Home / Financial Firm (Unknown - Insurer) / Determination 245993

Determination 245993

Flood exclusion denial of home building claim after Queensland inundation

FirmFinancial Firm (Unknown - Insurer)
Decided2012-06-20
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$280,000
SourceAFCA PDF

Summary

The Applicants' Queensland home was inundated in January 2011 and the FSP declined their roughly $280,000 claim under the flood exclusion. The Panel found the PDS clearly informed them of the exclusion and the water was backflow from Bundamba Creek, so the denial stood.

The PDS satisfied section 35 of the Insurance Contracts Act 1984, and backflow from a creek is floodwater excluded under the policy.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 245993 Determination Page 1 of 11 Case number: 245993 General Insurance - Domestic Insurance - Home Building & Contents - FSP Decision – Flood - Denial of claim – Section 35 Insurance Contracts Act 1984 18 June 2012 Background 1. The Applicants held a Home Building and Contents Insurance Policy (the policy) with the Financial Services Provider (FSP) and issued through the FSP‟s agent “N”. 2. The insured property was extensively damaged due to the significant weather events experienced in Queensland (QLD) during January 2011 and for which a claim was lodged under the policy. 3. The FSP on completing its investigation into the circumstances leading up to the loss determined that the damage was due to the event “Flood”. The claim was declined on the basis of flood being an excluded event under the policy. 4. The Applicants remain dissatisfied with the FSP‟s decision to decline the claim and are seeking full indemnity under the policy. Summary of Applicants‟ position 5. In disputing the FSP‟s decision to decline the claim, the Applican ts have sought legal representation by “L”. In the interest of brevity both the Applicants and L will be referred to as the “Applicants” for the purpose of this determination. 6. The Applicants purchased the policy approximately 15 years before the date of lo ss through the FSP‟s agent “N” whilst organising a home loan for the property. The Applicants maintain that they were induced into purchasing the property by N‟s representative and given the assurance that it provided full comprehensive cover. 7. The Applicants were never advised that there was a flood cover limitation within their policy and considered at all times that they had full flood cover. Accordingly, they maintain the extent of cover available under the policy was misrepresented by the FSP through its agent. 8. The FSP failed to discharge its obligations set out under Section 35 of the Insurance Contracts Act 1984 (the Act). Determination Case No: 245993 Determination Page 2 of 11 9. The definition of flood provided within the policy is too broad and does not meet the FSP‟s obligations to clearly communicate the exclusion. 10. The Applicants maintain that the original policy did provide indemnity for loss or damage arising from the event flood. Therefore, the FSP had an obligation to inform the Applicants of the variatio n in the terms of the policy. 11. The definition not only excludes cover for loss arising from flood but also floodwater combined with run-off and/or rainwater. On the one hand the Applicants are given the impression they are covered for loss arising from rainwater and run- off under the „Defined Events‟ sec tion of the Product Disclosure Statement (PDS). 12. There is difficulty in terms of the definitions of flood and run-off overlapping. Further, the definitions of the terms flood, run-off, storm and rainwater appear to be contradictory and confusing from a cons umer‟s perspective. 13. The Applicants rely upon previous determinations (e.g. 40607) issued by the Service to support their position regarding the lack of clarity of the policy wording. 14. The inundation of the Applicants‟ property was due to a combination of topography of the area and characteristics of overland flow which were factors in combining the rainwater and run-off caused by the storm. This was further exacerbated by the flows from a large stormwater drain situated south of the property under Gibson Street. 15. Information in respect to the time of the inundation provided in the FSP‟s loss adjuster “C”‟s report conflicts with that of the FSP‟s appointed hydrologist‟s (W) report. The Applicants submit the information regarding the circumstances leading up to the inundation of the property submitted by C would be more accurate, as this assessment occurred closer to the actual event. 16. The Applicants maintain that the FSP has failed to properly investigate the claim, with W‟s site specific assessment not occurrin g until July 2011, almost six months after the date of loss. 17. The Applicants are seeking full indemnity for their loss estimated to be in the vicinity of $280,000. Summary of FSP‟s position 18. The FSP is unable to supply the original policy inception documentation as it can only produce records/data going back to 2005. However, it has made available for consideration the relevant policy documentation from 2005 onwards up until the 2010-2011 renewal periods. 19. The date of loss falls within the policy period 5 October 2010 – 5 October 2011, and is subject to policy terms and conditions of the PDS made available to consumers in 2005. Case No: 245993 Determination Page 3 of 11 20. The FSP has been able to locate the PDS in place in 1998 and which was provided to the Applicants at policy inception. The FSP notes, contrary to the Applicants‟ contention this policy document clearly informs that loss arising from flood is excluded from cover. 21. In addition to the PDS‟s, the FSP submits that each policy renewal certificate (RC) also clear states: “ Please note: Flood is n ot covered by this policy.” which clearly informs of the fact that the policy excluded from cover loss or damage arising from flood. 22. Prior to 2006 it was the FSP ‟s practice to include with each RC a copy of the relevant PDS, a process since altered to only attaching a PDS in the instance any alterations are made to the policy terms. 23. In support of its position the FSP has provided a number of documents, extracts and mailing records since 2005 which purport to show dispatch details for the Applicants. 24. The FSP also refutes the Applicants contention that the wording of the flood exclusion is unclear, rather maintains it is clear and complies with the requirements set out under Section 35 of the Act. 25. Based on the available evidence, including the reports submitted by C, W and the Insurance Council of Australia (ICA), the FSP maintains that the damage claimed by the Applicants is caused by the event flood as defined within the policy. 26. The FSP relies on the following[policy provisions: “Words with special meanings …. “ flood ” means the inundation of normally dry land by water that has escaped or has been released from the normal confines of any natural watercourse, lake or lagoon whether or not altered or modified or of any reservoir, canal or dam. [Note: this policy does not cover loss, liability, injury or damage caused by or arising from flood to buildings and/or contents]. ... “ rainwater ” means rain falling naturally from the sky onto buildings and/or ground. ... “ run-off ” means rainwater that has collected on or has flowed across normally dry ground or has overflowed from swimming pools or spas. … Insured events we will pay ... 9. Storm rainwater or run-off … Case No: 245993 Determination Page 4 of 11 We will pay for loss or damage caused by storm, rainwater or run-off. “ storm ” means violent wind ( including cyclones and tornados), thunderstorms and hail which may be accompanied by rain or snow. „ rainwater‟ means rain falling naturally from the sky onto buildings and/or ground. “ run-off ” means rainwater that has collected on or has flowed across normally dry ground or has overflowed from swimming pools or spas. … We will not pay for loss or damage; a caused by;  flood, or  flood water combined with run-off and/or rainwater. “ flood ” means the inundation of normally dry land by water that has escaped or has been released from the normal confines of any natural watercourse, lake or lagoon whether or not altered or modified or of any reservoir, canal or dam. ... When we will not pay a claim under your policy ... 2. Unless we state differently in your policy, we will not pay for: a. flood as defined on page 5;” Issues 27. Whether the FSP has complied with its obligations under Section 35 of the Act to clearly inform the Applicants of the terms of the policy in a clear, concise and effective manner; and 28. Whether the wat er inundation to the Applicants‟ home was flood water as defined by the policy or rainwater run-off. Relevant Law Section 35 of the Act provides that, where a claim is made under a prescribed contract and the event giving rise to the claim is a prescribed event in relation to the contract, an insurer may not refuse to pay an amount equal to the minimum amount of cover set out in the regulations made pursuant to the Act unless it can prove that before the contract was entered into, the insurer clearly informed the insured in writing of the relevant provisions of the contract, or that the insured knew or a reasonable person in the circumstances could be expected to have known of such provision. Case No: 245993 Determination Page 5 of 11 Reasons for decision 29. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the complex nature of the issues. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 30. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 31. There has been an exchange of material between the parties. Each party therefore is aware of the issues and has had the opportunity to comment. 32. Prior to arriving at a determination the Panel has read and considered all the material submitted by the parties to FOS. 33. The Panel notes the parties do not dispute the following:  The Applicants held an active Home Insurance Policy with the FSP at the time of the loss.  The policy was purchased through the FSP‟s agent N whilst organising the home loan for the insured property.  The Applicants were provided with the relevant policy documentation, including the PDS, by N at the time the policy was purchased.  The insured property has suffered extensive damage arising from the water inundation of the property.  The exact time of the inundation of the property is unknown however it is believed that the insured property was inundated between the late hours of 11 January and early hours of 12 January.  The Applicants vacated the insured property at approximately 6.00pm on 11 January, at which stage their home had not been inundated. However, water levels were rising and had reached just below the swimming pool in the back yard. Provision of the PDS 34. The Panel having considered the evidence made available by the parties ‟ notes the underlying assertion that the Applicants may not have been provided with the relevant wording as required under Section 35 of the Act. However, such an allegation has not been specifically articulated by the Applicants in their submission to the Service. 35. A significant portion of the Applicants‟ submission revolves around their concerns with the alleged lack of clarity of the policy wording and structure. Further the Applicants assert that at the time they first took out the policy they understood that the policy provided cover for flood, and any subsequent change has not been clearly advised to them. Case No: 245993 Determination Page 6 of 11 36. The Panel notes that there is an acknowledgement by the Applicants of having been provided with the relevant PDS at inception of the policy. Further, having been provided with the opportunity to consider and express their position on the FSP‟s submission relating to the proof of dispatch/provision of the policy documentation over the years, the Applicants have not disputed such. 37. The Panel has reviewed the FSP‟s detailed evidence made available in its effort to establish that it has a system in place which not only generates but regulates the processes followed by the FSP and its mailing house when generating and posting policy documentation (including PDS‟s) to its policyholders. 38. Where a decision in relation to a dispute depends on the Service deciding whether or not the FSP sent and the Applicants received, a specific document (e.g. COI, PDS, SPDS, Renewal certificate etc), there are steps the FSP will need to take to satisfy the Service about the dispatch and receipt of the document. 39. The Panel has reviewed the evidence made available by the FSP in terms of establishing the provision of the relevant policy documentation to the Applicants. The Panel, ha ving carefully reviewed the FSP‟s documentation in this regard and noting receipt of these documents is not in dispute, is satisfied the FSP has established compliance with Section 35 of the Act in this regard. Clearly inform and Policy Wording 40. The Panel notes the Applicants contend that the PDS they were originally provided with at inception of the policy did provide cover loss arising from the event flood. The FSP has made available wording from this PDS issued in February 1998 and notes that under the sub-heading for the insured event “Storm or rainwater” it provides: “We will not pay for loss or damage: e. caused by flood, the action of the sea, high water, tsunami, erosion, landslide or subsidence; “flood” means the inundation of normally dry land by wa ter overflowing from the normal confines of any natural watercourse or lake whether or not altered or modified or of any reservoir, canal or dam.” 41. Accordingly, the Panel is satisfied that despite the Applicants‟ position, it is evident that at inception of the policy, there was no cover for loss or damage arising from the event flood. 42. The Panel notes the Applicants have argued that the structure and presentation of the FSP‟s policy wording applicable at the time of loss is in breach of Section 35 of the Act. It is their position that the wording does not adequately inform the consumer of the presence of the flood exclusion relied upon. Further, that the flood exclusion relied upon is too broad in its application and it is contradictory and confusing. This does not correspond Case No: 245993 Determination Page 7 of 11 with the FSP‟s responsibility to ensure the policy documents are clear, concise and effective. 43. The Panel has examined the FSP‟s PDS relevant to the time of loss. The document consists of 53 pages. A “Table of Contents” is found within th e opening pages of the document providing a number of emboldened sub headings each with a sequence of headings relevant to that sub heading. 44. A similar index is found for the cover provided “ If you have buildings cover ” and “ If you have contents cover ” sec tions of the document. 45. One such sub heading is titled “ Insured events we will pay ” followed by a range of specified events. Included in the range of specified events is the event “ Storm, rainwater or run-off ” with the page number indicating where this event is found. 46. The Panel having reviewed the event “ Storm, rainwater or run-off ” in the PDS notes that it provides the definitions of relevant terms i.e. Storm, rainwater, run-off and following these definitions is the statement that flood is not covered immediately followed by the definition of flood with the word “flood” in bold. 47. The index also provides the sub heading “When we will not pay a claim under your policy” referring the reader to page 37 of the document. Included at point 3 in this section is the wording which excludes flood as defined and refers to the page number (page 5) where the definition is found. 48. After analysis of the document the Panel is satisfied that the policy is clearly indexed and the exclusion from cover loss or damage caused by flood is clearly expressed. The Panel is satisfied the FSP has met its obligations under Section 35 of the Act to clearly inform by providing the Applicants with the relevant documents. Inception of the policy through FSP‟s agent N 49. The Applicants maintain at the time of arranging the home loan for the insured property through N and arising from the conduct of its representative, they were induced into purchasing the policy. Further, that they were given the impression that they had full comprehensive cover including full flood cover (Statutory Declarations submitted by Applicants). 50. The FSP has rejected the Applicants‟ allegation in this regard and maintains that the Applicants were provided with the relevant policy documentation which clearly outlined the extent of cover available under the policy. 51. The Panel notes there is no clear evidence as to the extent of the conversation that occurred or whether or not misleading information was provided to the Applicants by N. Nor is there any evidence to establish any actual prejudice suffered by the Applicants. 52. It is also noted that since policy inception and through to the time of the loss the Applicants had an extended period of time to, not only read and consider Case No: 245993 Determination Page 8 of 11 whether policy appropriate to their needs, but also arrange alternative cover in the instance they were not satisfied with the scope of cover available. Proximate Cause and Hydrology Evidence 53. The Applicants as an alternative argument maintain that the inundation of the property was initially due to stormwater run-off because of the topography of the area and the addition of stormwater overflowing from a stormwater drain south of the property. 54. The FSP maintains the damage claimed was clearly the result of floodwater inundation which is specifically excluded under the policy. In maintaining this position the FSP has relied upon reports submitted by the different consultants i.e. C, W and the ICA hydrologists‟ panel. 55. The Panel has considered these reports and notes that they have been exchanged between the parties. Therefore, in the interest of brevity, the Panel will only refer to that information within the reports it finds relevant to this determination. ICA Hydrology Report 56. The ICA hydrological report Volume 3 titled “Flooding in the Ipswich City LGA ” is relevant to the floodi ng in the area of the Applicants ‟ property and provides the following relevant information:  There were four distinct rainfall periods across the Ipswich City LGA during the period from 9 January to 13 January. (Page i para 2) – The first event occurred around 1000 to 1200 hours on 9 January. – The second occurred around 1500 to 2100 hours on 9 January. – The third from around 0700 to 1100 hours on 10 January. – The fourth from around 0600 to 1500 hours on 11 January.  Rainfall in the 24 hours to 0900 on 11 January was also significant across the entire LGA (25-200mm). Rainfall was heaviest in the northwest area of the LGS around Tallegalla. (7.2.2)  Large releases were made from the Wivenhoe dam over the period 0600 hours and possibly as early as 0300 hours on 11 January until around 0300 hours on 12 January. (9.3)  Release from the dam caused a flood wave in the Brisbane River. As the flood wave moved downstream water levels in the lower reaches of the Bremer River and tributaries and other Brisbane River tributaries draining into Ipswich City LGA were affected by backwater flooding. (9.3)  It was concluded that the dam release flood was the immediate cause for flooding along the reach of the Brisbane River downstream of the dam and along tributaries through the Ipswich City LGA. (9.3) 57. In relation to Bundamba Creek, the ICA report noted: Case No: 245993 Determination Page 9 of 11  After midday on 11 January water levels at the Bundamba (Hanlon Street) Alert respond in concert with water levels in the Brisbane River at Moggill indicating that water levels at Hanlon Street Alert were fully dictated by Brisbane River levels after this time. (8.4.4)  By about midnight on 11 January backwater effects from the Brisbane River had entered upstream along Bundamba Creek to the Bundamba School Alert. After this time water levels at Bundamba School Alert mirror Brisbane River water levels at Moggill Creek. (8.4.4)i C‟s Report „Flood damage claim‟ dated 31 January 2011  Inspection revealed water levels almost reached the roof on the upper level of the property causing extensive damage.  A bend of the Bremer River is about 400m southwest of the property. Further, a creek runs behind the property with its banks normally wit hin 75m. This creek feeds into the Bremer River approximately 1.3km north of the property.  It appears water backed up from Bremer River into Bundamba Creek and caused the flooding.  The height of habitable floor level above surrounding ground is 6cm above ground level. The upper portion of the dwelling ranges from being about 1.66m above ground level.  The property was inundated on 11 January, with the inundation of the yard commencing at approximately 5.00pm, with water entering the dwelling and garage at around 10.00pm on 11 January.  The inundation at the property peaked at around 10.00am on 12 January and this is based on reports and video footage shown on the news.  Water came from the direction of Bundamba Creek located just east of the property and caused extensive damage to the insured dwelling and swimming pool.  C did not believe the policy would respond to the loss as protection for loss arising from flooding is not available under the policy.  The water that inundated the home was dirty. W‟s “Water Damage Assessment” Report dated 4 August 2011  The date of inspection was 8 July 2011.  The approximate time of initial inundation was around 3.00am on 12 January; however the exact time is unknown.  The floor level of the house is approximately 0.6m above the surrounding ground level.  After receiving a text message from the SES recommending evacuation, the Applicants left their home at approximately 6.00pm on 11 January. Case No: 245993 Determination Page 10 of 11  The property had not yet been inundated however the Applicants did notice that water levels were just below the swimming pool located in the back yard.  The Applicants confirmed that they could see Bundamba Creek, located in close proximity of the property, was rising quickly.  The Applicants were unable to return home until 13 January, at which time they found although water had receded from their building, the backyard and swimming pool within it were still inundated.  The peak 1 hour rainfall intensity of 16.3m/hr occurred at 2.00pm on 11 January. Peak stormwater run-off from the surrounding catchment would have occurred within 10 to 30 minutes after peak rainfall.  No significant rainfall was recorded at Bundamba Alert rainfall station after 5.00pm on 11 January.  Recorded rainfalls in the area of the insured property were not particularly severe being less than 1yr ARI for all durations.  The property is located approximately 95m from Bundamba Creek.  Peak levels at Bundamba Creek (Hanlon Street) Alert occurred at 3.00pm on 12 January, with water levels peaking at the insured property at about the same time.  Based on observations approximate time of initial inundation above floor level was 3.00am 12 January.  Given the low intensity rainfall recorded at the subject property and the fact that the property was not inundated above floor level on this (11 January) afternoon, the subject property could not have been inundated by stormwater run-off 58. The Panel has considered the Applicants‟ reference to the stormwater drain located under Gibson Street. However, in line with the available evidence and considering the timing of the inundation of the property, the water overflowing from the stormwater drain is on the balance of probabilities, backflow water and accordingly in line with prevailing law is considered floodwater. 59. In order to clarify a number of issues the Panel Chair Ombudsman conducted a site inspection on 5 June 2012. The Applicants and the FSP‟s representative were present. 60. The Applicants have a large number of photographs covering before and after the inundation. The photographs show the water adva ncing towards the property from the direction of Bundamba Creek. The Applicants described the water as slowly advancing from this direction. The Applicants confirmed the garage/workshops were inundated from this water. They had not been inundated whilst it was raining. 61. The evidence establishes that the water responsible for the inundation of the property arrived from the rear of the property which is consistent with water Case No: 245993 Determination Page 11 of 11 escaping from Bundamba Creek which is in close proximity to the property. The Panel is satisfied that this water was backflow from the Bundamba Creek and as such, is properly categorised as flood water for the purpose of the policy. 62. The inundation of the property is not consistent with stormwater run-off inundating the property as this usually accepted to occur within a short period after peak rainfall in an area, which on this occasion was approximately at 2.00pm on 11 January. Although there is some dispute as to whether the water which first inundated the home and garage occurred at 10.00pm on 11 January 2011 (as earlier reported) or 3.00am on 12 January 2011 (as reported later) at best this would still be some 8 hours after the peak rainfall, and some 5 hours after the rainfall effectively ceased altogether. 63. On the basis of the available information the Panel is satisfied that, on the balance of probabilities, the water which inundated the Applicants‟ home was floodwater. 64. During the site inspection, the Applicants advised of problems experienced in a claim for inundation/damage to the bathroom prior to the floods, due to storm damage. That claim had been accepted but only partially covered. This matter has been raised by FOS with the FSP and is subject of a separate dispute should the parties be unable to resolve the matter. Determination 65. On the basis of the available information and the above reasons the Panel determines that:  the Applicants were clearly informed of the policy exclusion of flood;  the damage to the Applicants ‟ property was caused by flood;  the FSP is entitled to deny the Applicants ‟ claim.