Home / Financial Firm (Unknown - Insurer) / Determination 246848

Determination 246848

Claim denial - flood exclusion versus flash flood cover

FirmFinancial Firm (Unknown - Insurer)
Decided2012-11-29
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicants' Milton home was inundated in January 2011 and the insurer denied the claim as flood. AFCA found flash flood cover applied to garage inundation up to 0.6 metres above benchmark, so the insurer must pay repair and replacement costs to that level with interest, but not damage above it.

Flash flood cover applies where flood is caused by heavy rain within 24 hours, judged by the dominant effective cause, which here was the heavy rain prompting the W4 dam release.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 246848 Determination Page 1 of 14 Case number: 246848 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of Claim - Water Inundation - Flood vs Flash Flood 7 November 2012 Background 1. The Applicants insured their home and contents with the Financial Services Provider (FSP). The relevant period of insurance operated for twelve months beginning from 2 November 2010. During this period, the building was insured up to a sum of $462,000 and the contents for $152,000. 2. On or about 11 January 2011, the Applicants‟ home in Milton was subject to extensive water inundation following severe weather events in Queensland. A claim was lodged. 3. The FSP denied the claim on the basis the damage was due to “flood”. The Applicants, through their solicitors, have disputed this. 4. For the sake of simplicity, reference to „the Applicants‟ will include their legal representatives. 5. The Applicants and the FSP have provided detailed submissions on the relevant issues. For the sake of brevity, the Panel will summarise these submissions given all of the material made available has been exchanged with the other party. Summary of Applicants ’ position 6. The Applicants submit the following as alternative arguments in response to the FSP‟s decision:  The FSP failed to inform them of the “unsuitability” of the insurance cover for their circumstances and misled them by not disclosing the exclusion for “flood” or the limitations of the “flash flood” cover.  The Product Disclosure Statement (PDS) failed to clearly inform them that “flood” was excluded as required under Section 35 of the Insurance Contracts Act 1984 (the Act).  The damage was due to “Flash flood and stormwater run - off”, which is an insured event. In particular, the inundation was due to heavy rain that fell from 4am on 11 January 2011 which resulted in the Wivenhoe Dam operators elevating their strategy to W4. This decision resulted in Determination Case No: 246848 Determination Page 2 of 14 massive discharges of water into the Brisbane River that ultimately inundated their property. Summary of FSP’s position 7. In response to the Applicants‟ arguments, the FSP submits the following:  It is not in dispute that a PDS was sent to the Applicants prior to the claim and this was sufficient to inform them of the limitations of the cover. The policy structure and layout of the PDS enables it to rely on the exclusion clause of “flood” pursuant to Section 35(2) of the Act.  It denies that the Applicants were in any way misled about the cover or that it has any obligation to ensure a policy is suitable to the Applicants‟ needs. 8. The FSP relies on a number hydrology reports authored by SC and the following policy provisions to deny the Ap plicant‟s claim : Page 3 of the Certificate of Insurance (COI) “ What optional covers are included and not included Home Contents ... Flood and storm surge not included not included...” Pages 10-12 of the PDS “ Words / terms with special meanings Wo rd / term Meaning ... Flood Rising water which enters your home as a result of it running off or overflowing from any origin or cause. This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance. Flash flood and stormwater run - off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run - off. ... Storm A violent disturbance of the atmosphere associated with strong winds including a cyclone, lightening, heavy rain, hail or snow, but not continuous bad weather by itself. ...” Pages 17-18 of the PDS Case No: 246848 Determination Page 3 of 14 “ Insured events you are covered for Damage caused by weather... What is covered What is not covered Storm Loss or damage:  caused by rain, hail or snow after it has reached the ground... ... Flash flood and stormwater run-off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run - off Loss or damage caused:  by flood... ...” Page 27 of the PDS “ Your home The most we will pay you for home claims What is covered What is not covered Flash flood and stormwater run-off We will pay up to 50% of your home sum insured or $25,000, whichever is higher. ... ...” Page 32 of the PDS “ Your contents The most we will pay you for contents claims What is covered What is not covered ... ... Flash flood and stormwater run-off We will pay up to 50% of your contents sum insured or $25,000, whichever is higher, but not exceeding your contents sum insured. ... ...” Page 48 of the PDS “ Optional covers for extra peace of mind The covers outlined in this section are optional and do not apply unless you have asked for them and we agree to cover you. Additional premiums apply Case No: 246848 Determination Page 4 of 14 for each cover. Your certificate of insurance will show which covers operate. All optional covers are subject to the terms and conditions of this policy.” Page 53 of the PDS “ Optional covers for extra peace of mind What is covered What is not covered Flood and storm surge This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance. Home and/or contents cover We cover you for loss of or damage to your home or contents caused by flood or storm surge which happens during the period of insurance at the property addre ss. We will pay up to the:  home sum insured, if your home is insured;  contents sum insured, if your contents are insured for damage caused by flood or storm surge, We will pay for loss or damage in the same way and in the same amounts as we do under insure d events cover. We will not pay for loss or damage to:  paths, driveways, paving, retaining walls (whether or not part of the home), tennis courts or other playing surfaces;  shade or sail cloth;  fabric awnings, swimming pool or spa covers or liners and the like;  glasshouse whether or not constructed principally of glass;  water in swimming pools or spas... ...” Issues 9. Whether the FSP breached its duty of utmost good faith and/or misrepresented the level of cover provided in allowing the Applicants to incept this type of policy. 10. Whether the Applicants were “clearly informed” about what the policy did and did not cover. 11. Whether the cause of the Applicants‟ loss was covered under the policy. Reasons for decision 12. Due to the nature of the dispute, the parties have been informed that the matter has been referred to the Panel for Determination in line with the Operational Guidelines to FOS‟s Terms of Reference. This dispute has not Case No: 246848 Determination Page 5 of 14 been the subject of a FOS Recommenda tion and has proceeded directly to Determination. 13. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 14. On 30 October 2012, the Panel Chair Ombudsman attended on site where he met with the Applicants and a representative of the FSP. 15. It is appropriate to consider the issues under the various headings. Utmost Good Faith 16. The Applicants have alleged the FSP breached its duty of utmost good faith by failing to ensure the policy provided adequate coverage or was suitable for their needs. They also suggest that the FSP “misrepresented” the policy by failing to properly explain the flood exclusion or flash flood limitations. 17. The Panel considers the A pplicants‟ arguments regarding the duty of utmost good faith and misrepresentation are misconceived. There is no legal principle that supports their argument that an insurer‟s duty of utmost good faith extends to enquiring and ensuring its policy is appropriate to the insured‟s needs. Such a duty is generally associated with insurance brokers or other professional parties where case law and statute make it clear these professionals have a duty to ensure the policy they procure is suitable to their client‟s needs. 18. There is no direct evidence from the Applicants that the policy was misrepresented to them and noting that the cover had been in place for about six years, the Panel is of the opinion that they had ample opportunity to familiarise themselves with the cover provided by consulting the PDS (assuming that this document served to “clearly inform” them of the limits of the cover). 19. Further to this, the PDS (for which there is no dispute as to receipt):  Is a standard home insurance policy that is available to the general public as opposed to being tailored to the Applicants‟ needs, and  Had a 21 day cooling off period which provided the Applicants ample opportunity to review the contract and obtain advice on it to ensure it was suitable to their needs. 20. Given this, the Panel does not accept the FSP breached its duty of utmost good faith with respect to offering its standard home insurance policy to the Applicants. Case No: 246848 Determination Page 6 of 14 Consideration of “ Flood ” Definition in PDS 21. It is accepted that the Applicants received the PDS from the FSP. It is further not disputed that they received an annual Certificate of Insurance (COI) upon each renewal of the cover. 22. The Applicants contend that the definition of flood contained in the PDS document is too broad, too difficult to comprehend and that the FSP has not met its obligations under section 35 of the Act to “clearly inform” them of what is and is not covered under the policy. 23. The Panel has previously considered this issue for the FSP‟s policy. It is satisfied that the two events (“flood” and “flash flood and stormwater run - off”) can be distinguished. 24. The Applicants have raised issue with the placing of definitions throughout the policy and the difficulty a “reasonable person” would have in evaluating it. The Panel is satisfied that the PDS should be read in its entirety and that (should this be done) the interpretation of same should not be difficult for a person of average intelligence and education. 25. The PDS has an index on the inside cover which highlights the areas of the policy in which the policyholder might find information. Included in this is “Words/terms with special meanings” on page 9, for which definitions of relevant terms in the policy are provided. Flood is included in this (on page 10), together with the qualification that: “... This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance. ” 26. In addition to this, page 53 directs the reader to “Flood and storm surge”, which is explained under the broader definition of “Optional covers for extra peace of mind”. This section explains that: “... This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance. ” 27. It is not in dispute that no cover was optioned by the Applicants for “Flood and storm surge” cover and therefore they were not covered for it under the policy. This is shown in the COI which shows that this cover was “not included”. 28. Accordingly, the Panel is satisfied that the FSP has satisfactorily defined the events in the policy and its PDS is sufficient to clearly inform the Applicants of the cover and exclusions as required under section 35 of the Act. It is therefore entitled to rely upon same in determining if the policy responds to the Applicants‟ loss. Case No: 246848 Determination Page 7 of 14 Water Inundation The Evidence 29. The Panel accepts that the FSP‟s policy does not extend cover to circumstances where a loss is caused by a flood. The policy also distinguishes between flood, flash flood and stormwater run-off (the latter two of which are covered). It does, however, extend cover for damage being a sudden flood “caused by heavy rain that fell no more than 24 hours prior” to the flash flood. 30. After the lodgement of the claim, the FSP appointed a loss adjuster (MY) to investigate and report on the damage caused to the Applicants ‟ property. The report estimated that there was about $100,000 worth of building damage and $30,000 of contents damage. Amongst the factual information, MY suggested that water first entered the property on 11 January 2011 and attributes the cause of the loss to “flood” (although it unaccountably states that the damage was discovered on 10 Ja nuary 2011). 31. The FSP subsequently engaged a hydrologist, SC, to provide a report as to the damage. 32. SC provided a statutory declaration dated 19 July 2011 in which he evaluated the cause of the loss in the region surrounding and specifically affecting the Applicants ‟ home. He found that:  a substantial amount of rain fell in the greater Brisbane area from 9 January 2011 and over the subsequent two days, which caused significant inflows into the Wivenhoe Dam, which peaked on the evening of 11 January 2011;  rain also fell in the area of the Bremer River from 6.00am on 11 January 2011. This rain travelled along the Bremer River to the junction of the Brisbane River and ultimately contributed about 15-25% of its peak flow;  a “small proportion” of the overall dep th of the Brisbane River “may be partially attributable to the rain that fell in the Bremer River catchment on 11 January 2011”, although the “overwhelming influence” was the rain that had fallen in the previous days.  the terrain data for the Applicants‟ h ome suggested that it was unlikely that the Applicants would have experienced significant stormwater or run- off problems during the period;  inundation from stormwater run- off requires “intense levels of rain” which is sufficient to overcome the stormwater drainage system. Any such run- off generally occurs during or very shortly after such an intense period of rainfall;  a review of the rainwater gauge at Toowong, approximately 2.8km from the Applicants‟ property and representative of its rainfall in the expert‟s Case No: 246848 Determination Page 8 of 14 opinion, revealed that 119mm of rain fell over 9 and 10 January 2011, with a further 74mm falling on 11 January 2011. The most intense rainfall on 11 January 2011 fell around 11am and minimal rainfall after 3.00pm. The rainfall had ceased by about 8.00pm;  the overall intensity of the rainfall was low and unlikely to result in run-off or stormwater inundation to the property;  when rain ceased around 8.00pm, the Brisbane River was not at a level where it could inundate the property. This inundation subsequently occurred at about 1am on 12 January 2011 and was caused by the flooding of the Brisbane River and not stormwater run-off or flash flooding (as defined in the policy). 33. As a result of the report from SC, the FSP denied the claim on the basis that it considered the cause of the loss to be flooding from the Brisbane River. 34. Since the matter has been referred to the Service, the Applicants have suggested that the releases of water from the Wivenhoe Dam on 11 January 2011 were a significant factor in the increased water levels in the Brisbane River and that this was a major influence in the inundation of their home. This is largely now agreed by the parties, although the dispute centres on whether such an event is covered under the policy. Releases from Wivenhoe Dam & Proximate Cause 35. The central issue for Determination in this dispute is whether the inundation of the Applicants‟ home on 11 January 2011 was due to flash flood as defined within the terms of the policy, that is, whether rain that fell no more than 24 hours prior to the inundation of the Applicants‟ property was the proximate cause of the inundation. 36. The Panel suspended issuing Determinations relating to this question after the Queensland Flood Commission of Inquiry had been recalled to hear f urther evidence from the Wivenhoe Dam‟s operating engineers. Once the final report was released, all relevant stakeholders were invited to put further submissions to the Panel relating to the impact of the heavy rainfall that commenced falling over the Wivenhoe Dam around 4.00am on 11 January 2011 and in particular the impact this had on the decision to adopt the W4 release strategy. 37. On 21 May 2012 FOS issued a memorandum to all relevant stakeholders advising that after considerable deliberation of all material available to it, the Panel formed a view that the heavy rain occurring from approximately 4.00am on 11 January 2011 and in particular the heavy rain between 4.00am and 8.00am on 11 January 2011 was a proximate cause of the W4 strategy being invoked and therefore a proximate cause or trigger that led to the flooding of many of the properties along the Brisbane River. 38. At that time, the Panel noted that to the approach taken in each dispute would depend upon the individual and unique factors relevant to the dispute Case No: 246848 Determination Page 9 of 14 and in that regard the parties were invited to make further submissions in relation to disputes before FOS. 39. In view of this, the FSP provided detailed further submissions to FOS in relation to this dispute. Included with the submissions were the following documents:  A Reference document for disputes relating to Queensland Floods (this is a general reference document) relating to the various submissions the FSP makes in relation to a number of issues. Not all issues raised in the reference document appear in the current dispute. The Reference document has been updated.  Letter from the FSP‟s hydrologist attaching a key information sheet for the Applicants‟ property;  Hydrologist report “Investigations of January 2011 inundation event – Brisban e”;  A further statement from the hydrologist, SC. 40. The Panel has reviewed the reference documents. Insofar as the reference documents relate to the current issues in dispute, those matters have been considered. 41. In summary the FSP argues that the proximate cause of the inundation of the properties, that is the real or effective cause of the damage caused to the properties downstream of the dam, is not simply the rain that occurred from 4.00am on 11 January 2011. The FSP maintains that on any reasonable view, the damage sustained to the downstream properties was the combined effect of all of the rainfall and not just the rain that had fallen from 4.00am on 11 January 2011 leading to the implementation of the W4 strategy from 8.00am that day. 42. There is no dispute that heavy rain fell over the Wivenhoe Dam catchment area and in fact parts of the Brisbane River from approximately 4.00am on 11 January 2011. 43. The FSP‟s hydrologist has relied on data from SEQWater dated 2 March 2011 which confirms the rapid increase in releases from the Wivenhoe Dam from 8.00am on 11 January 2011. Examination of the SEQWater report identifies the rapid increase in the inflows to the Wivenhoe Dam commencing from about 4.00am, 11 January 2011. The report confirms the inflows into the dam had been decreasing from as early as 8.00am from 10 January 2011 with steady decreases from approximately 3.00pm on 10 January 2011 to 2.00am on 11 January 2011. 44. The Queensland Flood Commission of Inquiry report confirms that prior to 4.00am on 11 January 2011 and in fact prior to 8.00am of 11 January 2011 the dam releases were being managed at the W3 strategy. Whilst it is accepted that the W3 strategy had led to an increase in the levels of the Brisbane River, the W3 strategy was designed to avoid where possible Case No: 246848 Determination Page 10 of 14 inundation of the properties below the Wivenhoe Dam by flooding from the Brisbane River. 45. There is no dispute that there were two significant rainfall spikes with rain that fell from 9 to 10 January 2011 being considered the first spike and rain that commenced falling from approximately 4.00am on 11 January 2011 being the second spike. 46. There is no dispute that following the second spike that the W4 strategy was adopted. The FSP has argued that the switch to strategy W4 was not the natural and ordinary consequence of the rain that fell and in fact the move to W4 strategy was not taken in accordance with the Wivenhoe Dam manual. In the Panel‟s view, the Queensland Flood Commission of Inquiry final report does not find the adoption of the W4 strategy at 8.00am on 11 January 2011 was inconsistent with the manual. Although there may be issues as to how the Wivenhoe Dam had been managed prior to this time, there is nothing in the material that has been provided to the Panel to suggest that the earlier management of the Wivenhoe Dam influenced to any significant degree, the adoption of the W4 release strategy at 8.00am on 11 January 2011. 47. The ICA hydrology and the information provided by the FSP‟s hydrologist confirms that the increased releases from the Wive nhoe Dam after the adoption of the W4 strategy led to the development of a flood wave that ultimately caused the flooding of many properties downstream of the Wivenhoe Dam. 48. The question arises as to what was the proximate cause of this inundation. In determining the proximate cause of the inundation it is necessary to look at the effective or dominant cause of the inundation. The Panel agrees with the FSP‟s general submission that the proximate cause is a cause determined by common sense evaluation of the relevant facts. In the event that there are two or more proximate causes, one within the policy and the other excluded, the policy does not respond. The proximate cause is not determined by identifying the last event or final trigger but by determining what is the dominant, effective, direct or efficient cause of the loss. 49. The FSP has maintained that the impact on the Wivenhoe Dam from the rainfall that fell in the early hours of 11 January 2011 was only 29% while 71% of the volume of the inflow came from the rain that fell on 9 and 10 January 2011 or earlier. The FSP maintains that to find the rainfall which had fallen from 4.00am on 11 January 2011 is the proximate cause is without foundation as such an approach produces an entirely artificial outcome. 50. With due respect to the FSP‟s argument the Panel disagrees. Whilst the Panel accepts there has been a significant impact on the levels of the Wivenhoe Dam by the rainfall that commenced falling on or about 9 January 2011 or earlier, the Panel is satisfied havi ng regard to the information that has been exchanged and the relevant legal principles, that the heavy rain that commenced falling on or about 4.00am on 11 January 2011 was the proximate or effective cause of the adoption of the W4 strategy. Case No: 246848 Determination Page 11 of 14 51. The Panel is also satisfied that whilst the level of the Brisbane River may have been increasing under the W3 strategy, it was the heavy rainfall from approximately 4.00am on 11 January 2011 that caused the need to adopt the W4 strategy at 8.00am on the same day. The Applicants’ Inundation 52. SC‟s statement indicates the effect of the W4 releases first reached the vicinity of the Applicants‟ property at 3.14pm on 11 January 2011. He estimated that the property was first inundated by the Brisbane River at 1.37am on 12 January 2011 and by 4.00am the same morning the property was inundated up to 0.4m above the relevant benchmark level. 53. The relevant benchmark level was SC‟s estimate of the lowest point of the structure of the house on the land. This was suggested to be the “ga rage”, which is at 4m AHD (Australian Height Datum). The property has an estimated fall from its rear to the front of 4m. It is estimated at 7.6m AHD at the rear of the property to 3.6m AHD at the front. This evidence has not been refuted by the Applicants in any manner. 54. SC has not addressed if the home was on stumps or a slab, nor has he defined the actual height level of the home, or its height relative to the garage or other improvements on the property. The Panel, based on the evidence supplied by the FSP, cannot establish whether SC conducted a site visit of the risk address; accordingly it will proceed on the basis this did not occur. 55. The Panel notes that according to SC‟s estimate, at 4.00am on 12 January 2011 (being 24 hours from the rain which commenced at 4.00am on 11 January 2011) the property was inundated to a level of 0.4 metres above the benchmark level. He also notes that the ultimate inundation of the property was 2.1m above the benchmark level. SC identified this peak inundation occurred at approximately 2.57am on 13 January 2011. 56. The Panel accepts the possibility that these assessments may not be entirely accurate. 57. When the Panel Chair Ombudsman attended on site he observed that there are a number of steps from the lower garage area to the floor area of the house itself. The Panel Chair Ombudsman estimated that the height difference was approximately 800mm to 1 metre. 58. At the site visit the Applicants confirmed that they remained at the property until approximately 6.00am on Wednesday 12 January 2011. At that time the water was at the top of the steps between the garage and the main part of the house but had not entered the main part of the house. 59. Further and in contrast to SC‟s estimate, the Applicants confirmed that water had entered the garage between 10pm and 11pm on Tuesday 11 January 2011 and possibly earlier. Case No: 246848 Determination Page 12 of 14 60. Given the eyewitness evidence of the Applicants, that water had entered the garage and this reached the benchmark level several hours prior to the time estimated by SC, the Panel i s satisfied that SC‟s estimate of the inundation above the benchmark at 4.00am on 12 January 2011, on the balance of probabilities is on the conservative side of the likely height of the inundation at that time. 61. Having considered all of the evidence and submissions of the parties and in particular the eyewitness evidence of the Applicants, the Panel is satisfied, on the balance of probabilities that at 4.00am on 12 January 2011, the garage was inundated to a level of 0.6 metres. 62. The FSP hydrologist has also speculated that if the W3 strategy had been maintained, then, according to the key conclusion statement, the Applicants‟ property would still have been inundated by approximately 8.25am on 12 January 2011. By 4am on this morning it still would have been 0.2 metres below the benchmark level. In other words, the property would not have been inundated inside the 24 hour period after the rainfall. 63. The Panel is concerned, however, that to reach such a conclusion it must be speculated that the releases from the dam would have continued at the same rate as the W3 level in the absence of any additional rainfall. The report does not address the possibility of the inflow into the Wivenhoe Dam decreasing. 64. The available information indicates the W3 strategy that was in place prior to 8.00am on 11 January 2011 had been successful in limiting the outflows and flooding below the Wivenhoe Dam. Whether the outflows would have continued at the same rate had the inflows continued to reduce is not known. 65. Instead, the Panel is satisfied that on the facts of what actually occurred on 11 January 2011, it was the heavy rainfall from approximately 4.00am on 11 January 2011 that caused the need to adopt the W4 strategy at 8.00am on the same day. This led to the inundation of the Applicants‟ property. 66. To this extent, the Panel is satisfied that the inundation of the Applicants‟ garage to the level of 0.6m above benchmark was caused by flood that occurred within 24 hours of the heavy rainfall. 67. The evidence also indicates that at that height the inundation at 4.00am on 12 January 2011 would not have entered the main part of the home. This finding is consistent with the Applicants‟ own evidence that at approximately 6.00am on Wednesday 12 January 2011 the water was at the top of the steps between the garage and the main part of the house but had not entered the main part of the house. 68. The Panel notes that after 4.00am on 12 January 2011 the level of inundation continued to increase to a peak of 2.1 metres above the bench mark. However, such further damage above 0.6 metres is excluded from cover, being outside the 24 hours period of cover. Case No: 246848 Determination Page 13 of 14 Quantum 69. The Renewal Certificate of Insurance for the relevant period provides a sum insured of $462,000 for the home with contents of $152,000. The Panel notes that for the event Flash flood and stormwater run-off the policy has a limit of 50% of the sum insured or $25,000 whichever is the greater, for each of the building and contents. Pursuant to the policy cap the FSP is liable up to an amount of $231,000 for the damage to the building and $76,000 for the contents. 70. Given the time since the loss was sustained, the Panel accepts that the parties may be unable to provide an exact estimate of the total loss sustained, or a breakdown of that loss. 71. The Applicants and the FSP are asked to work cooperatively together to establish the extent of the loss sustained and to reach an agreement as to cost of repairs and replacement of the various contents lost. 72. Insofar as the FSP may have made payment of a co mpassionate sum to the Applicants, FOS does not have jurisdiction to deal with this payment but acknowledges that the FSP, given the terms on which the compassionate payment was made, may be entitled to deduct this payment from any settlement sum. 73. The Panel has also considered the issue of interest. 74. The FSP has argued that interest is only payable from the date from which it was unreasonable to withhold payment. The FSP maintains that it is entitled to a reasonable period to investigate and determine its position, and given the complex nature of the flood disputes, the delays are not unreasonable. Further complex situations require substantial periods of time for independent bodies such as the Queensland Flood Commission of Inquiry and FOS, to make conclusions on the issues in dispute. 75. The FSP maintains that it did not act unreasonably in this dispute and therefore interest is not payable. Alternatively if some period of interest is to be awarded it should be reduced to account for the substantial delays thro ugh the course of the process which were not the FSP‟s fault. 76. Section 57 of the Insurance Contracts Act requires interest be paid when it becomes “unreasonable for the insurer to have withheld payment”. An examination of relevant case law indicates that most probably, interest will be awarded from either when an insurer first emphatically denied liability or disputed a matter, or from when in the normal course of events the claim should have been paid if liability had not been disputed. 77. In this dispute the Panel accepts that the FSP was entitled to withhold payment of the settlement monies until such time as it had properly investigated the dispute and made its decision as to liability. Case No: 246848 Determination Page 14 of 14 78. The FSP made its original decision to deny the claim after receiving relevant assessment reports, hydrology reports and other information. The FSP was aware of the terms of its policy and aware of the relevant provisions under which liability might arise and chose to deny the claim having reviewed those relevant provisions and the evidence available to it. 79. In the Panel‟s view, at that point the FSP has made its decision on the claim and it is appropriate that from that time interest be paid unless it can be established that the Applicant had withheld information from the FSP that would have led to an alteration of its decision. 80. Accordingly, the Panel determines that it is appropriate that the FSP in this dispute pay interest from the day upon which the FSP determined to deny liability of the Applicant‟s claim, until payment of the claim. Determination 81. The FSP is to meet the cost of repairs incurred by the Applicants and the cost of the replacement of items damaged as a result of the inundation of the property up to 0.6 metres above the bench mark level being the floor of the garage. Any payment is subject to the limitations expressed in paragraph 69 of this Determination. 82. Insofar as the FSP is to cash settle the claim, the FSP is to pay interest from 30 March 2011 (being the date of rejection of the claim) to date of payment of the claim, in accordance with Section 57 of the Act.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.