Denial of flood inundation claim at Goodna home and contents

FirmFinancial Firm (Unknown - Insurer)
Decided2012-10-04
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicants' Goodna home was inundated in January 2011 and the FSP denied the claim as flood. The Panel found the loss was flash flood caused by heavy rain within 24 hours, so it is covered subject to the policy cap, with interest from the denial date.

The rain from 4am on 11 January 2011 was the proximate cause of the W4 release and the inundation, so the loss is flash flood within 24 hours and covered under the policy.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 245989 Determination Page 1 of 15 Case number: 245989 General Insurance - Domestic Insurance - Home Building - Flash flood - FSP Decision - Denial of claim - Exclusion/condition - Flood 25 September 2012 Background 1. The Applicants insured their home and contents in Goodna with the Financial Services Provider (FSP). The relevant period of insurance operated for twelve months beginning from 15 January 2010. During this period, the building was insured up to a sum of $175,000 and the contents for $117,000. 2. On 12 January 2011, the Applicants lodged a claim under the policy due to extensive water inundation following severe weather events in Queensland. 3. The FSP denied the claim on the basis the damage was due to “flood”. The Applicants, through their solicitors, have disputed this. 4. For the sake of simplicity, reference to the Applicants will include their legal representatives. 5. The Applicants and the FSP have provided detailed submissions on the relevant issues. For the sake of brevity, the Panel will only briefly summarise these submissions given all of the material made available has been exchanged with the other party. Summary of Applicants ’ position 6. The Applicants submit the following as alternative arguments in response to the FSP’s decision: a. The FSP represented to them at policy inception that they were covered for “flood”. b. The FSP’s policy failed to clearly inform them that “flood” was excluded and that there was a cap on payment for damage caused by flash flood or stormwater runoff, as required under section 35 of the Insurance Contracts Act 1984 (the Act). c. The damage was due to “Flash flood and stormwater run - off”, which is an insured event. In particular, the inundation was due to heavy rain Determination Case No: 245989 Determination Page 2 of 15 that fell from 4am on 11 January 2011 which resulted in the Wivenhoe Dam (the dam) operators elevating their strategy to W4. This decision resulted in massive discharges of water into the Brisbane River that ultimately inundated their property. 7. The Applicants seek to be indemnified for their claim. Summary of FSP’s position 8. In response to the Applicants ’ arguments, the FSP submits the following: a. It denies any of its telephone consultants misrepresented to the Applicants at inception that flood is covered. b. The policy structure and layout enables it to rely on the exclusion claus e of “flood” and the payment cap pursuant to section 35(2) of the Act. Further, the Applicants were made aware at inception of the flood exclusion clause. c. The Applicants have not discharged their onus of proving that the cause of the loss was “Flash flood and stormwater run- off”. In the alternative, it submits there was more than one proximate cause; if flash flood was a proximate cause, then the rain which fell from 9 January 2011 was also a proximate cause and is excluded under the policy; as such by application of the Wayne Tank principle, the policy would not respond. The proximate cause of the loss was “flood” as defined in the policy. 9. The FSP relies on a number of hydrology reports authored by its hydrologist (SC) and the following policy provisions to deny the Applicants’ claim : Page 3 of the Certificate of Insurance (COI) “ What optional covers are included and not included Home Contents ... Flood and storm surge not included not included...” Pages 10-12 of the Product Disclosure Statement (PDS) “ Words / terms with special meanings Word / term Meaning ... Flood Rising water which enters your home as a result of it running off or overflowing from any origin or cause. This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance. Case No: 245989 Determination Page 3 of 15 Flash flood and stormwater run - off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run - off . ... Storm A violent disturbance of the atmosphere associated with strong winds including a cyclone, lightning, heavy rain, hail or snow, but not continuous bad weather by itself.” Pages 17-18 of the PDS “ Insured events you are covered for Damage caused by weather... What is covered What is not covered Storm Loss or damage:  caused by rain, hail or snow after it has reached the ground; ... ... Flash flood and stormwater run-off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run - off Loss or damage caused:  by flood; ...” Page 27 of the PDS “ Your home The most we will pay you for home claims What is covered What is not covered Flash flood and stormwater run-off We will pay up to 50% of your home sum insured or $25,000, whichever is higher. ...” Page 32 of the PDS “ Your contents The most we will pay you for contents claims What is covered What is not covered Case No: 245989 Determination Page 4 of 15 ... ... Flash flood and stormwater run - off We will pay up to 50% of your contents sum insured or $25,000, whichever is higher, but not exceeding your contents sum insured. ...” Page 48 of the PDS “ Optional covers for extra peace of mind The covers outlined in this section are optional and do not apply unless you have asked for them and we agree to cover you. Additional premiums apply for each cover. Your certificate of insurance will show which covers operate. All optional covers are subject to the terms and conditions of this policy.” Page 53 of the PDS “ Optional covers for extra peace of mind What is covered What is not covered Flood and storm surge This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance. Home and/or contents cover We cover you for loss of or damage to your home or contents caused by flood or storm surge which happens during the period of insurance at the property address. We will pay up to the:  home sum insured, if your home is insured;  contents sum insured, if your contents are insured for damage caused by flood or storm surge, We will pay for loss or damage in the same way and in the same amounts as we do under insured events cover. We will not pay for loss or damage to:  paths, driveways, paving, retaining walls (whether or not part of the home), tennis cou rts or other playing surfaces;  shade or sail cloth;  fabric awnings, swimming pool and spa covers or liners and the like;  glasshouse whether or not constructed principally of glass;  water in swimming pools or spas; ...” Issues 10. Whether the FSP misrepresented to the Applicants prior to the claim that they were covered for flood. Case No: 245989 Determination Page 5 of 15 11. Whether the Applicants were “clearly informed” about what the policy did and did not cover. 12. Whether the cause of the Applicants’ loss was covered under the policy. Reasons for decision 13. Due to the nature of the dispute, the parties have been informed that the matter has been referred to the Panel for Determination in line with the Operational Guidelines to the Financial Ombudsman Service’s Terms of Reference. This dispute has not been the subject of a Recommendation and has proceeded directly to Determination. 14. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 15. It is appropriate to consider the issues under the various headings. Whether the FSP misrepresented to the Applicants prior to the claim that they were covered for flood 16. The Applicants allege they wanted to switch insurers but wanted to keep the same level of comprehensive cover. They contend they asked the FSP to be covered for everything and were expecting to have a level of cover which included cover for flood. 17. The FSP has provided recordings of the inception call between the female Applicant and an FSP’s consultant. 18. The Panel has carefully listened to these recordings and is satisfied that in two separate instances the FSP’s consultant clearly conveys to the female Applicant that flood is not covered in the policy because that option of cover has not been selected by her. Specifically the Panel notes: FSP representative: If you’d like a more comprehensive cover against flood damage you will need to apply for this separately. Female Applicant: No that’s fine. 19. The Panel is satisfied this is sufficient evidence to establish that the FSP did not misrepresent to the Applicants at inception that they were covered for flood. Consideration of “Flood” Definition in PDS 20. The Applicants argue that the policy fails to clearly inform as to the derogation from flood cover and the limitations on the extent of cover for flash flood. There is no dispute that the Applicants had received the policy documentation (including the PDS) and COI. Case No: 245989 Determination Page 6 of 15 21. Section 35(2) of the Act, according to established law, says that a proposed insured will be “clearly informed” if they are provided with the relevant documentation in writing and within that document the relevant exclusion and/or limitation is clear, unambiguous and a person of average intelligence and education is likely to have little difficulty in finding and understanding it. 22. The Applicants have raised a number of issues in respect of the PDS which are substantially the same as issues already raised in previous Determinations and addressed fully by the Panel. The Panel intends to adopt the approach adopted in those previous matters. 23. In summary, the Panel has reviewed the FSP’s policy on a number of occasions. The policy is indexed with relevant sections covering the insured events. The policy sets out the definitions of storm and flash flood and stormwater runoff. 24. The policy clearly identifies that flood and storm surge is an optional cover but otherwise flood is excluded from cover. The COI also clearly identifies that flood and storm surge is not covered with respect to the Applicants ’ policy. 25. Having considered the Applicants ’ submissions and the FSP’s policy documents, the Panel is satisfied that the PDS could be read and understood by a person of average intelligence and education. Therefore the Panel concludes that the FSP has met its obligations to clearly inform the Applicants of the extent of the exclusions and limitations in accordance with the requirements of the Act. Water Inundation The Evidence 26. The FSP has relied on the expert evidence of its hydrologist “SC”. 27. The Panel considers the following information from the hydrologist report entitled “Investigation of the January 2011 Inundation Event - Brisbane” is of relevance to this dispute:  In the Brisbane River catchment above Wivenhoe Dam, rainfall commenced at approximately 6am on 9 January 2011. These inflows contributed to a peak outflow from Wivenhoe Dam occurring at approximately 12 midnight on 12 January 2011.  Significant Wivenhoe Dam discharges occurred later than 24 hours after the start of the rainfall event that led to the significant inflows into the dam.  Damage directly associated with Brisbane River inundation within Brisbane after 6am on 12 January 2011 was caused by flood. Whereas, inundation before 6am on 12 January 2011 may be partially attributable to rainfall that fell within the catchments downstream of Wivenhoe Dam in the preceding 24 hours. Case No: 245989 Determination Page 7 of 15 28. SC in a statement dated 1 August 2011 refers to the risk address and says the following:  A substantial amount of rain fell in the Brisbane River catchment above the Wivenhoe dam before and during the period 9 – 11 January 2011. This caused significant inflows into the Wivenhoe dam, the level of which peaked in the evening of 11 January 2011.  A substantial amount of rain also fell in the Bremer River catchment from around 6am on 11 January 2011. This river would have contributed in the order of 15 –25% to the Brisbane River’s peak flow.  The major influence on the flooding of Brisbane River was rain which fell some days earlier over the Wivenhoe Dam catchment, causing its subsequent release from the dam.  The property’s level varies between 10.5– 11.5mAHD and has stormwater infrastructure on the street (C Crescent). The property is approximately 0.5m higher that the street level.  The property is on the west side of C Crescent which is higher than the east side. Local runoff would drain from west to east and through the curb and channelling, away from the property.  The property is not particularly vulnerable to stormwater or local runoff.  Data from Opossum rainfall alert gauge (3.6km from the property) shows that approximately 61mm of rain fell between 9 – 10 January 2011.  Approximately 44mm of rain fell on 11 January 2011, with the majority occurring around 11am. There was minimal rainfall between 6pm on 11 January and 15 January 2011.  The rainfall was of very low intensity throughout this period (less than 1 in 1 year event) and unlikely to cause stormwater or runoff inundation of the property.  The cause of inundation of the property was the rising level of Brisbane River, which was caused by rain falling more than 24 hours earlier. 29. The hydrologist also provided a report dated 7 June 2012. This report says in summary the following:  The effect of the discharge rate (from water release from the dam) on the height of the river at any given location is not dependent upon the actual water particles released into the river reaching that location.  The impact of the release of water is to produce a “wave” effect which increases the height of the river downstream, regardless of whether the released water particles have actually reached the location where the rise is recorded.  This wave travels faster than the individual water particles, so the increase in water level due to the wave occurs sooner than the arrival of individual water particles. Case No: 245989 Determination Page 8 of 15  The property had a height of 10.4 – 12mAHD. The approximate benchmark level is 11mAHD.  The property at bench mark level would have been first inundated at 7.06pm on 11 January 2011.  The W4 releases commenced at 8am on 11 January 2011. There is a distance of 82.4km between the Wivenhoe Dam and the property.  The effect of the W4 releases first reached the vicinity of the property at 12.50pm on 11 January 2011.  The W4 releases at the time of benchmark inundation would have contributed 0.2m of it and the approximate peak contribution of W4 releases to the inundation would have been of 2.2m.  The approximate peak contribution of the W4 releases to the Brisbane River water level before 4am on 12 January 2012 would have been 1.6m.  Had discharge from the Wivenhoe Dam continued at the W3 rates, the river level would have first inundated the benchmark level at approximately 7.50pm on 11 January 2011 and the river level at 4am on 12 January 2011 would have been at 12.9mAHD, 1.9m above the benchmark level.  With the W4 releases, the river level at 4am on 12 January would have been at approximately 14.5mAHD, 3.5m above the benchmark level.  The peak of the Brisbane River’s level in the vicinity of the property was 16.6mAHD. The peak height above the benchmark level was 5.6m.  The peak flood level in the vicinity of the property occurred at 4.56pm on 12 January 2011. 30. SC has presented a second statement dated 7 June 2012, which in summary says the following:  Heavy rain that fell on 11 January 2011 was not the only cause of the substantial releases from the Wivenhoe Dam later that same day, causing the Brisbane River to become vastly elevated.  Levels of water at the dam started increasing rapidly from around midday on 9 January 2011. As a result of rain between 6 – 9 January, the dam’s level was at 68.54mAHD, which is 1.54m above the Full Supply Level.  The rainfall on 9 – 10 January 2011 contributed roughly 71% of the increase in the Wivenhoe Dam levels.  The elevated water levels of the dam on the mo rning of 11 January 2011 were a result of substantial rain that fell over the Wivenhoe Dam catchment between 9 – 11 January 2011 and earlier.  As such, what caused the identified rises in the Brisbane River was water that had been released from the dam earlier than 11 January 2011 and inflows from other parts of the Brisbane River catchment. Case No: 245989 Determination Page 9 of 15 31. The loss assessor’s report says the following:  The entire building is damaged and all contents are destroyed.  Flood waters fully inundated both levels above the roof, engulfing the entire property. The water peaked at 6.1m, above roof level.  Water inundated the property for 24 hours. 32. The female Applicant has provided a Statutory Declaration, which in summary says:  On 11 January 2011, while on holidays, she received a text from SEQWater, saying there was a flash flood warning.  She was eventually able to get to her house at about 5 -6am on 12 January 2011. At that time the water was already halfway up the roof.  When she lodged her claim, the FSP told her all customers were covered for flash flooding. Based on that information, she thought she would be covered and rejected donations and made decisions based on the belief she would be paid out. 33. The Applicants have also relied on:  daily weather observations and radar images from the Bureau of Meteorology (BOM) for the period 9 – 13 January 2011;  the hydrology report commissioned by the Insurance Council of Australia (ICA report);  the supplementary witness statement of RA;  the Queensland Floods Commission of Inquiry’s Interim Report;  SEQWater’s report on the operation of Somerset Dam and Wivenhoe Dam, and  an extract of the transcript of proceedings of the Queensland Flood Commission of Inquiry. Releases from Wivenhoe Dam & Proximate Cause 34. The central issue for Determination in this dispute is whether the inundation of the Applicants’ home was due to flash flood as defined within the terms of the policy. That is, whether rain that fell no more than 24 hours prior to the inundation of the Applicants’ property was the proximate cause of t he inundation. 35. The Panel suspended issuing Determinations relating to this question after the Queensland Flood Commission of Inquiry had been recalled to hear further evidence from the Wivenhoe Dam flood engineers. 36. Once the final report was released, all relevant stakeholders were invited to put further submissions to the Panel relating to the impact of the heavy rainfall that commenced falling over the Wivenhoe Dam around 4am on 11 Case No: 245989 Determination Page 10 of 15 January 2011 and in particular the impact this had on the decision to adopt the W4 release strategy. 37. On 21 May 2012, the Financial Ombudsman Service (FOS) issued a memorandum to all relevant stakeholders advising that after considerable deliberation of all material available to it, the Panel formed a view that the heavy rain occurring from approximately 4am on 11 January 2011 and in particular the heavy rain between 4am and 8am on 11 January 2011 was a proximate cause of the W4 strategy being invoked and therefore a proximate cause or trigger that led to the flooding of many of the properties along the Brisbane River. 38. At that time, the Panel noted that the approach that each dispute would take depended upon the individual and unique factors relevant to the dispute and in that regard the parties were invited to make further submissions in relation to disputes before FOS. 39. In view of this, the FSP provided detailed further submissions to FOS on 14 June 2012 in relation to this dispute. Included with the submissions were the following documents:  A reference document for disputes relating to Queensland Floods (this is a general reference document) relating to the various submissions the FSP makes in relation to a number of issues. Not all issues raised in the reference document appear in the current dispute; The reference document has been updated;  Letter from SC attaching a key information sheet for the Applicants’ property;  Hydrologist report “Investigations of the January 2011 Inundation Event - Brisbane” dated March 2011;  Statements from SC dated 1 August 2011 and 7 June 2012. 40. The Panel has reviewed the reference documents. Insofar as the reference documents relate to the current issues in dispute, those matters have been considered. 41. In summary, the FSP argues that the proximate cause of the inundation of the property, that is the real or effective cause of the damage caused to the properties downstream of the dam, is not simply the rain that occurred from 4am on 11 January 2011. 42. The FSP maintains that on any reasonable view, the damage sustained to the downstream properties was the combined effect of all of the rainfall and not just the rain that had fallen from 4am on 11 January 2011, leading to the implementation of the W4 strategy from 8am that day. 43. There is no dispute that heavy rain fell over the Wivenhoe Dam catchment area and in fact parts of the Brisbane River, from approximately 4am on 11 January 2011. Case No: 245989 Determination Page 11 of 15 44. SC has relied on data from SEQWater dated 2 March 2011 which confirms the rapid increase in releases from the Wivenhoe Dam from 8am on 11 January 2011. 45. Examination of the SEQWater report identifies the rapid increase in the inflows to the Wivenhoe Dam commencing from about 4am, 11 January 2011. The report confirms the inflows into the dam had been decreasing from as early as 8am from 10 January 2011, with steady decreases from approximately 3pm on 10 January 2011 to 2am on 11 January 2011. 46. The Queensland Flood Commission of Inquiry report confirms that prior to 4am on 11 January 2011 and in fact prior to 8am on 11 January 2011, the dam releases were being managed at the W3 strategy. 47. Whilst it is accepted that the W3 strategy had led to an increase in the levels of the Brisbane River, the W3 strategy was designed to avoid, where possible, inundation of the properties below the Wivenhoe Dam by flooding from the Brisbane River. 48. There is no dispute that there were two significant rainfall spikes with rain that fell from 9 to 10 January 2011 being considered the first spike and rain that commenced falling from approximately 4am on 11 January 2011 being the second spike. 49. There is no dispute that the W4 strategy was adopted following the second spike. The FSP has argued that the switch to strategy W4 was not the natural and ordinary consequence of the rain that fell and in fact the move to W4 strategy was not taken in accordance with the Wivenhoe Dam manual. 50. In the Panel’s view, the Queensland Flood Commission of Inquiry final report does not find the adoption of W4 strategy at 8am on 11 January 2011 was inconsistent with the manual. 51. Although there may be issues as to how the Wivenhoe Dam had been managed prior to this time, there is nothing in the material that has been provided to the Panel to suggest that the earlier management of the Wivenhoe Dam influenced to any significant degree the adoption of the W4 release strategy at 8am on 11 January 2011. 52. The ICA hydrology and the information provided by the FSP’s hydrologist confirms that the increased releases from the Wivenhoe Dam after the adoption of the W4 strategy led to the development of a flood wave that ultimately caused the flooding of many properties downstream of the Wivenhoe Dam. 53. The question arises as to what was the proximate cause of this inundation. In determining the proximate cause of the inundation it is necessary to look at the effective or dominant cause of the inundation. Case No: 245989 Determination Page 12 of 15 54. The Panel agrees with the FSP’s general submission that the proximate cause is a cause determined by common sense evaluation of the relevant facts. 55. In the event that there are two or more proximate causes, one within the policy and the other excluded, the policy does not respond. The proximate cause is not determined by identifying the last event or final trigger but by determining what is the dominant, effective, direct or efficient cause of the loss. 56. The FSP has maintained that the impact on the Wivenhoe Dam from the rainfall that fell in the early hours of 11 January 2011 was only 29%, while 71% of the volume of the inflow came from the rain that fell on 9 and 10 January 2011 or earlier. The FSP maintains that to find the rainfall which had fallen from 4am on 11 January 2011 is the proximate cause is without foundation as such an approach produces an entirely artificial outcome. 57. With respect to the FSP’s argument the Panel disagrees. Whilst the Panel accepts there has been a significant impact on the levels of the Wivenhoe Dam by the rainfall that commenced falling on or about 9 January 2011 or earlier, the Panel is satisfied having regard to the information that has been exchanged and the relevant legal principles, that the heavy rain that commenced falling on or about 4am on 11 January 2011 was the proximate or effective cause of the adoption of the W4 strategy. 58. The Panel is also satisfied that whilst the level of the Brisbane River may have been increasing under the W3 strategy, it was the heavy rainfall from approximately 4am on 11 January 2011 that caused the need to adopt the W4 strategy at 8am on the same day. 59. As such the Panel is satisfied that the Wayne Tank principle has no application as the rain that fell over the Wivenhoe Dam from 4.00am on 11 January 2011, is the proximate cause of the loss. The Applicants’ Inundation 60. SC’s statement indicates the effect of the W4 releases first reached the vicinity of the Applicants’ property at 12.50pm on 11 January 2011. He estimated that the property was first inundated by the Brisbane River at 7.06pm on 11 January 2011 and by 4am on 12 January 2011, the river level would have been up to 3.5m above the relevant benchmark level. 61. The relevant benchmark level was SC’s estimate of the lowest point of the structure of the house on the land. This evidence has not been refuted by the Applicants in any manner. 62. The Panel notes that the ultimate inundation of the property would have been 5.6m above the benchmark level. SC identified this peak inundation occurred at approximately 4.56pm on 12 January 2011. Case No: 245989 Determination Page 13 of 15 63. The Panel accepts the possibility that these assessments may not be entirely accurate. The Panel notes that SC has variously described the property as being 10.5m to 11.5m AHD and also 10.4m to 12m AHD. 64. The FSP hydrologist has speculated that if the W3 strategy had been maintained, then, according to the key conclusion statement, the Applicants’ property would still have been inundated by approximately 7.50pm on 11 January 2011 and by 4am on 12 January 2011 it would have been inundated to a level of 1.9m above the benchmark level. 65. The Panel is concerned, however, that to reach such a conclusion it must be speculated that the releases from the dam would have continued at the same rate at the W3 level in the absence of any additional rainfall. The report does not address the possibility of the inflow into the Wivenhoe Dam decreasing. 66. The available information indicates the W3 strategy that was in place prior to 8am on 11 January 2011 had been successful in limiting the outflows and flooding below the Wivenhoe Dam. Whether the outflows would have continued at the same rate had the inflows continued to reduce is not known. 67. Instead, the Panel is satisfied that on the facts of what actually occurred on 11 January 2011, it was the heavy rainfall from approximately 4am on 11 January 2011 that caused the need to adopt the W4 strategy at 8am on the same day. This led to the inundation of the Applicants ’ property . 68. The only available information as to at what level the property was inundated by 4am on 12 January has been provided by SC (3.5m above the benchmark level). The Applicants have indicated that at approximately 5- 6am on that same day, the water was halfway up the roof. 69. Considering the property is a two-storey building, the Panel is of the view that SC’s conclusions and the Applicant s ’ observations are broadly consistent with the extent of damage that occurred by 4am on 12 January. The Panel also notes that the loss assessor’s statement that water peaked at 6.1m above roof level is not supported by any evidence and is not consistent with any available data. 70. The Panel is satisfied that the inundation of the Applicants ’ property to the level of 3.5m above benchmark level (which is the estimated level as at 4.00am on 12 January 2011) was caused by flash flood that occurred within 24 hours of the heavy rainfall and therefore falls within the coverage provided by the policy. Further, given the extent of the inundation, the Panel is satisfied that at 4.00am on 11 January 2011, the Applicants ’ entire loss is covered by the policy definition of flash flood. Quantum 71. The Renewal Certificate of Insurance for the relevant period provides a sum insured of $175,000 for the home with contents cover of $117,000. The Panel notes that cover for Flash flood is limited to 50% of the sum insured or Case No: 245989 Determination Page 14 of 15 $25,000 (whichever is greater) for each of the building and contents. Pursuant to the policy cap the FSP is therefore liable up to an amount of $87,500 for the damage to the building and $58,500 for the contents. 72. Given the time since the loss was sustained, the Panel accepts that the parties may be unable to provide an exact estimate of the total loss sustained, or a breakdown of that loss. 73. The Applicants and the FSP are asked to work cooperatively together to establish the extent of the loss sustained to the property and to reach an agreement as to cost of repairs or replacement of the various contents lost. 74. Insofar as the FSP may have made payment of a compassionate sum to the Applicants, FOS does not have jurisdiction to deal with this payment but acknowledges that the FSP, given the terms on which the compassionate payment was made, may be entitled to deduct this payment from any settlement sum. 75. The Panel has also considered the question of interest. 76. The FSP has argued that interest is only payable from the date from which it was unreasonable to withhold payment. The FSP maintains that it is entitled to a reasonable period to investigate and determine its position, and given the complex nature of the flood disputes, the delays are not unreasonable. Further complex situations require substantial periods of time for independent bodies such as the Queensland Flood Commission of Inquiry and FOS, to make conclusions on the issues in dispute. 77. The FSP maintains that it did not act unreasonably in this dispute and therefore interest is not payable. Alternatively if some period of interest is to be awarded it should be reduced to account for the substantial delays through the course of the process which were not the FSP’s fault. 78. Section 57 of the Insurance Contracts Act requires interest be paid when it becomes “unreasonable for the insurer to have withheld payment”. An examination of relevant case law indicates that most probably, interest will be awarded from either when an insurer first emphatically denied liability or disputed a matter, or from when in the normal course of events the claim should have been paid if liability had not been disputed. 79. In this dispute the Panel accepts that the FSP was entitled to withhold payment of the settlement monies until such time as it had properly investigated the dispute and made its decision as to liability. 80. The FSP made its original decision to deny the claim after receiving relevant assessment reports, hydrology reports and other information. The FSP was aware of the terms of its policy and aware of the relevant provisions under which liability might arise and chose to deny the claim having reviewed those relevant provisions and the evidence available to it. Case No: 245989 Determination Page 15 of 15 81. In the Panel’s view, at that point the FSP has made its decision on the claim and it is appropriate that from that time interest be paid unless it can be established that the Applicant had withheld informa tion from the FSP that would have led to an alteration of its decision. Determination 82. The FSP is to meet the cost of repairs incurred by the Applicants and the cost of the replacement of items damaged as a result of the inundation of the property. Any payment is subject to the policy limitations referred to in this Determination. 83. Insofar as the FSP is to cash settle the claim, the FSP is to pay interest from 30 March 2011 (being the date of rejection of the claim) to date of payment of the claim, in accordance with section 57 of the Act.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.