Home / Financial Firm (Unknown - Insurer) / Determination 247473
Determination 247473
Claim denial - seepage, inherent defects and faulty workmanship exclusions
Summary
An owner-builder claimed water damage to a newly built basement, attributing it to an open sliding door during a storm. AFCA preferred the insurer's engineer over the applicant's non-independent engineer, found the damage was caused by seepage and building defects, and held the section 46 defect exception unavailable, so no indemnity was owed.
Once the insured establishes a prima facie loss, the insurer must prove an exclusion applies, and the seepage, inherent defect and faulty workmanship exclusions were established on the balance of probabilities.
Subjects and remedies
home or building damageno remedy
Text of the determination
Case No: 247473 Determination Page 1 of 6
Case number: 247473
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim
16 January 2012
Background
1. The Applicant held a home building and contents insurance policy with the
Financial Services Provider (FSP) from 15 April 2010 and the policy was
current at the time of the loss.
2. The Applicant lodged a claim with the FSP for water damage sustained to
the flooring of the basement.
3. On 7 December 2010 he informed the broker the damage was caused as a
result of a burst pipe in the bathroom.
4. However, on 30 December 2010, he informed the broker the damage was
caused as a result of a storm and subsequent water entry into the property.
5. The FSP denied the Applicant’s claim on the grounds that the policy
excludes cover for a claim arising from seepage, faulty workmanship,
inherent defects, etc.
6. The Applicant is of the view the damage to the property was caused by
storm water entering the property via an open door and expects the claim to
be accepted by the FSP.
Summary of Applicant’s position
7. The Applicant believes the loss occurred as a result of his son-in-law
accidentally leaving the sliding door to the subject room open during a storm
event.
8. The Applicant rejects the FSP’s findings and presents a repor t from his
engineer (B) and expects the FSP to honour the claim.
Determination
Case No: 247473 Determination Page 2 of 6
Summary of FSP’s position
9. Subsequent to the lodgement of the claim, the FSP appointed a loss
assessor, leak detection service (A) and an engineer (M) to investigate the
circumstances surrounding the loss and to identify the cause of the loss.
10. The FSP relies on M’s findings which suggest the water entry to the dwelling
was the result of significant defects to the property.
11. The FSP sa ys the Applicant’s opinion that the front entry door was left open
during the storm event remains unsubstantiated.
12. The FSP relies on the following policy provisions:
“This Policy does not cover:
...
(b) loss or damage resulting from or caused by:
...
water seeping through the wall or floor, other than escaping from a
gutter, drain, tank, pipe, water-bed or other apparatus designed to
store or carry any liquid located on or outside the home site;
...
inherent defects, structural defects, faulty workmanship or faulty
design;
...
any consequential loss other than that specifically provided by this
Policy;”
13. The FSP maintains denial of the claim on the grounds the damage was
caused by the above factors which are excluded under the policy.
Issue
14. Whether the FSP is entitled to deny the Applicant’s claim.
Reasons for decision
15. Due to the nature of this dispute, FOS has considered it appropriate to
expedite the dispute in accordance with the Operational Guidelines to the
FOS Terms of Reference. This dispute has not bee n the subject of a FOS
Recommendation and has proceeded directly to Determination.
16. I am satisfied that a full exchange of information has taken place between
each party and that each party has had the opportunity to address any
issues raised.
Case No: 247473 Determination Page 3 of 6
17. The onus of proof rests on the Applicant to establish that, on the balance of
probabilities, he has suffered a loss caused by an insured risk. Once the
Applicant has established that the loss was caused by a risk insured under
his policy, the onus then shifts to the FSP to show that, on the balance of
probabilities, the loss falls within an exclusion clause in the policy.
18. The importance of the wording above must be emphasised. It is for the
Applicant to establish his case on the balance of probabilities. The
subsequent evidence to which I refer must be considered in that light.
19. The Applicant was the owner/builder of the insured property and the property
sustained water damage in December 2010.
20. The Applicant initially notified the cause of damage as a burst pipe and t hen
three weeks later amended the cause of loss to storm/rain water entry into
the property via an open sliding door. I do not think anything turns on this
changed position. The Applicant has provided an adequate explanation for
it.
21. The issue remains whether the storm/rain water entered the property via the
sliding door to the basement or as a result of other causes as highlighted by
M, in what can be described as a very thorough report.
22. A attended the Applicant’s property and identified the following:
“The subfloor inspection to PVC stormwater lines which are all fed under
house and with water released through lines no leaks to pipes were found.
Subfloor dirt was found to be wet and all down pipe fed holes to under house
in brickwork are open. Also holes in brickwork found throughout and to
windows sills, also noted was open drain holes from balcony into cellar which
is next to lower level room. Water egress to lower level room is from vent
holes, holes in brickwork where downpipes feed through, holes in brickwork
window sill and no drainage pipe from balcony. House is near completion and
spray tests to these areas showed water egress to under subfloor.”(sic)
23. M attended the Applicant’s property in May 2011, approximately five months
after the loss and highlights the following as the cause of water of entry into
the property:
Seepage through the northern wall of the subject basement rooms;
Incorrect grading of the concrete paving along the north side of the
subject room;
Ponding due to incorrect grading of the paving against the subject wall;
Inadequate application of a waterproof membrane on the buried face
of the wall;
Absence of caulking at the paving to the north wall interface allowing
surface rainwater run-off from the incorrectly graded paving to flo w
down the buried face of the wall and contribute to saturation of the soil
external to the subject room;
Case No: 247473 Determination Page 4 of 6
Suspected inadequate/incorrectly laid AG drain beneath the path which
appears to have been laid in fill and therefore could be ineffective;
Insufficient set down of the subject door threshold;
Suspect open brick perp wall vents which were retrospectively sealed
by the Applicant including a movement joint presumably to prevent
water damage to the subject timbering flooring;
Soil build-up against the rear/western wall causing excessive
dampness into the room in the absence of waterproof membrane and
suspected inadequate AG drain (if it exists);
Incorrect grading of the paving along the south side of the house and
absence of caulking at the paving to brick wall interface;
A suspect AG drain beneath the southern path;
Inadequate caulking and sealing of movement joints and penetrations
through external walls;
Bridged attempted brick wall movement joints;
Excessively high paving shedding rainwater run-off directly into
brickwork open perps; and
Inadequate drainage provision at the front of the property to address
seepage from the front yard.
24. Further M rejects the Applicant’s view that the damage was caused by an
open door as below:
“Any traces of moisture from this December 2010 event - particularly noting
the summer months, would have disappeared within merely a few days or
possibly up to a week. The [M] report, however, confirms not only excessively
high moisture readings of the timber floor more than four months later but
moisture readings in the north wall plaster well above the floor off the scale
noting that the wall could not have been affected by rainwater through the
door opening. Similar off the scale readings were also noted and taken of the
basement floor slab in areas well away from the subject doorway and again
some four months after the alleged event.
Having regard to the above, it is the Writer’s firm opinion that damage of the
magnitude of alleged damage being claimed from alleged rainwater entry
through the sliding door (without any date or details of wind direction/rainfall
etc.) is completely untenable and unable to be substantiated”
25. The Applicant’s appointed engineer B reported:
“As outlin ed above the amount of water that could potentially be entering the
rumpus room floors or walls is minute and every point outlined within the
report has been developed with speculation and no substantial evidence. The
owner has clearly mitigated any risk of water damage and ingress of moisture
within this room with a number of measures as outlined above, this building
has clearly been built within all design requirements and relevant standards,
there has been no evidence that the builder has not met any of these
standards.
Case No: 247473 Determination Page 5 of 6
In conclusion the list of issues outlined in the [M] report could potentially have
minor effect on a house over a long period of time but this building is only 6
months old and the amount of water/moisture that could have potentially
entered this room over this short period of time would not have been
substantially enough to cause the magnitude of damage that has happened to
this flooring (sic).”
26. B confirms that during the construction there were a number of inspections
by a licensed building inspector, the Applicant has over 30 years of
experience in the construction industry and that he too witnessed the works
by regular inspections.
27. The two reports from B are expressed in argumentative terms and in the
form of a response to the original (and subsequently the second) report of M.
They do not appear to be independent. Had an entirely independent
engineer provided a report on behalf of the Applicant, this may well have
assisted his position.
28. Due to B’s close involvement in the constructio n process, I am unable to
accept his findings as independent and unbiased. Furthermore, I find that he
has rejected the findings of M but has not identified the cause of loss and
how the subject room sustained such extensive damage.
29. Faced with the divergence between the reports of M and B, I do not consider
that the Applicant has overcome the onus referred to in paragraph 17 above.
30. I am not satisfied the sliding door being left open is capable of causing such
damage. I am of the opinion that high moisture readings approximately five
months after the loss indicate ongoing water seepage issues at the property.
31. The Applicant might have had recourse under Section 46 of the Insurance
Contracts Act 1984 (the Act), if it can be established that he was unawa re of
the building defects prior to the inception of the insurance contract.
32. Section 46 of the Act provides that if a claim is made in respect of a loss that
occurred in whole or in part as a result of a defect or imperfection in a thing
and the insured was not aware of the defect or a reasonable person in the
circumstances could not be expected to have been aware of the defect or
imperfection the insurer may not rely on an exclusion clause that refers to
the condition of the thing before the contract was e ntered into.
33. However, based on the fact that the Applicant was the owner/builder of the
recently built property (which appears to be near completion), I am satisfied
the Applicant must have been reasonably aware of the condition of the
property and therefore, he will not be entitled for recourse under Section 46
of the Act.
34. Based on the above, I am satisfied the damage to the Applicant’s property
was caused by seepage, inherent building defects and faulty workmanship
and therefore, the FSP is entitled to rely on its exclusions.
Case No: 247473 Determination Page 6 of 6
Determination
35. On the basis of the available information, I determine the FSP is not required
to indemnify the Applicant.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.