Determination 246492

Denial of home building claim (inundation, flood vs flash flood)

FirmFinancial Firm (Unknown - Insurer)
Decided2012-10-16
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$80,500
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Homeowners claimed under their building policy for inundation from the January 2011 Queensland floods, and the FSP denied the claim as flood damage excluded by the policy. AFCA found the inundation was caused by flash flood within 24 hours of heavy rain, and ordered payment of the $80,500 policy maximum plus interest from the denial date.

The proximate cause was heavy rain from 4am on 11 January 2011 leading to the W4 dam release strategy, so the damage fell within the flash flood and stormwater run-off cover, subject to its cap.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 246492 Determination Page 1 of 11 Case number: 246492 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of Claim - Inundation - Flood vs Flash Flood 24 September 2012 Background 1. The Applicants insured their home building for the sum of $161,000 with the Financial Services Provider (FSP) for the period of twelve months beginning from 17 May 2010. No contents cover was included in the policy. 2. On or about 12 January 2011, the Applicants‟ home was inundated following severe weather events in Queensland. A claim was lodged. 3. The FSP denied the claim on the basis the damage was due to “flood”. The Applicants, through their solicitors, have disputed this. 4. For the sake of simplicity, reference to the Applicants will include their legal representatives. 5. Both the Applicants and the FSP have provided detailed submissions on the relevant issues. For the sake of brevity, the Panel will only briefly summarise these submissions given all of the material made available has been exchanged with the other party. Summary of Applicants ’ position 6. The Applicants submit the following as alternative arguments in response to the FSP‟s decision:  The FSP represented to them at policy inception that they were covered for all natural disasters, including “flood”.  The Product Disclosure Statement (PDS) was not provided to them prior to payment being made when the policy was incepted in or around 1999/2000.  The FSP‟s policy failed to clearly inform them that “flood” was excluded as required under Section 35 of the Insurance Contracts Act 1984 (the Act). Determination Case No: 246492 Determination Page 2 of 11  The damage was due to “Flash flood and stormwater run - off”, which is an insured event. In particular, the inundation was due to heavy rain that fell from 4am on 11 January 2011 which resulted in the Wivenhoe Dam operators elevating their strategy to W4. This decision resulted in massive discharges of water into the Brisbane River that ultimately inundated their property. Summary of FSP’s position 7. In response to the Applicants‟ arguments, the FSP submits the following:  It is not in dispute that a PDS was sent to the Applicants prior to the claim. Further, the policy structure and layout in conjunction with evidence of its despatch, enables it to rely on the exclusion clause of “flood” pursuant to Section 35(2) of the Act.  It denies that any of its consultants would have misrepresented the extent of cover provided to the Applicants at the time of policy inception. Alternatively, the Applicants are unable to establish any detriment suffered from the alleged misrepresentation. 8. The FSP relies on a number of hydrology reports authored by SC and the following policy provisions to deny the Applicants‟ claim : Page 3 of the Certificate of Insurance (COI) “ What optional covers are included and not included Home Contents ... Flood and storm surge not included not included...” Pages 10-12 of the PDS “ Words / terms with special meanings Word / term Meaning ... Flood Rising water which enters your home as a result of it running off or overflowing from any origin or cause. This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance. Flash flood and stormwater run - off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run - off. ... Storm A violent disturbance of the atmosphere associated with strong winds including a cyclone, lightening, Case No: 246492 Determination Page 3 of 11 heavy rain, hail or snow, but not continuous bad weather by itself. ...” Pages 17-18 of the PDS “ Insured events you are covered for Damage caused by weather... What is covered What is not covered Storm Loss or damage:  caused by rain, hail or snow after it has reached the ground... ... Flash flood and stormwater run-off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run - off Loss or damage caused:  by flood... ...” Page 27 of the PDS “ Your home The most we will pay you for home claims What is covered What is not covered Flash flood and stormwater run-off We will pay up to 50% of your home sum insured or $25,000, whichever is higher. ... ...” Issues 9. Whether the FSP misrepresented the extent of cover provided by the policy to the Applicants when the policy was incepted and whether the Applicants were prejudiced by any such representation. 10. Whether the Applicants were “clearly informed” about what the p olicy did and did not cover through the provision of the PDS. 11. Whether the cause of the Applicants‟ loss was covered under the policy. Case No: 246492 Determination Page 4 of 11 Reasons for decision 12. Due to the nature of the dispute, the parties have been informed that the matter has been referred to the Panel for Determination in line with the Operational Guidelines to FOS‟s Terms of Reference. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 13. This decision has been made by a Panel consisting o f an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 14. It is appropriate to consider the issues under the various headings. Clearly Inform of Derogation from standard cover 15. The Applicants allege that the FSP misrepresented the level of cover provided under the policy, when the cover was incepted in or around 1999/2000. They suggest that they requested “cover for everything including natural disasters” and the policy clearly did not provide such protection. 16. Leaving aside the vague nature of the allegation, the Panel is satisfied that every insurance policy has limitations and no product provides cover for “everything”. No specifics about the alleged discussion were provided, including the name of the representative, the date or actual details of the discussion and any responses given by the FSP. 17. The Applicants do not recall receipt of the PDS at initial policy inception, although they state it was not received prior to inception. This would only be relevant in the event a claim had occurred in the period of alleged non- provision of the PDS. It is not in dispute that the Applicants subsequently received a PDS, and an annual Certificate of Insurance (COI) from the FSP. 18. The Applicants contend that the definition of flood is too broad, too difficult to comprehend and that the FSP has not met its obligations under section 35 of the Act to “clearly inform” them of the limits of the cover. 19. The Panel has previously considered this issue for the FSP‟s policy. It is satisfied that the two events (“flood” and “flash flood and stormwater run - off”) can be distinguished. 20. The Applicants have raised issue with the placing of definitions throughout the policy and the difficulty a “reasonable person” would have in evaluating it. The Panel is satisfied that the PDS should be read in its entirety and that (should this be done) the interpretation of same should not be difficult for a “reasonable person”. 21. The PDS has an index on the inside cover which highlights the areas of the policy to which the policyholder might find information. Included in this is: “Words/terms with special meanings” on pa ge 9, for which definitions of Case No: 246492 Determination Page 5 of 11 relevant terms in the policy are provided. Flood is included in this, together with the qualification that: “... This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance. ” 22. In add ition to this, page 53 directs the reader to “Flood and storm surge”, which is explained under the broader definition of “Optional covers for extra peace of mind”. This section explains that: “... This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance. ” 23. It is not in dispute that no cover was optioned by the Applicants for “Flood and storm surge” and therefore they were not covered for it under the policy. 24. Accordingly, the Panel is satisfied that the FSP has satisfactorily defined the events in the policy as required under section 35 of the Act and that it is entitled to rely upon same in determining if the policy responds to the Applicants‟ loss. Water Inundation The Evidence 25. After the lodgement of the claim, the FSP appointed a loss adjuster (MY) to investigate and report on the damage caused to the Applicants ‟ property. The report confirmed that the home was almost wholly inundated and attributed the damage to “flood”. 26. The FSP subsequently engaged a hydrologist, SC, to provide a report as to the damage. 27. SC provided a statutory declaration dated 14 July 2011 evaluating the cause of the loss in the region surrounding and specifically affecting the Applicants ‟ home. He found that:  a substantial amount of rain fell in the greater Brisbane area from 9 January 2011 and over the subsequent two days, which caused significant inflows into the Wivenhoe Dam, which peaked on the evening of 11 January 2011;  rain also fell in the area of the Bremer River from 6am on 11 January 2011. This rain travelled along the Bremer River to the junction of the Brisbane River and ultimately contributed about 15-25% of its peak flow;  a “small proportion” of the overall depth of the Brisbane River “may be partially attributable to the rain that fell in the Bremer River catchment on 11 January 2011”, although the “overwhelming influence” was the rain that had fallen in the previous days. Case No: 246492 Determination Page 6 of 11  the terrain data for the Applicants‟ home suggested that it was unlikely that the Applicants would have experienced significant stormwater or run- off problems during the period;  inundation from stormwater run- off requires “intense levels of rain” which is sufficient to overcome the stormwater drainage system. Any such run- off generally occurs during or very shortly after such an intense period of rainfall;  a review of the rainwater gauge at Corinda, approximately 2.3km from the Applicants‟ property and representative of its rainfall , in the expert‟s opinion, revealed that 85mm of rain fell over 9 and 10 January 2011, with a further 33mm falling on 11 January 2011. The most intense rainfall fell on 11 January 2011 up to 11am and then gradually subsided until 5pm that afternoon. Approximately 2mm fell on 12 January 2011;  the overall intensity of the rainfall was low and unlikely to result in run-off or stormwater inundation to the property;  the Applicants‟ property was inundated by floodwater from the Brisbane River and not stormwater run-off or flash flooding (as defined in the policy). 28. As a result of the report from SC, the FSP denied the claim on the basis that it considered the cause of the loss to be flooding from the Brisbane River. Since the matter has been referred to the Service, the Applicants have suggested that the releases of water from the Wivenhoe Dam on 11 January 2011 were a significant factor in the increased water levels in the Brisbane River and that this was a major influence in the inundation of the Applicants‟ home. 29. The central issue for Determination in this dispute is whether the inundation of the Applicants‟ home was due to flash flood as defined within the terms of the policy; that is whether rain that fell no more than 24 hours prior to the inundation of the Applicants‟ property was the proximate cause of the inundation. 30. On 21 May 2012 FOS issued a memorandum to all relevant stakeholders advising that after considerable deliberation of all material available to it, the Panel formed a view that the heavy rain occurring from approximately 4.00am on 11 January 2011 and in particular the heavy rain between 4.00am and 8.00am on 11 January 2011 was a proximate cause of the W4 strategy being invoked and therefore a proximate cause of the flooding of many of the properties along the Brisbane River. 31. At that time, the Panel noted that in relation to the approach that each dispute would depend upon the individual and unique factors relevant to the dispute and in that regard the parties were invited to make further submissions in relation to disputes before FOS. Case No: 246492 Determination Page 7 of 11 32. In view of this, the FSP provided detailed further submissions to FOS in relation to this dispute. Included with the submissions were the following documents:  A Reference document for disputes relating to Queensland Floods (this is a general reference document) relating to the various submissions the FSP makes in relation to a number of issues. Not all issues raised in the reference document appear in the current dispute;  Letter from the FSP‟s hydrologist attaching a key information sheet for the Applicants‟ property;  Hydrologist report “Investi gations of January 2011 inundation event – Brisbane”;  Statement from the hydrologist. 33. In summary the FSP argues that the proximate cause of the inundation of the properties, that is the real or effective cause of the damage caused to the properties downstream of the dam, is not simply the rain that occurred from 4.00am on 11 January 2011. The FSP maintains that on any reasonable view, the damage sustained to the downstream properties was the combined effect of all of the rainfall and not just the rain that had fallen from 4.00am on 11 January 2011 leading to the implementation of the W4 strategy from 8.00am that day. 34. The FSP‟s hydrologist has relied on data from SEQWater dated 2 March 2011 which confirms the rapid increase in releases from the Wivenhoe Dam from 8.00am on 11 January 2011. Examination of the SEQWater report identifies the rapid increase in the inflows to the Wivenhoe Dam commencing from about 4.00am, 11 January 2011. The report confirms the inflows into the dam had been decreasing from as early as 8.00am from 10 January 2011 with steady decreases from approximately 3.00pm on 10 January 2011 to 2.00am on 11 January 2011. 35. The Queensland Flood Commission of Inquiry report confirms that prior to 4.00am on 11 January 2011 and in fact prior to 8.00am of 11 January 2011 the dam releases were being managed at the W3 strategy. Whilst it is accepted that the W3 strategy had led to an increase in the levels of the Brisbane River, the W3 strategy was designed to avoid where possible inundation of the properties below the Wivenhoe Dam by flooding from the Brisbane River. 36. There is no dispute that there were two significant rainfall spikes with rain that fell from 9 to 10 January 2011 being considered the first spike and rain that commenced falling from approximately 4.00am on 11 January 2011 being the second spike. 37. There is no dispute that following the second spike that the W4 strategy was adopted. The FSP has argued that the switch to strategy W4 was not the natural and ordinary consequence of the rain that fell and in fact the move to W4 strategy was not taken in accordance with the Wivenhoe Dam manual. In the Panel‟s view, the Queensland Flood Commission of Inquiry‟s final Case No: 246492 Determination Page 8 of 11 report does not find the adoption of W4 strategy at 8.00am on 11 January 2011 was inconsistent with the manual. Although there may be issues as to how the Wivenhoe Dam had been managed prior to this time, there is nothing in the material that has been provided to the Panel to suggest that the earlier management of the Wivenhoe Dam influenced to any significant degree, the adoption of the W4 release strategy at 8.00am on 11 January 2011. 38. The ICA hydrology and the information provided by the FSP‟s hydrologist confirms that the increased releases from the Wivenhoe Dam after the adoption of the W4 strategy led to the development of a flood wave that ultimately caused the flooding of many properties downstream of the Wivenhoe Dam. 39. The question then arises as to what was the proximate cause of this inundation. In determining the proximate cause of the inundation it is necessary to look at the effective or dominant cause of the inundation. The Panel agrees with the FSP‟s general submission that the proximate cause is a cause determined by common sense evaluation of the relevant facts. In the event that there are two or more proximate causes, one within the policy and the other excluded, the policy does not respond. The proximate cause is not determined by identifying the last event or final trigger but by determining what is the dominant, effective, direct or efficient cause of the loss. 40. The FSP has maintained that the impact on the Wivenhoe Dam from the rainfall that fell in the early hours of 11 January 2011 was only 29% while 71% of the volume of the inflow came from the rain that fell on 9 and 10 January 2011 or earlier. The FSP maintains that to find the rainfall which had fallen from 4.00am on 11 January 2011 is the proximate cause is without foundation as such an approach produces an entirely artificial outcome. 41. With due respect to the FSP‟s argum ent the Panel disagrees. Whilst the Panel accepts there has been a significant impact on the levels of the Wivenhoe Dam by the rainfall that commenced falling on or about 9 January 2011 or earlier, the Panel is satisfied having regard to the information that has been exchanged and the relevant legal principles, that the heavy rain that commenced falling on or about 4.00am on 11 January 2011 resulted in the adoption of the W4 strategy. 42. The Panel is also satisfied that whilst the level of the Brisbane River may have been increasing under the W3 strategy, it was the heavy rainfall from approximately 4.00am on 11 January 2011 that caused the need to adopt the W4 strategy at 8.00am on the same day. 43. In the Panels view the heavy rainfall from 4.00am on 11 January 2011 over the Wivenhoe Dam and Brisbane River combined with the heavy rain that commenced fall over the Bremer River from approximately 6.00am that same day was the proximate or effective cause of the inundation of the A pplicant‟s property. Case No: 246492 Determination Page 9 of 11 The Applicants ’ Inundation 44. SC‟s statement indicates the effect of the W4 releases first reached the vicinity of the Applicants‟ property at 2.39pm on 11 January 2011. He estimated that the property was first inundated by the Brisbane River at 10.34pm on Tuesday, 11 January 2011. This compares favourably with his initial estimate in an earlier report. 45. Most relevantly he estimates that at/before 4.00am on 12 January 2011 the river level would have been approximately 6.9m AHD which is 1.2m above the approximate benchmark level which is noted as being characterised by „Slab on Ground‟ in reference to the r isk address. 46. The relevant benchmark level is SC‟s estimate of the lowest point of the house. As explained above, the home is situated on a slab and for the purposes of this Determination, the Panel accepts that the benchmark is the floor level of the home. 47. The Panel notes that the ultimate inundation of the property was 3.5m above the benchmark level. SC identified this peak inundation occurred at approximately 12.24am on 13 January 2011 which is well outside the relevant 24 hour period for cover under the flash flood provisions. 48. The FSP hydrologist has speculated that if the W3 strategy had been maintained, then, according to the key conclusion statement, the Applicants‟ property would still have been inundated by approximately 11.05pm on 11 January 2011 and by 4.00am would have been inundated to a level of 0.9m above the benchmark level. The Panel is concerned however that to reach such a conclusion it must be speculated that the releases from the dam would have continued at the same rate at the W3 level in the absence of any additional rainfall. The report does not address the possibility of the inflow into the Wivenhoe Dam decreasing. 49. Based on the available information the Panel is satisfied that the inundation of the Applicants‟ property to the level of 1.2m above the floor of the residence was caused by “flash flood ” that occurred within 24 hours of the heavy rainfall and is therefore covered under the terms of the policy. Quantum 50. The Renewal Certificate of Insurance for the relevant period provides a sum insured of $161,000 for the home. Pursuant to the policy cap for the insured event of “Flash flood and stormwater runoff”, the FSP is liable up to an amount of up to $80,500 for the damage to the building. 51. Given the time since the loss was sustained, the Panel accepts that the parties may be unable to provide an exact estimate of the total loss sustained, or a breakdown of that loss. However, in this regard the Panel notes the FSP‟s loss assessor‟s report dated 9 February 2011, pursuant to his inspecti on on 3 February 2011, records the dwelling as being a „total loss‟ and suggests a reserve of $160,000 . Case No: 246492 Determination Page 10 of 11 52. The Applicants ‟ property is a single storey residence and the Panel accepts that inundation to a level of 1.2m above benchmark would cause considerable damage to the building and at least cause 50% of the total damage. As the assessor has assessed the property as a total loss and given the limitations under the cover the Panel determines it is fair in the circumstances that the FSP be liable to pay the Applicants the sum of $80,500 in accordance with the maximum payable under the flash flood provisions of the policy. 53. Insofar as the FSP may have made payment of a compassionate sum to the Applicants, FOS does not have jurisdiction to deal with this payment b ut acknowledges that the FSP, given the terms on which the compassionate payment was made, may be entitled to deduct this payment from any settlement sum. 54. The Panel has also considered the issue of interest. 55. The FSP has argued that interest is only payable from the date from which it was unreasonable to withhold payment. The FSP maintains that it is entitled to a reasonable period to investigate and determine its position, and given the complex nature of the flood disputes, the delays are not unreasonable. Further complex situations require substantial periods of time for independent bodies such as the Queensland Flood Commission of Inquiry and FOS, to make conclusions on the issues in dispute. 56. The FSP maintains that it did not act unreasonably in this dispute and therefore interest is not payable. Alternatively if some period of interest is to be awarded it should be reduced to account for the substantial delays through the course of the process which were not the FSP‟s fault. 57. Section 57 of the Insurance Contracts Act requires interest be paid when it becomes “unreasonable for the insurer to have withheld payment”. An examination of relevant case law indicates that most probably, interest will be awarded from either when an insurer first emphatically denied liability or disputed a matter, or from when in the normal course of events the claim should have been paid if liability had not been disputed. 58. In this dispute the Panel accepts that the FSP was entitled to withhold payment of the settlement monies until such time as it had properly investigated the dispute and made its decision as to liability. 59. The FSP made its original decision to deny the claim after receiving relevant assessment reports, hydrology reports and other information. The FSP was aware of the terms of its policy and aware of the relevant provisions under which liability might arise and chose to deny the claim having reviewed those relevant provisions and the evidence available to it. 60. In the Panel‟s view, at that point the FSP has made its deci sion on the claim and it is appropriate that from that time interest be paid unless it can be established that the Applicants had withheld information from the FSP that would have led to an alteration of its decision. Case No: 246492 Determination Page 11 of 11 61. Accordingly, the Panel determines that it is appropriate that the FSP in this dispute pay interest from the day upon which the FSP determined to deny liability of the Applicants ‟ claim, until payment of the claim. Determination 62. The FSP is to pay the Applicants the sum of $80,500 being 50% of the sum insured in accordance with the flash flood provisions of the policy. 63. Further the FSP is to pay interest from 15 March 2011 (being the date of rejection of the claim) to date of payment of the claim, in accordance with Section 57 of the Act.