Denial of hail damage to colorbond and terracotta tiled roof

FirmFinancial Firm (Unknown - Insurer)
Decided2011-11-18
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$19,000
Non-financial loss—
Amount claimed$19,000
SourceAFCA PDF

Summary

The applicant's home metal and tiled roof was declined by the FSP as not hail damaged. AFCA ordered $19,000 plus GST for the metal roof, indemnity for 52 tiles with the amount left to negotiate, and interest.

On the balance of probabilities, the photographic and independent evidence showed hail damage, so the FSP's expert evidence of no damage was not preferred.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 246385 Determination Page 1 of 7 Case number: 246385 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim 15 November 2011 Background The Applicant‟s home (located in Lysterfield, Victoria) has been insured with the Financial Services Provider (FSP) under home and contents policy since March 2008. Her home was struck by a severe hailstorm on 6 March 2010. A claim for the damage was lodged with the FSP who declined liability for the home‟s colorbond and tiled roof, contending that it was not damaged during the hailstorm. Summary of Applicant’s Position The hailstorm damaged her colorbond and tiled roof, cracking approximately 30 tiles in half and chipping others. The storm also damaged mortar that was on the roof, causing them to fall out in sections. The FSP took six months to come out and fix the damage it had accepted liability for. In the meantime, she had to replace some of the cracked tiles on her own to stop water from continuing to leak into her home. She had to borrow some tiles from a neighbour because she did not have enough to cover the damage. She finds it hard to believe that the FSP‟s roofer had inspected the whole roof, as claimed. If he spent that much time on the roof, he would have cracked a number of tiles as they are now very weak. She also finds it hard to believe that all of the damage on the roof could be considered prior handling damage. Everyone in Lysterfield has had their roof replaced, so she must be lucky that hers was not damaged as claimed. She also questions how her home could leak if the roof was not damaged during the hailstorm. Determination Case No: 246385 Determination Page 2 of 7 Summary of FSP’s Position Its roofing expert has advised that the Applicant‟s roof did not sustain any damage from the March 2010 hailstorm. His report is objective, more extensive and thorough, and should be accepted. The FSP relies on the following policy provisions: “ EXCLUSION APPLICABLE TO YOUR POLICY IN RESPECT OF ALL SECTIONS IN THE POLICY, WE WILL NOT COVER YOU FOR DAMAGE, LOSS OR LIABILITY CAUSED BY, ARISING FROM OR INVOLVING ANY OF THE FOLLOWING:  Cracking, chipping, scratching, denting, splitting or tearing unless caused by an insured event. …  Wear and tear, lack of maintenance or inherent defect, including gradual deterioration. ” Issue Whether the Applicant‟s roo f was damaged by hail. Reasons for Decision I note that the material has been exchanged and the parties have had the opportunity to respond to the issues raised. The evidence The Applicant maintains that her roof (ie. colorbond and tiled roof) was damaged during the hailstorm. She also maintains that the hailstorm had weakened the entire roof (in addition to physically damaging some of the tiles) so it should be replaced in its entirety. To support her position, she has provided the following information:  Q RT reported that “most of the tiles have chips or hair line cracks on them due to the force of the hail hitting on them”.  QRT further explained that terracotta tiles would lose its integrity when impacted by hail although it may still look good. Most of the tiles on the Applicant‟s roof produced a “dull sound” (instead of a “tinny one”) which indicates that the tiles have become weak and will break with any pressure. The tiles should have a “tinny” sound if it still had integrity.  Having spent 25 years in the industry, QRT was of the opinion that the damage to the Applicant‟s roof is not pre -existing damage. Case No: 246385 Determination Page 3 of 7  VRS‟s quote acknowledges that the damage to her roof was “due to storm damage”.  She has had to replace some 30 roof tiles to check the leaking into her home because the FSP had not addressed her claim for 6 months. I note that the FSP has not disputed this fact. She also supplied a number of photographs which show damage to a number of the roof tiles. These photos show that the damaged areas were in bright orange colour with no signs of stains or discolouration (so as to be consistent with long term exposure). The Applicant has provided a further report from SRS which acknowledges that not all of the damage on the roof was storm related. In particular, this report states:  Hail damaged all colorbond roof sheets and some 22 north facing roof tiles.  The remaining roof tiles are in good order.  The deterioration of mortar in several areas of the roof was due to faulty work (and not the hailstorm). The roof‟s ridge bedding is of “very „weak‟ consistency”, causing a failure of the “final skin of mortar” to adhere adequately. The SRS report also included a number of photographs showing sections of the roof where damage is consistent with hail impact and sections where the damage is consistent with long term deterioration. The FSP relies substantially on the evidence of roofer RC who claims:  He inspected the entire roof and found no hail damaged roof tiles.  A number of tiles had chips but these were due to prior handling damage. He bases this view on the fact he has been in the industry for 30 years.  The vast majority of tiles are in “as new condition”.  The vast majority of the cement work on the roof was unaffected by storm damage and is “generally in quite good serviceable condition”. Areas with deteriorated cement work were due to wear and tear and faulty workmanship.  There was only one roof tile which presented a surface de -lamination. This was a manufacturing issue.  The damage to the flexible point layer between the tiled roof and metal deck roof was caused by heavy rains occurring before the pointing has had time to cure. There are two aspects to the roof claim, the metal (colorbond) roof and the tiled roof. For clarity, I will deal with each separately. Case No: 246385 Determination Page 4 of 7 Metal (colorbond) roof I find RC‟s evidence with respect to the metal roof somewhat simplistic. He provided one photograph showing the whole metal deck roof (which appears to be taken from a distance) and then made a statement that it had no hail damage beneath the photograph. The main body of his report does not specifically address the metal deck roof itself. More importantly, RC‟s evidence is in direct conflict with a number of photographs provided by the Applicant and SRS. These photos were taken at a closer distance and clearly show damage that is consistent with hail impact of the roof. These photos have been exchanged and there has been no persuasive response to them. On balance, I find the photos provided by the Applicant and SRS more persuasive than RC‟ s general and sweeping comment with respect to the metal roof. In this instance, these pictures appear to be worth the proverbial thousand words. Furthermore, information widely available in the public domain confirms that areas in and around Melbourne was struck by a rare and significantly severe hailstorm on 6 March 2010. More importantly, it has also been widely documented that Lysterfield was one of the several suburbs identified as being severely impacted by hail on that day. I also note that this was a fact that RC himself acknowledges. Considering these matters on a balance of probabilities, I am more inclined to the view that the damage on the metal roof was likely caused by the March 2010 hailstorm. Based on the photographs provided, it also appears to me that SRS had conducted a more thorough inspection of the metal roof than RC. For this reason, I am more inclined to prefer SRS‟s report over RC‟s report and as such, accept SRS finding that all roof sheets on the metal roof have been damaged by hail. In light of the above analysis, I am satisfied that the Applicant should be entitled to indemnity for the whole metal deck roof. The material contains a single quote of $19,000, plus GST to replace the metal roof, so I am view that the Applicant is entitled to this amount. Tiled roof Insofar as the terracotta tiled roof is concerned, I have placed little reliance on the VRS report in determining if it had been damaged by hail. This report was of limited assistance as it was lacking in specific details. Of the remaining reports (ie. the QRT, SRS and RC reports), I have difficulty accepting QRT‟s evidence that the all roof tiles require replacement. Case No: 246385 Determination Page 5 of 7 QRT‟s evidence is that it found “most of the tiles” have chips or hair line cracks . This suggests that not all roof tiles have sustained damage. QRT also says that “most of the tiles” presented a “dull sound” which suggest that he either did not conduct a sound test on all roof tiles or did not find all tiles damaged (if I accept that a sound test was an acceptable method for testing the integrity of a roof tile). On the whole, I find that QRT has not sufficiently explained why the whole roof required replacement. I also have difficulty accepting RC‟s evidence that none of the roof tiles sustained hail damage. The evidence at hand weighs heavily against such a proposition. 2. Firstly, it is widely documented that the March 2010 hailstorm was of a rare severity and Lysterfield was one of several suburbs which had been severely impacted by the hailstorm. RC accepts this fact himself. Secondly, the damage which RC claims to be prior handling damage appears to be fresh. This is evident from the fact that the damaged areas were still in bright orange colour. If these were prior handling damage (as claimed), it would be reasonable to anticipate some staining or discolouration so as to be consistent with long term exposure. In my view, this is a material inconsistency in RC‟s hypothesis. Thirdly, RC‟s report does not account for or acknowledge the unchallenged evidence that the Applicant has had to replace some 30 roof tiles on her own (to prevent further leaks) in view of the delays in having her claim resolved. The fact he claims most of tiles were “as new” may be because 30 damaged tiles have been replaced. Fourthly, photographic evidence has shown that RC was incorrect in his analysis that the metal roof did not sustain any hail damage. If he was incorrect on that point, it casts doubt as to whether his comments with respect to the chipped roof tiles could be regarded as correct; particularly when the damage he claims is prior handling damage appears to be fresh. Lastly, i t is not in dispute that the Applicant‟s home sustained water entry during the March 2010 hailstorm. There is also nothing in the material to suggest that the home has had a prior history of water entry. This suggests that the March 2010 hailstorm did cause some damage to the roof. Collectively, I find the evidence at hand leaning against a suggestion that the tiled roof did not sustain any hail damage. I note that both QRT and RC rely substantially on their years in the roofing industry to justify their respective positions. Whilst I accept experience adds some weight to an expert‟s view, I do not consider it to be the only reason for accepti ng an expert‟s view. Case No: 246385 Determination Page 6 of 7 I also do not agree that the length of an expert‟s report necessarily means that expert provided a more detailed and thorough analysis. A brief report can sometimes indicate that a more detailed and thorough analysis may have been carried out. Whilst the SRS report may be brief, it clearly outlines how many roof tiles and metal roof sheets have been hail damaged. It also persuasively explains why it considers certain damages were due to faulty workmanship. It also provided photographs which show the relevant damages. On the whole, the report indicates to me that its author had taken the trouble to look closely at both roofs, conduct an actual audit of what has been damaged, and explained what caused them. Despite its brevity, I find the SRS report to be of much assistance in this dispute. In any case, I am of view that w hat ultimately determines if an expert‟s view should be accepted is whether it makes reasonable sense in light of the surrounding circumstances. Evidence of the circumstan ces surrounding the Applicant‟s claim weighs heavily against a suggestion that her roof did not sustain any hail damage at all. Furthermore, the damage which RC claimed to be prior handling damage appears to be fresh. In my view, RC would have to provide a more plausible and rational explanation for his conclusions instead of placing blanket reliance on his years of experience in the roofing industry. Considering all matters on a balance of probabilities:  I have not been persuaded that the whole of the Applicant‟s tiled roof requires replacement. However, I am satisfied that some 22 roof tiles (as identified by SRS) were damaged in the March 2010 hailstorm and the Applicant is entitled to indemnity for them.  I am also satisfied that she is entitled to indemnity for the 30 tiles she has had to replace on her own. The FSP has not responded to her evidence that she has had to replace them to check further leaks and also because the FSP has not address her claim for some six months; leaving me with little choice but to accept her evidence in its entirety.  I am not satisfied that the Applicant is entitled to indemnity for the deterioration of the mortar works on the roof. On this matter, the evidence of the experts is fairly consistent in that these were due to poor workmanship and general wear and tear, rather than the March 2010 hailstorm. Accordingly, I am satisfied that the Applicant is only entitled to the cost of replacing 52 roof tiles. However, I am unable to determine the amount that should be payable in that regard as the quotes supplied only provides a lump sum amount for a complete roof replacement. Case No: 246385 Determination Page 7 of 7 I will accordingly leave this aspect of the dispute to the parties to resolve by way of direct negotiation. However, the parties are at liberty to refer a fresh dispute for the Service ‟s consideration if a dispute should later arise as to the amount the Applicant is entitled to in that respect. Determination 3. In light of the above analysis, I determine as follows: (a) The FSP is to pay the Applicant the sum of $19,000 plus GST for the replacement of her metal (colorbond) roof. (b) The FSP is to indemnify the Applicant for the cost of replacing 52 roof tiles on her terracotta roof. (c) The FSP is to pay interest on the amount stipulated in (a) above and on the amount assessed as payable for (b) above at the statutory rate from 17 April 2010, being one month from the date the Applicant lodged her claim, until her claim in settled in full. For purposes of (b) above, I consider one month to be reasonable time for the FSP to investigate and determine the cost to replace 52 roof tiles on the terracotta roof. As there has been a lapse of some six months before the FSP made its decision on the claim, I also consider it appropriate to refer the matter to the Code Compliance Manager for further consideration.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.