Home / Financial Firm (Unknown - Insurer) / Determination 247318
Determination 247318
Partial denial of sewer leak water damage to laundry area
Summary
The FSP paid part of a water escape claim from a cracked sewer pipe but denied damage to the south-eastern laundry area. AFCA found the damage was partly related to the broken pipe, apportioned the costs 60/40 in the FSP's favour, and ordered payment of $3,040 with interest.
Under Terms of Reference 8.2 fair apportionment applied because the damage was partly caused by the insured leak, while the Applicants' extension built without notice to the FSP prejudiced its assessment.
Issues
- Claim denial primary · upheld
“I am inclined to accept the report of the Applicant's builder as to the damage of the laundry was to some degree related to the broken pipe.”
- Claim amount dispute secondary · upheld
“I am not prepared to accept that the whole of that damage was reparable.”
Subjects and remedies
home or building damagepay claimpay interest
Text of the determination
Case No: 247318 Determination Page 1 of 7
Case number: 247318
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Claim Amount - Escape of Water
28 February 2012
Background
1. This is a review of a Recommendation by this Service’s Cas e Manager dated 5
December 2011 in favour of the Financial Services Provider (FSP). The
Applicant has rejected the Recommendation and in accordance with the Terms
of Reference the matter has been referred to me for determination.
2. The relevant background, summaries of the parties’ position and issues in
dispute have been set out in brief in the Recommendation and in the interests
of clarity and completeness I will repeat same.
3. The Applicant held a home buildings insurance policy with the Fi nancial
Services Provider which was current at the time of the loss.
4. On 8 May 2006, the Applicant contacted the FSP to lodge a claim for water
damage to his property caused by a leaking sewer pipe under the house. The
Applicant estimated that the pipe had cracked on or around 1 January 2006.
5. The FSP accepted the claim for damage sustained to the eastern wall of the
property and paid the Applicant $4,500, less the policy excess of $300. The
FSP has denied the Applicant’s claim for damage to the south eastern area of
the property.
6. The Applicant disputes the FSP’s decision to partially deny his claim and seeks
the outstanding repair costs of $7,600 to the south eastern section of his home,
$660 incurred to obtain an expert report and unquantified future repair costs.
Summary o f Applicant’s Position
7. The Applicant says that he was required to immediately attend to repairs at the
south eastern section of his home beneath his laundry room.
8. He further says that this damage is solely related to water damage from the
cracked sewer pipe.
9. As such, he submits that cover should be provided under the terms of the
policy.
D e terminatio n
Case No: 247318 Determination Page 2 of 7
Summary of FSP’s Position
10. The FSP says that the damage was not caused by the leaking of water from the
sewer pipe.
11. The FSP further says that even if it were to be established that the damage was
caused in this manner, the Applicant’s actions of carrying out repairs and then
building an extension onto the south eastern area of the property has
prejudiced its ability to determine the extent of its liability.
12. The FSP relies on the following policy provisions contained within the Product
Disclosure Statement (PDS) which the Applicant does not dispute receiving:
“ we will NOT cover
loss, damage, injury or death that occurs as a result of
...
wear, tear, rust, corrosion, deterioration or erosion
...
atmospheric conditions or extreme temperature
...
subsidence or landslide unless it happens immediately following an earthquake
or explosion ”
Issue
13. Whether the FSP is entitled to partially deny the Applicant’s claim.
Reasons for Decision
14. There has been a full exchange of information and each party has had the
opportunity to address the issues raised. I have read all of the exchanged
information and I have carefully considered the submissions of the parties,
including the Applicant ’s further submission dated 2 January 2012. The Case
Manager set out her reasons in paragraphs 13-25 inclusive. I restate same as
follows:
“13. It is not in dispute that a sewer pipe under the Applicant’s property
cracked and released water into the soil below around the beginning of
2006.
14. Following lodgement of the claim, the FSP appointed a building
contractor (S) to attend the Applicant’s property and report on the
extent and cause of the damage. S reported:
“On inspection of the corner area of the building there is clear
evidence of settlement. There are numerous cracks in the joints of
Case No: 247318 Determination Page 3 of 7
the sandstone footings and cracking to the face brickwork. All the
cracking is evident in the one area.
...
We recommend that an engineer attend the site once out plumber
has investigated the issue.
...
Leak was found in the se wer area. There was broken sewer pipe
under the laundry area. It was leaking to the side pathway. The
leak was visible when the kitchen and laundry areas were used.
In our opinion this is a legitimate claim as the leaking pipe (sic)
has caused the damage and subsidence”
As recommended by S, the FSP appointed a further building
consultant, (IT) to attend the Applicant’s property and report on
the extent and cause of the damage. IT concluded:
“After having inspected and checked the areas to the rear section
of the d welling, I am of the opinion that movement within this
region has been developing for some time, and prior to the
current o wner’s purchase (2000).
...
For the most part, the cracking to the exterior and also the interior
of the laundry have had attempted patching in the past. In the
areas of the south-eastern corner where no patching has taken
place, the cracking would be defined as Category 2 in accordance
with AS 2870, and therefore only localised pointing of the mortar
would be required.
I would recommend that the insured have the cracked se wer line
to the laundry tub repaired, and then this situation be re-evaluated
to determine if any remedial work is required after the soil has
dried.
At this stage, I consider that only minor repair works would be
necessary, as the majority of the problems to the masonry
structure clearly appear to pre- date the current owners purchase.”
15. Upon receipt of this report, the FSP advised the Applicant that he
should have the sewer pipe repaired and allow the soil to dry before a
further inspection of the property was undertaken. The Applicant was
also advised to call the FSP once the pipe had been repaired.
16. The Applicant, according to the FSP’s screen notes, was advised of
this on 12 July 2006, 3 August 2006 and 31 August 2006.
Case No: 247318 Determination Page 4 of 7
17. Despite further telephone calls and letters from the FSP, the Applicant
did not contact it to discuss the repairs to the pipe. As no further
communication was received from the Applicant, the FSP closed its
claim file. On 21 March 2007, the Applicant telephoned the FSP to
advise that the repairs to the se wer pipe had been completed.
18. The FSP’s claim handler attempted to return the Applicant’s call of 21
March 2007 however he was unable to make contact. Again, the FSP’s
claim file was closed until 19 December 2007 when the Applicant rang
the FSP to inform it that the pipe had been repaired approximately four
months previously.
19. The FSP agreed to re- inspect the Applicant’s property. IT was
appointed to re-attend the property and report on any damage present.
IT reported:
“I discussed the resultant damage situation with them, and they
informed me that since my original inspection over 18 months
ago, they have undertaken to have a ne w two storey addition
constructed at the rear, and in the course of this, underpinning
works were carried out. They are not a ware as to the extent of
the remedial work, or costs of the underpinning, although they
did state this was necessary before the ne w construction was
completed.
On both sides of the dwelling there are aged stepped cracks,
although on one side the builder has carried out minor pointing
repairs. In some case, particularly towards the front of the
house, the cracks are completely unrelated to the escape of
water from the laundry, and are indicative of general building
movement, as is not uncommon on buildings of this age.
In view of the fact that there is not any resultant damage now
evident, the o wners speculated that they might be considered
for some compensation, as they believe they have repaired the
majority of the resultant damage in the course of carrying out
this rear addition. It is not possible to quantify the value of this,
as all work is now concealed by the addition, and possibly part
of the damage has been demolished and rebuilt.”
20. On 11 April 008, the FSP informed the Applicant that the claim would
be denied as any sighted damage was not ne w damage and that he
had prejudiced its position by adding the extension to the property
without providing the FSP with an opportunity to re-inspect prior to
construction commencing.
21. The Applicant has provided a statement from his building contractor
who completed the construction of the extension. This statement dated
15 August 2009 details:
Case No: 247318 Determination Page 5 of 7
“Before we commenced construction to build two storey
extension ... we checked the existing d welling and find the big
crack on corner of the Southeast wall, because the existing
sewerage pipe from the laundry at that corner had been broken
due to the footing too much loose. To prevent the existing corner
of the Southeast wall may to be collapse, we fixed every existing
damaged portion immediately, this included footings, walls and
some plumbing work.” (Sic)
22. This building contractor also submitted an un-receipted invoice for the
repairs dated 20 December 2006. The date of this invoice pre-dates
the statement given by the Applicant to the FSP that the pipe had been
repaired in approximately August 2007 as detailed in paragraph 19.
23. The Applicant has also provided a report from an engineer who
inspected the property in September 2006. The engineer detailed that
various cracks in walls were caused by the leaking of water which may
have caused the movement in the footings underneath the laundry
area.
24. The engineer recommended that repairs should commence
immediately. However, as previously mentioned, it is unclear as to
when the pipe was actually repaired. Furthermore, it is not known what
additional damage may have occurred to the property due to the delays
in repairing the leak.”
15. In summary, the Case Manager rejected the Applicant’s claim because he did
not carry the burden of proving that the loss claimed in respect of the laundry
area was caused by the leaking pipe.
16. I do not disagree with the Case Manager’s findings but I add the following
comments.
17. In this further submission the Applicant states in paragraphs 6:
“Whilst we are fully aware that it is our responsibility to demonstrate that the loss
claimed is a result of an insured event, [insurer] have acted in a fraudulent and
conniving manner in order for them to prove that these damages are not covered
under their policy. Based on all the information that I have provided to [insurer], I
am in belief that this claim is covered under the policy as there is sufficient
evidence to support our claim.”
18. I note the Applicant’s acceptance of burden of proving that the claimed loss is a
result of an insured event . Insofar as the Applicant has alleged fraud ulent
conduct on the part of the FSP, I note that there is not a single piece of
evidence of fraudulent conduct and I reject that unsubstantiated and serious
allegation.
19. This matter has a very long history and it is extremely difficult for a decision
maker so long after the event to derive a satisfactory outcome. This is
particularly so when there has been an intervening event at the instigation of
the Applicant namely the construction of the building extension of which the
Case No: 247318 Determination Page 6 of 7
FSP was not informed. The Case Manger has noted that this has caused
prejudice to the FSP’s ability to accurately assess the claim and I give weight to
that issue accordingly.
20. Most importantly, in respect of the crucial issue of proving that claimed loss
results from a insured event I note the Applicant relies heavily on a estimate of
the cost of repairs given early in the proceedings by the plumber in the sum
$24,156. I note specifically that this is nothing more than an estimate and in
both the plumber’s report and the consultant’s report emphasis is placed upon
the need for an engineer to provide a scope of works. The plumber estimate is
nothing more than that.
21. The important issue is whether the claimed loss for the alleged laundry damage
was caused by the leak from the cracked sewer pipe.
22. The Applicant engineer stated:
“The above mentioned defects and/or damages are very likely to have been
caused by the leaking water of the cracked sewer pipe, which could have cause
the movement of part of the footings underneath the laundry of the house.
The defects and/or damages need to be fixed immediately”.
23. It is common ground that the cracked sewer pipe caused the damage which
caused settlement in the area of the kitchen. The damage to the laundry area is
rather vexed. The FSP’s assessor in relying on the plumber report stated:
“Service call to conduct a pressure test. No leak found in the hot and cold copper
pipes. Leak was found in the sewer area. There was a broken pipe under the
laundry area. It was leaking to the side pathway. The leak was visible when the
kitchen and laundry area were used.
In our opinion this is a legitimate claim as the leaking pipe (sic) has caused the
damage and subsidence.”
24. As noted above, the Applicant’s engineer when dealing with the laundry stated:
“For the most part, the cracking to the exterior and also the interior of the laundry
have had attempted patching in the past. In the areas of the south-eastern
corner where no patching has taken place, the cracking would be defined as
Category 2 in accordance with AS 2870, and therefore only localised pointing of
the mortar would be required.
I would recommend that the insured have the cracked sewer line to the laundry
tub repaired, and then this situation be re-evaluated to determine if any remedial
work is required after the soil has dried.
At this stage, I consider only minor repair works would be necessary as the
majority of the problems to the masonry structure clearly appear to pre-date the
current owners’ purchase.”
25. In expressing an opinion as to the majority of the problems from the masonry
structure pre- dating the current owner’s purchase the engineer appears to be
Case No: 247318 Determination Page 7 of 7
stepping into the area of assigning liability rather than confining his remarks as
to whether the damage to the laundry was caused by the broken sewer pipes.
26. Terms of Reference 8.2 states:
“Subject to paragraph 8.1, when deciding a Dispute and whether a remedy
should be provided in accordance with paragraph 9, FOS will do what in its
opinion is fair in all the circumstances, having regard to each of the following:
a) legal principles;
b) applicable industry codes or guidance as to practice;
c) good industry practice; and
d) previous relevant decisions of FOS or a Predecessor Scheme (although FOS
will not be bound by t hese).”
27. T he Applicant’s engineer states that the damage sewer pipe could have caused
the settlement of the property in the area of the laundry. Some support for that
proposition is also obtained from the FSP’s assessor’s report. By contrast the
FSP’s engin eer report (IM) acknowledges damage in the laundry area but
seeks to minimise the cost referable to the broken pipe to require only minor
repair work. As noted above, the building of the extension without reference to
the FSP has complicated the picture.
28. I am inclined to accept the report of the Applicant’s builder as to the damage of
the laundry was to some degree related to the broken pipe. However, I am not
prepared to accept that the whole of that damage was reparable.
29. In the circumstances, I intent to apply Terms of Reference 8.2 and apportion
costs of 60/40 basis in favour of the FSP.
Determination
30. Accordingly, I determine that the FSP pay the sum 3,040 together with interest
thereon at the statutory rate from 9 March 2010 until settlement.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.