Text of the determination
Case No: 247514 Determination Page 1 of 26
Case number: 247514
General Insurance - Domestic Insurance - Home Building – Home Contents
Service - Delay in claim handling – unsatisfactory repairs – extent of damage
16 November 2011
Background
1. On 29 January 2011, the Applicant’s home and contents suffered substantial
damage during a severe storm in the area.
2. The Financial Services Provider (FSP) accepted liability for a claim under the
Applicant’s home cover insurance policy. Following assessment of the damage,
a builder was appointed to rectify the assessed damage.
3. On 6 May 2011, the Applicant complained to the FSP that some damage
agreed to by assessor had not been included in the rectification works and that
the standard of works carried out was unsatisfactory.
4. The FSP arranged for a building consultant to inspect and report on the
standard of work and the extent of damage caused by the storm.
5. By letter dated 1 July 2011, the FSP addressed each of the Applicant’s
complaints and advised the only outstanding work in regard to the building
claim at that time was the entire roof replacement, completion of minor
electrical work, pool pump to be re-installed, pool water to be cleaned. The
claim for damaged contents was outstanding.
6. By letter dated 29 July 2011, the FSP required the Applicant to undertake a
number of maintenance, wear and tear items which must be completed before
the works in relation the insured damage can be commenced.
7. The Applicant claims that the scope of works prepared by the FSP does not
include all the damage to this home.
Summary of Applicant ’s Position
These comments have been taken from Applicant’s emails of 21/10 and 8/9)
8. The FSP denies that the structure moved during the tornado and is refusing to
accept damage to walls and sliding doors. The Ap plicant states that the FSP’s
building manager reported the structure had lifted although no further
comments had been made since.
Determination
Case No: 247514 Determination Page 2 of 26
9. The FSP contends that water damage did not happen. However a water pipe in
the house broke when the roof was torn off which explains the water damage.
10. The builder pulled the bath room to pieces before the engineer inspected the
house so that the engineer could not see the damage which was caused to the
shower area. They disposed of the shower and other fittings. The FSP denied
that the shower area had been damaged at all.
11. The FSP had breached the Privacy Act by seeking personal information from
his employer who has since dismissed him.
12. He had asked the FSP to inspect the ride-on mower, but instead it had denied
the mower had been damaged by the storm and refused to pay for its repair or
replacement. The FSP has denied his claim for the ride on mower
13. The FSP denied the claim for his lap top computer which is the subject of his
complaint relating to the FSP’s breach of the Priva cy Act. The FSP informed his
employer it had been informed by him (the Applicant) that the computer did not
work so he could not do his job. The computer he used for his work was
insured with flexi-rent and exchanged without issue. The laptop specified on his
contents schedule was a different laptop. The FSP denied his claim for this
item.
14. The FSP continues to take full payment for his contents insurance since
January 2011. As he does not have any contents and his house is destroyed,
he should not be asked to continue to pay the premium.
15. The FSP threatened him by telling him his rental allowance will cease after 12
months.
16. The assessor told him;
That the roof would be entirely rebuilt and may take on a new shape to
withstand future storms.
Due to water damage and structural damage to the house, the north wall
would need to be replaced and gyprock installed to completely repair the
damage.
17. The assessor also supplied invoices which show fraudulent events relating to
monies paid to the building company which do not match work items said to be
for work which was said to be completed and never was. ( email 8/9 to FOS)
This relates to 4 fence panels at the pool. The fence had been bent back into
shape and only 1 panel was replaced. Four panels were ordered and only one
was used.
18. At the time of his compliant to FOS the roof had not been repaired although the
building consultant had reported the work carried out on the roof was not
satisfactory.
Case No: 247514 Determination Page 3 of 26
19. The damage to the roof is far more extensive than the building consultant
stated who did not look under the tine sheets or inside closed parts of the roof
at all. The roof is missing a number of supports to make it comply with the
Australian Standards.
20. The building company supervisor reported that the main structure had lifted
beyond the sighted damage and will require further work. Cracks to the walls
above all windows and doors were caused by the structure lifting and not wear
and tear.
21. The sub contract builder SB is not a registered builder and not qualified to carry
out the work.
22. The consultant referred to by the FSP as an engineer is in fact only a building
consultant.
23. The FSP states that the building consultant, builder and loss adjuster
determined that further damage was not storm related. The consultants made
this finding after the shower and damage to the wall lining sheet in the adjacent
bedroom to the shower had been removed by the builder for no apparent
reason The FSP should be required to replace the shower
24. Photographs of the shower show the cement floor has no water marks which
would be evident from long term leaking alleged by the FSP. The timber
between the walls at floor level also do not show any water stains from a long
term leak.
25. The work done to the shower by the plumber was according to standards
requires at the time.
26. The only conclusion to be made is that the pipe leak caused by damage from
the storm allowed water to leak for a number of hours and is the only cause of
water damage to that area.
27. At the time of the storm there was damage to water pipes in the section of the
roof which had to cut and clamped as it was leaking through the wall. The FSP
has not investigated this at all.
28. The area of floor damage is caused totally as a result of the pipe damage
during the storm and continued to leak for a number of hours directly onto the
floor.
29. He returned the water pump on the first few days of work as requested by the
builder to test the water pipes. The water pump was removed by the builder
and has not been returned to him. This proves that the water test was not done.
30. He has requested the pump be returned on a number of occasions since May
when the assessor discovered the builder had the pump after he had been
accused of stealing that same pump.
Case No: 247514 Determination Page 4 of 26
31. This information is important as it shows the cause for the water damage had
not been investigated and assumptions based on no real facts were made and
the report fabricated.
32. The FSP is responsible for storm damage to the premises which include the
shower and floor.
33. The large shed has had a concrete floor added since he moved in and the
electrical system has been installed and meets all required Australian
Standards. Walls to the storeroom and bedroom on the shed have been
replaced by qualified tradesman to Australian Standards.
34. The roof of this shed sustained damage and was marked for extra work by the
building consultant (2 nd report). The insulation is to be replaced. On the original
quote both roller doors were to be replaced.
35. The doors fell to pieces after the builder SBhad repaired them. This repair work
was well below standard and the doors need to be replaced to comply with
Australian Standards. The doors were damaged by the storm.
36. The house was built 25 years ago to Australian Standards at that time. It may
not meet current standards now, but he insured the house with the FSP in good
faith.
37. He is not required to continually cause the house to meet changing Australian
Standards, but when major works are required whoever is responsible to do
that work must comply with the current standards. The FSP therefore is
required to repair his home to current Australian Standards.
38. The builder, BC noted on the last sentence on the 1 st page of the storm
damage report stated the main structure of the house lifted beyond the sighted
damage and will require further work to ensure the integrity of the roof.
39. That report shows cracks above windows and doors which are storm related
resulting from the main structure moving.
40. The Scope of Works (SOW) prepared after the meeting with the building
consultant showed the roof was to be strengthened with supports between the
roof and floor.
41. To do this cladding has to be removed and replaced. The FSP requires him to
carry out this work after which the strengthening of the main structure can be
done.
42. A major stoppage has occurred as he cannot afford to do this work.
43. Removing and replacing the cladding is not required as a result of
maintenance. Damage to the cladding was caused by the main structure lifting.
44. The building consultant advised that the cladding could be removed and
replaced as it needed to be done when the main structure supports were put in
place, not after the cladding had been repaired.
Case No: 247514 Determination Page 5 of 26
45. The FSP has therefore created a stalemate.
46. The FSP also advised that he is to repair the shower before it will commence
the repairs.
47. He did not remove the shower. This was done by the builder who has disposed
of the base. The building consultant advised him at their meeting that he would
have the shower base replaced and the walls tiled so that no leakage could
return provided he (the Applicant) agreed to paint the bathroom when the work
was completed.
48. The bathroom area and floor was flooded by a leak from the pipes to the solar
hot water system damaged by the storm.
49. The solar system was not included in the replacement. It was damaged by the
SES who cut the pipes and crimped the ends so that tarpaulins could be placed
over the roof.
50. Water had leaked from the pipe through the wall and onto the bedroom floor
adjoining the bathroom. This was storm damage. Mould is now on the floor and
joining walls which did not exist before the storm.
51. The FSP is responsible for repairing the walls and electrical systems.
52. The admission by the building consultant that the main structure lifted supports
his argument that that damage to glass sliding door frames was caused by the
storm. Bends shown in photographs is consistent with the roof and main
structure lifting. These doors were maintained and repaired by him prior to the
storm.
53. While the FSP states that most of work has been completed, the following
works remain outstanding:
The roof needs replacing and built to have structural integrity consistent
with Australian Standards
Walls and floors are to be repaired or replaced.
Electrical board and systems are to be repaired including instillation of
RCD switches and smoke detectors and alarms.
Replace beams in the roof which are bent as the main structure lifted.
Replace the water system pump removed from the site by the builder SB.
Replace the covers and top of the stove hot plate which was destroyed by
the unlicensed builders walking over the stove.
Bring the pool system back to proper condition and clean the pool,
Repair fences that trees have fallen on.
Repairs to the veranda due to the main structure lifting.
Replace internal roof with gyprock sheeting in the main bedroom, ensuite
and office area.
Case No: 247514 Determination Page 6 of 26
Full restoration of the shower and bathroom
Repair all light fittings and replace all globes taken from the house by
unknown persons.
Refill 2 gas bottles due to unknown persons swapping full bottles with
empty bottles.
Items stolen from the locked room in the garage
The FSP is responsible to have the policy in his name only.
Restore the property to excellent condition consistent with Australian
Standards.
Supply new for old replacement furnishings and other contents items.
Repair or replace the ride-on mower damaged in the storm.
Replace contents shown as high risk valuables on the policy schedule and
not class them as work equipment.
Supply new for old work equipment.
Medical treatment for mental injury suffered due to the storm event.
Investigate all fraudulent actions made by the assessor, builder and
unlicensed builder relating to the supply of and receiving payment for
material and work not completed as described in the work to date reports.
54. The Applicant submits the FSP should:
Pay rental allowance for the same type of premises as the damage home.
Pay all lost earnings due to the FSP’s insistence that he undertake work
which should only be carried out by qualified staff which rendered him
unable to complete his usual employment to a satisfactory level.
Disregard any information obtained by persons they consider are family
members
Treat him as the only claimant.
At its expense complete all work that needs to be carried out whether it is
damage, wear and tear or maintenance as the risk premises were
properly maintained while he has owned the property.
55. The Applicant requests FOS to direct the FSP pay the full sum insured for
building of $359,000 and for contents $180,00 if the building cannot be returned
to its pre loss condition within 4 months.
Contents
56. During the life of the policies he has never had any reason to include his
estranged wife in the policy by name or by position. He agrees a policy was
taken out for his hearing aid by his wife.
Case No: 247514 Determination Page 7 of 26
57. His wife’s name does not appear on the title deed or any banking
documentation to show ownership of the risk property is in other than his name.
58. The FSP has taken a stance that his wife is also included in the building and
contents policy which is incorrect
59. His wife is not a co-insured under the policy. They have separated and he does
not consider her to be family and he is waiting on the time set at law to make
the marriage null and void.
60. The Applicant makes a number of allegations concerning his wife. The Panel
refers to its comments in paragraph 101 below.
61. His wife is not providing truthful information to the FSP.
- His wife did not live at the house for over 60 days before the storm.
- His wife had come to the house with police on two occasions before the
storm to collect all her personal belongings.
- His wife come to the house after the storm and removed items which had
been marked for disposal because of the damage.
62. The assessor has not included all the damaged contents in the claim including
a queen size bed
63. His request for an advance payment of $20,000 has been ignored by the FSP.
The unlawful inclusion of his wife in the policy is to blame for the lesser amount
offered as the FSP has also made offers to her which is not legal as she is not
a co-insured.
64. His wife’s name or signature do not appear on the copies of handwritten policy
schedules supplied by the FSP. Without a signed document requesting
insurance as joint co-insured, his wife is not a co-insured. The forms submitted
to the FSP were in his name only and did not have his wife’s signature.
65. He is the only person named on the forms signed only by him. He therefore
seeks damages from the FSP for the hardship caused to him.
Summary of FSP’s Position
66. The FSP relies on the following policy terms:
“Definitions (The Meaning of Some Words)
“ damage ” or “ damaged ” means when an item insured by this policy is physically
harmed but does not include wear and tear.
...
“ partner ” means your husband or wife, or a person with whom you cohabit in a
defacto relationship, BUT does not include a person with whom you may share your
home for any financial consideration.
Case No: 247514 Determination Page 8 of 26
...
“ spouse ” means your husband or your wife.
...
” wear and tear” means damage or a reduction in value through age, ordinary use of
lack of maintenance.
...
“your” and “ your” means the person(s) named in the schedule as the insured
including a family member.”
67. The FSP relies substantially on reports provided by an assessor and a building
consultant.
Builder contracted to carry out the work
68. The FSP states that the repair work was carried out by BC and subsequently
certified by the building consultant to have been carried out to a good standard.
69. The builder BC is covered under a Western Australia building licence.
70. The loss adjuster is a chartered loss adjuster.
71. Should the Applicant have any concerns about the work practices of the builder
he should raise them with the proper authorities or statutory bodies.
Pool fencing
72. Six sheets of the fence were disturbed by the storm Five were put back and the
sixth was replaced.
73. The policy provides it with the option to repair, rebuild or replace. The policy
states:
“If this policy insures your building and we accept your claim, at our option we will
pay for the reasonable cost of repairing or replacing your home ...
74. It elected to repair the fence and roof rather than replace the entire fence and
roof.
Rental allowance
75. Storage and rent claims received have been paid up to date.
Work stoppage
76. The vast majority of work has been completed. The repairs outstanding are the
roof replacement, completion of minor electrical work, pool pump re-
instatement and cleaning the pool.
Sliding doors and shower
Case No: 247514 Determination Page 9 of 26
77. The building consultant and assessor determined this further damage claimed
by the Applicant is not storm related.
78. The building consultant considered the shower condition was a result of sub-
standard installation and non compliant with any regulations/building codes.
Damaged areas of the house not repaired
79. The work carried out was certified as of a good standard by the building
consultant. Other damage raised by the Applicant was not storm related.
North wall
80. The north wall was not damaged by storm. Neither the building consultant or
the assessor made any reference to the wall requiring repair or replacement.
Contents claim
81. The Applicant’s wife is listed on the policy and her removing items cannot be
considered theft.
82. The FSP is currently investigating the Applicant’s assertion she should not be
named in the policy.
Work items stolen from shed
83. The Applicant has not provided any evidence of ownership for the claimed
items. Notwithstanding the lack of evidence payment for the maximum amount
was made for tools of trade.
Assessor’s conversation with Applicant’s wife
84. The Applicant’s wife was contacted as a joint insured. The FSP’s privacy policy
states:
“We, or our authorised agent, may disclose your personal information.
...
to another person named as co-insured on your policy (for the purpose of
confirming if full disclosure has been made to us).”
85. The FSP is investigating the Applicant’s assertion his wife should not be named
on the policy.
Illness brought on by the storm
86. The policy does not provide cover for depression, anxiety and panic attacks.
Wife included in correspondence and claim
Case No: 247514 Determination Page 10 of 26
87. The policy schedule shows that the insured is the Applicant and his wife. The
Applicant’s wife received correspondence as a joint insured.
Poor workmanship
88. An independent building consultant was appointed to report on the standard of
repairs carried out to date. The consultant concluded the repairs conducted
were of good quality with the exception of the roof. It has agreed to re-sheet the
roof in accordance with the consultant’s report.
Roller doors
89. It is entitled under the policy to elect to repair, rebuild or replace damaged
items.
Building standards
90. The building consultant stated that the standard of construction of the dwelling
and shed ‘is well below par’.
91. The policy provides:
“We will not pay for damage caused by water:
Penetrating or entering your building because it has not been properly
maintained or as a result of a design fault, structural defect or because of
defective workmanship.”
92. Whether the Applicant was aware the workmanship was defective prior to
purchasing the property is not relevant.
Co-insured
93. Valuables cover is an extension of the home cover. The application for
extension of cover was signed by both the Applicant and his wife. This
authorised it to include the Applicant’s wife on the policy.
94. Further, the Applic ant’s wife was included on all renewal notices since 2008
and the Applicant has not asked for her name to be removed prior to the
dispute.
Gyprock installed to ceiling
95. Photos do not show gyprock installed to the ceiling. Installation of gyprock
would therefore be an improvement and not covered by the policy.
Issues
96. Whether the FSP has settled the claim according to the terms of the policy.
Case No: 247514 Determination Page 11 of 26
Reasons for Decision
97. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the complex nature of the issues. This dispute
has not been the subject of a FOS Recommendation and has proceeded
directly to Determination.
98. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance matters and a
representative with extensive experience in consumer claims.
99. There has been an exchange of material between the parties. Each party
therefore is aware of the issues and has had the opportunity to comment.
100. Prior to arriving at a determination the Panel has read and considered all the
material submitted by the parties to FOS.
Named Insured ’ s
101. As noted above the Applicant makes a number of allegations concerning his
wife. Having regard to the parties’ circumstances, the Panel does not place any
weight on that evidence.
102. The Applicant argues that his estranged wife is not a co-insured or joint insured
and as such, the claim is to be assessed on the basis the he alone in the
named insured.
103. The Applicant states that his wife is not on the schedule for the building or
contents insurance. He further states his wife had apparently arranged a
valuables policy insuring his hearing aid. He states that he never gave his wife
permission to include her name on the building/contents policy and contends
that she therefore has no rights under the policy. (email 9/8 page 6 pars 12)
104. The Applicant further states that his estranged wife is not registered on the
property's title deed or on any banking documents
105. The FSP advised that the valuables cover is an extension of the home cover
policy. The application for extension of cover was signed by both the Applicant
and his wife, thus authorising her name to be included in the policy. In addition,
the Applicant’s wife has been included in renewal notices since 2008 and the
Applicant has not requested her name be removed at any time prior to the
storm in January 2011.
106. A copy of the renewal notice sent to the Applicant for the period 8 January 2010
to 8 January 2011 vests in the joint names of the Applicant and his wife. A
covering letter asked the policyholder:
“if you notice anything that’s not quite right or if there’s anything you don’t
understand, please let us know right away”.
Case No: 247514 Determination Page 12 of 26
107. Copies of a ‘Home Building and/or Contents Proposal” document displaying the
period of insurance from 7 February 2007 vests in the Applicant’s name and is
signed on 23 February 2007by the Applicant only. The proposal for insurance is
for both the building and contents.
108. A copy of a document titled “Valuables Proposal” covering a hearing aid vests
in both the Applicants and his wife’s name. The document is signed by both
parties and is stamped ‘Risk Accepted 9/7/07’.
109. Examination of the FSP’s home Cover policy document reveals “Valuables
Insurance is an optional cover within the policy.
110. It follows that when applying for ‘Valuables Insurance’ the application was
completed in the joint names of the Applicant and his wife. The FSP has then
amended the policy to vest in joint names.
111. As a result at the time of the loss in January 2011, the Applicant’s wife was a
co-insured under the policy.
112. The policy defines “you” as the person named in the schedule as the insured
including a family member. The policy pr ovides cover for ‘you’. As the
Applicant’s wife is named in the schedule any reference to family member is not
relevant as she has equal rights under the policy as the Applicant.
113. Until such time as the Applicant’s wife is removed from the policy, the claim
must be assessed and paid out on the basis that she is a co-insured with equal
rights to any payment.
114. These circumstances do not affect settlement of the claim where the property is
repaired or replaced. However in the event a cash settlement is made the
payment must be made in the joint names unless the Applicant’s wife
authorises the FSP to make the payment to the Applicant only.
115. The Panel is mindful of the circumstances which may arise in an insurance
claim when the parties separate. However the Panel does not have the
authority to cause the FSP to make any payment to the Applicant only or to
prevent the FSP from discussing the claim with her.
116. For these reasons, the Panel concludes that the FSP may settle the claim
based on the policy vesting in the joint names of the Applicant and his
estranged wife.
Building damage
The evidence
117. The following is relevant information from reports provided by the assessor.
The building was inspected in company with the building contractor. A
SOW was prepared.
Case No: 247514 Determination Page 13 of 26
The builder found that the main structure lifted beyond the sighted
damage and will require further works to ensure integrity of the roof.
Polystyrene ceilings are in place and the damaged ceilings will only be
replaced with gyprock panels. Use of gyprock will require additional
battens to be fixed to carry the new material.
Builders have allowed for a possible upgrade of electrical services as the
present switchboard is not compliant with current regulations.
Building repairs should be completed by 15 April 2011.
The builder was asked to replace the shower base. The Applicant had
advised that it was damaged by a pot falling onto the plastic base during
the storm.
When the shower base was removed there was evidence of previous
cracking and patching. Silicone had been used to repair it. A metal
barbeque plate had been fitted underneath the shower tray.
He spoke with the Applicant’s wife who insisted that the Applicant was
fully aware of the state of the house and construction issues had always
been a concern. A number of repairers had evidently had difficulty with
misaligned windows and doors.
118. The building consultant in a report dated 31 May 2011 provided the following
information.
An inspection of the Applicant’s property was carried out in company with
the building contractor.
The works carried out so far by the builder was of a good standard with
the exception of the replacement of the roof sheeting to the front elevation
veranda where the bottom corrugations of the custom orb sheeting require
turning up.
The sub contract electrician is preparing to upgrade both the main
switchboard and sub boards which will include mandatory RCDs.
Damage to the sheet flooring in the living area does not appear to be
storm related and can be traced back to poor installation at the time of
construction.
Localised staining in the floor area near the end of the wall in the living
room is not storm related. The stain is an oil based material. The roof
does not leak in this area.
Damage to the wall lining sheet in the bedroom adjacent to the shower is
not storm related but is very long term damage from a leaking shower.
The large shed is in need of remedial work. This is not storm related.
There is sufficient storm damage to both the main roof and verandas to
warrant full roof and gutter replacement.
The report stated:
“Generally speaking the standard of construction of this dwelling and the large
shed is well below par and they do not meet the current Building Code of
Case No: 247514 Determination Page 14 of 26
Australia requirements on lots of issues. Whilst many of these requirements may
well not have been in place at the time of the building permit being issued, the
licensed builder carrying out these remedial works has a responsibility to meet
these standards.
119. The building consultant recommended that both the builder and the Applicant
sign off on an in-depth SOW covering all aspects of the repairs and upgrade.
The consultant further recommended an onsite meeting with the local shire
Environmental Health Officer/Building Surveyor
120. Following the site inspection, the assessor reported a building licence had been
issued to the builder by the Shire’s representative as the cost of repairs
exceeded $20,000.
121. According to the FSP, the SOW prepared by the building consultant considered
the following items were maintenance and wear and tear issues and unrelated
to the storm.
All external wall cladding require refixing with a material suitable for use
with CCA treated pine.
New timber external architraves
Remove shade cloth green house and replace or refix all battens prior to
replacing shade cloth
Ease and adjust veranda sliding door and replace roller if required.
Summary
122. It is common ground the Applicant’s home was badly damaged du ring the
storm event. Photographs presented to the Panel show a storm approaching of
significant strength clearly capable of causing widespread damage to property.
123. The policy provides as follows;
“Your Building
Repair, Rebuilding Or Replacement
If this policy insures your building and we accept Your claim, at our option we will
pay for the reasonable cost of repairing, rebuilding or replacing your home at the site
to its condition when new, or
to its condition when last renovated, altered or restored.
We will not pay for the portion of these building costs which relate to the undamaged
parts of your building.
...
3.2 Your Building - Building Costs
If this policy insures your building as part of your sum insured, you are insured for
building costs following damage to your building for:
...
complying with a statutory notice that:
Case No: 247514 Determination Page 15 of 26
1. relates to that part of your building which is damaged
and
2. is served after the damage occurred.
124. It follows that insured damage to the building will be repaired to its condition
when new, last renovated, altered or restored. The policy does not insure
undamaged parts of the building. Further, the FSP is required to pay for costs
to comply with statutory notices only when the notice has been served.
125. The Panel will consider the evidence in relation to each of the items of concern
to the Applicant and the terms of the policy.
Expertise of consultants involved in the assessment of the damage.
126. The FSP has advised that the loss assessor was a chartered loss adjuster. The
Panel had reviewed his reports and considers that the issues involved in
reporting on the damage and possible cause for the damage have been clearly
reported. His reports show that he has consulted with the builder and building
consultant during his involvement in the claim the claim.
127. The builder consultant MS is a registered building consultant.
128. The builder BC is part of an integrated group and holds a West Australia
building licence.
129. The Panel is therefore satisfied that the contractors and consultant
commissioned by the FSP were appropriately qualified to report on the possible
cause and extent of damage to residential premises
130. The Panel notes the Applicant’s allegation of fraudulent behaviour by the
assessor. The assessor (report 9 24/6) expressed concern with the Applicant’s
allegations of possible fraudulent activity in relation to the claim and although
not responding to the allegations advised that if the Applicant continued to
make these comments they may need to seek legal advice as they consider the
statements actionable.
131. The Applicant’s allegations of fraud are therefore potentially a civil matter and
will not be dealt with by the Panel.
Roof
132. The FSP has accepted that the entire roof sheeting of the main building be
replaced. The Panel notes existing roof battens, framing and tie downs will be
checked for compliance.
133. The Applicant states that he was informed that the roof may take on a new
shape to withstand future winds. However the policy provides that the FSP is
liable for returning the roof the condition it was in when new.
Case No: 247514 Determination Page 16 of 26
134. Accordingly, the Panel is satisfied that the FSP is required to re-sheet the roof
with similar material and construction as it was prior to the storm subject to
compliance with current building regulations. .
135. This part of the dispute has therefore been resolved.
North wall
136. No evidence has been submitted to show that the north wall of the building
sustained damage during the storm event.
137. Accordingly, the Panel considers the FSP is not liable for the condition of the
north wall.
Ceiling damage
138. The evidence has established that the ceilings in the master bedroom, study,
ensuite and walk-in wardrobe prior to the storm were polystyrene material. The
FSP is therefore required to replace these ceilings with polystyrene and not
gyprock.
139. The SOW includes an item for this work.
Internal damage – cracks in walls
140. According to the assessor (report dated 12 March 2011), the builder found the
main structure had lifted beyond the sighted damage and will require further
works to ensure the integrity of the roof.
141. The Applicant contends that cracks in the walls above windows and doors
which extend to the roof were caused by the structure lifting. The Applicant
states that the cracks were not evident one month before the storm when
photographs were taken in preparation for sale of the house. The Applicant has
submitted photographs of the interior of the home before the storm and after
the storm. The photographs show evidence of cracks as described by the
Applicant.
142. The material submitted by the FSP does not contain any comment in relation to
these cracks.
143. Given about one third of the roof of the building was lifted off by the force of the
storm and there is evidence the main structure lifted during the storm, the Panel
is of the opinion that the cracks described by the Applicant may reasonably be
regarded as having been caused by the storm.
144. The Panel therefore considers the FSP is responsible for rectifying the wall
cracks above the windows and doors.
Case No: 247514 Determination Page 17 of 26
Internal damage – shower, shower unit and adjacent bedroom wall lining sheet
145. The building consultant confirmed that he advised the Applicant that the
remedial works required for the shower were at his cost as the original work
was totally substandard and not compliant with any relevant codes or
regulations. The consultant noted:
“There is nothing in these photos or the information obtained from [builder] that
suggests that this shower was ever installed to any acceptable code, therefore
all remedial work associated with the shower regardless of any other
circumstances has to be deemed maintenance or upgrading both of which
should be the policyholder’s responsibility”.
146. According to the assessor, he was informed by the Applicant that a pot fell on
top of the plastic base of the shower during the storm.
147. The Applicant argues that as the FSP considers the damage to an adjoining
wall not storm related the FSP removed the shower base and unit for no
apparent reason.
148. The Panel has not been provided with any detailed explanation for the removal
of the items.
149. It appears from the material that investigations were carried out to determine
the cause for damage to the wall lining sheet in the bedroom adjacent to the
shower. The building consultant considered that that damage was long term
damage caused by the leaking shower. The shower base and shower unit were
apparently removed by the contractors when seeking the source of damage to
the adjacent wall.
150. The Panel has viewed a number of captioned photographs of the shower base.
These show a plastic party plate used as a base to cover a large hole and an
external water grate fitted to it. The extra large hole in the shower base was
due to the original floor waste having broken out when stood on as the shower
base was totally unsupported.
151. The Panel is therefore satisfied that the shower was non compliant and that its
condition was largely due to the construction methods employed in fitting the
base.
152. Further there is no evidence to show that the shower or the shower unit
sustained damage during the storm.
153. Nevertheless, the shower base and unit which were in place (P102) were
removed by the builder, apparently as part of the investigative process to
establish the extent of damage to the building caused by the storm. As such,
the Panel considers that the FSP is responsible for reinstating the shower base
and unit following completion of that part of the investigation.
Case No: 247514 Determination Page 18 of 26
154. However, reinstatement of the shower base and unit must comply with current
building standards. The Panel accepts that the FSP is not responsible for the
additional costs which will be incurred in having the shower compliant. In these
circumstances, the Panel consider having regard to what is fair, that the FSP is
liable for 50% of the costs of reinstating the shower base and unit.
155. As the damage to the adjacent wall arose from long term leaks from the shower
base, the Panel concludes the FSP is not responsible for repairing that wall.
Flooring
156. The Panel notes the SOW includes “refix flooring where required and sand
throughout.”
157. According to the building consultant, an area of localised staining in the floor
area near the end of wall in the living room is from an oil based material and not
storm related. The consultant also found that the condition of the sheet flooring
in the living area was due to poor installation and not storm related.
158. About one third of the roof was blown off during the storm It is therefore
reasonable to conclude that a considerable amount of rainwater entered the
premises during the storm.
159. In these circumstances, the Panel accepts that all flooring apart from the area
near the end of the wall in the living room and the living room is to be included
in the SOW. The work is limited to sanding only and not replacement as noted
on the SOW referred to by the FSP
Electrical boards
160. According to the SOW electrical works have been accepted by the FSP.
161. These include but are not limited to checking the wiring throughout the
premises and upgrade where required and supply and install new switchboard
and sub-boards, smoke detectors and alarm.
162. This part of the dispute has therefore been resolved.
Water system pump
163. The Applicant asserts the sub contractor to the builder has failed to return the
water pump.
164. The Panel considers that the FSP is to contact the contractor and recover the
pump.
Stove covers
165. No evidence has been presented to show that the stove covers sustained
damage during the storm or as a result of the builder’s activities.
Case No: 247514 Determination Page 19 of 26
166. Accordingly, the Panel considers the FSP is not responsible for these items.
Pool
167. The SOW includes reinstalling the pool equipment and cleaning the pool water.
168. This part of the dispute is therefore resolved.
Fences
169. Damage to fences caused by falling trees has not been included in the SOW.
170. No evidence has been submitted to show that fencing was reported damaged
as a result of the storm.
171. Further, the Panel had viewed an extensive number of photographs of the
damage, none of which show any fencing damage.
172. The Panel therefore concludes the FSP is not responsible for damage to
fencing.
173. The FSP has repaired the pool fence by reusing some original panels and one
new panel. Reuse of existing material is common practice when the material is
not otherwise damaged.
Veranda
174. The Applicant has provided a number of captioned photographs of the wooden
veranda flooring. The photographs show the flooring is out of level.
175. The various contractors’ reports make no mention of damage to the veranda.
While the veranda is under a roof the Panel notes that it is partly exposed to the
elements.
176. Accordingly, the Panel concludes the condition of the veranda does not fall
within the cover provided by the policy.
Roller doors
177. The Applicant refers to the original quote which included replacement of the
roller doors.
178. The policy provides the FSP with the option to repair or replace the damaged
property.
179. Accordingly the FSP was entitled to repair the doors subject to the doors
operating correctly and no physical damage evident.
180. However, the Applicant states that both roller doors have since fallen off their
hinges. (email25/10 point5)
Case No: 247514 Determination Page 20 of 26
181. The Panel finds that the FSP is to re-inspect the doors. If the doors are found to
be faulty, then they are to be replaced.
Scope of works – Applicant’s responsibilities
182. By letter dated 29 July 2011 to the Applicant, the FSP set out a list of
maintenance items identified by the building consultant which were to be
completed by the Applicant at his expense before rectification of the insured
damage in accordance with the building consultant’s SOW could commence.
183. The Panel has not been provided with a copy of that SOW.
184. The FSP stated that the building consultant advised that this work must be
done before the insured damage can be repaired.
185. By email dated 17 June 2011, the building consultant confirmed the
maintenance items were ‘just that – maintenance items”. Nevertheless it has
not been explained to the Panel why it is imperative that these items be
rectified before the insured damage can be repaired.
Wall cladding
186. The Applicant states (email 8 September 2011 page 9 para 7: email 9/August
2011 )P 284 &p 86) that he was informed by the building consultant the
cladding would be removed and replaced as it was needed to be done while
the main structure supports were put in place.
187. It appears to the Panel that if re-fixing the external wall cladding is required to
allow the insured damage repairs to commence, then that work falls within the
ambit of the work required to repair the insured damage. The condition of the
wall cladding prior to the loss is not relevant.
188. It is not uncommon that undamaged components of insured property must be
removed and replaced to allow the damaged sections of the property to be
repaired. When this occurs the Panel considers the cost for the ‘remove and
replace’ works falls within the scope of works to repair insured damage.
Architraves
189. The Applicant states (email 9 August 2011) the architraves were not fitted to
the building prior to the storm.
190. The Panel has not been provided with any evidence to show why in these
circumstances the Applicant is required to install features which did not
previously exist so that insured damage may be repaired.
Shade cloth and green house battens
191. The Applicant states (email 31 July 2011 para 8) the fernery was damaged
during the storm by a large tree.
Case No: 247514 Determination Page 21 of 26
192. The Panel does not understand why the Applicant is responsible for this work. If
the greenhouse was damaged during the storm, the FSP is responsible for
rectifying that damage notwithstanding the pre loss condition of the
greenhouse.
Ease and adjust veranda sliding door and internal entry door, fit new
skirting to bedroom 2
193. The Panel has not been provided with an explanation why rectification of these
items impinges on commencement of repairing insured damage.
194. In summary, the Panel considers that in the event that the items referred to as
maintenance in the FSP’s letter of 29 July 2011 a part from the bathroom, are
required to be carried out to allow repairs for the insured damage to
commence, then this work must be considered as part of the rectification works.
In this case the responsibility for those works rest with the FSP.
195. In the event it is not imperative that these works must be completed to allow
repair of the insured damage commence, then the FSP is to arrange for the
insured damage works to commence without further delay.
Contents
196. It has been established that the Applicant’s estr anged wife is a co-insured. As
such, any property removed by her from the home cannot be regarded as theft
within the terms of the policy.
197. The FSP offered settlement of the contents claim based on the assessor’s
recommendations. (email 9 September 20119.) The settlement offer included
obtaining quotes for specific items from Harvey Norman and JB Hi FI plus a
cash settlement in the sum of $4,716. The FSP advised that once the quotes
were received, the Applicant would be advised of the sums so that he could
decide which store he wanted the funds to be allocated.
198. The Applicant was advised that if he chose to replace the items through the
FSP’s suppliers an authority letter would be sent to the providers
199. The Applicant was also advised that the items which the Applicant had advised
were taken by his wife were not included in his contents claim.
200. The Panel is satisfied that the FSP’s procedure to settle the contents claim is
consistent with the usual practice adopted by many insurers and is according to
the terms of the policy.
201. The Applicant asked that the FSP provide a part payment by cash to him in the
sum of $20,000 (email 7 September 2011)
202. Cash settlement of the clam or part of the claim is at the FSP’s discretion
Case No: 247514 Determination Page 22 of 26
203. For the reasons expressed above in paragraphs 100 to 114, the Panel is of the
opinion that the FSP is entitled to seek a release from the Applicant’s wife
before making any cash settlement payment to the Applicant.
204. The policy provides cover for tools of trade up to a limit of $1,000. The FSP
states that although the Applicant did not provide any evidence of ownership, a
payment was made up to the limit of $1,000.
205. The Applicant asserts (email9 September 2011 p5) that a Toshiba satellite A30
computer listed as a valuable item for $2,000 and a portable Cannon printer
IP90 listed as a valuable content item for $500 were damaged in the storm. He
states the FSP limited payment for these items to $1,000.
206. The Applicant acknowledged that these items were used in his business.
207. Section 2.1 of the policy provides that limits apply to high risk items unless they
are specifically shown on the schedule. The maximum amount payable for
computer equipment is $4,000.
208. Examination of a copy of the Applicant’s schedule for the period commencing 1
March 2011 (the Panel notes it has not been provided with a schedule for the
period commencing prior to the loss) reveals contents were insured for
$191,000 with a notation a High Risk Item Limit of $38,200 any one claim
applies. The schedule does not contain a list of specified items.
209. However, the copy of the Home Building and/or Contents Proposal completed
by the Applicant on 23 February 2007 includes a number of specified items
under the heading ‘Computer Equipment You are insured for a maximum of
$4,000 in total unless you ins ured for a separate sum and detailed below.” .
210. Included in the listed specified items are a Toshiba laptop $2,000 and a Canon
printer $500. In these circumstances the Panel considers the limits which apply
to tools of trade do not apply to these listed items.
211. According to the assessor’s report dated 12 February 2011, a desktop
computer and Lexmark printer were damaged.
212. The Panel notes a Cannon printer has been included in the list of items
submitted to JB Hi Fi for quotation purpose. However there is no evidence of
the Toshiba laptop having been included or otherwise discussed.
213. In these circumstances the Panel consider having regard to what is fair in all
the circumstances that the FSP is to indemnity the Applicant for the Toshiba
laptop computer.
214. The P anel considers in all other respects relating to the Applicant’s work tools,
the settlement was according to the terms of the policy.
Case No: 247514 Determination Page 23 of 26
Ride on mower
215. According to the Assessor (report 25 June 2011), following an inspection of the
mower he was unable to find any evidence of storm damage.
216. The Applicant was asked to provide an independent report to verify the nature
and extent of damage.
217. The Panel has not been provided with any independent reports confirming the
mower sustained damage as a result of the storm.
218. Accordingly the Panel considers the claim for the mower does not succeed.
Accommodation expenses
219. The policy provides cover for accommodation costs when the insured premises
are not fit to live in as a result of an insured event, up to the time it will take to
repair the damage or 12 months from the time of the damage. The
accommodation may be similar accommodation to the insured premises.
220. The policy further provides that the FSP will reimburse the policyholder for
accommodation expenses incurred. This means that the costs must be incurred
before the FSP will make a payment. As such, payments will usually be in
arrears.
221. Following the damage, the Applicant has been staying with friends. The FSP
accepted the claim for accommodation expenses and reimbursed the Applicant
for the accommodations costs incurred while with his friends.
222. The Applicant now advises (email 9/8 page 9) that the delay in paying the
accommodation expenses had caused friction between him and his friends and
as a result he is seeking accommodation commensurate with his home.
223. The Panel accepts that the Applicant is entitled to seek temporary
accommodation similar to his home. However, unless the Applicant enters into
an arrangement with the FSP any rental costs will only be reimbursed to the
Applicant after he has paid the rent and submitted the documentation to the
FSP.
224. The period for which temporary accommodation expenses will be reimbursed is
limited to 12 months.
225. The FSP’s advice to the Applicant in this regard was therefore alerting hi m, to
his entitlement according to the policy limits
226. The Panel notes the Applicant’s comment (email 25/10) that reimbursement
payments by the FSP have been up to eight weeks late.
Case No: 247514 Determination Page 24 of 26
227. The Panel recommends that the Applicant submit the documentation for
reimbursement of his rent payments to the FSP on a monthly basis .The Panel
expects the FSP to reimburse the Applicant within five working days of
receiving the relevant documentation.
Breach of Privacy
228. The Applicant submits (email 18/9) that the FSP breached its obligations
pursuant to the Privacy Act by contacting his employer in a relation to a
computer forming part of his claim without his authority.
229. The Applicant states that his employment with the organisation was terminated
in September 2011 as a result o f the “a trumped up reason” because of the
privacy breach.
230. The Panel recommends that the Applicant lodge his compliant with the Privacy
Commissioner for investigation of the issues.
Compensation
231. The Applicant is seeking (email 9/8 page 7) compensation arising from the
FSP’s breach of the Privacy Act by failing to remove his wife’s name from the
policy. He contends that he has suffered personally and financially by the FSP
disclosing information to his wife and in doing so has breached privacy laws.
232. In addition, the Applicant advised that he is seeking assistance from the FSP
for medical treatment. (email 9/8) He states his injury/illness of depression and
anxiety was caused by the insured event. The FSP has given no assistance in
any matter and caused him financial loss by not paying.
233. It has been established that at the time of the loss the policy vests in the joint
names of the Applicant and his estranged wife. This gives the FSP the right to
contact the Applicant’s wife in relation to the claim. It also im pacts on the
manner in which any cash settlement of the claim may be made.
234. Accordingly, the Panel is of the opinion that the FSP’s interviews with the
Applicant’s wife were lawful in the context of the claim.
235. The policy does not provide benefits as a result of stress, depression and other
medical conditions which may arise as a result of significant damage to an
insured property.
236. For these reasons, the Panel concludes the FSP is not liable to pay
compensation to the Applicant as a result of his medical condition.
Ongoing premium payments
237. The Applicant states that the FSP has continued to collect his monthly premium
payments for the insurance cover on his building and contents.
Case No: 247514 Determination Page 25 of 26
238. Although the building sustained significant damage as a result of the storm,
according to the evidence the damage can be repaired at a cost much less than
the total sum insured.
239. The claim for damaged contents is also considerably less than the sum insured
for contents thus indicating that not all the contents in the home were damaged
to the extent that it may be deemed a total loss
240. However in the event that no contents remain in the premises and the Applicant
does not wish to continue the cover for his contents he may instruct the FSP to
remove the contents cover from the policy. The cancellation is to be effective
from the time the contents were removed from the house and the FSP was no
longer at risk. Any premium collected in the interim is to be refunded to the
Applicant.
241. Until such time as the Applicant instructs the FSP to cancel the policy, the FSP
is at risk for the assets and is entitled to premium for that risk.
Determination
242. For the reasons expressed above, the Panel determines:
1. The FSP is entitled to assess the loss based on the policy vesting in the
joint names of the Applicant and his estranged wife.
2. The FSP is to replace the entire roof sheeting as agreed by it.
3. The FSP is not liable for the condition of the north wall.’
4. The FSP is entitled to replace the damaged ceilings with the same material
which existed prior to the storm being polystyrene.
5. The FSP is liable for rectifying cracks in the walls above the windows and
doors.
6. The FSP is liable for 50% of the cost of reinstating the shower base and
unit.
7. The FSP is not liable for the wall lining sheet adjacent to the bathroom.
8. The FSP is liable for rectifying all the flooring apart from the area near the
end of the wall in the living room. This involves sanding only and not
replacement.
9. The FSP is to seek recovery of the water system pump from the sub
contract builder.
10. The FSP is not liable for the stove covers.
11. The Applicant has not established the fences were damage by the storm.
Case No: 247514 Determination Page 26 of 26
12. The FSP is not liable for the condition of the veranda
13. The FSP is to re-inspect the roller doors and replace them if found to be
faulty.
14. The FSP is to commence repairing the insured damage. In the event that
this work requires removal and replacement of undamaged items, then the
FSP is to include the removal and replacement of these items within the
SOW. This does not include the bathroom which has been addressed
separately in the determination.
15. The FSP’s offer to settle the contents claim by replacement of the damaged
items through nominated suppliers is according to the terms of the policy
and good insurance practice.
16. The FSP is to indemnify the Applicant for the Toshiba laptop computer and
Cannon printer up to the value specified on the proposal form.
17. The FSP is not liable for the condition of the ride on mower.
18. The FSP is liable for the Applicant’s temporary accommodation expenses
for accommodation similar to the accommodation enjoyed in his home. The
FSP is to reimburse the Applicant for any sums incurred within 5 working
days of receiving the relevant documentation.
19. The FSP is not liable to pay compensation.
20. The FSP is to reimburse the Applicant with the contents premiums paid to it
on instruction from the Applicant that the cover is to be removed from the
policy. The refund is to be calculated on a pro rata basis from the time the
contents were no longer in the home and the FSP was not at risk.
.