Home / Financial Firm (Unknown - Insurer) / Determination 247086
Determination 247086
Flood versus flash flood denial of January 2011 inundation claim
Summary
Owners' home and contents were inundated in January 2011 and the FSP denied the claim as flood, which the policy excludes. AFCA found the loss was caused by flash flood within the policy's 24-hour rule, ordered the claim settled under flash flood cover, paid $25,000 for contents, and ordered interest. The building figure was left for the parties to agree.
Under the policy's flash flood cover, heavy rain falling within 24 hours of the sudden flood, which was the proximate cause, was covered.
Issues
- Claim denial primary · upheld
“Panel determines the FSP settle the Applicants' claim in accordance with the terms of the policy for flash flood”
- Product terms interpretation secondary · upheld
“Inundation was flood within 24 hours of the heavy rainfall, so the flash flood provisions of the policy apply”
Subjects and remedies
home or building damagenatural disasterpay claimpay interest
Text of the determination
Case No: 247086 Determination Page 1 of 9
Case number: 247086
General Insurance - Domestic Insurance - Home Contents - FSP Decision -
Flood
15 August 2012
Background
1. The Applicants held a policy of insurance for the period 30 July 2010 to 30 July
2011 with the FSP covering the home sum insured in the amount of $377,000
and contents sum insured of $30,000.
2. On 11 January 2011 the Applicants‟ home was inundated with water following
heavy rainfall in the area. The Applicants‟ property was eventually inundated to
roof height and a claim lodged with the FSP for the damage sustained.
3. The Financial Services Provider (FSP) denied liability for a claim under the
Applicants‟ household insurance policy on the ground the damage was caused
by flood water and was excluded from cover provided by the policy.
Summary of Applicants ’ Position
4. The Applicant (husband) states there is mixed information in relation to the
source and timing of the water which occurred prior to the major flooding.
5. The inundation on the morning of 11 January 2011 occurred through
stormwater due to the rain. The front of the house is low set and the drain from
which the water flowed was about 1 metre from the drain in Logan Avenue and
close to the entrance to their home. On the morning of 11 January the
stormwater blew the manhole cover off the drain and the drainage system failed
to remove the water to the extent that by late afternoon there was no access to
their property. By early evening the water had entered the house.
6. The water which came through the stormwater system affected the house and
contents before the main water event on 12 January 2011.
Summary of FSP’s Position
Determination
Case No: 247086 Determination Page 2 of 9
7. The FSP relies substantially on hydrologist reports to argue that the cause of
inundation of the Applicant s‟ property was the rising level of the Brisbane River
which was itself caused by rain which fell more than 24 hours earlier, or a
combination of rainfall from 9 January 2011 to 11 January 2011, which would
be excluded under the terms of the policy.
8. The hydrologist considered the property did not appear to have been inundated
by stormwater run-off or other local run-off.
9. The proximate cause, or at the very least a proximate cause of the loss was
rain which fell in the Wivenhoe Dam catchment from 9 January and earlier
which had the effect of raising the level of the Brisbane River; as that rain fell
more than 24 hours prior to the inundation of the Applicants‟ property, the
inundation does not satisfy the definition of „flash flood‟.
10. The FSP relies on the following policy terms:
“Words/terms with special meanings
Word/term Meaning
Flood Rising water which enters your home as a result of running off or
overflowing from any origin or cause. This policy does not cover
flood unless we have agreed and it is shown on your certificate of
insurance.
Flash flood and
stormwater run -
off
A sudden flood caused by heavy rain that fell no more than 24
hours prior to the flash flood or stormwater run - off.
....
Insured events you are covered for
What is covered What is not
covered
Flash flood and stormwater run-off
A sudden flood caused by heavy rain that feel no more than 24
hours prior to the flash flood or stormwater runoff.
...
Your home
The most we will pay for home claims
Flash flood and stormwater run-off
We will pay up to 50% of your home sum insured or $25,000 whichever is the higher.
...
Your contents
The most we will pay you for your contents claims
Flash flood and stormwater run-off
Case No: 247086 Determination Page 3 of 9
We will pay up to 50% of your contents sum insured or $25,000, whichever is the
higher, but not exceeding your contents sum insured.”
Issues
11. Whether the inundation was flood as defined by the policy or flash flood as
defined by the policy.
Reasons for Decision
12. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the complex nature of the issues. This dispute
has not been the subject of a FOS Recommendation and has proceeded
directly to Determination.
13. There has been an exchange of material between the parties. Each party
therefore is aware of the issues and has had the opportunity to comment.
14. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
15. Prior to arriving at a determination the Panel has read and considered all the
material submitted by the parties to FOS.
16. In view of the issues involved in this dispute, the Panel Chair Ombudsman
conducted a site inspection with the Applicants and the FSP on 17 January
2012. At the time of the site inspection the Applicants were well advanced in
repairs to their property and in fact the property which was originally a single
level weather board property had been raised by approximately 4.7 metres. In
view of this, no internal inspection of the property was conducted but this is not
seen as critical in this dispute.
17. The Applicants described there being a dam like effect immediately at the front
of the property on the morning of 11 January 2011. It was raining quite heavily
at that time and around midday a lid was blown off a stormwater drain at the
front of the property. At the time of the site inspection it was raining lightly and
water could be observed pooling around the front of the Applicants‟ property.
18. According to the Applicants they commenced moving items from the property
around midday on 11 January 2011. Water was pooling at the front of his
driveway at that time and by 4.00pm the street had been cut off because it had
started to flood.
19. The Applicants‟ original home was b uilt about a metre above ground at the front
with the land rising towards the rear so that the back of the Applicants‟ home
was at ground level. The Applicants believe that by about 8.00pm to 9.00pm
Case No: 247086 Determination Page 4 of 9
water was around a metre through the home. By that time it was no longer
raining heavily.
20. The FSP was invited to obtain information as to the time it takes for water to
reach the Applicants‟ property from the Wivenhoe Dam, as consideration
needed to be given to whether the rain that fell over the Wivenhoe Dam from
4.00am on 11 January 2011 could be considered the proximate cause of the
inundation.
21. The FSP provided a subsequent submission which was received by the Service
on 27 January 2012. Most of the issues in that submission have been further
argued in additional information provided by the FSP. The Panel does not
propose to repeat them at this stage.
22. The Panel notes however, from that submission that the FSP sought to rely
upon further hydrology that identified it would take approximately 15 hours 30
minutes to 20 hours 30 minutes for water to reach the Oxley Creek Mouth alert
from the Wivenhoe Dam following the increase in releases from the dam at
8.00am (W4) on 11 January 2011. The FSP argues that the W4 releases from
the Wivenhoe Dam could not have been a cause of inundation of the
Applicants‟ property as the Applicants‟ property was inundated before the
increased releases reached the house. The FSP argued that the first of the
increased releases of water from the dam would have reached the vicinity of
the A pplicants‟ property between 11.30pm on 11 January 201 1 and 4.30am on
12 January 2011, well after the Applicants claim the inundation commenced.
23. Although the Applicants have argued that stormwater run-off was the cause of
initial inundation of the Applicant s‟ property, given the height of the Applicants‟
property, the Panel is satisfied that this is unlikely to have been the case. Whilst
the Applicants observed initial water pooling at the front of his property around
midday on 11 January 2011, there is no s uggestion that the water at that stage
had inundated his home. The Panel is persuaded that most likely the inundation
near the Applicants‟ property commenced later that afternoon and was most
likely as a result of water back flowing through the drainage system as a result
of the increased levels of the Brisbane River and the Brisbane River backing up
onto Oxley Creek and Little Doris Creek.
24. The central issue for Determination in this dispute is whether the inundation of
the Applicants‟ home on 11 January 20 11 was due to flash flood as defined
within the terms of the policy that is whether rain that fell no more than 24 hours
prior to the inundation of the Applicants‟ property was the proximate cause of
the inundation.
25. The Panel suspended issuing Determinations relating to this question after the
Queensland Flood Commission of Inquiry had been recalled to hear further
evidence from the Wivenhoe Dam flood engineers. Once the final report was
released, all relevant stakeholders were invited to put further submissions to
the Panel relating to the impact of the heavy rainfall that commenced falling
over the Wivenhoe Dam around 4.00am on 11 January 2011 and in particular
the impact this had on the decision to adopt the W4 release strategy.
Case No: 247086 Determination Page 5 of 9
26. On 21 May 2012 FOS issued a memorandum to all relevant stakeholders
advising that after considerable deliberation of all material available to it, the
Panel formed a view that the heavy rain occurring from approximately 4.00am
on 11 January 2011 and in particular the heavy rain between 4.00am and
8.00am on 11 January 2011 was a proximate cause of the W4 strategy being
invoked and therefore a proximate cause or trigger that led to the flooding of
many of the properties along the Brisbane River.
27. At that time, the Panel noted that in relation to the approach that each individual
dispute would depend upon the individual and unique factors relevant to the
dispute and in that regard the parties were invited to make further submissions
in relation to disputes before FOS.
28. In view of this, the FSP provided detailed further submissions to FOS on 12
June 2012 in relation to this dispute. Included with the submissions were the
following documents:
A Reference document for disputes relating to Queensland Floods (this is
a general reference document) relating to the various submissions the
FSP makes in relation to a number of issues. Not all issues raised in the
reference document appear in the current dispute;
Letter from the FSP‟s hydrologist attaching a key information sheet for the
Applicants‟ property ;
Hydrologist report “Investigations of January 2011 inundation event –
Brisbane” dated March 2011;
Statement from hydrologist dated 7 June 2012.
29. The Panel has reviewed the reference document. Insofar as the reference
document relates to the current issues in dispute, those matters have been
considered.
30. Essentially the reference document argues relevant to this dispute and
consistent with earlier arguments that the hydrology reports from the
hydrologist and the ICA support the view that the rainfall on 11 January 2011
was not the cause of inundation of the properties, but that it was the rain that
fell more than 24 hours earlier, particularly the rai n of the 9 and 10 January
2011 that was the cause of the inundation.
31. In summary the FSP argues that the proximate cause of the inundation of the
properties, that is the real or effective cause of the damage caused to the
properties downstream of the dam, is not simply the rain that occurred from
4.00am on 11 January 2011. The FSP maintains that on any reasonable view,
the damage sustained to the downstream properties was the combined effect of
all of the rainfall and not just the rain that had fallen from 4.00am on 11 January
2011 leading to the implementation of the W4 strategy from 8.00am that day.
32. The Applicants have advised that they have perused the further submission
and are still of the opinion that water first entered their property from the drains,
the drains not being able to handle the excessive volume of water in the area.
Case No: 247086 Determination Page 6 of 9
33. The Panel has thoroughly reviewed the material exchanged, in particular the
hydrology information. The Panel notes with interest that the hydrologist
statement dated 7 June 2012 is in fact identical from paragraphs 1 through to
22 to the earlier statement of the hydrologist dated 24 October 2011 and
referred to in the FSP‟s further submission of 24 January 2012. The Panel
notes the conclusion by the hydrologist that it was the substantial rain that had
fallen over the Wivenhoe Dam catchment between 9 and 11 January 2011 and
indeed earlier, which led to the increase in the releases in the Wivenhoe Dam.
34. The Panel also notes with interest the earlier argument by the FSP that the
App licants‟ property would not have been inundated by water release from the
dam until between 11.30pm on 11 January 2011 and 4.30am on 12 January
2011. The hydrologist in the key conclusions statement attached to his further
report concluded that the effect of the W4 releases first reached the vicinity of
the property at 2.39pm on Tuesday, 11 January 2011 and that by 4.00am on 12
January 2011, the river level with the W4 releases would have been
approximately 6.2 metres AHD which is 1.6 metres above the benchmark level
of the Applicants‟ property.
35. There is no dispute that heavy rain fell over the Wivenhoe Dam catchment area
and in fact parts of the Brisbane River from approximately 4.00am on 11
January 2011. It is not disputed that in addition to this there was heavy rain
over the Bremer River which influenced the level of the Brisbane River and that
rain commenced at approximately 6.00am on 11 January 2011.
36. The FSP‟s hydrolog ist has relied on data from SEQWater dated 2 March 2011
which confirms the rapid increase in inflows to the Wivenhoe Dam from 4.00am
on 11 January 2011. Examination of the SEQWater report identifies the rapid
increase in the inflows to the Wivenhoe Dam commencing from about 4.00am,
11 January 2011. The report confirms the inflows into the dam had been
decreasing from as early as 8.00am from 10 January 2011 with steady
decreases from approximately 3.00pm on 10 January 2011 to 2.00am on 11
January 2011.
37. The Queensland Flood Commission of Inquiry report confirms that prior to
4.00am on 11 January 2011 and in fact prior to 8.00am of 11 January 2011 the
dam releases were being managed at the W3 strategy. Whilst it is accepted
that the W3 strategy had led to an increase in the levels of the Brisbane River,
the W3 strategy was designed to avoid where possible inundation of the
properties below the Wivenhoe Dam by flooding from the Brisbane River. The
FSP hydrologist has speculated that if the W3 strategy had been maintained ,
then, according to the key conclusion statement, the Applicants‟ property would
still have been inundated by approximately 5.08pm on Tuesday, 11 January
2011 and by 4.00am would have been inundated to a level of 1.2 metres above
the benchmark level.
38. The Panel is concerned however that to reach such a conclusion it must be
speculated that the releases from the dam would have continued at the same
rate at the W3 level in the absence of any additional rainfall. The report does
not address the possibility of the inflow into the Wivenhoe Dam decreasing.
Case No: 247086 Determination Page 7 of 9
39. The available information indicates the W3 strategy that was in place prior to
8.00am on 11 January 2011 had been successful in limiting the outflows and
flooding below the Wivenhoe Dam. Whether the outflows would have continued
at the same rate had the inflows continued to reduce is not known.
40. There is no dispute that there were two significant rainfall spikes with rain that
fell from 9 to 10 January 2011 being considered the first spike and rain that
commenced falling from approximately 4.00am on 11 January 2011 being the
second spike.
41. There is no dispute that following the second spike that the W4 strategy was
adopted. The FSP has argued that the switch to strategy to W4 was not the
natural and ordinary consequence of the rain that fell and in fact the move to
W4 strategy was not taken in accordance with the Wivenhoe Dam manual. In
the Panel‟s view, the Queensland Flood Commission of Inquiry final report does
not find the adoption of W4 strategy at 8.00am on 11 January 2011 was
inconsistent with the manual. Although there may be issues as to how the
Wivenhoe Dam had been managed prior to this time, there is nothing in the
material that has been provided to the Panel to suggest that the earlier
management of the Wivenhoe Dam influenced to any significant degree, the
adoption of the W4 release strategy at 8.00am on 11 January 2011.
42. The ICA hydrology and the information provided by the FSP‟s hydrologist
confirms that the increased releases from the Wivenhoe Dam after the adoption
of the W4 strategy led to the development of a flood wave that ultimately
caused the flooding of many properties downstream of the Wivenhoe Dam.
43. The Panel is satisfied based on the information exchanged and in particular the
key conclusion statements provided by the FSP‟s hydrologist, that as a result of
the W4 releases the Applicants‟ property was first inundated at or about 3.00pm
on 11 January 2011 which is consistent with the Applicants‟ own observations
and subsequently was inundated to a level of approximately 1.6 metres above
the benchmark level by 4.00am, 12 January 2011. The benchmark level relied
upon by the FSP‟s hydrologist is the lowest point of the house or other relevant
structure on the land after consideration of the nature of the structure, and
whether the structure was a single level dwelling co nstructed upon a ground
slab or not. The Applicants‟ property was a single level property and in the
Panel‟s view given this height of inundation, the majority of the loss suffered by
the Applicants would have been sustained as a result of the inundation prior to
4.00am, 12 January, 2011.
44. The question arises as to what was the proximate cause of this inundation. In
determining the proximate cause of the inundation it is necessary to look at the
effective or dominant cause of the inundation. The Panel agrees with the FSP‟s
general submission that the proximate cause is a cause determined by
common sense evaluation of the relevant facts. In the event that there are two
or more proximate causes, one within the policy and the other excluded, the
policy does not respond. The proximate cause is not determined by identifying
the last event or final trigger but by determining what is the dominant, effective,
direct or efficient cause of the loss.
Case No: 247086 Determination Page 8 of 9
45. The FSP has maintained that the impact on the Wivenhoe Dam from the rainfall
that fell in the early hours of 11 January 2011 was only 29% while 71% of the
volume of the inflow came from the rain that fell on 9 and 10 January 2011 or
earlier. The FSP maintains that to find the rainfall which had fallen from 4.00am
on 11 January 2011 is the proximate cause is without foundation, as such an
approach produces an entirely artificial outcome.
46. With all respect to the FSP‟s argument the Panel disagrees. Whilst the Panel
accepts there has been a significant impact on the levels of the Wivenhoe Dam
by the rainfall that commenced falling on or about 9 January 2011 or earlier, the
Panel is satisfied having regard to the information that has been exchanged
and the relevant legal principles, that the heavy rain that commenced falling on
or about 4.00am on 11 January 2011 was the proximate or effective cause of
the adoption of the W4 strategy which in turn caused the inundation of the
Applicants‟ property commencing at approximately 3.00pm on 11 January
2011.
47. The Panel is satisfied that whilst the level of the Brisbane River may have been
increasing under the W3 strategy, it was the heavy rainfall from approximately
4.00am on 11 January 2011 that caused the need to adopt the W4 strategy at
8.00am on the same day, and that this led to the inund ation of the Applicants‟
property, and to this extent the Panel is satisfied that the inundation of the
Applicants‟ property to the level of 1.6 metres above benchmark was caused by
flood that occurred within 24 hours of the heavy rainfall.
48. Whilst the Pan el accepts that the assessments of the FSP‟s hydrologist may
not be entirely accurate, the Panel has considered these assessments as
against the comments attributed to the Applicants and made by the Applicants
during the course of the site inspection. The Panel is satisfied that the FSP‟s
hydrologist findings can be relied upon as a reasonable assessment as to the
initial inundation of the Applicants‟ property and inundation of the Applicants‟
property within the 24 hours of the commencement of the heavy rain.
49. The Panel notes that the Applicants‟ property was ultimately inundated to a
level of approximately 4.6 or 4.7 metres, that is to roof height. Whilst noting this,
the Panel believes that the majority of the Applicants‟ damage would have been
sustained as a result of initial inundation to a level of 1.6 metres.
50. The Applicants‟ property was a single level property. A quotation has been
provided by the Applicants covering the scope of works to a total price of
$133,620. In addition the Applicants claim total loss of contents, the Panel
notes insured for the sum of $30,000.
51. Under the terms of the policy and in particular under the flash flood provisions
of the policy, the policy will respond to pay up to 50% of the home building sum
insured, or $25,000 which ever is the higher. In this case the home building is
insured for the sum of $377,000. The assessed loss is $133,620 which is less
than the 50% insured sum. Based on the information available, the Panel is not
able to determine the extent of damage caused to the building as a result of the
inundation to 1.6 metres. Whilst the Panel considers the majority of the loss
would be caused by this level of inundation, the parties are asked to work
Case No: 247086 Determination Page 9 of 9
cooperatively to settle this aspect of the dispute. If the parties are unable to
agree within 30 days of acceptance of this Determination, the Panel will
determine the amount.
52. Insofar as the loss of contents is concerned, the policy provides for payment of
50% of the sum insured or the sum of $25,000 which ever is the higher. The
Applicants were insured for the sum of $30,000 contents and claimed a total
loss of contents. There is no dispute as to the total loss of contents and in the
circumstances the FSP is liable to meet the sum of $25,000 which is the higher
figure available under the policy.
Determination
53. Accordingly, the Panel determines the FSP settle the Applicants‟ claim in
accordance with the terms of the policy as relates to damage to the home and
loss of contents pursuant to the policy cover provisions for flash flood.
54. Insofar as the FSP is to cash settle the claim, interest is payable in accordance
with section 57 of the Insurance Contracts Act 1984 from 5 May 2011 being the
date of final claim declinature, to the date of compliance with this determination.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.