Home / Financial Firm (Unknown - Insurer) / Determination 246169

Determination 246169

Denial of flood damage claim and related misrepresentation claims

FirmFinancial Firm (Unknown - Insurer)
Decided2012-04-30
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant's home was inundated by Bremer River floodwater in January 2011 and the FSP denied the claim under the flood exclusion. AFCA accepted the hydrology evidence, found no misrepresentation, found the policy clearly excluded flood, and rejected the non-financial loss claim.

The site-specific hydrology report established the inundation was flood as defined, and the policy wording met the clear-information requirement of section 35 of the Insurance Contracts Act.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 246169 Determination Page 1 of 14 Case number: 246169 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim (Flood) 27 April 2012 Background 1. The Applicant holds an insurance policy with the Financial Services Provider (FSP) for his residential home and contents. The policy was incepted on 30 December 2003. The relevant period of insurance operated for twelve months beginning on 8 October 2010. During this period, the building was insured for complete replacement, the contents up to a sum insured of $87,000 and personal valuables up to a sum of $2,000. Claims were subject to a standard excess of $100 and a flexi-premium excess of $900. 2. On 13 January 2011, the Applicant lodged a claim with the FSP due to water inundation following extreme weather events in Queensland. The following description was recorded on the FSP‟s system notes: “Due to the recent storms we have had to evacuate our home. I have been staying with my mother in law. I have returned home today and found the upstairs suffered 2 inches of water and all of our contents are damaged. I will be removing the carpets today and disposing of the off food to make the home sanitary.” 3. The FSP denied the claim on the basis the damage was caused by “flood”. The Applicant‟s solicitors ha ve disputed this. 4. For the sake of simplicity, reference to the Applicant will include his legal representatives. 5. Both the Applicant and the FSP have provided detailed submissions on the relevant issues. The Panel will only briefly summarise these submissions given all of the material made available has been exchanged with the other party. Summary of Applicant’s position 6. The Applicant has relied on the following alternative arguments in disputing the FSP‟s decision:  The FSP represented to him at policy inception that the policy would cover flood. Further and in the alternative, the FSP ought to have Determination Case No: 246169 Determination Page 2 of 14 informed him that the policy was not suitable to his needs in line with its duty of utmost good faith,  The Applicant believed he was covered for flood as a result of a water damage claim that was paid a few years prior to this claim,  Upon lodging the current claim, the FSP represented that it would be accepted. As a result of this, he disposed of items he could have otherwise salvaged,  The FSP is unable to discharge its obligations under section 35 of the Insurance Contracts Act 1984 (the Act) to rely on the flood exclusion, or  The FSP is unable to discharge its onus to establish the proximate cause of his loss in totality was due to “flood”. 7. The Applicant is also seeking compensation for non-financial loss as a result of the FSP‟s claim handling, in particular the FSP‟s misrepresentation at claim lodgement that he was covered for flood. Summary of FSP’s position 8. The FSP ha s responded in the following regarding the Applicant‟s arguments: a. The Applicant has provided insufficient evidence to establish that it misrepresented to him at policy inception that the policy covered flood. Further and in the alternative, even if it was found that it did, this was ameliorated by the fact it sent a copy of the policy that clearly excluded flood and this exclusion was communicated to him in a telephone conversation on 27 December 2010. b. In relation to the alleged misrepresentation at claim lodgement, the FSP notes the Applicant has provided insufficient evidence to establish this occurred. In this regard, the FSP refers to the claim system notes as well as a directive issued to staff that customers with a home policy were to be informed that flood is not covered. c. The FSP has provided evidence to establish that Section 35 of the Act has been complied with. 9. The FSP has relied on two reports commissioned by the Insurance Council of Australia (ICA) in addition to a site specific hydrology report to establish the damage to the Applicant‟s property was solely caused by “flood”. Accordingly, it is entitled to rely on the following policy provisions to deny the claim: “What we cover – insured events This section described under the heading: Yes – the insured events you are covered for, No – the conditions and exclusions that specifically apply to particular insured events … Case No: 246169 Determination Page 3 of 14 Yes Storm and rainwater including stormwater run-off from areas surrounding the site, or water escaping from any water main, drain, pipe, street gutter, guttering or surface … No Damage or loss caused by flood . Flood means the inundation or covering of normally dry land by water which: escapes or overflows from, or cannot enter, because it is full or has overflowed, or is prevented from entering, because other water has already escaped or been released from it, the normal confines of any watercourse or lake, including any that may have been modified by human intervention, or reservoir, canal, dam or stormwater channel. Flood does not mean stormwater run-off from areas surrounding the site, or water escaping from any water main, drain, pipe, street gutter, guttering or surface.” Issues 10. Whether the FSP misrepresented to the Applicant prior to the claim that he was covered for flood; 11. Whether payment of a previous water damage claim entitled the Applicant to believe he was covered for flood; 12. Whether the FSP misrepresented at claim lodgement that the Applicant was covered for flood; 13. Whether the FSP discharged its obligations under section 35 of the Act to clearly inform the Applicant that the po licy does not respond to flood; and 14. Whether the damage sustained was due to flood. Reasons for decision 15. Due to the nature of the dispute, the matter has been referred to the Panel for Determination in line with the Operational Guidelines to the Service‟s Terms of Reference. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination 16. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 17. It is appropriate to consider the issues under the various headings. Case No: 246169 Determination Page 4 of 14 Misrepresentation before the claim that the policy covered flood 18. The substantive evidence provided by the Applicant is contained in a statutory declaration he completed on 28 November 2011 which stated the following on this issue: “I took out my policy with [FSP] on the 30 th of December 2003 over the phone. From that phone conversation, I recall that I was left with the understanding that I had flood cover. I remember specifically asking about flood because we live close to the Bremer River. My wife, who was with me while I made the call, also remembers me asking about flood cover specifically.” 19. The Panel does not consider this evidence persuasive. As submitted by the FSP, this evidence was provided eight years after the event, allowing the potential for poor recall to be substantively prevalent. Further, the details contained in this statutory declaration are sparse as it provides no context of the conversation or the actual wording used by the parties that led the Applicant to this “understanding”. 20. In addition, both parties acknowledge the Applicant contacted the FSP on 27 December 2010 to enquire about whether the policy covered flood. The Applicant provided the following evidence in his solicitors‟ letter dated 10 May 2011 regarding his recollection of this conversation: “I rang [FSP] on 27 December 2010 or thereabouts because we had s ome minor flooding in the Ipswich area. I was ringing them to check that I was covered for flood. She told me that I had never been covered for flood. I said to her that was not my understanding. I said I‟m sure that I am covered. It left me scratching my head because I couldn‟t understand why she was saying that I was not covered. She didn‟t refer me to any documents and given that I had such a strong belief that I was covered, I thought she had made a mistake and given that I was subsequently given different advice after I made my claim, her comments did not dispel my belief that I was covered for flood.” 21. The FSP provided a copy of its contemporaneous file notes of this conversation and this stated the following: “IO called to advise through the storm the river out (sic) may overflow and flood the property. Advised flood is not covered as noted in PDS page 12/13. IO was not happy about this and will be looking around for another policy.” 22. Comparing the two versions, the Panel accepts the following can be taken as accepted between the parties and therefore fact:  A conversation between the FSP and the Applicant occurred on 27 December 2010;  The Applicant enquired about whether the policy covered him for flood; and  The FSP responded by informing him the policy did not cover flood. Case No: 246169 Determination Page 5 of 14 23. Although the parties dispute whether the FSP referred him to the policy, the Panel accepts it is clear the Applicant was informed in this conversation that he was not covered for flood. Despite this, the Applicant maintains he so strongly believed he was covered for flood that he took the view the FSP had made a mistake. 24. In regards to the policy, the Panel is persuaded the Applicant has received a copy of this given the following:  The FSP has provided persuasive evidence in line with the guidelines published by FOS in its Circular, edition three, to establish that a copy of the policies for both the building and contents were sent to the Applicant prior to the claim, and  The Applicant has provided no evidence stating he did not receive his policy. His arguments regarding the policy are instead focused on its structure and wording, which the Panel will deal with later. 25. The Applicant has also referred to the reasoning contained in a previous Determination issued by FOS (case 233281) to substantiate his submission regarding this issue. However, there are a number of distinguishing features between that case and this one which was highlighted by the FSP and the Panel accepts these are material. These are: a. The previous Determination contained objective evidence by way of a call recording regarding the inception of the policy, as opposed to a statutory declaration provided by the Applicant eight years after the fact. b. The policy was incepted as recently as April 2010 in the previous Determination. The Applicant‟s policy was incepted in December 2003. c. In the previous Determination, the Applicant was not clearly informed by telephone two weeks prior to the claim that the policy did not cover flood. 26. In light of these significant distinguishing features, the Panel does not accept the findings and reasoning in case number 233281 should be adopted in this case. 27. Although the Applicant may have thought the FSP made a mistake when discussing flood cover on 27 December 2010, having considered the overall evidence, the Panel does not accept the Applicant has established that at the time of the water inundation, he was under the reasonable apprehension that he was covered for flood. 28. In relation to the Applicant‟s submissions that the FSP had a duty of utmost good faith to advise him about the unsuitable nature of the policy, the Panel considers this is misconceived. This duty is synonymous with insurance brokers, not insurance companies. Further, there is no legal precedent or other evidence to substantiate the A pplicant‟s submission that the duty of utmost good faith extends this far. Case No: 246169 Determination Page 6 of 14 Misrepresentation at claim lodgement 29. The Applicant provided another statutory declaration dated 22 November 2011 to address this issue and it contained the following relevant remarks: “After the January 2011 flood event I phoned [FSP] to lodge my claim with the Customer Service Office on the 13 th of January 2011. I remember speaking to a female representative and telling her that we had suffered damage from the flood. She said to me „don‟t worry about anything, you‟re covered for full rebuild if necessary plus we have extra cover for specified items‟. I remember saying that I had all this stuff that had been damaged and she telling me that I should make the house safe and get rid of all items that had come in contact with the water.” 30. In contrast, the FSP relies on the claims description recorded on its system notes, which have been extracted in the “Background” of this Determination, along with the following claim note recorded for that day: “IO aware of XS and NCB. IO is living with mother-in-law at the moment and is happy to stay there until everything settles down.” 31. The Panel notes that in his submissions regarding this issue, the Applicant has referred to legal concepts such as “misrepresentation” and “detriment”. These concepts are generally associated with the equitable principle of estoppel which, broadly speaking, require three elements to be satisfied: a. A clear representation was made to the Applicant; b. The Applicant relied on that representation to his detriment; and c. The extent of the detriment suffered. 32. The two leading cases that sets out this equitable principle are Walton Stores (interstate) Ltd v Maher (1988) 164 CLR 387 and Commonwealth v Verwayan (1990) 170 CLR 394. 33. The FSP has not provided persuasive evidence to rebut the contents contained in the Applicant‟s statutory declaration regarding this conversation. Although it has provided a copy of the relevant claim notes, it has not provided any statement from the author or any other information that would enable the Panel to attribute greater weight to this evidence, such as:  Evidence that the author has a history of taking contemporaneous and substantive claim notes, and/or  Other examples of the author having dealt with insureds around this time who enquired about flood cover and her response being in line with the directive. 34. Despite this, the Applicant‟s evidence is limited regarding this substantive issue. For instance, he has indicated in his statutory declaration that he i nformed the FSP‟s claims operator that he suffered damage from flood. Case No: 246169 Determination Page 7 of 14 However, he has not set out the actual wording he used. That is, in his statutory declaration, he refers to his enquiry without any quotations, which is contrasted to his reference to th e FSP‟s response when his declaration uses direct quotation marks. 35. This distinction is critical. In order for the Panel to be satisfied what the FSP‟s representation was, it was incumbent upon the Applicant to attempt to identify, in as precise words as possible, the wording of his enquiry. Without such evidence, the FSP‟s response can become open to various interpretations. 36. For instance, according to the FSP‟s claim notes, the following was recorded: “Due to the recent storms we have had to evacuate our home …” 37. The FSP has noted that in reference to storms, its response was not misleading or incorrect because it was consistent with the fact the policy does cover storm damage. The Panel accepts this explanation is reasonable if the Applicant‟s description o f the loss was in line with the above statement. 38. In response to the FSP‟s evidence the Applicant, through his solicitors in a letter dated 13 January 2012, has stated he had no recollection of making such a statement but he does not believe he used the wor d “evacuated”. 39. The Panel considers this response is equivocal as the Applicant does not refute or deny making this statement. He only states he has no recollection of making such a statement except for the use of the word “evacuated”, which he states he did not say. This implies that the Applicant cannot recall, with sufficient clarity, the nature of his enquiry to enable him to respond with more decisiveness whether he referred to storms or floods in his conversation. 40. This is consistent with his statutory declaration where he does not refer to his enquiry in direct quotes. In light of the Applicant‟s inability to identify the specific nature of his enquiry, the Panel is not prepared to accept that the FSP‟s response clearly represented to him that he was c overed for flood. 41. Further, the Panel considers that this representation should not be considered in isolation. The conversation dated 27 December 2010 should also be factored in determining whether it was reasonable for the Applicant to accept he was covered for flood based on this one telephone call on 13 January 2011. 42. Particularly, regarding the conversation on 27 December 2010, the Panel accepted the Applicant was clearly informed he was not covered for flood. Further, the Panel has accepted the Applicant was also in receipt of the relevant policy that stated “flood” was not covered. Accordingly, in light of this and the fact the Applicant is not able to identify, with sufficient degree of certainty, the nature of his enquiry to the FSP in his conversation on 13 January 2011, the Panel is not satisfied it was reasonable for the Applicant to infer from the FSP‟s response that he was covered for flood. Case No: 246169 Determination Page 8 of 14 43. It therefore follows the Applicant is not entitled to any damages as a result of this conversation, which includes his claim for non-financial loss. Payment of a previous claim 44. The previous claim arose on 21 September 2008 when the following description was recorded on the FSP‟s system notes: “In the storm last night water has overflowed in the window tracks o nto the wooden window sill and onto my wife‟s side of the bed, pillows and a bit of the carpet as well.” 45. The Applicant has submitted that based on the FSP‟s acceptance of this previous claim, he had an expectation that all water damage claims would be paid. This is misconceived. 46. The nature of the damage sustained in this previous claim cannot be considered synonymous with “flood”. As evident in the FSP‟s policy, storm and rainwater are covered and this event appears to satisfy that insured event. 47. Further, there is nothing to indicate that the water which entered the home was due to water escaping the confines of the Bremer River. Instead, it appears clear based on the system notes produced by the FSP, which the Applicant has not refuted, that the water which entered the home did not escape or overflow from any nearby watercourse. 48. As such, the Panel does not accept it was reasonable for the Applicant to conclude that payment of one water damage claim is a clear representation that all water damage claims would be paid regardless of the source. Does the FSP’s policy clearly inform the Applicant flood is not covered? 49. Section 35(2) of the Act states that when a claim is made under a “prescribed contract” for a “prescribed event”, an insurer cannot refuse to pay the claim unless it can establish that it clearly informed its insured in writing that it would not cover this event. Section 34 of the Act has defined the terms “prescribed contract” and “prescribed event” by referring to the Insurance Contracts Regulations 1985. 50. There is no dispute that contracts of insurance covering a person‟s home and contents are a “prescribed contract” and damage due to flood is a “prescribed event”. 51. The onus is therefore on the FSP to establish that it has clearly informed the Appl icant prior to the claim that it would not cover damage caused by “flood”. This is generally done by an insurer providing a copy of its policy to its insured which is meant to set out completely the rights and obligations of both parties under the insurance contract. 52. Further, the Courts have supported this and particularly, in the case of Marsh v CGU Insurance Ltd [2004] NTCA 1, Mildren J provided the following Case No: 246169 Determination Page 9 of 14 comments that are particularly relevant to the operation of Section 35(2) of the Act: “In Hams & Anor v CGU Insurance Ltd(2002) 12 ANZ Insurance Cases 61 - 525, Einstein J held that the provisions of s 35(2) of the Insurance Contracts Act 1984 (Cth) could be met if the insurer provided to the proposed insured a document such as the proposed policy, which contained the relevant wording. I agree. … Whether the policy wording in fact "clearly informed" the insured that there was no cover for flood is a question of fact to be determined by an examination of the document in question. … Furthermore, the la nguage of s 35(2) suggests that the proposed insured can be clearly informed merely by providing the insured with a copy of the policy which shows the exclusion in clear and unambiguous terms. … The answer to the question "is flood covered" is easily ascertainable by any person of average intelligence and education. ” (Panel emphasis) 53. As stated previously, the Panel has accepted the Applicant received a copy of the relevant policies given the FSP‟s persuasive evidence regarding despatch of documents and the fact the Applicant has not stated he did not receive same. 54. Instead, the Applicant‟s submissions have focused substantially on the structure of the policy itself and the fact he considers it is too complex and confusing. In this regard, the Applicant has re lied on two previous Determinations issued by the Service, namely case numbers 40607 and 41709. The FSP, in contrast, has referred to two Determinations that were issued more recently and focused on the exact terms of this policy, namely case numbers 233366 and 245167. 55. Pursuant to clause 8.2 of the Terms of Reference, a Panel in determining a dispute considers what is fair in all the circumstances having regard to relevant legal principles, the terms of the policy, good insurance practice, and previous determinations where applicable. In determining whether a policy satisfies the requirements of Section 35(2) of the Act, the Panel will apply the reasoning of Mildren J in the case of Marsh, namely considering whether a person of average intelligence and education, having reviewed the Applicant‟s policy, would have been able to ascertain that flood is not covered. 56. The Applicant‟s insurance contract regarding the building and contents are set out in two different policy documents. However, the relevant terms and structure are essentially identical. 57. Upon reviewing the policies, the Panel considers that a person of average intelligence and education would easily have ascertained that “flood” is not covered given the following:  The policy contains an index on the front;  One of the headings contained in this index is “What we do not cover – general exclusions”, in which most people would expect to find any exclusions of cover; Case No: 246169 Determination Page 10 of 14  Upon turning to the appropriate page, an insured would find that flood is excluded;  The def inition of relevant terms is set out under the heading “What do we mean by that”, which is referred to in the index and is where an insured would reasonably expect to contain defined terms;  The FSP has also placed this exclusion with prominence alongside the insured event of “Storm and rainwater” given it is likely this exclusion would be most applicable under this insured event. 58. The Applicant has stated the actual definition of the term “flood” is confusing when you consider its structure: “ Flood means the inundation or covering of normally dry land by water which: escapes or overflows from, or cannot enter, because it is full or has overflowed, or is prevented from entering, because other water has already escaped or been released from it, the normal confines of any watercourse or lake, including any that may have been modified by human intervention, or reservoir, canal, dam or stormwater channel. 59. In reviewing this definition, the Panel notes it begins by referring to the inundation or covering of normally dry land by water. This, in itself, is clear. 60. Following on from this, the definition refers to three different types of situations that leads to this outcome, namely:  Water that escapes or overflows from the normal confines of any watercourse …  Water that cannot enter (because it is full or has overflowed) the normal confines of any watercourse …  Water that is prevented from entering (because other water has already escaped or been released from it) the normal confines of any watercourse. 61. For the sake of clarity, the definition has only articulated the sentence “the normal confines of any watercourse…” once given it is consistently applied to all three scenarios. 62. Based on the structure of this definition, it is clear there are three types of water inundation that falls within the term “flood”. In the Panel‟s opinion, these are separate and distinct given the use of the conjunctive “or”. Accordingly, even if the Panel was to accept that one of these situations was unclear or ambiguous, they can be severed from the contract and the others would still apply. 63. In relation to the first situation, the Panel considers this definition is clear as it reflects the common definition used by many insurers and currently being contemplated by Parliament in the ame ndments to the Act. Case No: 246169 Determination Page 11 of 14 64. In relation to the second and third aspects, the Panel does not consider that this definition is synonymous to the one contained in case number 40607. In that case, the flood definition included flood water combining with rain water. T he FSP‟s definition does not state this and accordingly, that previous Determination is distinguishable. 65. Further, the Panel considers the definition is relatively clear. That is, if water is unable to drain into any watercourse, lake, reservoir, canal, dam or stormwater channel because it is full, has overflowed or other water which has escaped or been released from it, it is deemed “flood”. This interpretation is consistent with the ordinary and natural meanings of the words used within their context of this definition. 66. Accordingly, the Panel considers the “flood” definition is clear for the purposes of Section 35 of the Act. It therefore follows the FSP is entitled to rely on same provided it is able to establish its applicability to the circumstances of this case. Water Inundation Hydrology reports 67. The FSP has relied on a site specific hydrology report dated 8 September 2011 that contained the following relevant material:  The property is located approximately 100m from the Bremer River. Runoff from the property would drain to the Bremer River within a few minutes.  Stormwater that lands on the northern side of B Street (the street the Applicant‟s property is located on) drains north and east and away from the property. There is virtually no external catchment that directs stormwater runoff to the property.  Rainfall data was collected from Bundamba (Hanlon Street) Alert, which is located approximately 1.7km east of the property. A total of 123mm was recorded between 0000 hours on 9 January 2011 and 1800 hours on 11 January 2011. No significant rainfall was recorded after 1400 hours on 11 January 2011. The peak hourly rainfall intensity of 16.3 mm/hr was recorded in the hour to 1400 hours on 11 January 2011. The peak stormwater runoff for the property would have occurred within 15 minutes of this peak intensity.  For durations of up to 24 hours, the recorded rainfall had an average recurrence interval (ARI) of less than 1 year.  Recorded water levels were obtained for the Bremer River at Ipswich Alert and the Bundamba Creek at the Bundamba (Hanlon St) Alert, located approximately 6.8km upstream and 1.6km downstream respectively from the property. The Bremer River peaked at a level of about 19.4m AHD at the Ipswich alert between 1300 and 1400 hours on 12 January 2011. The water level in Bundamba Creek peaked slightly later at approximately 1500 hours, also at 19.4m AHD. Case No: 246169 Determination Page 12 of 14  The ground levels of the property range from approximately 13m AHD at the south east end, backing onto the Bremer River, to 16.9m AHD to the north west and directly adjacent to B Street. This indicates the entire property would have been inundated by the peak water level. 68. Based on the above, the hydrologist concluded as follows: “The subject property was inundated by floodwaters from the Bremer River. Initial inundation of the subject property from the river would have occurred at about 1700-1800 hours on 11 th January, about 3-4 hours after the peak rainfall in the area occurred. Any water that entered the subject property after about 1700 hours on 11 January could not have been stormwater runoff because rainfall ceased at about this time.” 69. The FSP has referred to two reports commissioned by the ICA titled “Flooding in the Brisbane River Catchment January 2011, Volume 1 – Overview” and “Flooding in the Brisbane River Catchment January 2011 – Flooding in Ipswich City LGA”. The first report, as evident by its title, provides a general overview of the Brisbane River catchme nt, whereas the second report contains more specific details regarding catchments affecting the Ipswich City LGA. 70. As the Applicant‟s property falls within the Ipswich City LGA, the Panel considers the following conclusions contained in the reports to be relevant: a. Very intense rain fell on the north-western parts of the Bremer River catchment between 0600 hours and 1800 hours on 11 January 2011. Rainfall elsewhere in the catchment was much less. b. Large releases were made from Wivenhoe Dam over the period fro m 0600 hours, possibly as early as 0300 hours on 11 January 2011, until around 0300 hours on 12 January 2011. c. Releases from Wivenhoe Dam caused a flood wave in the Brisbane River. As the flood wave moved downstream, backwater flooding occurred along the lower reaches of the Bremer River and its tributaries. During this time, a significant flood event in the Bremer River was also trying to exit into the Brisbane River. d. It was concluded that the dam release flood from Wivenhoe Dam was the immediate cause of flooding along the reach of the Brisbane River downstream of the Dam and along tributaries through the Ipswich City LGA. Applicant’s Submissions regarding hydrological evidence 71. The Applicant has stated that as the site specific report was commissioned eight months after the event, this should not be relied upon. In this regard, the Applicant has referred to two previous Determinations, namely 41709 and 238186. 72. In relation to the latter, the Panel does not consider it is applicable. In that case, the substantive issue the Panel considered was whether the dispute should be delayed to enable the FSP to provide a site specific report. For Case No: 246169 Determination Page 13 of 14 reasons expressed in that Determination, the Panel did not consider it was appropriate. 73. This is significantly distinguishable from this case where the FSP has already obtained a site specific report, exchanged this with the Applicant and the Applicant has had a reasonable opportunity to consider same and respond to its contents. 74. In relation to case number 41709, the Panel consi ders the Applicant‟s reference to that case to be taken out of context. In that case, the delay in the commissioning of the report was but one of the factors that the Panel relied upon in finding in favour of the Applicant. As is evident upon reading the Determination, the Panel highlighted various omissions and factors behind the hydrology report that, combined with the late appointment of the hydrologist, resulted in its decision being against that insurer. 75. In light of this, the Panel considers it is appropriate to consider the site specific report when reviewing the source of the water inundation. Analysis 76. The FSP has provided a copy of its loss adjuster‟s report dated 17 February 2011 which contained a questionnaire at the rear setting out some of the evidence obtained from the Applicant regarding the inundation. In particular, the following was recorded:  The inundation to the yard occurred at approximately 6.00pm on 11 January 2011,  The water came into the house at approximately 11.00pm on 11 January 2011, and  The water was dirty. 77. The Panel notes the Applicant has not asserted that this evidence was incorrect or that he was misquoted by the loss adjuster. Accordingly, the Panel accepts this reflects the Applicant‟s evidence regarding the water inundation. 78. The FSP‟s site specific report referred to rainfall data from the Bundamba (Hanlon Street) Alert rainfall station, which is located approximately 1.7km east of the property. The Panel considers this was appropriate and indicative of the rainfall proximat e to the Applicant‟s property. 79. According to the records of this station, the peak rainfall hourly intensity was between 1 and 2pm on 11 January 2011. Although rainfall continued for three hours after that, the hourly amount was minimal in comparison. No rainfall was recorded after 5pm on 11 January 2011. 80. The Applicant‟s evidence about the inundation was that it reached his yard at 6pm but did not reach his house until 11pm on 11 January 2011 . In the Panel‟s opinion, it would appear unusual that stormwater inundation to the property would occur six hours after the last rainfall and nine hours from the Case No: 246169 Determination Page 14 of 14 peak rainfall as this type of inundation would more normally occur contemporaneously to heavy rainfall. 81. This is also consistent with the FSP‟s hydrologist who found that given the drainage and catchment characteristics of the property, runoff inundation would occur within 15 minutes of peak rainfall intensity. 82. Accordingly, the Panel considers the hydrologist‟s conclusion regarding the water inundation is consistent with the rainfall, river levels and the Applicant‟s evidence as well as being logical in the overall circumstances. Further, the hydrologist is appropriately qualified to report on the cause of water inundation. 83. In light of these factors, the Panel accepts the hydrologist‟s conclusions regarding the water inundation. 84. It follows from this that as the hydrologist identified that the water which inundated the Applicant‟s property escaped th e confines from the Bremer River, which is a natural watercourse, the damage to the Applicant‟s property was due to “flood” as defined by the policies. 85. Accordingly, the FSP was entitled to deny the Applicant‟s claim. Determination 86. On the basis of the available information the Panel determines the FSP was entitled to deny the Applicant‟s claim on the basis it was due to “flood”.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.