Text of the determination
Case No: 246592 Determination Page 1 of 11
Case number: 246592
General Insurance - Domestic Insurance - Home Building & Contents - FSP
Decision – Flood - Denial of claim-Exclusion/ condition
19 October 2012
Background
1. The property the subject of this dispute is insured in a company name under
a Farm Insurance Policy (the policy) with the Financial Services Provider
(FSP). The property is occupied by the Applicant‟s mother. The Applicant is
authorised to act on her behalf.
2. The policy provides cover for Accidental Damage to the insured property
subject to the relevant policy limitations.
3. The insured property in Charlton sustained extensive damage when
inundated by water on 14 January 2011 following the significant weather
events experienced in Victoria in January 2011.
4. The FSP has declined indemnity to the Applicant on the basis the damage
claimed was due to the event „flood‟, which is excluded under the policy.
5. The Applicant remains dissatisfied with the FSP‟s decision to decline the
claim and is seeking indemnity for his loss due to stormwater inundation
under the policy.
Summary of Applicant’s position
6. The Applicant in disputing the FSP‟s decision to decline the claim has sought
the assistance of legal representatives “M”. In the interest of brevity both the
Applicant a nd “M” will be referred to as the “the Applicant” for the purpose of
this determination.
7. The policy does not exclude from cover loss/damage arising from
stormwater inundation. The damage claimed is due to clear stormwater
runoff as opposed to floodwaters which came later.
8. The Applicant maintains other insurers have proceeded to settle claims
submitted for neighbouring properties on the basis of storm damage. The
FSP also settled the claim of “C” located on “D Street” on the basis of storm
damage. C‟s home w as located close to the river with an inundation level of
Determination
Case No: 246592 Determination Page 2 of 11
2.5cm whilst the Applicant‟s property is nowhere near the river and had
approximately 40cm of water above floor level.
9. The Applicant was not at home at the time of inundation and therefore is
unable to provide any photographic evidence of stormwater entering the
property before the Avoca River (the river) broke its banks.
10. The evidence made available by the FSP‟s appointed hydrologists “W” is
general and based on assumptions as to what may or may not have
happened based on previous flood events. The Applicant relies upon the
hydrology reports submitted by his preferred consultant “PM”.
11. The Applicant has expressed concerns regarding the management of this
claim and also the previous claim relating to the September 2010 flood
event.
12. The Applicant is seeking the FSP to provide indemnity for the damage to the
insured property arising from the initial stormwater inundation before the
floodwaters ultimately arrived after the River broke its banks.
Summary of FSP’s position
13. Based on the available evidence it is clear that the damage claimed is due to
floodwater inundation, an event clearly excluded under the policy.
14. The Applicant was not present at the property at the time of the event and
cannot specify a time for when the property was inundated. However, the
Applicant maintains he was in town (Charlton) to attend a Shire meeting on
14 January 2011 and checked on the insured property around 5.30pm, at
which time it had not been inundated.
15. W concludes that inundation of properties east of Armstrong Street on the
morning of 14 January can be attributed to stormwater. However, any
flooding occurring after lunchtime can be directly attributed to flooding of the
Avoca River and Yeungroon Creek systems.
16. Even if the FSP accepted (which it does not) PM‟s report relied upon by the
Applicant, the inundation of the property in line with the Applicant‟s advice,
occurred after PM‟s estimated time specified for the stormwater inundation.
17. Further, PM‟s estimated inundation height of 40cm for the Applicant‟s
property would not have been sufficient to enter/inundate the home, which
according to PM‟s calculations is 42cm above ground level.
18. The FSP finds it concerning that PM does not account for the affect of the
Yeungroon Creek upon the flooding event in Charlton. Therefore, the
Service should be concerned about the reliability of his evidence in light of
this oversight and give preference to W‟s evidence.
Case No: 246592 Determination Page 3 of 11
19. The Applicant‟s position suggesting that the cause of the loss was due to
stormwater inundation is both unsupported and unfounded. Accordingly, the
FSP was entitled to decline indemnity to the Applicant as the damage
claimed was, on the balance of probabilities, due to the specifically excluded
event „Flood‟.
20. The FSP relies on the following policy provisions:
“ Words with special meaning
“Flood” means the inundation of normally dry land by water escaping, or
being released from, the normal confines of a reservoir, natural watercourse
or lake (whether or not they have been altered or modified). Flood also
includes water discharge from any sewerage or waste water systems due to
pressure induced by Flood water.
…
Section A - Home Cover
What you are insured for
We will pay for loss of damage caused by the Occurrences listed under the
Defined Events Cover or Accidental Damage Cover to your Building or
Contents depending on the cover type you have selected…
…
What you are not insured for
Under Section A – Home Cover, we will not pay for
2. loss of or damage to your property caused by:
a. Flood, the action of water from the sea, high sea water, tidal action or
Tsunami. ”
Issues
21. Whether damage to the Applicant‟s property was caused by flood water as
defined by the policy.
22. Whether the FSP is entitled to decline indemnity to the Applicant under the
claim.
Reasons for decision
23. As advised to the parties, FOS has considered it appropriate to refer this
dispute directly to the Panel in accordance with the Operational Guidelines
to the FOS Terms of Reference. This is because of the complex nature of
the issues. This dispute has not been the subject of a FOS Recommendation
and has proceeded directly to Determination.
24. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
Case No: 246592 Determination Page 4 of 11
25. There has been an exchange of material between the parties. Each party is
therefore, aware of the issues and has had the opportunity to comment. In
these circumstances the details contained in the relevant hydrological
reports will not be recited in this determination except where considered
relevant.
26. Prior to arriving at a determination the Panel has read and considered all the
material submitted by the parties to FOS.
27. The Panel notes the parties do not dispute the following:
The Applicant held an active farm building and contents insurance
policy with the FSP at the time of loss.
The FSP provided and the Applicant received the relevant policy
documentation including the Product Disclosure Statement (PDS).
The insured property suffered significant damage arising from the
weather events experienced in the area during January 2011.
The Applicant was not present at the insured property when the
inundation occurred.
The policy provides indemnity for loss or damage arising from
accidental damage, however, excludes from cover loss arising from the
event „Flood‟.
28. The Panel having reviewed the available evidence is satisfied that the main
issue in contention between the parties relates to whether the insured
property was initially inundated by stormwater which would give rise to a
degree of indemnity under the policy. The Panel is satisfied that the property
was ultimately inundated by floodwater to the maximum level; however,
consideration as to whether there was an extent of initial stormwater
inundation has been detailed below.
Cause of the Loss
29. The Panel has been provided with multiple consultants‟ reports obtained and
relied upon by the parties. The Panel notes that this information has been
exchanged between the parties, each having had the opportunity to
comment. Accordingly, in the interest of brevity, the Panel will only restate
information from these reports if found necessary in providing this
Determination.
Consultant’s Reports
“Assessor MY’s” Water Damage Claim Report dated 2 1 April 2011
Property inundated by flood and stormwater from nearby paddocks.
Most of the dwelling affected with damage to floors, walls, skirting
boards, doors, cupboards, general contents including whitegoods.
Full hydrology report recommended.
Case No: 246592 Determination Page 5 of 11
PM’s Charlton Floods: January 2011 - Site Specific Report dated March 2012
Site visit (Charlton) undertaken on 2 -3 March 2012, with interviews also
carried out with the homeowners.
A survey revealed that the stormwater drainage system empties directly
into the Avoca River close to the Calder Highway Bridge. The
implication of this being as river levels rose in the Avoca River the
stormwater outlet would have been inundated with river water. This
would result in the drains being backfilled to capacity preventing
stormwater on the surface from draining away.
A survey revealed that the upper height of the stormwater outlet pipe is
4.6m (relative to the river height records). This water level was reached
early in the morning on 13 January [2011]. From this point on the
stormwater drainage system in Charlton would not be able to drain
away freely. Stormwater accumulation therefore becomes an issue in
Charlton from mid-morning on 13 January.
Survey reveals that the eastern side of Charlton has a significant
depression and occupies lower land than the western side of Charlton.
The town slopes towards the north i.e. Armstrong Street is 35cm higher
at the junction with Donald Street compared to High Street side, and
Wilson Street is 45cm higher at the junction with Watson Street
compared to High Street end.
Therefore, water moves through the town (high to low) until it is
impeded by the train tracks that run parallel to Davies Street. Both
topographical survey and new modelling indicate that property in the
east of Charlton, especially those close to High Street were inundated
by locally accumulating stormwater which followed a drainage line
independent of any watercourses close to Charlton.
The witness accounts provide varied evidence in respect to the arrival
of sediment laden water flows associated with the rapid rise in water
levels. The likely explanation for this is that inundation from the river (in
the afternoon of 14 January) was widespread, with water levels rising
accordingly. However, the complete mixing of the two water bodies had
not yet occurred in the central and high parts of town.
The mixing of clear water and muddy water was a gradual process and
it is likely that it took some time for water sourced directly from the river
to flow across the whole town and mix with locally sourced stormwater.
In this situation flooding in some houses was therefore controlled by the
rise in the river level but the actual water at the site was stormwater.
Major flood level for Charlton is 7.5m at the gauging station near the
bridge over the Avoca River, which was reached at 5.15pm on 14
January. It is possible that other parts of the riverbank to the south and
west of Charlton had low points which allowed water to leave the river
and inundate parts of the town somewhat earlier than 6.00pm. Flood
modelling indicates earlier overtopping of the river played a part in
inundating the west and southwest of Charlton.
Case No: 246592 Determination Page 6 of 11
Witness accounts were consistent in that the water came from the
south east of town and standing water had filled the drains by the
morning of 14 January.
Clearwater before 6.00pm 14 January is likely to be stormwater. After
this time water levels may have risen because of the influence of river
water. The presence of clear water cannot be taken as an indicator of
local stormwater after 6.00pm.
For properties on a slab close to the ground stormwater levels may
have been sufficient to cause damage to the lower parts and
furnishings within properties. However, for houses on raised slabs it is
unlikely that stormwater would be responsible for damage to the interior
of the property footings.
The Applicant‟s property is on the west side of Wilson Street, close to
the junction with High Street. It is approximately 160m from the drain
running through the east of Charlton.
PM interviewed the Applicant who had no first hand observations,
however, held that the property was inundated with clear water
sometime after 5.00pm on 14 January.
The total depth of inundation in the house was 25cm (250mm) with the
base of the home approximately 32cm above ground level built on
stumps, with a further 10cm step up from the base of the house to top
of floorboards.
There was no evidence from the site or the Applicant to draw any
conclusions. However, on comparison with other nearby properties it is
likely that up to 40cm of inundation occurred before the onset of
flooding from the River. The depth of inundation would have inundated
the house to the base of the home and saturated the floorboards.
W’s Flood Assessme nt Report 31 January 2011
Multiple site inspections were undertaken on 24 January 2011.
The average rainfall records for the upper regions of the Avoca River
catchment are about 600mm per annum.
The Avoca River has flooded the town of Charlton a number of times in
the past due to high rainfalls.
The Avoca River catchment soaked from previous rainfalls resulted in a
higher than average conversion of rainfall to runoff, increasing the
water flowing directly into watercourses and resulting in flooding across
Victoria.
Flood warnings were issued for a number of rivers including the Avoca
River with the one of the towns affected by the flooding being Charlton.
Historically Charlton has been flooded from two directions in a north
south plain with an area remaining flood free through the centre of town
along the St Arnaud – Charlton Road.
Case No: 246592 Determination Page 7 of 11
The most intense rainfalls periods in Charlton were experienced in the
morning of 11 January 2011 and early morning 13 January, with the
maximum flood level in Avoca River reaching its peak early morning 15
January.
Flooding of the township was similar to the September 2010 event,
however, a much greater volume of water has been experienced in the
eastern end of town on this occasion (January 2011).
Given the timing of the flooding of the eastern edge is similar to that of
the gauge readings it is suggested that the Yeurngoon Creek and
Avoca River flows merged to become one system.
Any flooding occurring after lunchtime (14 January) can be directly
attributed to Avoca River/Yeurngoon Creek flooding.
Flood inundation that occurred east of Armstrong Street early morning
(14 January) can be attributed to stormwater flooding.
W’s (additional) Flood Assessment Report (site specific) 2 July 2012
The insured property included a residential dwelling and is located in
Charlton.
The town of Charlton is surrounded by a high ridge to both the east and
west of town constricting the floodplain through the township.
The catchment areas for the following watercourses are:
Yeungroon Creek (the Creek) 72km 2
Charlton St Arnaud Road Tributary (CSAT) 7km 2
Calder Highway Tributary (CHT) 3km 2
The stormwater runoff generated in the catchments will concentrate
along drainage lines and normally flow into the Avoca River (the River)
upstream of Charlton for CSAT and downstream for CHT and to the
east and further downstream of Charlton for the Creek.
Charlton received its largest rainfall total on the Thursday of 66mm
recorded to 9.00am on Friday 14 January. The available date shows
the rainfall over the area occurred in three main bursts.
The highest one minute rainfall intensity occurred at 6.28am on 13
January at 1.44mm/per minute.
The maximum rainfall intensities are not exceptional and are generally
equivalent to an ARI of 1-2 years.
Locally derived stormwater flows could not have caused significant
flooding in Charlton after 7.00am-8.00am on 14 January.
Most of the flows caused by direct stormwater runoff generated from
within the town and the catchment of Calder Highway would have
passed through the town to the Avoca River by about 8.00am on 14
January.
Case No: 246592 Determination Page 8 of 11
The continuing flows into Charlton from about 8.00am (14 January)
would have been caused by overland flows resulting from breakouts
from the CSAT, the Creek and the River from further upstream.
Given the size of its catchment, the CSAT would have contributed flows
into Charlton prior to the Creek and the River.
The site of interest is a residential property located on Wilson Street in
Charlton south of High Street and approximately 175m west of the
culvert where the CHT crosses High Street.
A Land Subject to Inundation Overlay (LSIO) and Floodway Overlay
(FO) indicate that the property lies just outside the LSIO associated
with CHT. The LSIO and FO were based on historic flood events which
were exceeded in January 2011.
The Applicant was not prepared to cooperate with W and therefore a
site inspection was undertaken from the front boundary of the property.
The floor of the property is raised approximately 30 -40cm clear of the
surrounding ground and would not be subject to overland flows or local
ponding of stormwater.
From the information provided by the Applicant the inundation of the
insured property occurred at some time after approximately 5.30pm on
14 January.
Water would have first flowed towards the property from east to west
from the CHT.
The area from Wright Road to the Calder Highway including the
channel and its surrounding area, up to a total of about 100m
(including the insured property), is covered by a Floodway Overlay
associated with the CHT.
Given the size of the CHT catchment and response time of two hours, it
is expected that peak discharge associated with the rainfall (up to
5.02am 14 January) would have occurred by the time the rainfall
ceased. Accordingly, rainwater runoff generated would have flowed
downstream of the Calder Highway by about 8.00am.
Any significant continuing flows in the tributary from after 8.00am (14
January) would be due to overland flows resulting from the „breakouts‟
from Yeungroon Creek, CSAT and later the River.
The extensive flooding of the property and dwelling that occurred late in
day on 14 January was caused by a combination of breakout flows
from the Creek and the River further upstream.
30. In view of the issues arising in this dispute, the Panel Chair Ombudsman and
a member of the Panel on 27 June 2012 conducted a site inspection of
Charlton and a number of the properties subject to disputes between the
policyholders‟ and various insurers including the FSP. The site visits
undertaken by the Panel representatives have assisted the Service in
gaining a greater understanding of the topography and impact of the
Case No: 246592 Determination Page 9 of 11
stormwater runoff in the area prior to the arrival of floodwater from Avoca
River.
31. The Panel representatives did not attend at the Applicant‟s site but attended
at two homes in Wilson Street.
32. The Applicant alleges that other claims in the area have been paid by
several FSP‟s. Unfortunately, this information does not assist the Panel.
33. Each claim must be considered on the basis of its own facts and particularly
the individual policy provisions relevant to the particular policy.
34. Policy provisions vary greatly and the circumstances may require payment in
the case of one policy but not another. The Panel is obliged to consider only
the facts and policy provisions of this dispute.
35. Having attended on site in Charlton and the surrounding area, the Panel is
satisfied that prior to the arrival of floodwater from the Avoca River, there
was a strong flow of water that came from the south/south east and entered
the town. Local residents claim that a major contributing factor for this results
from the Charlton-St Arnaud Road having been raised and acting as a levy
for the natural floodplain, restricting the flow towards the Avoca River and
diverting the water towards town.
36. Witness accounts confirmed that the culverts laid beneath Charlton-St
Arnaud Road where the road dissects the natural flow path of stormwater
runoff were inadequate to channel the approaching stormwater runoff from
the south/southeast. This stormwater approached the town as overland flow
along a flood plain with no clear boundaries and/or bank etc. Unable to flow
through the culverts this water has changed direction and flowed along the
built up road and through the paddocks to the east of the road in the
direction of town and effectively the insured property on Wilson Street.
37. The policy is an accidental damage contract and accordingly provides cover
for accidental damage to the insured building and contents subject to the
noted limitations/exclusions provided within the PDS. It is not disputed that
the Applicant‟s property sustained damage a nd therefore the Panel is
satisfied that the Applicant has established a prima facie claim under the
policy. The onus rests with the FSP to establish its entitlement to decline
indemnity in line with the specified policy limitation i.e. the damage claimed
is due to the event „Flood‟.
38. The Panel has carefully considered all of the evidence. Of particular interest
are the following points:
The Applicant originally stated that prior to attending a Shire meeting;
he checked the house around 5.30pm on 14 January 2011. The
Applicant has since confirmed he attended the Shire meeting on 13
January 2011.
Case No: 246592 Determination Page 10 of 11
In his later submission, the Applicant states that he was unsure of the
timing of the inundation but it was likely to have been before 6.00pm,
however, there is no further explanation as to why this would be the
case.
the base of the home is estimated to be about 320mm above the
ground level and about 420mm from the ground to the level of the
floor in the home.
PM reports that by 5.45pm to 6.00pm on 14 January 2011 mudd y
water was observed moving down High Street. Also, sometime
around 6.00pm a rapid rise associated with inundation from the river
began and then, water in Wilson Street began to rise rapidly around
6.00pm to 6.30 pm.
39. The Applicant has provided Statutory Declarations from two near
neighbours, who report that at 5.30pm on 14 January 2011, their homes
were inundated by clear water.
40. Unfortunately, neither neighbour gives details of the heights of the property
or inundation. The Applicant‟s home is some 40 odd c entimetres above
ground. It is not known as to what is the height of the neighbours‟ homes, on
the ground or not.
41. Given there was no imminent danger of inundation at 5.30pm and noting that
the stormwater build-up would have occurred gradually, the Panel is not
persuaded that stormwater would have inundated to a level of 320mm to
420mm by 6.00pm. From that time the water rose rapidly as stormwater
mixed with flood water from the river, at which time it is likely that the home
was inundated to and above floor level.
42. In addition, the Panel is also informed by its many site inspections in
Charlton, including properties in and close to Wilson Street. The Panel has
accepted that in a number of disputes there would have been some low level
stormwater runoff in the area prior to 6.00pm.
43. Having considered all of the above, the Panel is persuaded that on the
balance of probabilities, the inundation of the Applicant‟s home at and above
floor level was caused by a combination of stormwater runoff and floodwater
from the river. Such water in combination is properly characterised as
floodwater and as such damage resulting from same is excluded from cover.
44. However, the Panel accepts that prior to the arrival of the river water there
would have been a level of stormwater runoff which affected the property. In
the absence of any direct or eyewitness account of the level, the Panel is
inclined to rely on its mandate to do what is fair in all the circumstances and
it therefore determines that stormwater runoff would have inundated the land
to a level of 150mm prior to the arrival of flood waters.
45. The Panel has not been provided with any evidence in respect to whether
the insured property includes structures (garage, sheds etc) constructed at
Case No: 246592 Determination Page 11 of 11
ground level and/or any contents stored within such structures, which would
be insured under the policy. Having determined similar matters in the area,
the Panel is mindful that a majority of properties in Charlton do have sheds
and garages constructed at ground level.
46. In the Panel‟s view the evidence does not show that stormwater runoff did
not inundate the property only that the inundation above floor level was
caused by floodwaters. Therefore, any damage to such structures at ground
level including contents stored within, arising from the initial inundation by
stormwater runoff up to 150mm falls within the scope of cover available
under the policy (regardless of whether the dwelling itself is deemed not to
have been inundated by stormwater runoff).
47. Accordingly, the Panel urges the parties to act in a cooperative manner to
reasonably establish the extent of damage (if any) to the insured property
arising from the initial inundation including but not limited to contents stored
in shed(s) and garage.
Determination
48. On the basis of the available information the Panel determines that the FSP
is not liable under the policy to provide indemnity to the Applicant for
damage to the insured dwelling at or above floor level in line with the matters
discussed above.
49. The parties are encouraged to act in a cooperative manner to establish if
there exists a level of indemnity under the policy in relation to structures
constructed at ground level (on the property) including any contents stored
within, damaged by the initial stormwater inundation.
50. In the instance it is established there exists a level of indemnity under the
policy in line with matters discussed above, if the FSP determines to cash
settle any such liability, the FSP is to pay to the Applicant interest at the
statutory rate, in line with the Insurance Contracts Act 1984, upon the final
settlement figure agreed between the parties from 26 May 2011 (date claim
declined) to final settlement of the claim.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.