
68. After reviewing the submissions of both parties, the Panel is satisfied that the
township of Laidley was in flood when the army / emergency services trucks
pushed debris into the Applicant‟s windows, causing the damage.
69. The Panel also accepts that if it were not for the flood, no damage could
have been caused, and as such flood is a proximate cause of the damage.
Case No: 247517 Determination Page 9 of 9
Due to the operation of the Wayne Tank principle (see paragraph 55 above)
the FSP is entitled to deny liability for the damage.
70. It is also apparent that the emergency services were responding to the flood
event in the township. The Panel accepts that as flood is not covered under
the Applicant‟s policy, then no extension of coverage is provided by the
operation of the DM Act.
71. The Panel therefore finds that the FSP is not liable for the damage to the
Applicant‟s unit‟s shop front windows.
Determination
72. On the basis of the available information the Panel determines that the FSP
is to indemnify the Applicant for damage caused by rainwater up to a height
of 150mm above the flood level of the property.
73. The FSP is to assess the extent of the damage so caused, and provide a
scope of works and costing to rectify the damage. The FSP is then to enter
into discussions with the Applicant to agree on an amount for settlement.
The Panel encourages the parties to work cooperatively to finalise this
matter. Should the parties be unable to agree on the settlement amount, the
parties can seek a further determination from the Panel on the amount.
74. The FSP is also to pay interest on the agreed amount at the statutory rate in
accordance with section 57 of the Insurance Contracts Act 1984 from 30
March 2011, being the date on which it denied liability for the claim to the
date of settlement.
75. The Applicant is not entitled to be indemnified for the damage for the
breakage of his unit‟s shop front windows.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.