Home / Financial Firm (Unknown - Insurer) / Determination 246170
Determination 246170
Claim denial under flood exclusion
Summary
The Applicant's tenanted home was damaged in the January 2011 Queensland floods and the claim was declined under the flood exclusion. AFCA found the damage was caused by floodwater from the Bremer River, that the policy disclosure was adequate, and upheld the decline.
Flood is clearly excluded by the policy wording, the insurer complied with section 35 of the Insurance Contracts Act, and the stormwater pipe claim fails because the backflow was floodwater.
Issues
- Claim denial primary · not upheld
“The available evidence establishes that the insured property was inundated by floodwater overflowing from the Bremer River; the policy does not cover loss caused by flood.”
- Failure to disclose secondary · not upheld
“The FSP provided the policy wording within 14 days and the wording clearly informs that flood is excluded.”
Subjects and remedies
natural disasterno remedy
Text of the determination
Case No: 246170 Determination Page 1 of 10
Case number: 246170
General Insurance - Domestic Insurance - Home Building – Claim declined –
Policy Exclusion – Flood – Sections 35 and 69 Insurance Contracts Act 1984
21 May 2012
Background
1. The Applicant held a Home Building Insurance Policy (the policy) with the
Financial Services Provider (FSP) covering her tenanted property.
2. The insured property was damaged due to the significant weather events
experienced in Queensland (Qld) during January 2011.
3. The FSP on concluding its investigation into the circumstances of the loss
declined the claim on the basis the damage was due to the event ‘Flood”,
which is specifically excluded under the policy.
4. The Applicant remains dissatisfied with the FSP’s decision to decline the
claim and is seeking complete indemnity under the claim.
Summary of Applicant’s position
5. In disputing the FSP’s declinature of her claim the Applicant has sought the
assistance of legal representatives “L”. In the interest of easy understanding
and brevity, both the Applicant and L will be referred to as “the Applicant” for
the purpose of this determination.
6. It is the Applicant’s contention that the FSP has failed to fulfil its obligations
to clearly inform her of the policy provisions as required under section 35 of
the Insurance Contracts Act 1984 (the Act) because:
The FSP failed to inform her of the flood exclusion prior to the inception
of the policy.
The wording of the Product Disclosure Statement (PDS) does not
satisfy the requirement to clearly inform a consumer of the extent
and/or limitations of the policy.
The mere provision of the policy is not always sufficient to satisfy the
obligations contained within section 35 of the Act. Therefore, the policy
should be read as the “Standard Cover” policy which includ es flood
cover.
Determination
Case No: 246170 Determination Page 2 of 10
7. In order for an event to be excluded from cover under the policy, the event
must fall precisely within the language of the definition used in the contract.
The Applicant’s property was damaged by an event which does not fall
within the policy definition of flood.
8. In the alternative, the Applicant does not accept that it was flood damage to
the insured property. Rather, she maintains that prior to any floodwater
reaching the property; stormwater run-off inundated the property and caused
the damage.
9. Further, noting that the policy provides cover for water leaking and escaping
from pipes, which a stormwater drain would be considered to be, the policy
provides cover for loss arising under such circumstances and accordingly
the Applicant is entitled to indemnity under the claim.
10. The sole effective/dominant cause of the loss was the release of water from
the dam. The time of inundation of the property is evidence of the dominance
and effective nature of the dam release in causing the Applicant’s loss. This
contention is clearly supported in the findings of the Insurance Council of
Australia (ICA) hydrology reports which confirm the immediate cause for the
flooding along the lower reaches of the river downstream of the dam, along
with the lower reaches of the Lockyer Creek and Bremer River, was release
from the dam.
11. Senior Flood Operations Manager “R” provided a document detailing
approximate flood peak travel times from the Bremer River to various
locations. On the basis of this guide it takes approximately 7hrs for water
from the Bremer River catchment to reach Trumpy Bridge near Woodend.
12. Using this guide, elevated Bremer River levels caused by rain that peaked at
6.00am on 11 January 2011 would have reached the Applicant’s property
before 1.00pm on the same day. As there is no evidence the property was
inundated at this juncture, these elevated levels were not the proximate
cause for the loss.
13. This case is not analogous to one where stormwater mixes with floodwater
and that floodwater would have inundated the property on its own. The
distinction is that the Bremer River on its own had not inundated the
Applicant’s property and as such is not a separate proximate cause. It can’t
be said that the Bremer River level in the absence of the releases from
Wivenhoe Dam (the dam) operated effectively to cause the loss at the
property.
14. Accordingly, the Panel should not be satisfied that there are two proximate
causes for the loss and/ or the application of the ‘Wayne Tank’ principle
which requires two independent proximate causes.
15. The Applicant maintains the opinion that:
The FSP’s assertion that the dam is a lake is untenable as the definition of
flood provided in the policy draws a clear distinction between a dam and a
lake.
Case No: 246170 Determination Page 3 of 10
The FSP’s position that the d am is a watercourse, modified or otherwise,
is without merit.
The FSP’s contention that, water released from a dam would almost
always enter a watercourse and damage caused by such an event would
be captured by the first sentence of the flood definition contradicts the
strict interpretation of the language within the policy.
16. Although the Applicant was not present at the insured property, as it was
tenanted at the time of the loss, the Applicant relies upon the tenant’s
recollection of the event and statutory declaration made available for review
and consideration by the Service.
17. The Applicant notes that the FSP has drawn a number of conclusions with
the aid of ‘Nearmap Photographic Images’ taken on 13 January 2011. The
Applicant maintains the only real conclusion that can be drawn from these
images is that water affected the property. They do not speak to how or
when the water got there.
18. The stormwater run-off would have occurred for a number of hours after the
storms which affected Ipswich up until 3.00pm on 11 January 2011. It is
artificial to say that the run-off from these storms ended before the property
was flooded late on 11 January 2011.
Summary of FSP’s position
19. The Applicant fails to appreciate that the initial burden of proof is on her to
establish that an insured event has occurred and the FSP maintains that
such burden has not been fulfilled.
20. The FSP refutes the Applicant’s contention that it had failed to fulfil its
obligations in line with section 35 of the Act. The FSP notes it is not in
dispute that the Applicant was provided with the relevant policy wording i.e.
the PDS and Certificate of Insurance (COI) at inception of the policy.
21. The consultants’ reports referred to and relied upon by the Applicant in
respect to the content of the PDS being confusing do not establish that the
FSP has failed to comply with its obligations under section 35 of the Act.
22. The FSP has at all times maintained that the Applicant’s property was
inundated by floodwaters which escaped from the normal confines of a
watercourse i.e. Bremer River; flood being a general exclusion across the
policy.
23. The flood exclusion would still apply in the instance the Applicant was able to
establish that some of the relevant river water was introduced into that
watercourse via a release from the dam. The Applicant has incorrectly
focused on the origin of part of the water that entered the watercourse,
without having regard to the fact that the water that did damage the property
had escaped the normal confines of a watercourse.
Case No: 246170 Determination Page 4 of 10
24. All evidence in this matter, both objective rainfall and river gauge data
supported by expert reports establishes without a doubt that the insured
property was damaged by flood, as defined within the policy.
25. Although the Applicant claims the damage to her property is due to
stormwater inundation, she has not submitted any evidence to support this
contention. The Applicant goes no further than to allege that the property
was initially inundated by stormwater run-off supported by the Statutory
Declaration from her tena nt, which states water had inundated the ‘yard’ and
makes no reference to water entering the insured building.
26. The evidence before the Service clearly establishes that the damage to the
property was in fact caused by the event “flood”, being water escaping from
any watercourse. This is also supported by the Applicant in her own
submission to the Service.
27. The Applicant also maintains that the sole proximate cause for the damage
to her property was water released from the dam, which she maintains is not
excluded from cover under the policy. It is her contention that the flood
exclusion only excludes from cover, water “escaping” from a dam as
opposed to water “released”.
28. The FSP submits the Service can determine this matter without addressing
the matter of whet her the flood exclusion applies to water “released” from the
dam. All evidence establishes it was water that escaped the normal confines
of the Bremer River that caused the inundation of the property.
29. The Service has considered this matter previously, whereby it was
established that the proximate cause for the loss was water from the Bremer
River and consequently flood damage, which is a general exclusion under
the policy.
30. In the context of the Applica nt’s claim, the closest related insured event is
“Storm”. The hydrology evidence confirms there was no significant rainfall in
the Applicant’s local area at the time of loss. Rather, the actual rainfall
recorded in the area was insufficient to be the sole cause of inundation of the
Applicant’s home.
31. The FSP maintains that if there is any question that the dam is a
watercourse in the alternative, it maintains that, the dam is an alteration or
modification of a watercourse. The dam is also known as Wivenhoe Lake
and the definition of flood within the policy includes water released from a
lake and is accordingly also excluded from cover.
32. The Applicant despite the ‘flood general exclusion’ seeks to rely upon the
insured event relating to water leaking/escaping from a pipe to obtain
indemnity under the claim. As noted above the Applicant has provided no
evidence which establishes anything further that the yard may have been
inundated by water escaping the stormwater drain.
Case No: 246170 Determination Page 5 of 10
33. The FSP maintains that the available evidence establishes that the water
that escaped the stormwater drain on the day was floodwater. Accordingly, it
by no means establishes an entitlement to indemnity under the policy for
loss or damage arsing from the insured event storm.
34. The FSP relies on the following policy provisions:
“ Page 15 Storm
…
However
we will NOT cover loss or damage cause by flood
…
Page 35 What you are not covered for – general exclusions
we will Not cover
…
loss, damage, injury or death that occurs as a result of
flood
…
Page 70 Glossary
flood
is the covering of normally dry land by water escaping or released from the
normal confines of a watercourse or lake, whether or not it is altered or
modified. Flood also includes water escaping from the confines of any
reservoir, channel, canal or dam.
Flood is not covered by this Policy. ”
Issues
42. Whether damage to the Applicant’s property was caused by flood water as
defined by the policy.
43. Whether the FSP was entitled to decline indemnity to the Applicant in line
with the policy.
Relevant Law
Section 13 of the Insurance Contracts Act 1984 provides that a contract of
insurance is a contract based on the utmost good faith, and there is implied in each
contract, a provision requiring each party to act towards the other party, in respect
of any matter arising under or in relation to it, with the utmost good faith.
Section 35 of the Act provides that, where a claim is made under a prescribed
contract and the event giving rise to the claim is a prescribed event in relation to the
contract, an insurer may not refuse to pay an amount equal to the minimum amount
of cover set out in the regulations made pursuant to the Act unless it can prove that
Case No: 246170 Determination Page 6 of 10
before the contract was entered into, the insurer clearly informed the insured in
writing of the relevant provisions of the contract, or that the insured knew or a
reasonable person in the circumstances could be expected to have known of such
provision.
Reasons for decision
44. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the complex nature of the issues. This dispute
has not been the subject of a FOS Recommendation and has proceeded
directly to Determination.
45. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
46. There has been an exchange of material between the parties. Each party
therefore is aware of the issues and has had the opportunity to comment. In
these circumstances the details contained in the relevant hydrological
reports will not be recited in this determination except where considered
relevant.
47. Prior to arriving at a determination the Panel has read and considered all the
material submitted by the parties to FOS.
48. The Panel notes the parties do not dispute the following:
The Applicant held an active Home Buildings Insurance policy with the
FSP at the time of the loss.
The FSP provided and the Applicant received the relevant policy
wording including the PDS and COI.
The property suffered significant damage due to the weather event
experienced in the area during January 2011.
The Applicant was not present at the insured building at the time of loss
as it is a tenanted property.
The provisions of the policy exclude from cover loss or damage arising
from the event “Flood”.
The insured property is in close proximity to the Bremer River.
49. The Applicant in disputing the FSP’s decision to decline the claim has raised
various concerns with the decision. The Panel acknowledges the FSP’s
reference to the fact that a number of these concerns raised by the Applicant
have previously been considered and determined by the Service. Further,
that reference to these previous determinations has been made by both the
Applicant and FSP in their current submissions to the Service.
Case No: 246170 Determination Page 7 of 10
50. Accordingly, in the interest of brevity the Panel will only briefly reiterate what
has been previously determined in respect to the identical arguments raised
by the parties, in addition to giving careful consideration to the new issues
raised by the parties.
Section 35 and “Clearly Inform”
51. The Applicant holds the opinion that the FSP has failed to satisfy its onus to
clearly inform her of the relevant provisions of the policy as:
The FSP did not make her aware of the fact that loss or damage arising
from the event flood was excluded from cover prior to the inception of
the policy.
The wording of the policy is confusing and beyond the understanding of
a person of reasonable intelligence and education; in support of which
she has submitted evidence from consumer communication
consultants.
Provision of the PDS
52. The Panel is satisfied that section 35 of the Act imposes the obligation on
the insurer to clearly inform a consumer of the scope and/or limitations of the
policy in writing before the contract is entered into. However, section 69(2) of
the Act provides that if it was not reasonably practicable for the information
to be so given orally or in writing, the information shall be deemed to have
been given if it is given in writing within 14 days after the day on which the
contract was entered into.
53. The Panel notes that it is not in dispute that the FSP provided the Applicant
with the relevant policy wording after inception of the policy and within14
days of the day the policy was issued. Accordingly, the Panel is satisfied that
the FSP fulfilled its obligations in line with section 35 of the Act in respect to
providing the Applicant with the relevant policy documentation.
Clear and unambiguous provisions
54. The Panel having satisfied itself that the FSP provided the relevant policy
documentation to the Applicant in line with the Act, has considered whether
the wording of the PDS is sufficient to clearly inform an insured that loss
arising from the event flood is excluded from cover.
55. It is well settled that the onus is on the insured to read and understand the
policy documents in order to determine whether the policy meets his or her
needs. Thus, the onus was on the Applicant to read and understand the
policy documents, including the PDS.
56. The Panel has carefully examined the PDS provisions relating to flood and
storm and is satisfied that the information made available under the relevant
headings on pages 15, 35 and 70 of the PDS clearly provide that the policy
excludes from cover loss or damage arising from flood. The exclusion from
Case No: 246170 Determination Page 8 of 10
cover is present both as an exception to cover available under the event
‘Storm’ as well as a general exclusion applicable to the policy as a whole.
57. Therefore, the Panel determines that the FSP in providing the PDS did
inform the Applicant of the exclusion of flood cover. Further, that the wording
of the policy is both clear and unambiguous in its meaning and application.
58. The Panel is mindful of the Applicant’s reference to and reliance upon
reports submitted by the consumer communication consultants in respect to
the wording and structure of the PDS. In the Panel’s opinion a PDS should
not be adversely critiqued because of what it actually is; that is, a legal
contract providing a wide range of benefits, subject to certain rules.
Proximate Cause and Hydrology Evidence
60. The Panel has been provided with multiple hydrology reports and
memorandums submitted by hydrologists appointed to the claim. This
information has been exchanged between the parties with each party having
had the opportunity to comment. Accordingly, the Panel will only reiterate
information from these reports it considers relevant.
W’s “Hydrology Report relating to the January 2011 Storm (Site specific
report) dated 14 April 2011.
The property is considered to be at the edge of the Bremer River (the
River) floodplain and is approx. 170m west of the main river channel.
Topographic data shows the ground elevation level of the property to be
between 14m and 15m AHD.
The tenant evacuated the property during the evening of 11 January
2011.
There is a stormwater drain located in the south east corner of the
property at the lowest point compared to anywhere else in the immediate
vicinity.
River level information was obtained from the River Gauge at Ipswich
located about 900m downstream of the property and the River Gauge at
Brassall (3km) upstream of the property.
Interpolation of the information obtained from these river gauges indicates
that the flood peak at the property would have been approximately 20m
AHD at midday on 12 January 2011.
With the property’s elevation level at between 14m -15m AHD and
considering the Applicant’s position regarding the peak inundation level at
the property, the flood peak would be in the order of 20m-21m AHD which
is consistent with the recorded river gauge data.
Rainfall for the general vicinity was obtained from the rain gauge at
Amberley (6km southwest) of the property. This shows low intensity,
continuous rainfall falling from 9.50am on 9 January delivering
approximately 85mm of rainfall over a period of two days.
Case No: 246170 Determination Page 9 of 10
High intensity causative rainfall began at 7.00am on 11 January before
finishing at 3.00pm the same day delivering an additional 100mm of rain.
This is calculated to be a 1 in 10 year ARI.
The interval between the end of causative rainfall and peak inundation at
the site would have been 21 hours.
Due to the small size of the local catchment and moderate intensity
rainfall it is considered unlikely that there was sufficient local run-off for
this to be a contributing factor to the inundation of the property.
In W’s opinion the inundation of the property was caused by water
escaping the confines of the river.
W ’ s Memorandum dated 11 January 2012
Information suggests rising water levels of the river would have started to
inundate the property at approximately 5pm on 11 January 2011.
The time of concentration for the catchment upstream of the property
would be in the order of 15 minutes from the last rainfall that fell in the
local catchment upstream of the property to pass the property.
Uniform depth calculations indicate that the depth of flow of local run-off
through the property’s yard would have been less than 2cm -3cm.
The property would not have been affected by any inundation from
sudden, excessive run-off of water prior to the arrival of rising water levels
from the river.
W’s Memorandum dated 12 March 2012
The stormwater drain located to the southeast extent of the site is
hydraulically connected to the river. Rising levels in the river would back
up the local sub-surface drainage system and inundate depressions in the
landscape (as is the case with the location of the stormwater drain) prior
to overland flows from the river reaching the area.
Water back charging from the stormwater drain would be classified as
‘ water escaping from the n ormal confines of a watercourse’ .
61. The Panel is satisfied the available information establishes, on the balance
of probabilities, the property was inundated on 11 January 2011. The
evidence supports a view that there was no significant rainfall in the
particular area immediately prior to water inundating the property.
62. The Panel has considered the Applicant’s reference to cover available under
the policy for water escaping pipes. However, on the basis of the available
information the water which escaped the stormwater drain (pipe) was back
flow from the Bremer River and accordingly considered floodwater.
Therefore, the reliance on the above mentioned insured event does not
come to the assistance of the Applicant in this instance.
Case No: 246170 Determination Page 10 of 10
63. In the absence of any evidence to the contrary, the Panel is not satisfied that
the Applicant has been successful in establishing that the water damage to
her property was the result of stormwater inundation on 11 January 2011.
64. The available evidence establishes that, on the balance of probabilities, the
insured property was inundated by floodwater overflowing from the Bremer
River on 11 January 2011.
65. The policy does not cover loss or damage caused by flood. It follows that the
Applicant’s claim does not succeed on the basis of the Applicant’s contention
that the damage was the result of stormwater.
Determination
66. On the basis of the available information the Panel determines that the loss
claimed by the Applicant was the result of flood as defined in the policy and
as such the FSP was entitled to deny liability for the claim.