Partial denial of shade sail support post replacement for faulty design and workmanship

FirmFinancial Firm (Unknown - Insurer)
Decided2012-03-21
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$11,208
Non-financial loss—
Amount claimed$11,208
SourceAFCA PDF

Summary

The applicant's shade sail support posts were denied as faulty design and workmanship, and she complained about service delays. AFCA determined the FSP must indemnify the replacement posts with interest, but refused the service compensation and apology.

The FSP did not establish that the post failure was caused by faulty design or workmanship the applicant knew or should have known about, so the policy exclusion did not apply.

Issues

Subjects and remedies

pay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 246067 Determination Page 1 of 6 Case number: 246067 General Insurance - Domestic Insurance - Home Building - Service - Delay in Claim Handling - Faulty Design and Workmanship 1 March 2012 Background 1. The Applicant held a home building insurance policy with the Financial Services Provider (FSP) which was current at the time of the loss. 2. It appears that the storm which had caused the damage had occurred on approximately 1 January 2011. 3. Whilst the FSP accepted the claim for the sail shade, the FSP has denied the claim for the cost of the shade supports. It suggests that these need to be replaced due to a design fault and poor workmanship when the posts were originally installed. 4. The Applicant disagreed with the FSP’s decision to deny this portion of her claim. 5. The Applicant has also expressed concern about various matters affecting the service provided by the FSP during the claims process. 6. When the matter was referred to this Service, it was the subject of a Recommendation. On 2 December 2011, after carefully considering all of the material and the various submissions made by the parties, a Case Manager recommended that the FSP settle the Applicant’s claim based upon the lower quotation of $11,207.59 less any sum already paid. 7. The Case Manager also recommended that the Applicant should be issued with a formal written apology because of the service issues which she had encountered throughout the claims process, and that the FSP pay the Applicant $500 compensation. 8. Whilst the Applicant accepted this Recommendation, the FSP did not. When rejecting the Recommendation, it made further submissions and attached information provided by its contractors which was of particular relevance both to the question of pre-existing problems with the sails and as to the service issues about which the Applicant has made complaint. Determination Case No: 246067 Determination Page 2 of 6 Summary of Applicant’s Position 9. The Applicant says the sail shade was installed in 2008 and despite other heavy storms the shade has never collected rainwater and failed. 10. The Applicant further says her property is in good condition and well maintained. 11. The Applicant submits the FSP’s expert has incorrectly detailed the material used for the shade and that the posts were not concreted into the ground. 12. In response to claims by the FSP that the Applicant had experienced previous problems with the sails and that water had collected in them earlier, the FSP has denied that she informed the contractors of the FSP of any such thing. She emphatically denies that there has ever been a collection of water prior to this incident. 13. On the question as to tension and the sail, the Applicant says “I did tell B & A (representatives of the FSP) that the original sail company had checked the tension of the sail (which I thought was a normal practice with a new sail), I did not say the sail had been retens ioned “numerous times”. They only checked it the once.” 14. On the question of stretching of the sail and the collection of water in the sail, the Applicant says “I did not advise B that “when it rained the sails would stretch”. B’s suggestion that I had “advised sails used to fill with water every time it rained” is a complete fabrication. First there was only one sail, not multiple sails, second I have never advised nor implied that the sail was in the habit of stretching when it rained. It had not done so on any occasion before, let alone “every time it rained”. The first time I had this problem is the subject of this claim.” Summary of FSP’s Position 15. The FSP says it is not liable to indemnify the Applicant for the original assembly of the sail shade due to faulty design and worksmanship when it was first installed. 16. The FSP relies on the following policy provision contained within the Product Disclosure Statement (PDS) which the Applicant does not dispute receiving: “We don’t cover loss, damage, injury or death arising from: ... faulty design or workmanship that you knew about or should have reasonably known about ” 17. When rejecting the Recommendation, the FSP supplied information that the Applicant had informed an assessor that “she had the original sail company attend her home to retension the sails on numerous times. The insured clearly Case No: 246067 Determination Page 3 of 6 advised that when it rained the sails which stretched, therefore the sails would have to be retens ioned”. 18. The FSP also supplied detailed information from its assessor as to her conduct in the handling of the matter. These matters were relevant to the recommendation that an apology should be offered, and that the Applicant should be paid $500 by way of compensation. Issue 19. Whether the FSP is entitled to parti ally deny the Applicant’s claim. Reasons for Decision 20. I am satisfied a full exchange of information has taken place between the parties and that each party has had the opportunity of addressing any issues raised therein. 21. There is no dispute that a storm event took place which resulted in damage to the Applicant’s sail shade. The FSP has partially admitted the claim as it is clear that damage occurred as a result of a storm event such as is covered under the policy. 22. But the question which has arisen is whether the FSP is liable to provide cover for the replacement of the supporting posts. As to this aspect, the FSP argues that the posts require replacing because they are a faulty design and workmanship which has originated since the date of construction. 23. As to the subject, I note that the sails had apparently been in place for some 2 to 3 years. 24. In the area in which this Applicant lives, there would have been many significant storms during that period of time. I would have thought that if the FSP’s argument th at the posts require replacing due to faulty design, poor workmanship etc., the problems would have developed much earlier. 25. The Applicant provided a report from expert (S) as to the cause of the damage. S reported: “As requested the following is a description of how your shade sail, support posts, anchor points in your roof wand water damage to your ceilings has come about. During the storm the wind has shaken your sail violently to the point where the tension on the sail was compromised. This allowed water to collect in the sail, creating enormous weight and strain on the support poles and the anchor points through your roof. Consequently these gave way and exacerbated the problem by allowing the sail to belly and collect even more water. The attachment points in the roof have moved cracking the roof tiles allowing the water to fall through to your ceiling.” Case No: 246067 Determination Page 4 of 6 26. S also provided a quotation for the cost of replacing the sail and posts in the sum of $11,207.59. 27. The Applicant obtained a further quotation and report from expert (SS). The quotation amounted to $11,525.88 and the report detailed: “Storms have shaken the sail & loosened the poles & footings in the ground causing water to collect in the sail resulting in undue pressure to the structure. Fitting a new sail to the existing poles will result in a repetition of the same damage. Because of this I have allowed for new longer poles to be embedded more securely.” 28. Faced with these opinions, the FSP appointed an expert to inspect the structure. The expert “U” reported: “SHADE SAIL HAS FAILED DUE TO POOR DESIGN, USE OF INFERIOR TRUCK TARP AS SAIL FABRIC, AND BAD WORKMANSHIP. NOT ENOUGH FALL HAS CAUSED TARP TO FILL WITH WATER STRETCH BEYOND IT ELASTAC LIMIT MAKING IT UNUSABLE AND UNREPAIRABLE. WEIGHT OF WATER HAS BENT ROOF FIXING POINTS WHICH ARE M20 TREADED ROD INSTEAD OF 75MM O.D. STEEL S.H.S. NO FLASHING BOOTS HAVE BEEN USED TO SEAL RODS. STEEL POSTS HAVE BEEN OVER LOADED BY THE LARGE AMOUNT OF WATER HELD IN SAIL AN NEED RE FOOTING. ... REPLACE WESTERN POST WITH MORE HEIGHT TO CREATE ENOUGH FALL RE- FOOT TWO OTHER POSTS” (sic) 29. I interpret the reports from the various experts as establishing that, no doubt with the benefit of hindsight, the original posts were not high enough to prevent the collapse of the structure during an extreme storm event, however, I am unable to reach the conclusion which is advanced by the FSP that this means that the cause of the damage must, inevitably, be due to faulty design and workmanship. 30. In any event, even if I considered that it had been established that there was faulty design and workmanship, the entire history of the matter does not satisfy me that the Applicant was reasonably aware of any such design faults or poor workmanship. 31. When the FSP’s assessor has claimed that the sail had been the subject of “re - tens ioning” numerous times, and that “the sails used to fill with water every time it rained”, the Applicant has strenuously denied any such suggestion. Importantly, she has advised that the sail had never stretched on any occasion before, let alone every time it rained. 32. She is adamant that she had never seen the sail hold water before – “in spite of the many storms, winds and showers that have been through here since it was erected.” Case No: 246067 Determination Page 5 of 6 33. Therefore, although I do not doubt that th e FSP’s assessor may have genuinely believed that she was communicating information which had been given to her by the Applicant, I am unable to accept that that information was correct. 34. I now turn to the Applicant’s claims in relation to inadequate servic e, and the length of time to attend and address the issues. 35. In considering these matters, reference must be made to paragraph 9 of the Terms of Reference for this Service. Paragraphs 9.2 and 9.3 are set out above: 9.2 Compensation for direct financial loss or damage Subject to paragraph 9.7, FOS may decide that the Financial Services Provider compensate the Applicant for direct financial loss or damage. 9.3 Other compensation a) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the Financial Services Provider compensate the Applicant for consequential financial loss or damage up to a maximum amount of $3,000 per claim made in the Dispute. b) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the Financial Services Provider compensate the Applicant for non-financial loss but only where: (i) an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the Applicant’s expectation of enjoyment or peace of mind has occurred; or (ii) in the case of a Dispute pertaining to an individual’s privacy rights – injury has occurred to the Applicant’s feelings or humiliation has been suffered by the Applicant. The maximum amount of compensation for non-financial loss will be $3,000 per claim made in the Dispute. c) Notwithstanding paragraphs 9.3 a) and b), FOS will not provide compensation for: (i) consequential financial loss; or (ii) non-financial loss, In a Dispute arising as a result of a claim on a General Insurance Policy that expressly excludes such liability. d) The cap on liability in paragraph 9.3 a) does not in any way restrict FOS’s ability to make an interest award under paragraph 9.5. 36. The Applicant is not suggesting that the delay has given rise to any direct financial loss or damage, so that any compensation pursuant to paragraph 9.2 need not be considered. 37. The Applicant would, however, suggest that the delays of which she complains should justify an award pursuant to 9.3. 38. It is important to note the wording of 9.3(b)(I). 39. As initially indicated by the Case Manager who noted that the FSP had not countered the Applicant’s allegations of inadequate service, I should have agreed with the Case Manager that this may be a matter appropriate for an award of compensation under paragraph 9.3(b)(I). Case No: 246067 Determination Page 6 of 6 40. However, in the material supplied by the assessor, some explanation is provided for the chain of events which occurred. I do note that the Applicant has not reported the matter until several weeks after the storm (although I note that she suggests that she notified the FSP as soon as she became aware of the damage). 41. Having taken into consideration the explanation which is provided by the FSP and notwithstanding the comments by the Applicant, I do not now consider it appropriate for an award of compensation under this heading. 42. Similarly, whilst the chain of events has caused significant concern to the Applicant, I do not believe that the FSP has behaved so inappropriately as to be required to apologise to her. Determination 43. I determine that the FSP is obliged to indemnify the Applicant for the losses which she has sustained, including the replacement of the posts. 44. As no challenge has been made to the sum of $11,207.59, being the lesser of the quote provided by the Applicant, I determine that this sum be paid to the Applicant together with interest upon such sum from 30 June 2011 until the date of settlement.