Determination 247133

Fire reinstatement settlement amount, statutory upgrades and maintenance backlog

FirmFinancial Firm (Unknown - Insurer)
Decided2012-06-06
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed$194,041
SourceAFCA PDF

Summary

After a March 2010 fire, the applicant disputed the FSP's $96,000 reinstatement figure, sought $161,000 for compliance works and other heads, and contested variations of $66,000. AFCA limited the FSP's liability to fire repairs and their direct compliance costs, ordered settlement on a new builder's quote, and ordered interest, but refused the rent, advice and other heads.

The policy covers only the cost of repairing fire-damaged parts of the building and the direct compliance cost of those repairs, not general statutory upgrades or maintenance works.

Issues

Subjects and remedies

home or building damagepay claimpay interestreassess claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 247133 Determination Page 1 of 8 Case number: 247133 General Insurance - Domestic Insurance - Home Building - FSP Decision – Claim amount 21 March 2012 Background 1. The Applicant incepted a home building and contents insurance policy with the Financial Services Provider (FSP) on 23 January 1997. The policy was renewed annually. 2. On 22 March 2010, the Applicant contacted the FSP to report that a fire had occurred at the property. The FSP arranged for an assessor to attend the property and report on the damage. A scope of works was obtained to repair damage to the building caused by the fire. Quotes were obtained based on the scope of works. 3. The Applicant advised she would like to proceed with the repairs as outlined in the scope of works using her nominated builder as per the quote of $89,122.44 including GST. The Applicant advised that her approval was given subject to the FSP not unreasonably withholding additional variation payments. 4. Following payment of the $89,122.44 the FSP received a quote for variations totalling $66,000. 5. The FSP duly arranged for the assessor to inspect the property and comment on the variations claimed. The assessor reported he did not believe the variations were claim related. 6. The Applicant believes she is entitled to the further payment to reinstate the house and has sought such from the FSP. The Applicant has had assistance in pursuing this matter with the FSP. 7. The FSP arranged for a building engineer to inspect the property to report on the damage and the disputed repairs claimed. Follo wing the engineer‟s finding the FSP advised its liability for the repairs resulting from the fire was $96,000. 8. The FSP maintained this decision following the Applicant‟s request for review through the FSP‟s internal dispute resolution procedures (IDR). Determination Case No: 247133 Determination Page 2 of 8 Su mmary of Applicant’s position 9. The submissions made to the Service on her behalf have been prepared by her representative. 10. She is aggrieved with the FSP‟s failure to adequately oversee the assessment of the loss and the excessive time associated with the assessment. 11. The scope of works relied upon by the FSP was incomplete as it was silent concerning statutory improvements required as part of fire reinstatement repairs for which the policy provides cover for. 12. The problems with the scope of works were brough t to the FSP‟s attention on various occasions. She obtained her own engineer‟s report which establishes building regulation breaches must be remedied as part of the fire reinstatement repairs. 13. The dispute has arisen due to the FSP‟s incorrect application o f facts. The FSP determines “the cost to repair the damage due to fire is $96,000 including statutory upgrades”. Whereas the FSP‟s engineer advised the cost of fire repair and statutory upgrades is $161,000. 14. Further the maintenance backlog estimated by th e FSP‟s engineer is stated as being $65,000. This figure is disputed as:  No itemisation or logical rigor is applied to the figure;  Statutory compliance issues concerning, amongst other things, rewiring and insulation are used to justify the maintenance backlog.  Statutory compliance issues are separate to maintenance and cannot be used as part of a discounting value. 15. The Applicant says she is seeking the following resolution:  $161,000 - for building restoration costs  $5,500 - for professional advice and reports associated with disputing the claim  $18,200 - 52 weeks rental reimbursement  $9,341.28 - estimated interest on monies unreasonably delayed. Summary of FSP’s position 16. There have been no excessive delays in the settlement of this claim 17. An engineer‟s repor t has confirmed the claimed additional damage was pre - existing and not caused by the fire. The FSP says the maintenance backlog figure was unofficially agreed to by the Applicant and her builder. Case No: 247133 Determination Page 3 of 8 18. The claimed variation amount is not for damage caused by event covered by the policy. 19. The FSP relies on the following policy provisions: “ Your responsibilities … Take good care of your building and contents Wear and tear, poor workmanship and lack of maintenance are not covered under this policy, so it is important to always maintain your building and contents in good repair and protect them by always using any security devices installed on the building. … The policy doesn’t cover everything General exclusions – apply to the overall policy Unless included in additional cover, we will not cover loss, damage or legal liability cause by: …  wear and tear and lack of maintenance, including rust, corrosion, deterioration, except in the cases of escape of liquid (refer page 21), or legal liability claims;  gradual loss or damage of any kind;  structural defects and faulty workmanship in the construction of the building or lack of maintenance to the building and/or contents; … Settling building claims … Total Building Replacement Cover will not apply if:  we determine the building to be in poor condition at the time of a claim. in this case, we will determine a reasonable allowance to be deducted from the claim settlement, based on the condition of the building or that part of the building that is in poor condition ; or” Issues 20. Whether the FSP‟s offer of settlement fulfils it obligations under the terms and conditions of the policy. Reasons for decision 21. Due to the nature of the dispute, this matter has been referred to the Panel for a Determination in line with the Operational Guidelines to the Financial Ombudsman Service‟s Terms of Reference. Case No: 247133 Determination Page 4 of 8 22. The Panel consists of an Ombudsman, a representative with extensive experience in insurance industry matters and a representative with extensive experience in consumer claims. 23. The Panel notes the exchange of material between the parties and the comments raised by the Applicant‟s representative in response to submissions made by the FSP. The Panel does not intend to recite the information unless it is relevant to the dispute. 24. The FSP accepted a claim for fire damage. A scope of works was obtained and a quote was provided based on this scope of works. The FSP offered settlement based on the quote and the Applicant was to undertake responsibility for the repair. 25. The Panel notes th e Applicant‟s representative was advised that unless a signed deed of release was in effect the FSP was willing to review variations that related to further damage or further works required in order to complete repairs. The Applicant‟s builder provided a f urther quote with a variation of $66,396. 26. The FSP did not accept the variation quote as it deemed it was related to maintenance works, thus it was unable to cover the additional damage as it was not caused by the fire or any event covered by the policy. 27. Th e Applicant‟s representative argued that the scope of works was incomplete and brought to the FSP‟s attention. 28. The Applicant arranged for a consulting structural engineer to report on the work required to reinstate the building. 29. In correspondence to the S ervice, dated 24 November 2011, the Applicant‟s representative argued the original scope of works was inadequate as it was devised without any plans or engineering computations. 30. However, the Panel notes it is common and accepted practice that scopes of works have been able to be provided without the need of plans or engineering computations, particularly when only a partial loss has occurred. 31. The FSP relies on its building engineer who estimated that the cost of reinstating the fire damage to current regulations to be approximately $96,000. 32. Further, the FSP‟s engineer estimated, in addition to fire damage, the cost to reinstate the house; including addressing structural compliance issues and maintenance related issues would be $161,000. The engineer also estimated a cost of $225,000 to rebuild the house. 33. The Panel notes the FSP‟s engineer has not succinctly differentiated in his report what repair work was compliance as distinct from maintenance related. The Applicant believes the FSP has confused itself with this issue. Case No: 247133 Determination Page 5 of 8 34. The Applicant raised the issue with the FSP‟s reference to the building being in poor cond ition as the assessor reported “ the home generally presents in an average condition”. However, the FSP‟s engineer reported “The property has suffered from long term maintenance neglect.” 35. The FSP‟s engineer supported his opinion of the house in poor condition by reference to:  floor stumps having outlived their useable life,  severe termite damage to the wall frame,  slab floor being sub-standard,  rear ramp and landing in poor condition and unsafe,  balcony in an unsafe condition,  wall, floor and roof frames needing strengthening,  poor drainage,  no proper retaining walls,  no proper sub-floor clearance. 36. The Panel has sighted photographs of the property showing the problems described by the FSP‟s engineer and it accepts his opinion that the above is required to be rectified to bring the house up to current day building compliance. 37. The Applicant sought advice from her consulting structural engineer as to why the works were deemed necessary. The Applicant‟s consultin g structural engineer reported: “In order to obtain a Building permit for the rectification works, the whole of the „affected building‟ must comply with current Codes, Regulations and the BCA that currently exist. As a result, any part of the existing building in this „area of works‟ must comply with AS1170.1, AS1170.3, AS1684, AS2870, ASD3600. These Codes cover the applicable loading requirements, timber framing, foundations, concrete works, and foundation stability. The structural members that need to be removed and replaced in order to comply with the Codes and regulations, must be done so irrespective of the reason‟, i.e. fire damaged or rotting.” 38. In its submission and correspondence the FSP referred to the following policy term: “ Settling building claims … Total Building Replacement Cover will not apply if: we determine the building to be in poor condition at the time of a claim. in this case, we will determine a reasonable allowance to be deducted from the claim settlement, based on the condition of the building or that part of the building that is in poor condition; or” Case No: 247133 Determination Page 6 of 8 39. The Panel does not believe the FSP has presented adequate detail as to the practical application of this wording to the circumstances of the claim. 40. Nevertheless it accepts the FSP‟s building engineer‟s opinion that considerable additional repairs are required to bring the house to conformity with current day regulations and that there are also significant maintenance issues over and above the repairs necessary to repair the fire damage. 41. The Applicant‟s policy covers her for “the costs incurred to repair or rebuild the damaged part of the building as near as possible to the condition prior to the event using only new materials.” Further, under the policy terms the FSP will either: a. repair or rebuild the damaged portions of the building, or b. pay the amount we determine to be the reasonable cost of repairing the damaged part of the building. 42. The Applicant is seeking the cost in bringing the house up to the current building code and compliance. The Applicant states under the policy the FSP will pay for any additional costs which are necessary to comply with government or local authority by-laws and regulations. 43. It is not disputed that to bring the home up to current day compliance is $161,000. The Applicant‟s representative h as recently indicated that the building will in addition need to be re-glazed and reclad in accordance with new bushfire regulations. 44. The Panel accepts the policy covers additional costs which are incurred in order to comply with government or local authority by-laws and regulations. However this benefit is confined to damage covered by the policy. It does not extend to have all of work required to be undertaken in order to bring the property up to current day statutory requirements or building code compliance. 45. The Panel accepts the FSP is only obliged to cover the cost of repairs directly resulting from the fire and the direct cost of compliance for those repairs. Accordingly the Panel does not accept the proposition that the FSP should be obliged to pay for works such as replacement of the concrete floor, retaining walls, replacement of the ramp and balcony or cladding of the house to make it compliant with current regulations. 46. Accordingly the Panel determines the FSP‟s liability is limited to the rep airing of actual damage caused by the fire and compliance required of those repairs. 47. The FSP has elected to cash settle for the repairs. Under the policy the FSP is obliged to pay the amount it determines to be the reasonable cost in repairing the damaged part of the building (Pol page 45) and the payment is based on the amount it would expect to pay for the work if it was authorised and completed by the FSP. Case No: 247133 Determination Page 7 of 8 48. The Panel notes the FSP‟s building engineer estimated the cost of repairs and compliance for fire damage to be $96,000. 49. However the Panel is not persuaded that an estimate provided by the building engineer fulfils the FSP‟s obligation under the policy as he is not a person who would be conducting the repair of the property. 50. As the FSP had previously ac cepted the Applicant‟s builder‟s quote and for him to undertake the work the FSP is to ask that builder to now quote on repairs and compliance as identified by the FSP‟s building engineer for the fire related damage. 51. On receipt of the new quote the FSP is to settle the claim on it subject to the FSP considering the quote being reasonable as to cost. If the quote is acceptable to the FSP it is to pay the Applicant the balance between the new quote and monies already paid to the Applicant for the building repairs. 52. Should the new quote not be acceptable see folio 64 b hereunder. Rent 53. The FSP has made no submission in response to the Applicant‟s request for 52 weeks rental reimbursement. 54. The Panel notes to the parties arguments regarding delays caused. The Pan el is not convinced the FSP‟s handling of the claim has caused the extended time frame. 55. The Panel notes the Applicant has already been paid for 52 weeks for rent. The Applicant policy provides cover for rent up to a maximum of 52 weeks. The Panel is satisfied the FSP has fulfilled its obligation under the policy for rent and that no further payment is required. Cost of professional advice and reports. 56. The Applicant is seeking $5,500 for professional advice and reports with disputing the claim. The FSP has made no response to this request. 57. The Applicant has not established these costs to the Panel by way of invoice. 58. Under clause 9.4 of the Services ‟ Terms of Reference the Panel can determine the FSP contribute to legal or other professional costs incurred by the Applicant in the course of the dispute but this is limited to $3,000 unless special circumstances apply. 59. The Panel would only consider costs if it was established that the advice or reports obtained by the Applicant assisted or presented a case that overwhelmingly established the FSP was incorrect with its decision case. 60. The Panel is unable to grant the relief the Applicant has sought for the costs incurred for professional advice and reports. Case No: 247133 Determination Page 8 of 8 Interest 61. The Applicant is seeking interest of $9,341.28 dispute on the basis of monies unreasonably delayed for settlement. 62. The FSP made payment of $89,122.44 to the Applicant in July 2010 for buildings repairs. The Applicant has therefore had the benefit of this money. 63. Nonetheless, the FSP consider interest should be paid on the balance of the money already paid for repairs and the ne w quote agreed upon. Determination 64. On the basis of the available information the Panel determines: a. The FSP is to settle on the Applicant‟s builder‟s new quote (to be obtained) for compliance of fire related damage repairs as identified by the FSP‟s building engineer. This settlement order is subject to the new quote being acceptable to the FSP as to its cost and to the deduction of monies already paid by the FSP for building repairs . b. In the event agreement is not reached on the cost expressed in the new quote the FSP is to obtain two alternative quotes for consideration by the parties as a basis for settlement agreement. If agreement is still not forthcoming either party may again approach the Service for a final determination. c. The FSP is to pay interest in accordance with section 57 of the Insurance Contracts Act 1984 on the balance payable by the FSP under this determination. Such interest is to be paid from a commencement date of 1 0 May 2011, being the date the FSP‟s building consultant provided his report, until the time payment is made.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.