Determination 247318

Partial denial of sewer leak water damage to laundry area

FirmFinancial Firm (Unknown - Insurer)
Decided2012-03-27
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$3,040
Non-financial loss—
Amount claimed$8,260
SourceAFCA PDF

Summary

The FSP paid part of a water escape claim from a cracked sewer pipe but denied damage to the south-eastern laundry area. AFCA found the damage was partly related to the broken pipe, apportioned the costs 60/40 in the FSP's favour, and ordered payment of $3,040 with interest.

Under Terms of Reference 8.2 fair apportionment applied because the damage was partly caused by the insured leak, while the Applicants' extension built without notice to the FSP prejudiced its assessment.

Issues

Subjects and remedies

home or building damagepay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 247318 Determination Page 1 of 7 Case number: 247318 General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim Amount - Escape of Water 28 February 2012 Background 1. This is a review of a Recommendation by this Service’s Cas e Manager dated 5 December 2011 in favour of the Financial Services Provider (FSP). The Applicant has rejected the Recommendation and in accordance with the Terms of Reference the matter has been referred to me for determination. 2. The relevant background, summaries of the parties’ position and issues in dispute have been set out in brief in the Recommendation and in the interests of clarity and completeness I will repeat same. 3. The Applicant held a home buildings insurance policy with the Fi nancial Services Provider which was current at the time of the loss. 4. On 8 May 2006, the Applicant contacted the FSP to lodge a claim for water damage to his property caused by a leaking sewer pipe under the house. The Applicant estimated that the pipe had cracked on or around 1 January 2006. 5. The FSP accepted the claim for damage sustained to the eastern wall of the property and paid the Applicant $4,500, less the policy excess of $300. The FSP has denied the Applicant’s claim for damage to the south eastern area of the property. 6. The Applicant disputes the FSP’s decision to partially deny his claim and seeks the outstanding repair costs of $7,600 to the south eastern section of his home, $660 incurred to obtain an expert report and unquantified future repair costs. Summary o f Applicant’s Position 7. The Applicant says that he was required to immediately attend to repairs at the south eastern section of his home beneath his laundry room. 8. He further says that this damage is solely related to water damage from the cracked sewer pipe. 9. As such, he submits that cover should be provided under the terms of the policy. D e terminatio n Case No: 247318 Determination Page 2 of 7 Summary of FSP’s Position 10. The FSP says that the damage was not caused by the leaking of water from the sewer pipe. 11. The FSP further says that even if it were to be established that the damage was caused in this manner, the Applicant’s actions of carrying out repairs and then building an extension onto the south eastern area of the property has prejudiced its ability to determine the extent of its liability. 12. The FSP relies on the following policy provisions contained within the Product Disclosure Statement (PDS) which the Applicant does not dispute receiving: “ we will NOT cover  loss, damage, injury or death that occurs as a result of ...  wear, tear, rust, corrosion, deterioration or erosion ...  atmospheric conditions or extreme temperature ...  subsidence or landslide unless it happens immediately following an earthquake or explosion ” Issue 13. Whether the FSP is entitled to partially deny the Applicant’s claim. Reasons for Decision 14. There has been a full exchange of information and each party has had the opportunity to address the issues raised. I have read all of the exchanged information and I have carefully considered the submissions of the parties, including the Applicant ’s further submission dated 2 January 2012. The Case Manager set out her reasons in paragraphs 13-25 inclusive. I restate same as follows: “13. It is not in dispute that a sewer pipe under the Applicant’s property cracked and released water into the soil below around the beginning of 2006. 14. Following lodgement of the claim, the FSP appointed a building contractor (S) to attend the Applicant’s property and report on the extent and cause of the damage. S reported: “On inspection of the corner area of the building there is clear evidence of settlement. There are numerous cracks in the joints of Case No: 247318 Determination Page 3 of 7 the sandstone footings and cracking to the face brickwork. All the cracking is evident in the one area. ... We recommend that an engineer attend the site once out plumber has investigated the issue. ... Leak was found in the se wer area. There was broken sewer pipe under the laundry area. It was leaking to the side pathway. The leak was visible when the kitchen and laundry areas were used. In our opinion this is a legitimate claim as the leaking pipe (sic) has caused the damage and subsidence” As recommended by S, the FSP appointed a further building consultant, (IT) to attend the Applicant’s property and report on the extent and cause of the damage. IT concluded: “After having inspected and checked the areas to the rear section of the d welling, I am of the opinion that movement within this region has been developing for some time, and prior to the current o wner’s purchase (2000). ... For the most part, the cracking to the exterior and also the interior of the laundry have had attempted patching in the past. In the areas of the south-eastern corner where no patching has taken place, the cracking would be defined as Category 2 in accordance with AS 2870, and therefore only localised pointing of the mortar would be required. I would recommend that the insured have the cracked se wer line to the laundry tub repaired, and then this situation be re-evaluated to determine if any remedial work is required after the soil has dried. At this stage, I consider that only minor repair works would be necessary, as the majority of the problems to the masonry structure clearly appear to pre- date the current owners purchase.” 15. Upon receipt of this report, the FSP advised the Applicant that he should have the sewer pipe repaired and allow the soil to dry before a further inspection of the property was undertaken. The Applicant was also advised to call the FSP once the pipe had been repaired. 16. The Applicant, according to the FSP’s screen notes, was advised of this on 12 July 2006, 3 August 2006 and 31 August 2006. Case No: 247318 Determination Page 4 of 7 17. Despite further telephone calls and letters from the FSP, the Applicant did not contact it to discuss the repairs to the pipe. As no further communication was received from the Applicant, the FSP closed its claim file. On 21 March 2007, the Applicant telephoned the FSP to advise that the repairs to the se wer pipe had been completed. 18. The FSP’s claim handler attempted to return the Applicant’s call of 21 March 2007 however he was unable to make contact. Again, the FSP’s claim file was closed until 19 December 2007 when the Applicant rang the FSP to inform it that the pipe had been repaired approximately four months previously. 19. The FSP agreed to re- inspect the Applicant’s property. IT was appointed to re-attend the property and report on any damage present. IT reported: “I discussed the resultant damage situation with them, and they informed me that since my original inspection over 18 months ago, they have undertaken to have a ne w two storey addition constructed at the rear, and in the course of this, underpinning works were carried out. They are not a ware as to the extent of the remedial work, or costs of the underpinning, although they did state this was necessary before the ne w construction was completed. On both sides of the dwelling there are aged stepped cracks, although on one side the builder has carried out minor pointing repairs. In some case, particularly towards the front of the house, the cracks are completely unrelated to the escape of water from the laundry, and are indicative of general building movement, as is not uncommon on buildings of this age. In view of the fact that there is not any resultant damage now evident, the o wners speculated that they might be considered for some compensation, as they believe they have repaired the majority of the resultant damage in the course of carrying out this rear addition. It is not possible to quantify the value of this, as all work is now concealed by the addition, and possibly part of the damage has been demolished and rebuilt.” 20. On 11 April 008, the FSP informed the Applicant that the claim would be denied as any sighted damage was not ne w damage and that he had prejudiced its position by adding the extension to the property without providing the FSP with an opportunity to re-inspect prior to construction commencing. 21. The Applicant has provided a statement from his building contractor who completed the construction of the extension. This statement dated 15 August 2009 details: Case No: 247318 Determination Page 5 of 7 “Before we commenced construction to build two storey extension ... we checked the existing d welling and find the big crack on corner of the Southeast wall, because the existing sewerage pipe from the laundry at that corner had been broken due to the footing too much loose. To prevent the existing corner of the Southeast wall may to be collapse, we fixed every existing damaged portion immediately, this included footings, walls and some plumbing work.” (Sic) 22. This building contractor also submitted an un-receipted invoice for the repairs dated 20 December 2006. The date of this invoice pre-dates the statement given by the Applicant to the FSP that the pipe had been repaired in approximately August 2007 as detailed in paragraph 19. 23. The Applicant has also provided a report from an engineer who inspected the property in September 2006. The engineer detailed that various cracks in walls were caused by the leaking of water which may have caused the movement in the footings underneath the laundry area. 24. The engineer recommended that repairs should commence immediately. However, as previously mentioned, it is unclear as to when the pipe was actually repaired. Furthermore, it is not known what additional damage may have occurred to the property due to the delays in repairing the leak.” 15. In summary, the Case Manager rejected the Applicant’s claim because he did not carry the burden of proving that the loss claimed in respect of the laundry area was caused by the leaking pipe. 16. I do not disagree with the Case Manager’s findings but I add the following comments. 17. In this further submission the Applicant states in paragraphs 6: “Whilst we are fully aware that it is our responsibility to demonstrate that the loss claimed is a result of an insured event, [insurer] have acted in a fraudulent and conniving manner in order for them to prove that these damages are not covered under their policy. Based on all the information that I have provided to [insurer], I am in belief that this claim is covered under the policy as there is sufficient evidence to support our claim.” 18. I note the Applicant’s acceptance of burden of proving that the claimed loss is a result of an insured event . Insofar as the Applicant has alleged fraud ulent conduct on the part of the FSP, I note that there is not a single piece of evidence of fraudulent conduct and I reject that unsubstantiated and serious allegation. 19. This matter has a very long history and it is extremely difficult for a decision maker so long after the event to derive a satisfactory outcome. This is particularly so when there has been an intervening event at the instigation of the Applicant namely the construction of the building extension of which the Case No: 247318 Determination Page 6 of 7 FSP was not informed. The Case Manger has noted that this has caused prejudice to the FSP’s ability to accurately assess the claim and I give weight to that issue accordingly. 20. Most importantly, in respect of the crucial issue of proving that claimed loss results from a insured event I note the Applicant relies heavily on a estimate of the cost of repairs given early in the proceedings by the plumber in the sum $24,156. I note specifically that this is nothing more than an estimate and in both the plumber’s report and the consultant’s report emphasis is placed upon the need for an engineer to provide a scope of works. The plumber estimate is nothing more than that. 21. The important issue is whether the claimed loss for the alleged laundry damage was caused by the leak from the cracked sewer pipe. 22. The Applicant engineer stated: “The above mentioned defects and/or damages are very likely to have been caused by the leaking water of the cracked sewer pipe, which could have cause the movement of part of the footings underneath the laundry of the house. The defects and/or damages need to be fixed immediately”. 23. It is common ground that the cracked sewer pipe caused the damage which caused settlement in the area of the kitchen. The damage to the laundry area is rather vexed. The FSP’s assessor in relying on the plumber report stated: “Service call to conduct a pressure test. No leak found in the hot and cold copper pipes. Leak was found in the sewer area. There was a broken pipe under the laundry area. It was leaking to the side pathway. The leak was visible when the kitchen and laundry area were used. In our opinion this is a legitimate claim as the leaking pipe (sic) has caused the damage and subsidence.” 24. As noted above, the Applicant’s engineer when dealing with the laundry stated: “For the most part, the cracking to the exterior and also the interior of the laundry have had attempted patching in the past. In the areas of the south-eastern corner where no patching has taken place, the cracking would be defined as Category 2 in accordance with AS 2870, and therefore only localised pointing of the mortar would be required. I would recommend that the insured have the cracked sewer line to the laundry tub repaired, and then this situation be re-evaluated to determine if any remedial work is required after the soil has dried. At this stage, I consider only minor repair works would be necessary as the majority of the problems to the masonry structure clearly appear to pre-date the current owners’ purchase.” 25. In expressing an opinion as to the majority of the problems from the masonry structure pre- dating the current owner’s purchase the engineer appears to be Case No: 247318 Determination Page 7 of 7 stepping into the area of assigning liability rather than confining his remarks as to whether the damage to the laundry was caused by the broken sewer pipes. 26. Terms of Reference 8.2 states: “Subject to paragraph 8.1, when deciding a Dispute and whether a remedy should be provided in accordance with paragraph 9, FOS will do what in its opinion is fair in all the circumstances, having regard to each of the following: a) legal principles; b) applicable industry codes or guidance as to practice; c) good industry practice; and d) previous relevant decisions of FOS or a Predecessor Scheme (although FOS will not be bound by t hese).” 27. T he Applicant’s engineer states that the damage sewer pipe could have caused the settlement of the property in the area of the laundry. Some support for that proposition is also obtained from the FSP’s assessor’s report. By contrast the FSP’s engin eer report (IM) acknowledges damage in the laundry area but seeks to minimise the cost referable to the broken pipe to require only minor repair work. As noted above, the building of the extension without reference to the FSP has complicated the picture. 28. I am inclined to accept the report of the Applicant’s builder as to the damage of the laundry was to some degree related to the broken pipe. However, I am not prepared to accept that the whole of that damage was reparable. 29. In the circumstances, I intent to apply Terms of Reference 8.2 and apportion costs of 60/40 basis in favour of the FSP. Determination 30. Accordingly, I determine that the FSP pay the sum 3,040 together with interest thereon at the statutory rate from 9 March 2010 until settlement.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.