Text of the determination
Case No: 246495 Determination Page 1 of 15
Case number: 246495
General Insurance - Domestic Insurance - Home Building and Contents - FSP
Decision - Claim amount
24 August 2012
Background
1. The Applicant holds a Home Building and Contents Policy of insurance with
the Financial Services Provider (FSP). The policy covers the building up to
$536,000 and contents up to $47,000.
2. On 12 January 2011 the Applicant‟s property was inundated by water.
3. The FSP declined the claim on the basis that the damage had arisen from
flood water which was excluded from cover under the policy.
4. The Applicant disputes the FSP‟s declinature on the basis that the
inundation was from stormwater run-off or flash flood which is covered by the
policy. Further that the FSP failed to properly inform him of the flood
exclusion under Section 35 of the Insurance Contracts Act 1984 (the Act).
Summary of Applicant’s position
5. The Applicant relies on Section 35 of the Act. Section 35 of the Act provides
that, where a claim is made under a prescribed contract and the event giving
rise to the claim is a prescribed event in relation to the contract, an insurer
may not refuse to pay an amount equal to the minimum amount of cover set
out in the regulations made pursuant to the Act unless it can prove that
before the contract was entered into, the insurer clearly informed the insured
in writing of the relevant provisions of the contract, or that the insured knew
or a reasonable person in the circumstances could be expected to have
known of such provision.
6. The Applicant contacted the FSP to make a claim and was told he was
covered but would get 50%. The Applicant believed he was covered for up to
50% of the claim but assumed this was the flash flood cover which had been
increased from 25% to 50%.
7. As a result of this misrepresentation the Applicant threw out items which may
have been salvageable as he thought he would be covered up to 50%.
Determination
Case No: 246495 Determination Page 2 of 15
8. The Applicant states that flood is a prescribed event for the purposes of
Section 35 of the Act, as defined by Section 14 of the Insurance Contracts
Regulations 1985. The Corporations Act 2001 further requires clear, concise
and effective disclosure.
9. The Applicant submits that the definitions of flood and flash flood are likely to
cause confusion for a reasonable consumer. Further, the definition of flash
flood appears contradictory to the flood definition. This makes it difficult for a
consumer to identify when cover would apply. In addition, the policy
definition of stormwater hitting the ground as flood would confuse a
reasonable consumer.
10. The Applicant submits that the cap on flash flood payments is not provided
until 8 and 14 pages after the definition and cover provisions of the policy.
This fails to properly inform consumers of the cap payment for flash flood.
11. The Applicant relies on reports from experts in consumer communication.
The reports show that the Product Disclosure Statement (PDS) could not be
understood by a person of average intelligence and education. The reports
state that a person would have difficulty in finding and comprehending the
relevant flood exclusion.
12. The Applicant submits that the techniques used in the PDS prevent a
consumer of average intelligence and education from fully understanding all
of the information contained in the PDS and comprehending the exclusions.
The exclusions in the PDS have not bee n clearly communicated to him.
13. The Applicant notes that in certain circumstances, merely providing the
policy document may not be enough to clearly inform a consumer of the
relevant provisions, such as where there is inadequate attention drawn to
certain provisions. An insurer may be required to do more than merely
provide the policy document to discharge its obligations under Section 35 of
the Act:
If the document provisions are complex and confusing; or
Where the language is unclear and ambiguous and the document is set
out in a manner which a person of average intelligence and education
is likely to have difficulty finding and understanding.
14. The Applicant contends the requirement to clearly inform under Section 35 of
the Act or to provide clear, concise and effective disclosure under the
Corporations Act has not been met.
15. The Applicant relies on Suncorp General Insurance Australia v Cheihk
[1999] NSWCA 238, Max Hams and 1 Ors v CGU Insurance [2002] NSWSC
273 and Marsh v CGU Insurance Ltd [2004] NTCA1 in support of its
contention.
16. The Applicant further relies on the Service‟s Determinations numbered
40607 and 41709 relating to the mixing of rainwater with water coming from
a watercourse. In particular the Service‟s criticisms of artificially defining
Case No: 246495 Determination Page 3 of 15
flood and the fact such policy construction may not be in compliance with
Section 35 of the Act.
17. The Applicant contends that he was not adequately informed of the
exclusions in the contract contrary to Section 35 of the Act. Accordingly, the
policy should revert to standard cover which includes flood.
18. In the alternative, the Applicant submits that the damage to the insured
property was caused as a result of run-off from a storm and/or flash flood.
19. The Applicant relies on Bureau of Meteorology (BoM) daily weather
observations over the period 9-12 January 2011 inclusive. The Applicant
notes rainfall of 40mm fell between 9.00am Monday 10 January 2011 to
9.00am Tuesday 11 January 2011. The Applicant submits this supports his
position that heavy rain occurred on Tuesday and it was only as a result of
this storm that his property was inundated, within the definition of the FSP‟s
policy.
20. The Applicant notes the ICA Hydrology Report for the Brisbane Local
Government Area indicates the heaviest falls were in areas north and west
of Brisbane with three day totals exceeding 200mm over most of the area
bounded by Brisbane, Gympie, Toowoomba, including the majority of the
Brisbane River catchment. Further, intense short-period falls also occurred
during the event, with one hour falls in e xcess of 60mm occurring on both 10
and 11 January 2011 at numerous stations in various locations north and
west of Brisbane.
21. The Applicant contends the evidence supports the view that the damage to
his property was the result of storm or flash flood caused by heavy rains.
22. The Applicant disputes the hydrologist report by “SC”. SC engaged with the
CSIRO definition of flood rather than the FSP‟s PDS definition which means
the conclusions of SC do not reflect „flood‟ under the policy.
23. The rainfall data indicates that heavy rain fell on Tuesday 11 January 2011
around 12.00pm and the Applicant contends this caused flash flooding and
damage to the property around 6.00pm the same day.
24. The Applicant seeks that the FSP adopt the misrepresentations made by its
employee of cover (post the inundation event) plus damages for this
misrepresentation. The Applicant contends that the damages should be
equal to the value of lost goods and the cost of repairing the home.
25. The Applicant seeks payment under Regulation 14 of the Ins urance
Contracts Regulations 1985. Alternatively, the Applicant seeks payment for
storm or flash flood.
Summary of FSP’s position
26. The FSP relies on the following policy terms and conditions:
Case No: 246495 Determination Page 4 of 15
“Words/terms with special meanings
Word/term Meaning
Flood Rising water which enters your home as a result of it running off or
overflowing from any origin or cause. This policy does not cover
flood unless we have agreed and it is shown on your certificate of
insurance.
Flash flood and
stormwater run -
off
A sudden flood caused by heavy rain that fell no more than 24
hours prior to the flash flood or stormwater run - off.
...
Insured events you are covered for
...
Damage by weather
What is covered What is not covered
Storm Loss or damage:
...
Flash flood and stormwater run-off
A sudden flood caused by heavy rain that fell no more
than 24 hours prior to the flash flood or stormwater run - off.
Loss or damage caused:
x by flood
x ...
...
Your contents
The most we will pay for contents claims
What is covered What we
will pay
Flash flood and stormwater run-off
We will pay up to 50% of your contents sum insured or $25,000,
whichever is the higher, but not exceeding your contents sum insured.”
27. The FSP relies on hydrology reports by SC from which the Panel notes the
following:
A substantial amount of rain fell into the Brisbane River catchment
above Wivenhoe Dam over the period 9, 10 and 11 January 2011
commencing at 9.00am on 9 January 2011. This resulted in significant
discharges of water from the Wivenhoe Dam which flowed into the
Brisbane River which flowed towards Brisbane.
The Bremer River contributed 15- 20% to the Brisbane River‟s peak
flow.
Case No: 246495 Determination Page 5 of 15
After 6.00am on 12 January 2011, the Brisbane River continued to rise
to its peak level of 4.45m at approximately 4 .00am on 13 January 2011.
The subject property slopes steeply towards “O” Street. There is some
local catchment to the north of the subject property. However, run-off
from rain falling in this area is likely to drain down the short street which
joins “O” Street to “P” Street. There is also a further low point to the
south of the property which means that it is likely that local run-off
would drain towards this location.
The terrain information suggests that it would be unlikely that the
subject property would experience significant stormwater problems
from stormwater or other local run-off.
Inundation resulting from stormwater or other local run-off generally
requires intense levels of rain and will generally occur at the same time
or immediately after intense rai n.
The gauge records show that approximately 81mm of rain fell over the
period 9 January 2011 to 10 January 2011 with a further 47mm falling
during the course of the day on 11 January 2011. The most intense
burst of rainfall on 11 January 2011 fell at approximately 11.00am.
From 6.00pm on 11 January 2011 to 15 January 2011, there was only
a further 2mm recorded (which fell on 12 January 2011 at
approximately 5.00pm).
The intensity analysis shows that the rainfall was of very low intensity
throughout this period (1 in 1 year event). SC opined that it is unlikely
that rainfall of this magnitude would cause stormwater or other run-off
inundation of the subject property.
SC concluded that the cause of inundation was the rising level of the
Brisbane River, which was itself caused by rain which fell more than 24
hours earlier.
SC was of the opinion that the water released at 8.00am on 11 January
2011 from the Wivenhoe Dam would not have reached the gauges
close to the insured property. The identified rises in the Brisbane River
was water that had been released from Wivenhoe Dam earlier and
inflows from other parts of the Brisbane River catchment.
The Panel notes a property report for the insured premise indicates the
ground levels of the property range from 4.7m to 7.8m and has a
minimum habitable floor level of 9.6m (above sea level).
The FSP obtained a further supplementary report dated 24 October
2011 from SC. SC has concluded that the cause of the rise of the
Brisbane River which inundated the property was rain which fell over
the Wivenhoe Dam on 9 to 11 January 2011. SC does not believe that
it was only the increased releases from the dam from 8.00am on 11
January (the W3 to W4 strategy shift) which caused the inundation. SC
also relies on the fact, that prior to the increased releases there were
already substantial volumes of water being released from the dam
before that time.
Case No: 246495 Determination Page 6 of 15
28. The FSP also relies on the ICA Hydrology Report, in particular the following:
There were three generally distinct and significant periods of rainfall
between 9 January and 13 January 2011. The third rainfall between
9.00pm Monday 10 January 2011 and 3.00pm on Tuesday 11 January
2011 delivered the heaviest fall.
The third rainfall event was the most significant over much of the lower
catchment but the second event was especially severe over the upper
reaches and catchment areas of Lockyer Creek and its tributaries that
abut the escarpment.
Rain ceased over the Brisbane City area around 6.00pm on Tuesday
11 January 2011 some 24-30 hours before flood levels in the Brisbane
River peaked.
Floodwaters moving down the Brisbane River over 9-14 January were
made up of releases from Wivenhoe Dam and floodwaters from
Lockyer Creek and the Bremer River.
The report does not quantify the relative contributions from the
Wivenhoe Dam and floodwaters from Lockyer Creek and the Bremer
River to flows in the Brisbane River or along the lower reaches of these
two tributaries.
29. The FSP relies on an assessor‟s report dated 2 February 2011 from which
the Panel notes the following:
The building sustained partial to moderate damage.
The contents were a total loss.
The water first entered the property at 12.00pm on 12 January 2011.
The water rose slowly.
The water came from the Brisbane River which is 300m away.
The property is on stilts and there is a 2.4m distance between floor
level and ground level.
The height at which the water peaked was 1.5m and the property was
inundated for 1.5 days.
30. The FSP relies on a recording of a telephone conversation between the
Applicant and its employee. It denies any misleading statements were
provided to the Applicant.
31. The Applicant has at no time denied receiving the PDS document. Further,
the Certificate of Insurance clearly states there is no cover for flood or storm
surge. Accordingly, the Certificate of Insurance informs the Applicant of the
relevant exclusion. The PDS clearly states the items which are covered and
the items which are not covered. The PDS provides a clear definition of what
is flood and what is not flood. Further, if the terms flood, flash flood and
storm water run-off are read together the difference becomes clear.
Case No: 246495 Determination Page 7 of 15
32. The PDS provides up to 50% of the home sum insured or $25,000 whichever
is higher for flash flood and stormwater run-off payments.
33. The PDS makes it clear at an early stage of the document where to locate
information. Further, the document is structured so as to provide covered
events and then the amount payable for these events. The flood exclusion is
repeatedly noted, is titled in a large bold italicized font and placed in
prominent positions throughout the PDS.
34. The FSP acknowledges the A pplicant‟s submission that the definition of
flood is too broad. However, it submits that Section 35 of the Act does not
limit the FSP‟s decision about what cover to offer but rather minimum cover
not to be provided. The Applicant must be clearly informed of the differences
between cover provided and minimum cover.
35. The FSP further submits that the Applicant‟s „awareness‟ of the exclusion is
not determinative of whether the FSP has complied with Section 35(2) of the
Act. The FSP is only required to clearly i nform the Applicant of the flood
exclusion.
36. The FSP relies on the hydrology report which states the cause of the
inundation at the property was flood from the rising Brisbane River, which
itself was caused by rain that fell more than 24 hours earlier. This is
corroborated by the ICA hydrology report.
37. The Applicant has provided no evidence (hydrological or otherwise) that the
rain or a storm which occurred on 11 January 2011 was responsible for
inundation on 11 January 2011 of the insured property. Further, there is no
evidence that rainfall which occurred within 24 hours was what caused the
inundation.
38. The FSP relies on Suncorp General Insurance Australia v Cheihk [1999]
NSWCA 238, Max Hams and 1 Ors v CGU Insurance [2002] NSWSC 273
and Marsh v CGU Insurance Ltd [2004] NTCA1 in support of its contention.
39. The FSP notes Determination numbered 239722 which confirmed the policy
documentation satisfied the legal obligation to clearly inform the Applicant.
The FSP contends this case is on point for its actual PDS document.
40. The FSP submits that the expert report from behavioural psychologists
should not be given weight on the following basis:
The experts are not able to tell a tribunal of fact what a document
conveys and the attempt by the experts to do so should be resisted.
There is insufficient evidence to demonstrate this is a subject area of a
body of knowledge or experience which is sufficiently organised or
recognised to be accepted as a reliable body of knowledge or
experience.
The paper discusses two different policies for two separate insurers of
which the FSP‟s is the shorter version. Further many comments made
by the experts at pages 13 and 14 come from another insurer‟s PDS.
Case No: 246495 Determination Page 8 of 15
The paper is based on abstract theories with no attempt to relate it to
the Applicant or to this case.
The paper does not answer whether the PDS informed the Applicant in
accordance with Section 35 of the Act.
The paper still indicates that under ideal conditions the flood section of
the PDS seems to be placed in a reasonable co ntext and at face value
should be easy to understand.
Issues
41. Whether misrepresentation occurred during the telephone call between the
FSP employee and the Applicant.
42. Whether the FSP has properly informed the Applicant of the policy terms and
conditions.
43. Wh ether the FSP has appropriately declined the Applicant‟s claim for
damage arising from water inundation.
Reasons for decision
44. FOS has considered it appropriate to elevate the dispute in accordance with
the Operational Guidelines to the FOS Terms of Reference. This is because
of the complex nature of the issues. This dispute has not been the subject of
a FOS Recommendation and has proceeded directly to Determination.
45. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
46. There has been an exchange of material between each party and the Panel
is satisfied each party has had an opportunity to reply to the issues raised.
47. The Panel has read each party‟s submissions and materials and will only
refer to the relevant submissions and materials raised.
48. The Panel Chair Ombudsman attended on site where he met with
representatives of the FSP. Unfortunately the Applicant was not able to
attend on that occasion but the Panel Chair Ombudsman subsequently
spoke by telephone with the Applicant.
49. The parties do not appear to dispute the following:
The rain ceased on Tuesday 11 January 2011 in the locale of the
Applicant‟s property.
The Applicant sustained damage as a result of water inundation.
Case No: 246495 Determination Page 9 of 15
50. The Panel considers that there are three discrete issues (listed above) which
will be reviewed separately.
Whether any misrepresentation has occurred by the FSP
51. The Panel has listened to the recording of the telephone conversation
between the Applicant and the FSP employee.
52. There would appear to be no evidence that the FSP made the representation
as claimed by the Applicant.
53. The FSP‟s employee specifically stated in the telephone conversation that
the “...Policy does not provide cover for flood but does provide cover for flash
flood and storm water runoff, up to 50% of the sum insured or $25,000
whichever is higher.” The policy definitions of flood and flash flood are then
provided to the caller (who is not the Applicant in this dispute).
54. Accordingly, there is no basis for a claim for damages arising from
misrepresentation. However, should the Panel determine below the
inundation causing the damage was the excluded event of „flood‟ (as
subsequently alleged by the FSP) rather than the defined event of „flash
flood‟, it may then be necessary for the Panel to consider whether the
Applicant suffered any prejudice, in relation to the disposal of water
damaged articles, arising from the relevant telephone conversation.
Whether the FSP properly informed the Applicant of the policy terms and
conditions
55. The Panel notes that the Applicant does not dispute receiving the policy
documents – including the Product Disclosure Statement (PDS). The
Applicant and FSP dispute whether the policy wording satisfies the
requirements of Section 35 of the Act or the Corporations Act 2011.
56. The Applicant and the FSP have both relied on several common law cases
regarding this particular issue including Suncorp General Insurance Australia
v Cheihk [1999] NSWCA 238, Max Hams and 1 Ors v CGU Insurance [2002]
NSWSC 273 and Marsh v CGU Insurance Ltd [2004] NTCA1 in support of
their arguments.
57. The policy does not provide flood cover unless otherwise requested and
noted on the Certificate of Insurance (CoI). The CoI issued to the Applicant
noted flood cover was not included under the policy.
58. The Applicant has not disputed he was provided with a copy of the PDS
following inception of the policy. It is the Applicant‟s responsibility to read the
policy and relevant material to ensure he had obtained the appropriate cover
for his needs.
59. The Panel does not accept the FSP‟ s argument that the behavioural
psychologists‟ reports cannot be considered. The Panel has in fact
considered the behavioural psychologists‟ reports and the comme nts made
Case No: 246495 Determination Page 10 of 15
therein, but are not persuaded by the reports. In the Panel‟s view, when
looking at whether an Applicant has been clearly informed for the purposes
of Section 35 of the Act, it is appropriate to look at the whole inception
process. There is nothing in this case to disprove the fact that the Applicant
had received the PDS documentation. Section 35 of the Act in most
circumstances will be satisfied where the appropriate PDS has been
supplied. This has been well recognised by the courts. In certain
circumstances where there is ambiguity or confusion, the provision of the
PDS itself will not be sufficient. In these circumstances it is necessary to look
at the whole process to determine whether the Applicant or a reasonable
person in the circumstances would have been clearly informed.
60. The Panel has looked at the PDS. Whilst the wording of the PDS is quite
broad, it is apparent from a reading of the documentation that it is indexed,
has appropriate references to the various definitions relied upon with respect
to storm, flash flood and flood and that it clearly identifies that it is not
intended to cover flood, unless specifically included on the CoI.
61. The Panel notes that the Certificate of Insurance clearly states flood cover is
not included. The behavioural psychologists‟ reports refer to the fact that
“under ideal conditions the flood section of each document seems to be
placed in reasonable context and on face value, should be easy to
understand.”
62. Although the Applicant has suggested he misunderstood the extent of cover,
the Panel is satisfied that the policy wording is sufficiently clear to establish
that the Applicant or a reasonable person in the circumstances would have
been clearly informed of the extent of the policy cover in accordance with
Section 35 of the Act
Whether the FSP has appropriately declined the Applicant’s claim for damage
arising from water inundation
63. The Service has determined in other disputes, following consideration of all
material exchanged, that the heavy rainfall commencing around 4.00am on
11 January 2011 was the proximate or dominant or effective cause of the
inundation of the properties downstream from the Wivenhoe Dam.
64. Subsequent to issuing these Determinations, the evidence of the Wivenhoe
Dam operations engineers was brought into question necessitating the recall
of the Queensland Flood Commission of Inquiry (CoI). The Service
suspended issuing further Determinations on this issue until the CoI
evidence had been completed. The parties to this dispute were then
permitted to make additional submissions as to whether anything arising out
of the final report of the CoI should cause the Panel to prospectively amend
its previous approach in respect of the „flash flood‟ provision of the policy.
65. The FSP has provided further submissions to the Financial Ombudsman
Service including a reference document, two additional hydrology reports
and a statement from the hydrologist. Only those parts of the additional
material relevant to the current dispute need to be considered.
Case No: 246495 Determination Page 11 of 15
66. In making this Determination the Panel has given consideration to all of the
material presented both prior to and subsequent to the further hearings of
the CoI.
67. As confirmed, the Panel Chair Ombudsman attended on site and
subsequently spoke with the Applicant.
68. The Applicant confirms that he stayed on site until approximately 5.00am on
Wednesday, 12 January 2011. The Panel considers that the Applicant‟s
eyewitness evidence is compelling but that the eyewitness evidence needs
to be considered in the light of all the other material provided, together with
the policy provisions.
69. The policy covers flash flood and stormwater runoff. In order for a claim to
fall under the insured event of flash flood and stormwater runoff, the
following elements must be established.
a. There was a sudden flood.
b. There was a heavy rain that occurred within 24 hours prior to that
flood.
c. The sudden flood was caused by that heavy rain.
70. There is no dispute that from 8.00am on 11 January 2011 releases from the
Wivenhoe Dam rapidly increased in response to the adoption of the W4
release strategy. The adoption of the W4 release strategy led to a wave of
water that travelled downstream along the Brisbane River.
71. The central issue in dispute in this matter is whether the heavy rain that fell
over the Wivenhoe catchment area from 4 .00am on 11 January 2011 could
be said to be the proximate or dominant or effective cause of the subsequent
inundation of the Applicant‟s property which is downstream.
72. In considering the proximate or dominant or effective cause, it is necessary
to consider the facts of the situation alongside the terms of the relevant
policy . In this context the Panel accepts the word „caused‟ within the flash
flood, stormwater runoff definition in the policy means in the insurance
context, proximate or direct cause.
73. It is a well established principle of insurance law that the proximate cause of
the loss is not the first, or the last, or the sole cause of the loss , but the
effective or dominant or operative cause. It is a question of fact to be
considered in each case and it is a common sense evaluation of the relevant
facts.
74. Earlier Determinations of the Service have considered the evidence that up
until 2.00am on 11 January 2011, inflows into the Wivenhoe Dam were
decreasing and that between 4.00am and 8.00am on 11 January 2011 there
was significant rainfall over the Wivenhoe Dam.
75. The evidence presented to the CoI was that it was this rainfall between
4.00am and 8am on 11 January 2011 that led to the decision by the
Case No: 246495 Determination Page 12 of 15
Wivenhoe Dam operating engineers to increase the release strategy from
W3 to W4.
76. The Panel has reviewed the material presented to the further hearings of the
CoI and notes that the evidence in respect to the inflows into the dam and
the rain which fell over the dam between 4.00am and 8am on 11 January
2011 and the decision to increase the release strategy from W3 to W4, was
not in any way challenged.
77. The Panel has given consideration to the evidence concerning the rainfall
which fell between 9 January and 11 January 2011 and earlier and its
contribution to the levels of the Wivenhoe Dam and decisions made in
respect to the Wivenhoe Dam.
78. The Panel has also considered the FSP‟s submission to the effect that it was
the combined effect of the rainfall over the whole period that led to the
decision to alter the release strategy from W3 to W4.
79. Having considered all of these matters, the Panel remains satisfied that it
was the rainfall which fell between 4 .00am and 8.00am on 11 January 2011
that was the proximate or dominant cause of the decision to change the
strategy from W3 to W4 which led to the inundation of the properties
downstream of the Wivenhoe Dam.
80. It is now appropriate to give particular consideration to the individual
circumstances of the Applicant‟s loss.
81. The additional evidence provided by the FSP‟s hydrologist is that the effect
of the W4 release strategy first reached the vicinity of the property at 2.43pm
on Tuesday, 11 January 2011 and that the approximate time the Brisbane
River reached the approximate lowest point of the structure of the house on
the land was 6.30pm on Tuesday, 11 January 2011 and finally that the ef fect
of the W4 release strategy at 4.00am on 12 January 2011 would have been
at approximately 2 metres above the lowest point of the structure of the
house on the land.
82. The estimates made by the FSP‟s hydrologist are not inconsistent with the
evidence ultimately given to the Panel Chair Ombudsman when he spoke
with the Applicant.
83. However, the Panel notes that the FSP‟s hydrologist‟s estimates and the
Applicant‟s evidence to the Panel Chair Ombudsman are not necessarily
consistent with the original submissions of the Applicant.
84. Nevertheless, having reviewed all of the evidence presented, the Panel
prefers the estimates provided by the FSP‟s hydrologist and the evidence of
the Applicant to the Panel Chair Ombudsman.
85. The Panel is of the view that the earlier information submitted to the Service
is insufficiently precise as to the nature, time and extent of inundation and
whether it applied to the land or the home.
Case No: 246495 Determination Page 13 of 15
86. When the Panel Chair Ombudsman spoke with the Applicant, he said that at
about 3.00pm on Tuesday, 11 January 2011, water started coming up the
street from the Brisbane River and the water crept up and the Applicant
evacuated the premises at 5.00am on Wednesday, 12 January 2011. At that
time, the Applicant says that the water was over the top of the fence at the
front of the house and about half way up the steps to the ground floor. As
advised previously, the Panel is satisfied that this is not inconsistent with the
FSP‟s hydrologist‟s estimate that at 4 .00am on 12 January 2011, the
Brisbane River level was 2 metres above the lowest point of the structure of
the house on the land.
87. Having considered all of this evidence the Panel is satisfied that the house
had been inundated within 24 hours of the sudden rain between 4.00am and
8.00am on 11 January 2011 over the Wivenhoe Dam which led to the
change to the W4 release strategy and ultimate inundation of the house.
88. In this regard the Panel also notes the assessor‟s statement that “the
property is on stilts and there is a 2.4m distance between floor level and
g round level”.
89. When considering these matters, the Panel is aware that the hydrologist‟s
evidence is an estimation and the eyewitness account of the events is
unlikely to be exact. The circumstances of this unfolding drama would
suggest that the Applicant was unlikely to have been using a measuring stick
and closely watching his clock.
90. Considering the Service‟s mandate to do what is fair in all the circumstances,
the Panel is satisfied that it is appropriate to determine that coverage under
the policy definition of flash flood should be provided to the inundation level
of 2 metres above ground level at the house.
91. The Panel acknowledges that the policy definition of flash flood provides for
coverage to 50% of the home and contents sums insured or $25,000,
whichever is the higher.
92. The Panel is aware that the FSP has made a number of other arguments in
response to the Applicant‟s claim and the Panel proposes to consider those
arguments.
93. The FSP argues that the Wivenhoe Dam‟s operating engineers‟ decision to
move from the W3 to the W4 release strategy, was an intervening cause that
was not covered by the policy.
94. In this regard the FSP argues that the decision to move to the W4 release
strategy was contrary to the dam manual, as evidence to the CoI indicates
that the earlier escalation to W3 had not occurred in a timely fashion.
95. The Panel has considered the evidence presented to the CoI and is satisfied
that there is no evidence to indicate that the decision to move to the W4
release strategy was anything but reasonable and appropriate and
consistent with the manual given the circumstances which confronted the
Case No: 246495 Determination Page 14 of 15
Wivenhoe Dam operating engineers at 8.00am on 11 January 2011. As
such, the Panel does not accept the FSP‟s argument in this regard.
96. The FSP have also suggested that there were two proximate causes of the
inundation and in circumstances where there are two proximate causes and
one cause is covered under the policy but the other is not covered under the
policy, then the FSP is entitled to deny coverage.
97. The Panel has considered this issue in earlier Determinations and the Panel
is not satisfied that the FSP has presented any additional information which
should alter the Panel‟s strongly held view in this regard.
98. The Panel is satisfied that within the policy the definition of flash flood
represents an exception to the policy‟s flood exclusion. The Panel is also
satisfied that the proximate cause of the damage to the Applicant‟s property
was flash flood and not flood and therefore there were not two proximate
causes occurring at the time but simply one, for which there is coverage
under the policy.
99. Finally, the FSP has argued that even without the change of release strategy
from W3 to W4, the Applicant‟s premises would ultimately have been
inundated by the Brisbane River because of the ongoing effect of the W3
release strategy.
100. The Panel is satisfied that the FSP‟s and their hydrologist‟s argument in this
regard is simply speculation as the reality of the situation is that the release
strategy was altered from W3 to W4 and the W4 release strategy impacted
upon the Applicant‟s property.
101. The Panel prefers to rely upon the facts as they occurred and not
speculation as to what might or might not have occurred had certain
circumstances been in place, which they were not.
102. As such, the Panel does not accept the FSP‟s argument in this regard.
Determination
103. On the basis of the available information the Panel determines no
misrepresentation has occurred.
104. On the basis of the available information the Panel determines the Applicant
has been properly informed of the policy terms and conditions.
105. The Panel determines that the FSP is to provide coverage for the Applicant‟s
loss, under the policy provision of flash flood, to the level of 2 metres above
ground level at the house.
106. The Panel determines that if any part of this dispute is to be resolved by way
of a cash settlement, the FSP is to pay interest at the rate specified by the
Case No: 246495 Determination Page 15 of 15
Insurance Contracts Act 1984 , on the cash settlement amount, from the date
of denial of the claim to the date of settlement.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.