Home / Financial Firm (Unknown - Insurer) / Determination 247133
Determination 247133
Fire reinstatement settlement amount, statutory upgrades and maintenance backlog
Summary
After a March 2010 fire, the applicant disputed the FSP's $96,000 reinstatement figure, sought $161,000 for compliance works and other heads, and contested variations of $66,000. AFCA limited the FSP's liability to fire repairs and their direct compliance costs, ordered settlement on a new builder's quote, and ordered interest, but refused the rent, advice and other heads.
The policy covers only the cost of repairing fire-damaged parts of the building and the direct compliance cost of those repairs, not general statutory upgrades or maintenance works.
Issues
- Claim amount dispute primary · upheld
“The FSP is to settle on the Applicant's builder's new quote for compliance of fire related damage repairs as identified by the FSP's building engineer”
- Claim denial secondary · not upheld
“The Panel accepts the FSP is only obliged to cover the cost of repairs directly resulting from the fire and the direct cost of compliance for those repairs”
- Delay secondary · not upheld
“The Panel is not convinced the FSP's handling of the claim has caused the extended time frame”
Subjects and remedies
home or building damagepay claimpay interestreassess claim
Text of the determination
Case No: 247133 Determination Page 1 of 8
Case number: 247133
General Insurance - Domestic Insurance - Home Building - FSP Decision –
Claim amount
21 March 2012
Background
1. The Applicant incepted a home building and contents insurance policy with
the Financial Services Provider (FSP) on 23 January 1997. The policy was
renewed annually.
2. On 22 March 2010, the Applicant contacted the FSP to report that a fire had
occurred at the property. The FSP arranged for an assessor to attend the
property and report on the damage. A scope of works was obtained to repair
damage to the building caused by the fire. Quotes were obtained based on
the scope of works.
3. The Applicant advised she would like to proceed with the repairs as outlined
in the scope of works using her nominated builder as per the quote of
$89,122.44 including GST. The Applicant advised that her approval was
given subject to the FSP not unreasonably withholding additional variation
payments.
4. Following payment of the $89,122.44 the FSP received a quote for variations
totalling $66,000.
5. The FSP duly arranged for the assessor to inspect the property and
comment on the variations claimed. The assessor reported he did not
believe the variations were claim related.
6. The Applicant believes she is entitled to the further payment to reinstate the
house and has sought such from the FSP. The Applicant has had assistance
in pursuing this matter with the FSP.
7. The FSP arranged for a building engineer to inspect the property to report on
the damage and the disputed repairs claimed. Follo wing the engineer‟s
finding the FSP advised its liability for the repairs resulting from the fire was
$96,000.
8. The FSP maintained this decision following the Applicant‟s request for
review through the FSP‟s internal dispute resolution procedures (IDR).
Determination
Case No: 247133 Determination Page 2 of 8
Su mmary of Applicant’s position
9. The submissions made to the Service on her behalf have been prepared by
her representative.
10. She is aggrieved with the FSP‟s failure to adequately oversee the
assessment of the loss and the excessive time associated with the
assessment.
11. The scope of works relied upon by the FSP was incomplete as it was silent
concerning statutory improvements required as part of fire reinstatement
repairs for which the policy provides cover for.
12. The problems with the scope of works were brough t to the FSP‟s attention
on various occasions. She obtained her own engineer‟s report which
establishes building regulation breaches must be remedied as part of the fire
reinstatement repairs.
13. The dispute has arisen due to the FSP‟s incorrect application o f facts. The
FSP determines “the cost to repair the damage due to fire is $96,000
including statutory upgrades”. Whereas the FSP‟s engineer advised the cost
of fire repair and statutory upgrades is $161,000.
14. Further the maintenance backlog estimated by th e FSP‟s engineer is stated
as being $65,000. This figure is disputed as:
No itemisation or logical rigor is applied to the figure;
Statutory compliance issues concerning, amongst other things, rewiring
and insulation are used to justify the maintenance backlog.
Statutory compliance issues are separate to maintenance and cannot
be used as part of a discounting value.
15. The Applicant says she is seeking the following resolution:
$161,000 - for building restoration costs
$5,500 - for professional advice and reports associated with disputing
the claim
$18,200 - 52 weeks rental reimbursement
$9,341.28 - estimated interest on monies unreasonably delayed.
Summary of FSP’s position
16. There have been no excessive delays in the settlement of this claim
17. An engineer‟s repor t has confirmed the claimed additional damage was pre -
existing and not caused by the fire. The FSP says the maintenance backlog
figure was unofficially agreed to by the Applicant and her builder.
Case No: 247133 Determination Page 3 of 8
18. The claimed variation amount is not for damage caused by event covered by
the policy.
19. The FSP relies on the following policy provisions:
“ Your responsibilities
…
Take good care of your building and contents
Wear and tear, poor workmanship and lack of maintenance are not covered
under this policy, so it is important to always maintain your building and
contents in good repair and protect them by always using any security devices
installed on the building.
…
The policy doesn’t cover everything
General exclusions – apply to the overall policy
Unless included in additional cover, we will not cover loss, damage or legal
liability cause by:
…
wear and tear and lack of maintenance, including rust, corrosion,
deterioration, except in the cases of escape of liquid (refer page 21), or legal
liability claims;
gradual loss or damage of any kind;
structural defects and faulty workmanship in the construction of the building
or lack of maintenance to the building and/or contents;
…
Settling building claims
…
Total Building Replacement Cover will not apply if:
we determine the building to be in poor condition at the time of a claim. in
this case, we will determine a reasonable allowance to be deducted from the
claim settlement, based on the condition of the building or that part of the
building that is in poor condition ; or”
Issues
20. Whether the FSP‟s offer of settlement fulfils it obligations under the terms
and conditions of the policy.
Reasons for decision
21. Due to the nature of the dispute, this matter has been referred to the Panel
for a Determination in line with the Operational Guidelines to the Financial
Ombudsman Service‟s Terms of Reference.
Case No: 247133 Determination Page 4 of 8
22. The Panel consists of an Ombudsman, a representative with extensive
experience in insurance industry matters and a representative with extensive
experience in consumer claims.
23. The Panel notes the exchange of material between the parties and the
comments raised by the Applicant‟s representative in response to
submissions made by the FSP. The Panel does not intend to recite the
information unless it is relevant to the dispute.
24. The FSP accepted a claim for fire damage. A scope of works was obtained
and a quote was provided based on this scope of works. The FSP offered
settlement based on the quote and the Applicant was to undertake
responsibility for the repair.
25. The Panel notes th e Applicant‟s representative was advised that unless a
signed deed of release was in effect the FSP was willing to review variations
that related to further damage or further works required in order to complete
repairs. The Applicant‟s builder provided a f urther quote with a variation of
$66,396.
26. The FSP did not accept the variation quote as it deemed it was related to
maintenance works, thus it was unable to cover the additional damage as it
was not caused by the fire or any event covered by the policy.
27. Th e Applicant‟s representative argued that the scope of works was
incomplete and brought to the FSP‟s attention.
28. The Applicant arranged for a consulting structural engineer to report on the
work required to reinstate the building.
29. In correspondence to the S ervice, dated 24 November 2011, the Applicant‟s
representative argued the original scope of works was inadequate as it was
devised without any plans or engineering computations.
30. However, the Panel notes it is common and accepted practice that scopes of
works have been able to be provided without the need of plans or
engineering computations, particularly when only a partial loss has occurred.
31. The FSP relies on its building engineer who estimated that the cost of
reinstating the fire damage to current regulations to be approximately
$96,000.
32. Further, the FSP‟s engineer estimated, in addition to fire damage, the cost to
reinstate the house; including addressing structural compliance issues and
maintenance related issues would be $161,000. The engineer also
estimated a cost of $225,000 to rebuild the house.
33. The Panel notes the FSP‟s engineer has not succinctly differentiated in his
report what repair work was compliance as distinct from maintenance
related. The Applicant believes the FSP has confused itself with this issue.
Case No: 247133 Determination Page 5 of 8
34. The Applicant raised the issue with the FSP‟s reference to the building being
in poor cond ition as the assessor reported “ the home generally presents in
an average condition”. However, the FSP‟s engineer reported “The property
has suffered from long term maintenance neglect.”
35. The FSP‟s engineer supported his opinion of the house in poor condition by
reference to:
floor stumps having outlived their useable life,
severe termite damage to the wall frame,
slab floor being sub-standard,
rear ramp and landing in poor condition and unsafe,
balcony in an unsafe condition,
wall, floor and roof frames needing strengthening,
poor drainage,
no proper retaining walls,
no proper sub-floor clearance.
36. The Panel has sighted photographs of the property showing the problems
described by the FSP‟s engineer and it accepts his opinion that the above is
required to be rectified to bring the house up to current day building
compliance.
37. The Applicant sought advice from her consulting structural engineer as to
why the works were deemed necessary. The Applicant‟s consultin g
structural engineer reported:
“In order to obtain a Building permit for the rectification works, the whole of the
„affected building‟ must comply with current Codes, Regulations and the BCA
that currently exist. As a result, any part of the existing building in this „area of
works‟ must comply with AS1170.1, AS1170.3, AS1684, AS2870, ASD3600.
These Codes cover the applicable loading requirements, timber framing,
foundations, concrete works, and foundation stability. The structural members
that need to be removed and replaced in order to comply with the Codes and
regulations, must be done so irrespective of the reason‟, i.e. fire damaged or
rotting.”
38. In its submission and correspondence the FSP referred to the following
policy term:
“ Settling building claims
…
Total Building Replacement Cover will not apply if:
we determine the building to be in poor condition at the time of a claim. in this
case, we will determine a reasonable allowance to be deducted from the claim
settlement, based on the condition of the building or that part of the building
that is in poor condition; or”
Case No: 247133 Determination Page 6 of 8
39. The Panel does not believe the FSP has presented adequate detail as to the
practical application of this wording to the circumstances of the claim.
40. Nevertheless it accepts the FSP‟s building engineer‟s opinion that
considerable additional repairs are required to bring the house to conformity
with current day regulations and that there are also significant maintenance
issues over and above the repairs necessary to repair the fire damage.
41. The Applicant‟s policy covers her for “the costs incurred to repair or rebuild
the damaged part of the building as near as possible to the condition prior to
the event using only new materials.” Further, under the policy terms the FSP
will either:
a. repair or rebuild the damaged portions of the building, or
b. pay the amount we determine to be the reasonable cost of repairing the
damaged part of the building.
42. The Applicant is seeking the cost in bringing the house up to the current
building code and compliance. The Applicant states under the policy the FSP
will pay for any additional costs which are necessary to comply with
government or local authority by-laws and regulations.
43. It is not disputed that to bring the home up to current day compliance is
$161,000. The Applicant‟s representative h as recently indicated that the
building will in addition need to be re-glazed and reclad in accordance with
new bushfire regulations.
44. The Panel accepts the policy covers additional costs which are incurred in
order to comply with government or local authority by-laws and regulations.
However this benefit is confined to damage covered by the policy. It does not
extend to have all of work required to be undertaken in order to bring the
property up to current day statutory requirements or building code
compliance.
45. The Panel accepts the FSP is only obliged to cover the cost of repairs
directly resulting from the fire and the direct cost of compliance for those
repairs. Accordingly the Panel does not accept the proposition that the FSP
should be obliged to pay for works such as replacement of the concrete
floor, retaining walls, replacement of the ramp and balcony or cladding of the
house to make it compliant with current regulations.
46. Accordingly the Panel determines the FSP‟s liability is limited to the rep airing
of actual damage caused by the fire and compliance required of those
repairs.
47. The FSP has elected to cash settle for the repairs. Under the policy the FSP
is obliged to pay the amount it determines to be the reasonable cost in
repairing the damaged part of the building (Pol page 45) and the payment is
based on the amount it would expect to pay for the work if it was authorised
and completed by the FSP.
Case No: 247133 Determination Page 7 of 8
48. The Panel notes the FSP‟s building engineer estimated the cost of repairs
and compliance for fire damage to be $96,000.
49. However the Panel is not persuaded that an estimate provided by the
building engineer fulfils the FSP‟s obligation under the policy as he is not a
person who would be conducting the repair of the property.
50. As the FSP had previously ac cepted the Applicant‟s builder‟s quote and for
him to undertake the work the FSP is to ask that builder to now quote on
repairs and compliance as identified by the FSP‟s building engineer for the
fire related damage.
51. On receipt of the new quote the FSP is to settle the claim on it subject to the
FSP considering the quote being reasonable as to cost. If the quote is
acceptable to the FSP it is to pay the Applicant the balance between the new
quote and monies already paid to the Applicant for the building repairs.
52. Should the new quote not be acceptable see folio 64 b hereunder.
Rent
53. The FSP has made no submission in response to the Applicant‟s request for
52 weeks rental reimbursement.
54. The Panel notes to the parties arguments regarding delays caused. The
Pan el is not convinced the FSP‟s handling of the claim has caused the
extended time frame.
55. The Panel notes the Applicant has already been paid for 52 weeks for rent.
The Applicant policy provides cover for rent up to a maximum of 52 weeks.
The Panel is satisfied the FSP has fulfilled its obligation under the policy for
rent and that no further payment is required.
Cost of professional advice and reports.
56. The Applicant is seeking $5,500 for professional advice and reports with
disputing the claim. The FSP has made no response to this request.
57. The Applicant has not established these costs to the Panel by way of
invoice.
58. Under clause 9.4 of the Services ‟ Terms of Reference the Panel can
determine the FSP contribute to legal or other professional costs incurred by
the Applicant in the course of the dispute but this is limited to $3,000 unless
special circumstances apply.
59. The Panel would only consider costs if it was established that the advice or
reports obtained by the Applicant assisted or presented a case that
overwhelmingly established the FSP was incorrect with its decision case.
60. The Panel is unable to grant the relief the Applicant has sought for the costs
incurred for professional advice and reports.
Case No: 247133 Determination Page 8 of 8
Interest
61. The Applicant is seeking interest of $9,341.28 dispute on the basis of monies
unreasonably delayed for settlement.
62. The FSP made payment of $89,122.44 to the Applicant in July 2010 for
buildings repairs. The Applicant has therefore had the benefit of this money.
63. Nonetheless, the FSP consider interest should be paid on the balance of the
money already paid for repairs and the ne w quote agreed upon.
Determination
64. On the basis of the available information the Panel determines:
a. The FSP is to settle on the Applicant‟s builder‟s new quote (to be
obtained) for compliance of fire related damage repairs as identified by
the FSP‟s building engineer. This settlement order is subject to the new
quote being acceptable to the FSP as to its cost and to the deduction of
monies already paid by the FSP for building repairs .
b. In the event agreement is not reached on the cost expressed in the
new quote the FSP is to obtain two alternative quotes for consideration
by the parties as a basis for settlement agreement. If agreement is still
not forthcoming either party may again approach the Service for a final
determination.
c. The FSP is to pay interest in accordance with section 57 of the
Insurance Contracts Act 1984 on the balance payable by the FSP
under this determination. Such interest is to be paid from a
commencement date of 1 0 May 2011, being the date the FSP‟s
building consultant provided his report, until the time payment is made.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.