Home / Financial Firm (Unknown - Insurer) / Determination 247225
Determination 247225
Home contents claim for flood damage declined under flood exclusion; flash flood cover not triggered
Summary
The complainant's home was inundated by Brisbane River flooding in January 2011 and her home contents claim of $35,460 was declined under the flood exclusion. AFCA found the inundation occurred outside the 24-hour flash flood window and that the policy clearly informed her of the flood limitations.
The loss was not caused by flash flood or stormwater run-off from heavy rain within 24 hours of inundation, and s35 of the Insurance Contracts Act 1984 was satisfied by clear policy wording.
Issues
- Claim denial primary · not upheld
“Panel determines that the policy does not extend to cover the Applicant's loss and that the FSP is entitled to refuse payment”
- Failure to disclose secondary · not upheld
“Panel is satisfied the Applicant has been clearly informed in accordance with Section 35 of the Act”
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Case No: 247225 Determination Page 1 of 11
Case number: 247225
General Insurance – Home Contents – Flash flood and stormwater run-off –
Policy exclusion - Flood – Insurance Contracts Act 1984 Section 35
11 September 2012
Background
1. The Applicant held a Home Contents Insurance policy (the policy) with the
Financial Services Provider (FSP). The policy was current for the period 27
December 2010 to 27 December 2011. The policy also covered flash flood
and stormwater run-off up to 50% of the contents sum insured or $25,000
whichever is higher.
2. The insured property sustained extensive damage due to the significant
weather events experienced in Queensland in January 2011.
3. A claim was lodged against the policy seeking indemnity for the resultant
loss however, the FSP declined the claim on the basis the loss was due to
“flood” , an event excluded under the policy.
4. The Applicant remains dissatisfied with the outcome of the claim and is
seeking a review of the FSP’s decision by the Service.
Summary of Applicant’s position
5. The Applicant maintains that her home was inundated due to the heavy
rainfall experienced in the area on 11 January 2011 as the water was unable
to drain away due to the rising levels of Brisbane River (the river).
6. The policy sold to the Applicant states that the flood cover is provided. At the
time the Applicant was not aware of the many different types of flood or that
the exact time of rainfall would come into play to render the policy invalid.
7. The terms of the policy relating to flash flood and stormwater run-off seemed
to cover the likely events that could occur to a property built close to a river.
The Applicant felt assured by the policy terms in that the home was covered
for loss arising from flood.
8. The Applicant was offered “ flood and storm surge ” cover however in line with
the policy terms, this cover relates to an increase in sea levels associated
with tropical cyclones and other intense storms. This cover seemed more
applicable to a marine environment.
Determination
Case No: 247225 Determination Page 2 of 11
9. The Applicant has obviously had difficulty in understanding the terms of the
policy and accordingly maintains that the FSP has failed to “ clearly inform ”
her of the extent or lack of flood cover under the policy.
10. Noting the government as a party other than the policyholders has requested
improvements to the definition of “flood”, establishes there is insufficient
clarity with the current policy wording.
11. The FSP has acknowledged there were two spikes in the water level of
Wivenhoe Dam (the dam) caused by inflows of rain. The first spike was due
to rainfall before the 11 January 2011, whilst the second spike was due to
rainfall on and after 11 January 2011, and which falls within the 24 hours
prior to inundation of the property.
12. The Applicant notes the FSP’s c ontention that the second spike alone would
not have caused the need for the dramatic water release from the dam had
the first spike not occurred. It is however the Applicant’s position that in this
instance it is a matter of fact that the first spike did actually occur and it was
the second spike that caused the increase in water release and subsequent
inundation of her home.
13. The rain that fell outside the 24 hours from inundation may have been
greater in volume but the fact remains that it was the effect of the rainfall
within the 24 hours of inundation that actually resulted in her loss.
14. As a lay person it is unreasonable for the Applicant to have considered or be
aware of the possible impact of the Wayne Tank principle noted and relied
upon by the FSP.
15. The Applicant believes a fair outcome is for the FSP to cover her for her loss
in the amount of $35,460 in line with the available proof of loss.
Summary of FSP’s position
16. The FSP denies anything in its submission to the Service “ confirms that the
rainfall occurring within 24 hours of inundation actually caused the dramatic
increase in the releases which led to the inundation ”.
17. It is artificial to look at the rain which fell immediately prior to the increased
releases from the dam without considering the substantial rainfall occurred
over the many days prior which filled the dam’s flood storage capacity.
18. In respect to the Wayne Tank principle, this does not affect the validity of the
policy, it merely goes to whether the policy applies to a particular event.
19. The FSP is not required to include an explanation of legal principles such as
“Wayne Tank” within the Product Disclosure Statement (PDS) and in
maintaining this position it has referred to the case of Hams v CGU Ltd
[2002] NSWSC 273 at [244].
Case No: 247225 Determination Page 3 of 11
20. The Applic ant’s reference to the “National Disaster Insurance Review” and
the definition of flood discussed in this review is irrelevant to the claim in
question. The definition of flood relevant to this matter is that which has been
provided in the PDS relevant to the policy in place at the time of loss.
21. The FSP maintains the decision to increase releases from the dam must be
seen in context of the already substantially increased water levels in the dam
as a result of the rain that fell from 9 January 2011. The FSP in maintaining
this position relies upon a statement made available by its commissioned
hydrologist “S C ”.
22. If only the second spike had occurred, the FSP maintains that it is unlikely
that the dramatic increase in releases would have been necessary as there
would have been sufficient flood storage capacity to store the inflows. In
other words, without the substantial increase in water levels of the dam
caused by the rain that fell from 9 January 2011 and earlier, there would
have been no need to increase the rate of releases from the dam.
23. The proximate cause of the loss is not the cause which was the most recent
in time but instead is the cause which a reasonable person would conclude
was the cause of the loss. The FSP submits, it is absurd to look at the
rainfall on 11 January 2011 in isolation from the days of heavy rainfall which
preceded it, and the consequential effect of the earlier rainfall in the dam
water levels.
24. The volume of rainfall that commenced on 9 January 2011 and earlier was
greater that the volume of rainfall that fell on 11 January 2011. Accordingly, it
would be this period of rainfall which will be considered the proximate cause
for the subsequent inundation and loss of the insured property.
25. At the very least, the rainfall both before and within the 24 hours prior to
inundation would be considered proximate causes of the water releases and
inundation of the insured property. Therefore, the loss would fall outside the
scope of the policy because of the operation of the Wayne Tank principle.
26. The FSP refers to the evidence submitted by SC and notes:
SC does not agree with the contention that it was only the heavy rain
that fell during 11 January 2011 that resulted in the substantial
releases from the dam and cause the vast elevation of the Brisbane
River.
The inflows shown in the second spike would be particularly
attributable to rain that fell earlier than 11 January 2011 because it
takes time for rain falling in upper parts of the catchment to travel to
the dam.
An analysis indicates that the rainfall on 9-10 January 2011
contributed roughly 71% of the increase in the dam water levels.
Case No: 247225 Determination Page 4 of 11
S estimates it would take between approximately 14-18 hours for the
water released from the dam to make its way to the Jindalee water
gauge and this estimate is accurate within plus or minus 10% to 20%.
From the morning of 10 January 2011 the water level of the river at
Jindalee began to rise as a result of the pre 11 January 2011 rainfall,
water releases and catchment inflows.
Terrain information suggests that it would be unlikely that the property
would experience significant stormwater problems arising from
stormwater or other local run-off.
The rainfall around the time of inundation of the insured property was
not sufficient to cause the inundation by stormwater run-off or other
local run-off.
To the extent that there was backflow in the stormwater system from
the river, the source of that water was no t run-off from local intense
rainfall, but the rising level of the river.
27. The FSP maintains the PDS is sufficiently clear to inform an insured about
the scope and/or limitations of flood cover available under the policy. The
Certificate of Insurance (COI) also clearly informs an insured that flood cover
is not included upon the policy. There is no dispute that the FSP provided
the Applicant with the relevant policy documentation.
28. The FSP notes the Service has in its previous determinations acknowledged
that the FSP’s policy documentation and wording are sufficiently clear for the
purpose of Section 35 of the Insurance Contracts Act 1984 (the Act) to
“Clearly Inform” a policyholder of the scope of cover regarding loss or
damage arising from flood, flash flood and or stormwater run-off.
29. The FSP maintains that the Applicant has not satisfied the onus to establish
that she has suffered a loss arising from an event insured under the policy.
30. The FSP relies on the following policy provisions:
“ Words / terms with special meanings
Flood
Rising water which enters your home as a result of it running off or overflowing from
any origin or cause. This policy does not cover flood unless we have agreed and it is
shown on your certificate of insurance.
Flash flood and stormwater run-off
A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash
flood or stormwater run-off.
...
Storm
A violent disturbance of the atmosphere associated with strong winds including a
cyclone, lightning, heavy rain, hail or snow, but not continuous bad weather by itself.
Case No: 247225 Determination Page 5 of 11
...
Insured events you are covered for
Damage caused by weather...
What is covered
Storm
What is not covered
Loss or damage:
× caused by rain, hail or snow after it has reached the ground;
× caused by rain or wind entering the home unless it enters through an opening in
the windows, walls or roof made by a storm;
...
What is covered
Flash flood and stormwater run-off
A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash
flood or stormwater run-off
What is not covered
Loss or damage caused:
× by flood;
...
The most we will pay you for home claims
What is covered
Flash flood and stormwater run-off
We will pay up to 50% of your home sum insured or $25,000 which ever is higher.
...
Optional covers for extra peace of mind
The covers outlined in this section are optional and do not apply unless you have
asked for them and we agree to cover you. Additional premiums apply for each
cover. Your certificate of insurance will show which covers operate. All optional
covers are subject to the terms and conditions of this policy.
What is covered
Flood and storm surge
This does not cover flood unless we have agreed and it is shown on your certificate
of insurance.
Home and/or contents cover
We cover you for loss of or damage to your home or contents caused by flood or
storm surge which happens during the period of insurance at the property address.
We will pay up to the :
home sum insured, if your home is insured;
contents sum insured, if your contents are insured for damage caused by
flood or storm surge.
Case No: 247225 Determination Page 6 of 11
We will pay for loss or damage in the same way and in the same amounts as we do
under insured events cover.’
...
‘Renewal – Certificate of Insurance
...
Period of insurance
from 15 Oct 2010 to midnight 15 Oct 2011
...
Contents Insurance
What optional covers are included and not included
...
Flood and storm surge not included
Please refer to your Product Disclosure Statement (PDS) and any Supplementary
product Disclosure Statement (SPDS) for full details of the optional covers available.
If you would like to vary your cover please call us on [telephone number] ”
Issue
31. Whether the Applicant’s property was inundated by flash flood and
stormwater run-off on 11 January 2011 so as to fall within the scope of
cover.
Reasons for decision
32. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the complex nature of the issues. This dispute
has not been the subject of a FOS Recommendation and has proceeded
directly to Determination.
33. There has been an exchange of material between the parties. Each party
therefore is aware of the issues and has had the opportunity comment. In
these circumstances the details contained in the relevant hydrological
reports will not be recited in this determination except where considered
relevant.
34. Prior to arriving at a determination the Panel has read and considered all the
material submitted by the parties to FOS.
35. The Panel having reviewed the submissions of the parties is satisfied the
parties do not dispute the following:
Case No: 247225 Determination Page 7 of 11
The Applicant held a policy of insurance covering the Applicant’s
contents for loss or damage arising from the listed insured events at
the time of loss.
“Flash flood and stormwater run- off” is listed as one of the insured
events for which the policy provides indemnity.
The Applicant’s home was inundated on 11 January 2011 and or early
hours of 12 January 2011.
The inundation of the property has resulted in significant damage/loss
of the insured contents.
The FSP fulfilled its obligations under the Act in terms of providing the
Applicant with the relevant policy documentation and wording.
The Applicant has made available a detailed list of the contents she
maintains were lost or damaged as a result of the inundation. The
extent/quantum of the loss has not been disputed by the FSP and
stands at $35,460.
The policy, if a claim is accepted by the FSP, limits its obligation to
provide indemnity for loss arising from the event of flash flood to
$25,000 or 50% of the contents sum insured, whichever is higher.
Clearly Inform
39. Section 35 of the Act provides that, where a claim is made under a
prescribed contract and the event giving rise to the claim is a prescribed
event in relation to the contract, an insurer may not refuse to pay an amount
equal to the minimum amount of cover set out in the regulations made
pursuant to the Act unless it can prove that before the contract was entered
into, the insurer clearly informed the insured in writing of the relevant
provisions of the contract, or that the insured knew or a reasonable person in
the circumstances could be expected to have known of such provision.
40. It is well established law that a fair reading of Section 35 in particular Section
35(2) of the Act requires that any relevant exclusion being in clear and
unambiguous language and in a manner which a person of average
intelligence and education is likely to have little difficulty in finding and
understanding if that person reads the policy in question.
41. There is no dispute in this matter that the Applicant had received a copy of
the PDS and in fact read the PDS. In the Applicant’s submission dated 10
March 2011, the Applicant confirmed that when considering the FSP for her
contents insurance she had read the PDS and noted she was covered for
flash flood and stormwater runoff. She admitted that she was offered
additional cover but did not understand the subtle differences between f lood,
storm, surge, runoff etc. The Applicant maintains that the PDS was not
clearly addressed in terms to allow such understanding.
Case No: 247225 Determination Page 8 of 11
42. The Panel has had the opportunity of reviewing the FSP’s PDS on a number
of occasions.
43. The policy is well set out. On the inside cover of the policy there is a
contents page that sets out the insured events that are covered, what
contents are insured, additional benefits available and general conditions.
44. Flood is defined at page 9 under the policy under the section “Words – terms
with special meanings”. Flood is described simply as the rising water which
enters your home as a result of it running off or overflowing from any original
course. It then identifies that the policy does not cover flood unless it has
been agreed to and is shown on the certificate of insurance. Under the
heading “Insured Event”, the policy identifies cover for storm, but then spells
out those events not covered. Under the sub- heading “Flash Flood and
Stormwater runoff”, the policy defines flash flood and stormwater runoff as a
sudden flood caused by heavy rain that fell no more than 24 hours prior to
the flash flood or stormwater runoff. Again, beside this definition at page 15
of the policy, the policy identifies that loss or damage caused by flood is not
covered.
45. The limitations on the policy cover for flash flood and stormwater runoff is set
out at page 23. This clearly identifies cover for up to 50% of the home sum
insured or $25,000 whichever is higher. The same provision is identified for
contents cover at page 28 of the policy.
46. The renewal certificate of insurance dated 15 October 2010 indicates that
flood and storm surge are not included in the contents cover.
47. Whilst the Panel accepts the PDS is quite broad, the Panel is satisfied from
the reading of the documentation including the PDS and certificate of
insurance that the policy is clear and unambiguous and that on reading of
the policy, the Applicant should have been aware of the relevant flood
exclusion and limitations under the policy.
48. The Panel is satisfied in the circumstances of this dispute the Applicant has
been clearly informed in accordance with Section 35 of the Act.
Cause of the loss
49. As noted above there has been an exchange of information between the
parties and as such the parties have had the opportunity to not only review
but also respond to the evidence relied upon. Therefore, in the interest of
brevity the Panel does not intend to recite the details contained in the
submissions (including expert reports) except where considered relevant.
50. On 21 May 2012 FOS issued a memorandum to all stakeholders identifying
that after considerable deliberation of all material available to it, the Panel
had formed a broad view that the heavy rain from 4.00am on 11 January
2011 and in particular the heavy rain that fell from 4.00am to 8.00am on 11
January 2011 was a proximate cause of adoption of the W4 strategy and
Case No: 247225 Determination Page 9 of 11
therefore a proximate cause or trigger that led to the flooding of many of the
properties along the Brisbane River.
51. At that time, the Panel noted that in relation to the approach, each individual
dispute would depend on the individual and unique factors relevant to the
dispute and in that regard, the parties were invited to make further
submissions in relation to disputes before FOS. In this dispute the FSP
provided further submissions to FOS on 13 June 2012. Included with the
submissions were the following documents:
a) Reference document for disputes relating to Queensland Floods (this is
a general reference document) relating to the various submissions the
FSP makes in relation to a number of issues. Not all issues raised in
the reference document appear in the current dispute;
b) Letter from the FSP’s hydrologist attaching a key information sheet for
the Applicant’s property;
c) Hydrologist report “Investigations of January 2011 inundation event –
Brisbane” dated March 2011;
d) Statement from hydrologist dated 7 June 2012.
52. The Applicant has not provided any response to this information.
53. Essentially, it is the FSP’s argument that the proximate cause of the
inundation of the Applicant’s property that is the real effective cause of
damage caused to the Applicant’s property is not simply the rain that
commenced falling at 4.00am on 11 January 2011 but on any reasonable
view is the combined effect of all of the rainfall that had fallen, commencing
from 9 January 2011 and earlier that led to the implementation of the W4
strategy and subsequent inundation of the properties.
54. The Panel has previously considered these arguments in previous
Determinations and consistent with those Determinations for the purpose of
the current dispute is of the view that the heavy rain that fell over the
Wivenhoe catchment area and in fact parts of the Brisbane River from
approximately 4.00am on 11 January 2011 together with the heavy rain that
commenced falling over the Bremer River from approximately 6.00am on
that same day ultimately caused the inundation of the Applicant’s property.
55. The issue however is whether the Applicant’s policy would extend to cover
the inundation. It is apparent based on the information exchanged that the
inundation of the Applicant’s property was not due to stormwater runoff.
56. The Panel accepts that at the time of inundation of the Applicant’ s property,
it had not been raining heavily since around mid-day on 11 January 2011.
57. In order to be covered under the terms of the policy, it is necessary for the
Applicant to establish that the inundation was due to heavy rain that fell no
more than 24 hours prior to the inundation.
Case No: 247225 Determination Page 10 of 11
58. The Panel notes that there is no clear information on the file to identify
exactly when the Applicant’s property was first inundated causing damage to
the contents. In the original assessor’s report, there is reference to the
d amage occurring on 11 January 2011. In the FSP’s commentary, there is
reference to the damage most likely occurring on 12 January 2011.
59. The Panel has carefully read the information exchanged and there is no
information provided by the Applicant to state the date or time the inundation
occurred.
60. A chart attached to the original submissions by the FSP’s hydrologist,
indicates the Brisbane River water levels near the Applicant’s property do
not reach the minimum property level until approximately 6.00am on 12
January 2011.
61. The flood wise property report for the Applicant’s property identifies the
minimum ground level of the Applicant’s property at 11.1m AHD and the
maximum ground level at 11.7m AHD. The interim residential flood level is
identified at 12.2m AHD with the residential flood level source identified as
the river. According to that report, the maximum habitable floor area of the
Applicant’s property is 12.7m AHD.
62. In the FSP’s key conclusion statement, SC identified the bench mark level of
the Applican t’s property being approximately 11.4m AHD. The hydrologist
has identified the property as a two storey property built on a slab at ground
level. The bench mark level is calculated by SC as being the lowest point of
the structure of the house on the land. It is reasonable to accept that this is
the lowest point of the house that would have suffered damage.
63. According to the hydrologist, whilst the effect of the W4 releases first
reached the vicinity of the property at approximately 1.42pm on Tuesday 11
January 2011, the Brisbane River did not reach the approximate bench mark
height of the Applicant’s property until 10.50am on Wednesday 12 January
2011, well after the commencement of the heavy rainfall at 4.00am on 11
January 2011 and outside the relevant 24 hour period for the purpose of the
policy.
64. The hydrology considered that by 4.00am on 12 January 2011, the height of
the river would have been approximately 9.9m AHD which is 1.5m below the
relevant bench mark level of the Applicant ’s property.
65. Although there are inconsistencies in the hydrologist report with his previous
statement, the hydrologist has explained these inconsistencies and in the
absence of any information to the contrary, the Panel is prepared to accept
the hydrologist latest key conclusion statement as an accurate account of
the most likely time of inundation of the property.
66. Whilst the Panel accepts the Applicant’s property was inundated as a result
of the heavy rain that had commenced falling from approximately 4.00am on
11 January 2011, the Panel is satisfied based on the information exchanged
that the Applicant’s property was not inundated until approximately 10.50am
Case No: 247225 Determination Page 11 of 11
on 12 January 2012 which is outside the relevant 24 hour period for cover
under the flash flood provisions of the FSP’s poli cy.
Determination
67. Accordingly, the Panel determines that the policy does not extend to cover
the Applicant’s loss and that the FSP is entitled to refuse payment of the
Applicant’s claim.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.