Determination 246833
Flood damage to rental unit denied under flood exclusion
Summary
The applicants' rental unit in a body corporate building was flooded from the Bremer River in January 2011 and the FSP declined the claim under its flood exclusion. The Panel found the damage was caused by flood, which the policy excludes, and that the FSP did not have to give the applicants a PDS on the exclusion.
Flood is an excluded event under the body corporate policy, and the PDS disclosure rules did not apply because the policyholder was not a natural person.
Issues
- Claim denial primary · not upheld
“the Panel accepts flood is an excluded event and... the FSP is entitled to deny policy cover for this event”
- Failure to disclose secondary · not upheld
“the FSP is not required to have provided the Applicants with a PDS advising the Applicants of the flood exclusion”
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Case No: 246833 Determination Page 1 of 5
Case number: 246833
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim - Exclusion/Condition - Damage Caused by Flood
28 October 2011
Background
1. The Applicants owned a rental unit which was subject to body corporate
insurance cover with the Financial Services Provider (FSP).
2. On 12 January 2011, the unit suffered damage from an inundation of water
during the period that flooding affected the Brisba ne and Ipswich local areas.
They lodged a claim for damage caused to the unit soon afterwards.
3. The FSP arranged for an assessor to inspect the property. It ultimately declined
the claim on the basis that the cause of the loss was flood, which was excluded
under the terms of cover.
4. The Applicants disagree with the decision and seek indemnity for their losses,
estimated at $80,540. The Applicants also held a Landlord Protection policy
with an unrelated insurer, however the sum assured was for contents only and
was considerably less than the quoted building rectification costs; hence the
Applicants need to receive indemnification under the body corporate insurance
cover.
Summary of Applicants’ Position
5. The Applicants say that insurance should provide cover for events that cannot
be anticipated or planned for. They submit that a flood qualifies as such an
instance.
Summary of FSP’s Position
6. The FSP says that the policy does not provide cover for flood damage.
7. It relies on the following policy provisions:
Pages 11 and 12 of the Product Disclosure Statement (PDS)
“ General Definitions – Applicable to All Policy Sections
...
Determination
Case No: 246833 Determination Page 2 of 5
Flood means the inundation of normally dry land by water escaping or released from
the normal confines of any natural or artificial watercourse, lake, lagoon, reservoir,
canal or dam.”
Page 19 of the PDS
“ Section 1 – Property Insured
1. The Indemnity
We will pay You up to the Sum Insured specified in the Schedule for Building(s)
and Common Contents, for accidental loss or damage... which occurs during the
Period of Insurance.
We will not pay You under Section 1 of the Policy in respect of any of the matters
set out in the Specific Exclusions or the General Exclusions...”
Pages 26-27 of the PDS
“ 6. Exclusions
...
We will not be liable in respect of any physical loss, destruction or damage directly
or indirectly caused by or arising out of or in consequence of or contributed to by:
...
6.25 Flood...”
Issue
8. Whether the Applicants are covered for their loss under the terms and
conditions of the FSP‟s pol icy.
Reasons for Decision
9. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the amount of the claim and the issues to be
considered. This dispute has not been the subject of a FOS Recommendation
and has proceeded directly to Determination.
10. This decision has been made by a Panel consisting of an Ombudsman, an
insurance industry representative and a consumer representative.
11. The Panel Chair Ombudsman attended on site with the Applicants and a
representative of the FSP. The male Applicant confirmed the details previously
provided to the Service.
12. The Applicants‟ unit was inundated with water on or about 12 January 2011.
The unit was one of several from the same address and body corporate,
situated in close proximity to the Bremer River.
Case No: 246833 Determination Page 3 of 5
13. After the report of the incident, the FSP appointed an expert to investigate and
report on the damage. This expert, CR, inspected the property on 3 February
2011. The report noted:
“During the period 11 January to 15 January 2011, several river systems in
Southeast Queensland including the Bremer and Brisbane Rivers, broke their
banks resulting in widespread flooding in and around Ipswich and Brisbane. This
claim arises from that event.
... there are several building[s] located on this property. Damage only occurred to
two buildings... [These] are located on the banks of the Bremer River. [Four
units, including the Applicants‟ unit] are located in the se two buildings. When the
Bremer River rose beyond its banks, these four units became inundated with
water.
...
The damage observed is the result of inundation of water originating from the
Bremer River...”
14. CR determined that that the buildings were flooded to depth of about 1.35m at
the peak of the flood. The heaviest rainfall was reported throughout 11 January
2011, finishing about 8pm that night. The property was not inundated until the
next day at approximately 9am, with water entering the buildings from about
4pm later that day.
15. The Insurance Council of Australia (ICA) compiled reports into the flooding
disasters in Queensland from this period. The reports detailed information
about the rainfall and its affect on the various areas.
16. The ICA noted that rainfall in the Ipswich area around Bremer Creek was
heaviest through the 6am to 6pm period on 11 January 2011. Page 76 of
Volume 1 of the report notes:
“Very intense rain fell on the northwestern parts of the Bremer River catchment
between 0600 hours and 1800 hours on Tuesday 11 January... The peak water
levels resulting from this rainfall event occurred in the afternoon and evening of
[11 January 2011]... in concert with high releases from Wivenhoe Dam. Thus,
whilst backwater flooding from the Brisbane River was occurring along the lower
reaches of the Bremer River, a significant flood event in the Bremer was trying to
exit into the Brisbane River... the relative combination of these two flood events
to water level behaviour along the lower reaches of the Bremer River has not
been investigated... it is concluded that backwater effects associated with dam
release flooding was a major factor in water level behaviour along the lower
reaches of the Bremer River.”
17. In Volume 3 of the report, the ICA more specifically focused on the Ipswich
area and noted:
“Floodwaters moving down the Brisbane River over the period 9 to 14 January
consisted of releases from Wivenhoe Dam and floodwaters from Lockyer Creek
and the Bremer River. The water level response to these „normal‟ flood events in
lower Lockyer Creek, in the lower Bremer River and in the lower Brisbane River
was dwarfed by the subsequent water level rise associated with releases from
Wivenhoe Dam over the period 0600 hours on Tuesday 11 January to 0300
hours on Wednesday 12 January. Dam releases over this period increased water
levels in the lower Bremer River at One Mile Bridge by over 7 m...”
Case No: 246833 Determination Page 4 of 5
18. From the above passages it is clear that floodwaters affected the Ipswich area,
particularly in relation to the release of water from the Bremer River. The
Applicants‟ property was located in close proximity to this river. The Applicants
also do not dispute that the damage to their unit was caused by flood waters.
19. The policy applicable to the Applicants was a policy incepted by the Body
Corporate. The policy has an exclusion for flood and the issue is as to whether
the FSP is required to specifically advise the Applicants that they are not
covered for flood damage.
20. The Applicants were potential beneficiaries under the policy and not the actual
policyholders. It is not known if they had received a copy of the strata insurance
PDS after the body corporate incepted the policy with an underwriting agent of
the FSP. In this regard, the Panel notes a broker (CB), arranged placement of
the relevant insurance on behalf of the „Body Corporate Community Title
Scheme number xxxxx‟(BCCTSxxxxx) – this being the formal legal designation
encapsulating the apartment building in which the Applicants‟ unit is situated;
from this it follows the policyholder is not a „natural person‟ as contemplated by
Regulation 9 – Home buildings insurance – Prescribed Contracts, of the
Insurance Contracts Regulations 1985, wherein it states: „The following class of
contracts of insurance is declared to be a class of contracts in relation to which
Division 1 of Part V of the Act applies, namely, contracts that provide insurance
cover in respect of destruction of or damage to a home building, where the
insured or one of the insureds is a natural person‟.
21. Accordingly, even if it could be established (which it has not) the FSP neglected
to provide a relevant PDS to „BCCTS xxxxx‟, as this entity is not a „natural
person‟ it has no recourse to any putative remedy provided by Regulation 9.
For the sake of completeness the Panel also notes, if CB was acting as the
agent of BCCTS, and not under any binder arrangement with the FSP, section
71 of the Insurance Contracts Act 1984, further relieves the FSP of any
statutory obligations in respect of PDS provision.
22. As such, in order for the flood exclusion to apply in this case the FSP is not
required to have provided the Applicants with a PDS advising the Applicants of
the flood exclusion.
23. There is an onus on an insured to establish on the balance of probabilities that
a claim fits the definition of an insured event. Should this onus be discharged, it
is then the responsibility of the insurer to establish the application of any
exclusion on which it relies to deny the claim.
24. To be entitled to cover from the FSP, the onus therefore rests with the
Applicants to establish that their loss fits within the scope of what is covered by
the FSP‟s policy.
25. The policy provides cover for accidental loss damage; prima facie therefore the
Applicants have established a potential claim arises, namely flood inundation,
under the policy‟s terms. The onus of proof then switches to the FSP to
demonstrate the applicability of a relevant exclusion, in order to deny the
Applicants indemnity under the policy. In this instance, the Panel accepts „flood‟
Case No: 246833 Determination Page 5 of 5
is an excluded event and as it has already accepted „flood‟ was the cause of
the inundation of the Applicants‟ property it follows the FSP is entitled to deny
policy cover for this event.
Determination
26. On the basis of the available information, the Panel determines that the FSP is
not obliged to cover the Applicants for their loss.