Home building and contents claim for Queensland flood damage declined as flood; AFCA found flash flood cover applied
Text of the determination
Case No: 246460 Determination Page 1 of 11
Case number: 246460
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim - Flood Damage
30 August 2012
Background
1. The Applicants held a home and contents policy with the Financial Services
Provider (FSP) from 27 October 2010. The policy provided building cover of
$290,000 and contents cover of $89,000.
2. On 11 January 2011, the Applicants‟ home was damaged as a result of water
inundation at the time of the flood events that affected significant parts of
Queensland.
3. The FSP arranged for an assessor to inspect the property and later for a
hydrologist to provide a report. It attributed the cause of the loss to flooding
which was excluded under the policy and declined the claim.
4. The Applicants disagree with the decision and seek reimbursement for their
losses, for up to $379,000.
Summary of Applicants’ position
5. The Applicants have been assisted in this matter by their legal representatives.
Reference to the Applicants includes reference to submissions made on behalf
of the Applicants by the legal representatives.
6. It is the Applicants‟ submission that their loss was due to flash flood and
stormwater runoff within the terms of the policy. The Applicants maintain that
their property is bound by a stormwater drain which overflows as a result of not
being able to carry the water away. They point out that the FSP‟s original
hydrology report failed to make reference to the relevant stormwater drain
immediately down from the property.
7. According to the Applicants they were forced to abandon their property on the
afternoon of 11 January 2011 as water was flowing from large open drains
running the length of Lower William Street. The Applicants maintain the water
was flowing towards the Brisbane River at that time. The Applicants have
provided a number of photographs of the area in flood in support of these
statements.
Determination
Case No: 246460 Determination Page 2 of 11
8. In the Applicants‟ most recent submission and in response to the FSP‟s
submission of 20 January 2012, the Applicants advise that the male Applicant
walked away from the property at 8:30pm on 11 January 2011 with water at
that stage coming over his ankles. The Applicants believe that as a kitchen
clock stopped at 4.22am and is at a height of 3.15 metres above the driveway,
that this supports the view that the water rose a further 3.1 metres from
approximately 8:30pm until 4:22am. They believe that by midnight water would
have been at least one metre above the floor boards.
Summary of FSP’s position
9. In the FSP‟s initial submissions, the FSP maintained that the Applicants had not
discharged the onus of proving that the cause of loss was by flash flood or
stormwater runoff and in the alternative if flash flood was a proximate cause
which was denied, then flood was also a proximate cause of the loss and by
application of the Wayne Tank principle the policy would not respond.
10. The FSP relies on the following policy provisions:
Pages 10-12 of the Product Disclosure Statement (PDS)
“ Words / terms with special meanings
Word / term Meaning
...
Flood Rising water which enters your home as a result of it
running off or overflowing from any origin or cause.
This policy does not cover flood unless we have
agreed and it is shown on your certificate of insurance.
Flash flood and
stormwater run - off
A sudden flood caused by he avy rain that fell no more
than 24 hours prior to the flash flood or stormwater
run - off.
...
Storm A violent disturbance of the atmosphere associated
with strong winds including a cyclone, lightening,
heavy rain, hail or snow, but not continuous bad
weather by itself.
...”
Pages 17-18 of the PDS
“ Insured events you are covered for
Damage caused by weather...
What is covered What is not covered
Storm Loss or damage:
Case No: 246460 Determination Page 3 of 11
caused by rain, hail or snow
after it has reached the
ground...
...
Flash flood and stormwater run - off
A sudden flood caused by heavy rain
that fell no more than 24 hours prior to
the flash flood or stormwater run - off
Loss or damage caused:
by flood...
...”
Page 27 of the PDS
“ Your home
The most we will pay you for home claims
What is covered What is not covered
Flash flood and stormwater run-off
We will pay up to 50% of your home sum
insured or $25,000, whichever is higher.
...
...”
Page 48 of the PDS
“ Optional covers for extra peace of mind
The covers outlined in this section are optional and do not apply unless you
have asked for them and we agree to cover you. Additional premiums apply
for each cover. Your certificate of insurance will show which covers operate.
All optional covers are subject to the terms and conditions of this policy.”
Page 53 of the PDS
“ Optional covers for extra peace of mind
What is covered What is not covered
Flood and storm surge
This policy does not cover flood unless
we have agreed and it is shown on your
certificate of insurance.
Home and/or contents cover
We cover you for loss of or damage to
your home or contents caused by flood
or storm surge which happens during the
period of insurance at the property
address.
We will pay up to the:
home sum insured, if your home is
insured;
We will not pay for loss or
damage to:
paths, driveways, paving,
retaining walls (whether or
not part of the home), tennis
courts or other playing
surfaces;
shade or sail cloth;
fabric awnings, swimming
pool or spa covers or liners
and the like;
glasshouse whether or not
constructed principally of
glass;
Case No: 246460 Determination Page 4 of 11
contents sum insured, i f your
contents are insured for damage
caused by flood or storm surge,
We will pay for loss or damage in the
same way and in the same amounts as
we do under insured events cover.
water in swimming pools o r
spas...
...”
11. In support of the FSP‟s argument, the FSP relied upon information contained in
the ICA Hydrology Reports and a report from its hydrologist SC.
12. In a further submission of 10 October 2011, the FSP disputed the Applicants‟
submission that the water was flowing to the river and argues the water was in
fact flowing along the stormwater drains towards the gully.
13. The FSP conceded that around 9.00pm on the day of the evacuation, the
Brisbane River would have reached the Applicants‟ property via the gully and it
is likely that it was only a short period of time between the evacuation and the
river reaching the property. Insofar as the Applicants allege the policy wording
was a nonsense, the FSP maintains that the policy wording is clear and further
that the evidence supports the view that the property was inundated as a result
of the rainfall from 9 January 2011 or earlier and that it was not rain that fell
within 24 hours of the inundation of the property.
14. The FSP made further submissions on 20 January 2012 and argues that the
rainfall on 9 and 10 January 2011 was more significant than the rainfall on 11
January. In the alternative the W4 releases could not have been the cause of
inundation of the Applicants‟ property because the property was inu ndated
before those releases reached the Applicants‟ house.
15. If the switch to the W4 release was the sole cause of the loss then such an
event is not properly characterised as flash flood and stormwater runoff
because of the actions of the Wivenhoe Dam operators being an intervening
cause.
16. In further submissions made on 19 June 2012, the FSP has sought to rely upon
a number of additional documents as follows:
Reference document for disputes relating to Queensland floods;
letter from hydrologist attaching key information sheet for the
Applicants‟ property -7 June 2012;
Hydrologist report – investigation of January 2011 inundation event –
Brisbane – March 2011;
General statement of SC (hydrologist)- 7 June 2012; and
Further supplementary statement of SC – 7 June 2012.
Case No: 246460 Determination Page 5 of 11
Issues
17. Whether the Applicants‟ loss was caused by an insured event.
18. If so, whether the FSP is entitled to rely upon any exclusion(s) under the policy
to avoid payment of the claim.
Reasons for decision
19. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the amount of the claim and the issues to be
considered. This dispute has not been the subject of a FOS Recommendation
and has proceeded directly to Determination.
20. This decision has been made by a Panel consisting of an Ombudsman, an
insurance industry representative and a consumer representative.
21. The jurisdiction of the Service allows for the consideration of matters up to a
limit of $500,000 although it is limited in terms of an award to a maximum of
$280,000. The parties have consented for the Service to consider the dispute
and insofar as any award may be made in favour of the Applicants it will be
limited to the jurisdictional amount.
22. It is not in dispute that the Applicants‟ home was inundated with water as a
result of a significant weather event that affected much of Queensland in early
January 2011. The Applicants attribute the damage to flash flood or stormwater
run-off whilst the FSP considers it was caused by flood. The FSP argues that
the loss is not covered as flood is excluded under its policy.
23. The Applicants have not disputed receipt of the PDS documents from the FSP
and it is therefore accepted that they had time and opportunity to familiarise
themselves with the terms and conditions of the insurance contract.
24. Whilst the Panel acknowledges the arguments made by the Applicants with
respect to the terms of the policy, the Panel accepts that the policy does not
extend to cover circumstances where a loss is caused by a flood. The Panel
accepts that the policy is sufficiently clear to distinguish between flood, flash
flood and stormwater runoff (the latter two of which are covered). It extends to
cover damage from sud den flood events “caused by heavy rain that fell no
more than 24 hours prior” to the flash flood.
25. The central issue in dispute in this matter is therefore whether the inundation of
the Applicants‟ property was caused by heavy rain that fell no more than 24
hours prior to that inundation.
26. The Applicants report that their home was first inundated with water on 11
January 2011. The water emanated from the nearby stormwater drains.
Case No: 246460 Determination Page 6 of 11
27. After the report of the incident, the FSP appointed a loss adjuster to investigate
and report on the damage caused to the Applicants‟ property.
28. The loss adjuster, MY, allegedly inspected the property on or about 14 January
2011. No report was provided by the FSP, although it conceded that the
purpose of this inspection was to determine whether the property required
hydrological investigation. The FSP contends that MY identified that the
Applicants‟ property required such a report.
29. The appointed hydrologist, SC, provided a statutory declaration as to the cause
of the loss in the region surrounding the Applicants‟ home. He found that:
A significant amount of rain fell in the Greater Brisbane Area from 9
January 2011 and over the subsequent two days, which caused
significant inflows into the Wivenhoe Dam, which peaked on the
evening of 11 January 2011;
The terrain data for the Applicants‟ home “does not suggest that [it] is
particularly vulnerable to stormwater or other local run-off for rainfall
intensities experienced in January 2011 in the location”;
Inundation from stormwater run-off r equires “intense levels of rain”
which is sufficient to overcome the stormwater drainage system. Any
such run-off generally occurs during or very shortly after such an
intense period of rainfall;
A review of the rainwater gauge at Wacol, approximately 3.4km from
the Applicants‟ property and representative of the rainfall there in the
expert‟s opinion, revealed that 87mm of rain fell over 9 and 10 January
2011, with a further 56mm falling on 11 January 2011. The majority of
the rainfall on 11 January 2011 fell in two bursts, being at 11.00am and
4.00pm.
30. He considered that the Applicants‟ property was inundated at approximately
9.00pm on 11 January 2011. The inundation was backflow water from the
Brisbane River. The flood from the river itself did not occur for another 12
hours.
31. As a result of the report from SC, the FSP denied the claim on the basis that it
considered the cause of the loss to be flooding from the Brisbane River. Whilst
the first inundation was backflow water from the river, this is still floodwater
based on common law interpretation of what constitutes a „flood‟. The FSP
provided a payment to the Applicants for $12,500 from its „compassionate
fund‟.
32. On 20 January 2012 the FSP in a further submission argued as follows:
The effect of the rainfall on 9 and 10 January 2011 was more significant
than the rainfall on 11 January 2011;
Further and alternatively, the W4 releases could not have been the
cause of the inundation of the Applicants‟ property because the
property was inundated before those increased releases reached the
house;
Case No: 246460 Determination Page 7 of 11
Alternatively, if the switch to W4 was the sole cause of the loss, then
such an event is not properly characterised as “Flash flood and
stormwater run- off” because the actions of the Wivenhoe Dam
operators are an intervening cause.
33. To assist in determining this dispute the Panel Chair Ombudsman met with the
Applicants on site with the FSP‟s representative on 6 February 2012.
34. The Applicants confirmed that they believe the stormwater drains at the bottom
of Lower William and Woolaroo Streets overflowed. Around 2.30-3.00pm on the
afternoon of 11 January 2011, the male Applicant observed water pooling in the
street and starting to spread through his backyard. They believe the stormwater
drain that circumnavigated the block had overflowed because of the heavy rain.
There was a lot of runoff which could not escape and it was also impacted by
the railway line which acted as a levy wall. By the time he turned the power off
at about 8:30pm on 11 January 2011, water was shin deep within his yard with
the house ultimately inundated to the roof line.
35. Although the Panel acknowledges the arguments made by the Applicants with
respect to the stormwater runoff being the cause of the initial inundation of the
property, the Panel is satisfied based on the hydrological evidence submitted
and the site inspection that it is unlikely that the Applicants‟ property was
inundated by stormwater runoff. Whilst the Applicants have observed the water
from the open drains pooling in the street and entering the yard, the Panel is
satisfied that most likely, given the timing of that event, that that water was
water backflowing from the Brisbane River through the gully and the drains.
The Panel is persuaded that most likely the inundation of the Applicants‟
property above floor level commenced sometime around 8:30-9:00pm on 11
January 2011 and that such water was water stemming from the Brisbane
River.
36. The question remains however whether this inundation was in fact flash flood
as defined within the terms of the policy or flood. That is, whether heavy rain
that fell no more than 24 hours prior to the inundation of the Applicants‟
property was the proximate cause of the inundation.
37. The Panel suspended issuing Determinations relating to this question after the
Queensland Flood Commission of Inquiry was recalled to hear further evidence
from the Wivenhoe Dam operating Engineers. Once the final report was
released, all relevant stakeholders were invited to put further submissions to
the Panel relating to the impact of the heavy rainfall that commenced falling
over the Wivenhoe Dam at around 4:00am on 11 January 2011 and the impact
this had on the decision to adopt the W4 release strategy.
38. On 21 May 2012, FOS issued a Memorandum to all relevant stakeholders
advising that after considerable deliberation of all material available to it, the
Panel had formed the view that the heavy rain occurring from approximately
4:00am on 11 January 2011 and in particular the heavy rain between 4:00am
and 8:00am on 11 January 2011 was a proximate cause of the W4 release
strategy being adopted and therefore a proximate or effective cause that led to
the flooding of many of the properties along the Brisbane River.
Case No: 246460 Determination Page 8 of 11
39. The Panel notes that in each individual dispute, there are individual and unique
factors relevant to the dispute and in that regard the Panel invited the parties to
make further submissions in relation to this dispute before FOS.
40. In view of this the FSP provided its further detailed submission to FOS on 12
June 2012 and included with it the documents referred to earlier in this
Determination.
41. Insofar as the Reference document is concerned, the Reference document
does not relate specifically to this dispute and many of the issues raised are not
relevant in this matter. Only those issues that are relevant to the current dispute
will be referred to.
42. Essentially for the purpose of this dispute the Reference document argues,
consistent with earlier arguments and submissions made by the FSP that the
hydrology reports from its hydrologist and the ICA support the view that the
heavy rainfall on 11 January 2011 was not the cause of the inundation of the
properties but it was the rain that fell more than 24 hours earlier, in particular
the rain that fell on 9 and 10 January 2011 was the cause of the inundation.
The FSP maintains that on any reasonable view the damage sustained to the
properties downstream of the dam was as a result of a combined effect of all of
the rainfall that had fallen and not just the rainfall that commenced from 4:00am
on 11 January 2011.
43. The Panel accepts the latest hydrology information provided by SC dated 7
June 2012, which in effect states that the Applicants‟ property would have first
been affected by the W4 releases at approximately 12:49pm on 11 January
2011 and ultimately to a level of approximately 3.5 metres above the
benchmark level by 4:00am on 12 January 2011. The benchmark level for
these purposes is that level which is the lowest point of the structure of the
house or other relevant structure on the land.
44. Whilst there are some discrepancies between this statement and earlier
reports, the Panel accepts that the latest statement, consistent with the advice
of SC, is a more accurate measure of both the timing of the rising water levels
prior to reaching the peak inundation level and the peak inundation level itself.
45. The information exchanged confirms that heavy rain fell over the Wivenhoe
Dam catchment area and in fact over parts of the Brisbane River from
approximately 4:00am on 11 January 2011. It is not disp uted that in addition to
this, there was heavy rain that commenced falling over the Bremer River which
influenced the level of the Brisbane River and that that rain commenced at
approximately 6:00am on 11 January 2011.
46. Information relied upon from SEQWater dated 2 March 2011 confirms the rapid
increase in inflows to the Wivenhoe Dam from 4:00am on 11 January 2011.
The report identifies that the inflows into the dam had been decreasing from as
early as 8:00am on 10 January 2011 and steadily decreasing from
approximately 3:00pm on 10 January 2011 to 2:00am on 11 January 2011. The
report identifies a rapid increase in the inflows to the Wivenhoe Dam
commencing at about 4:00am on 11 January 2011, consistent with the heavy
Case No: 246460 Determination Page 9 of 11
rainfall that commenced falling over the Wivenhoe Dam catchment area at that
time.
47. The Queensland Flood Commission of Inquiry Report confirms that prior to
8:00am on 11 January 2011 the dam releases were being managed at the W3
strategy. Whilst it is accepted that the W3 strategy led to an increase in the
levels of the Brisbane River, the strategy was designed to avoid wherever
possible the inundation of properties below the Wivenhoe Dam.
48. Part of the key statement from the FSP‟s hydrologist indicates that if the W3
release strategy had been maintained at the same level as it was prior to
8:00am on 11 January 2011, then the Applicants‟ property would still have been
inundated with the water reaching the benchmark level at approximately
7:51pm on 11 January 2011 and on the same assumption the house would
have been inundated to approximately 1.9 metres above benchmark level by
4:00am on 12 January 2011. Whilst the Panel acknowledges the hydrologist‟s
opinion, the Panel is concerned that it must be speculated that the releases
from the dam would have continued at the same rate; that is the same release
rate under W3 in the absence of any additional rainfall. Whether the outflows
would have continued at the same rate if the inflows had continued to reduce
as they had been prior to 2:00am on 11 January 2011 is not known.
49. There is no dispute that there were two significant rainfall spikes with rain that
fell from 9 and 10 January 2011 being considered the first spike and rain that
commenced falling from approximately 4:00am on 11 January 2011 being the
second spike. There is no dispute that it was only after the second spike that
the W4 release strategy was adopted. Although the FSP argues that the switch
to strategy W4 was not the natural and ordinary consequence of the rain that
fell and in fact was not taken in accordance with the Wivenhoe Dam manual,
the Panel does not agree. In the Panel‟s view the Queensland Flood
Commission of Inquiry Final Report does not find the adoption of the W4
release strategy was inconsistent with the manual. There are clearly issues as
to how the Wivenhoe Dam had been managed prior to this time, but in the
Panel‟s view these are not relevant to the decision made to adopt the W4
release strategy at 8:00am on 11 January 2011.
50. The FSP argues that the impact on the Wivenhoe Dam from the heavy rainfall
that fell in the early hours of 11 January 2011 was only 29% whilst 71% of the
volume of inflow came from the rain that fell on 9 and 10 January 2011. In the
FSP‟s view to find that the rainfall that had fallen from 4:00am on 11 J anuary
2011 was the proximate cause would be without foundation as such an
approach produces an entirely artificial outcome.
51. The Panel acknowledges the FSP‟s argument with respect to the proximate
cause. The Panel agrees with the FSP‟s general submission t hat the proximate
cause is a cause determined by common sense evaluation of the relevant facts.
If there are two or more proximate causes, one within the terms of the policy
and one excluded, the policy would not respond. The proximate cause is to be
determined by what is the dominant, effective, direct or efficient cause of the
loss.
Case No: 246460 Determination Page 10 of 11
52. The Panel accepts there has been a significant impact on the level of the
Wivenhoe Dam by the rain that commenced falling on or about 9 January 2011
or earlier. The Panel however is of the view having regard to all of the
information exchanged and the relevant legal principles that the heavy rain that
commenced falling on or about 4:00am on 11 January 2011 was a proximate or
effective cause of the adoption of the W4 strategy which in turn contributed to
the inundation of the Applicants‟ property commencing at approximately
12:49pm on 11 January 2011. Whilst the Panel accepts that the level of the
Brisbane River may have been increasing under the W3 strategy, there is no
doubt, based on the information exchanged, that the heavy rainfall from
approximately 4:00am on 11 January 2011 caused the need to adopt the W4
strategy at 8:00am on that same day.
53. In the Panel‟s view, the proximate cause of the inundation of the Applicants‟
property was the heavy rain that commenced falling at approximately 4.00am
on 11 January 2011 over the Wivenhoe Dam leading to the adoption of the W4
release strategy combined with the heavy rain that had commenced falling over
the Brisbane River at or about the same time and the heavy rain that
commenced falling over the Bremer River from approximately 6.00am on 11
January 2011.
54. Taking all factors into account, and in particular the evidence of the Applicants‟
and the FSP‟s hydrologists, the Panel accepts the Applicants‟ property was
inundated within 24 hours of the commencement of the heavy rainfall and that
that inundation is covered under the terms of the policy as “flash flood – storm
water runoff”.
55. The Panel is satisfied that the FSP‟s hydrologist‟s findi ngs, in particular the
findings in the key fact statement can be relied upon as a reasonable
assessment as to the level of inundation of the Applicants‟ property and
accepts that the Applicants‟ property was inundated to a height of 3.5 metres
above benchmark level within 24 hours of commencement of the heavy rainfall.
Whilst the property was ultimately inundated to a level of 5.6 metres above the
benchmark level, it is clear that the majority of the damage to the Applicants‟
home and contents would have occurred as a result of the inundation to the
level of 3.5 metres. Insofar as inundation above that level has caused any
additional damage, then this would be excluded under the terms of the policy
as it would be inundation outside of the relevant 24 hour period.
56. According to the information exchanged, the Applicants‟ home building was
insured for the sum of $290,000 with the contents sum insured for $89,000.
57. Under the terms of the policy and in particular under the flash flood provisions,
the policy will respond to pay 50% of the home building sum insured or $25,000
whichever is the higher. In this case, the home being insured for the sum of
$290,000, then the maximum liability of the FSP would be $145,000.
58. Based on the information available, the Panel is not able to determine the
extent of the damage caused to the building as a result of the inundation. Whilst
the Panel accepts that the majority of the damage would be caused by this
level of inundation, the parties are asked to work cooperatively to settle this
Case No: 246460 Determination Page 11 of 11
aspect of the dispute. If the parties are unable to agree within 30 days of
acceptance of this Determination, then the Panel will determine the amount.
59. Insofar as the loss of contents is concerned, the policy provides for payment of
50% of the sum insured or the sum of $25,000 whichever is the higher. The
Applicants were insured for the sum of $89,000 and it is reasonable to accept
that they have suffered a total loss of contents. In these circumstances 50% of
the sum insured equals $44,500 and the FSP would be liable to meet the
Applicants‟ loss of contents to the sum of $44,500.
60. The FSP has paid the Applicants a compassionate sum. The conditions of
payment of the compassionate sum do not fall within FOS‟ jurisdiction , but the
Panel acknowledges that the FSP should it choose to do so, may take into
account this payment in determining any payment to the Applicants.
Determination
61. Accordingly, the Panel determines the FSP settles the Applicants‟ claim in
accordance with the terms and conditions of the policy as it relates to damage
to the home and loss of contents pursuant to the policy cover provisions for
flash flood.
62. Insofar as the FSP is to cash settle the claim, interest is payable in accordance
with Section 57 of the Act from 1 July 2011 being the date of the FSP‟s IDR
decision to decline the claim to date of payment of the claim.