Text of the determination
Case No: 245989 Determination Page 1 of 15
Case number: 245989
General Insurance - Domestic Insurance - Home Building - Flash flood - FSP
Decision - Denial of claim - Exclusion/condition - Flood
25 September 2012
Background
1. The Applicants insured their home and contents in Goodna with the
Financial Services Provider (FSP). The relevant period of insurance
operated for twelve months beginning from 15 January 2010. During this
period, the building was insured up to a sum of $175,000 and the contents
for $117,000.
2. On 12 January 2011, the Applicants lodged a claim under the policy due to
extensive water inundation following severe weather events in Queensland.
3. The FSP denied the claim on the basis the damage was due to “flood”. The
Applicants, through their solicitors, have disputed this.
4. For the sake of simplicity, reference to the Applicants will include their legal
representatives.
5. The Applicants and the FSP have provided detailed submissions on the
relevant issues. For the sake of brevity, the Panel will only briefly summarise
these submissions given all of the material made available has been
exchanged with the other party.
Summary of Applicants ’ position
6. The Applicants submit the following as alternative arguments in response to
the FSP’s decision:
a. The FSP represented to them at policy inception that they were
covered for “flood”.
b. The FSP’s policy failed to clearly inform them that “flood” was excluded
and that there was a cap on payment for damage caused by flash flood
or stormwater runoff, as required under section 35 of the Insurance
Contracts Act 1984 (the Act).
c. The damage was due to “Flash flood and stormwater run - off”, which is
an insured event. In particular, the inundation was due to heavy rain
Determination
Case No: 245989 Determination Page 2 of 15
that fell from 4am on 11 January 2011 which resulted in the Wivenhoe
Dam (the dam) operators elevating their strategy to W4. This decision
resulted in massive discharges of water into the Brisbane River that
ultimately inundated their property.
7. The Applicants seek to be indemnified for their claim.
Summary of FSP’s position
8. In response to the Applicants ’ arguments, the FSP submits the following:
a. It denies any of its telephone consultants misrepresented to the
Applicants at inception that flood is covered.
b. The policy structure and layout enables it to rely on the exclusion
claus e of “flood” and the payment cap pursuant to section 35(2) of the
Act. Further, the Applicants were made aware at inception of the flood
exclusion clause.
c. The Applicants have not discharged their onus of proving that the
cause of the loss was “Flash flood and stormwater run- off”. In the
alternative, it submits there was more than one proximate cause; if
flash flood was a proximate cause, then the rain which fell from 9
January 2011 was also a proximate cause and is excluded under the
policy; as such by application of the Wayne Tank principle, the policy
would not respond. The proximate cause of the loss was “flood” as
defined in the policy.
9. The FSP relies on a number of hydrology reports authored by its hydrologist
(SC) and the following policy provisions to deny the Applicants’ claim :
Page 3 of the Certificate of Insurance (COI)
“ What optional covers are included and not included
Home Contents
...
Flood and storm surge not included not included...”
Pages 10-12 of the Product Disclosure Statement (PDS)
“ Words / terms with special meanings
Word / term Meaning
...
Flood Rising water which enters your home as a result of it
running off or overflowing from any origin or cause.
This policy does not cover flood unless we have
agreed and it is shown on your certificate of insurance.
Case No: 245989 Determination Page 3 of 15
Flash flood and
stormwater run - off
A sudden flood caused by heavy rain that fell no more
than 24 hours prior to the flash flood or stormwater
run - off .
...
Storm A violent disturbance of the atmosphere associated
with strong winds including a cyclone, lightning, heavy
rain, hail or snow, but not continuous bad weather by
itself.”
Pages 17-18 of the PDS
“ Insured events you are covered for
Damage caused by weather...
What is covered What is not covered
Storm Loss or damage:
caused by rain, hail or snow
after it has reached the ground;
...
...
Flash flood and stormwater run-off
A sudden flood caused by heavy rain
that fell no more than 24 hours prior to
the flash flood or stormwater run - off
Loss or damage caused:
by flood; ...”
Page 27 of the PDS
“ Your home
The most we will pay you for home claims
What is covered What is not covered
Flash flood and stormwater run-off
We will pay up to 50% of your home sum
insured or $25,000, whichever is higher.
...”
Page 32 of the PDS
“ Your contents
The most we will pay you for contents claims
What is covered What is not covered
Case No: 245989 Determination Page 4 of 15
... ...
Flash flood and stormwater run - off
We will pay up to 50% of your contents
sum insured or $25,000, whichever is
higher, but not exceeding your contents
sum insured.
...”
Page 48 of the PDS
“ Optional covers for extra peace of mind
The covers outlined in this section are optional and do not apply unless you
have asked for them and we agree to cover you. Additional premiums apply
for each cover. Your certificate of insurance will show which covers operate.
All optional covers are subject to the terms and conditions of this policy.”
Page 53 of the PDS
“ Optional covers for extra peace of mind
What is covered What is not covered
Flood and storm surge
This policy does not cover flood unless
we have agreed and it is shown on your
certificate of insurance.
Home and/or contents cover
We cover you for loss of or damage to
your home or contents caused by flood
or storm surge which happens during the
period of insurance at the property
address.
We will pay up to the:
home sum insured, if your home is
insured;
contents sum insured, if your
contents are insured for damage
caused by flood or storm surge,
We will pay for loss or damage in the
same way and in the same amounts as
we do under insured events cover.
We will not pay for loss or
damage to:
paths, driveways, paving,
retaining walls (whether or
not part of the home), tennis
cou rts or other playing
surfaces;
shade or sail cloth;
fabric awnings, swimming
pool and spa covers or liners
and the like;
glasshouse whether or not
constructed principally of
glass;
water in swimming pools or
spas; ...”
Issues
10. Whether the FSP misrepresented to the Applicants prior to the claim that
they were covered for flood.
Case No: 245989 Determination Page 5 of 15
11. Whether the Applicants were “clearly informed” about what the policy did and
did not cover.
12. Whether the cause of the Applicants’ loss was covered under the policy.
Reasons for decision
13. Due to the nature of the dispute, the parties have been informed that the
matter has been referred to the Panel for Determination in line with the
Operational Guidelines to the Financial Ombudsman Service’s Terms of
Reference. This dispute has not been the subject of a Recommendation and
has proceeded directly to Determination.
14. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
15. It is appropriate to consider the issues under the various headings.
Whether the FSP misrepresented to the Applicants prior to the claim that they
were covered for flood
16. The Applicants allege they wanted to switch insurers but wanted to keep the
same level of comprehensive cover. They contend they asked the FSP to be
covered for everything and were expecting to have a level of cover which
included cover for flood.
17. The FSP has provided recordings of the inception call between the female
Applicant and an FSP’s consultant.
18. The Panel has carefully listened to these recordings and is satisfied that in
two separate instances the FSP’s consultant clearly conveys to the female
Applicant that flood is not covered in the policy because that option of cover
has not been selected by her. Specifically the Panel notes:
FSP representative: If you’d like a more comprehensive cover
against flood damage you will need to apply for this separately.
Female Applicant: No that’s fine.
19. The Panel is satisfied this is sufficient evidence to establish that the FSP did
not misrepresent to the Applicants at inception that they were covered for
flood.
Consideration of “Flood” Definition in PDS
20. The Applicants argue that the policy fails to clearly inform as to the
derogation from flood cover and the limitations on the extent of cover for
flash flood. There is no dispute that the Applicants had received the policy
documentation (including the PDS) and COI.
Case No: 245989 Determination Page 6 of 15
21. Section 35(2) of the Act, according to established law, says that a proposed
insured will be “clearly informed” if they are provided with the relevant
documentation in writing and within that document the relevant exclusion
and/or limitation is clear, unambiguous and a person of average intelligence
and education is likely to have little difficulty in finding and understanding it.
22. The Applicants have raised a number of issues in respect of the PDS which
are substantially the same as issues already raised in previous
Determinations and addressed fully by the Panel. The Panel intends to adopt
the approach adopted in those previous matters.
23. In summary, the Panel has reviewed the FSP’s policy on a number of
occasions. The policy is indexed with relevant sections covering the insured
events. The policy sets out the definitions of storm and flash flood and
stormwater runoff.
24. The policy clearly identifies that flood and storm surge is an optional cover
but otherwise flood is excluded from cover. The COI also clearly identifies
that flood and storm surge is not covered with respect to the Applicants ’
policy.
25. Having considered the Applicants ’ submissions and the FSP’s policy
documents, the Panel is satisfied that the PDS could be read and
understood by a person of average intelligence and education. Therefore the
Panel concludes that the FSP has met its obligations to clearly inform the
Applicants of the extent of the exclusions and limitations in accordance with
the requirements of the Act.
Water Inundation
The Evidence
26. The FSP has relied on the expert evidence of its hydrologist “SC”.
27. The Panel considers the following information from the hydrologist report
entitled “Investigation of the January 2011 Inundation Event - Brisbane” is of
relevance to this dispute:
In the Brisbane River catchment above Wivenhoe Dam, rainfall
commenced at approximately 6am on 9 January 2011. These inflows
contributed to a peak outflow from Wivenhoe Dam occurring at
approximately 12 midnight on 12 January 2011.
Significant Wivenhoe Dam discharges occurred later than 24 hours
after the start of the rainfall event that led to the significant inflows into
the dam.
Damage directly associated with Brisbane River inundation within
Brisbane after 6am on 12 January 2011 was caused by flood.
Whereas, inundation before 6am on 12 January 2011 may be partially
attributable to rainfall that fell within the catchments downstream of
Wivenhoe Dam in the preceding 24 hours.
Case No: 245989 Determination Page 7 of 15
28. SC in a statement dated 1 August 2011 refers to the risk address and says
the following:
A substantial amount of rain fell in the Brisbane River catchment above
the Wivenhoe dam before and during the period 9 – 11 January 2011.
This caused significant inflows into the Wivenhoe dam, the level of
which peaked in the evening of 11 January 2011.
A substantial amount of rain also fell in the Bremer River catchment
from around 6am on 11 January 2011. This river would have
contributed in the order of 15 –25% to the Brisbane River’s peak flow.
The major influence on the flooding of Brisbane River was rain which
fell some days earlier over the Wivenhoe Dam catchment, causing its
subsequent release from the dam.
The property’s level varies between 10.5– 11.5mAHD and has
stormwater infrastructure on the street (C Crescent). The property is
approximately 0.5m higher that the street level.
The property is on the west side of C Crescent which is higher than the
east side. Local runoff would drain from west to east and through the
curb and channelling, away from the property.
The property is not particularly vulnerable to stormwater or local runoff.
Data from Opossum rainfall alert gauge (3.6km from the property)
shows that approximately 61mm of rain fell between 9 – 10 January
2011.
Approximately 44mm of rain fell on 11 January 2011, with the majority
occurring around 11am. There was minimal rainfall between 6pm on 11
January and 15 January 2011.
The rainfall was of very low intensity throughout this period (less than 1
in 1 year event) and unlikely to cause stormwater or runoff inundation
of the property.
The cause of inundation of the property was the rising level of Brisbane
River, which was caused by rain falling more than 24 hours earlier.
29. The hydrologist also provided a report dated 7 June 2012. This report says
in summary the following:
The effect of the discharge rate (from water release from the dam) on
the height of the river at any given location is not dependent upon the
actual water particles released into the river reaching that location.
The impact of the release of water is to produce a “wave” effect which
increases the height of the river downstream, regardless of whether the
released water particles have actually reached the location where the
rise is recorded.
This wave travels faster than the individual water particles, so the
increase in water level due to the wave occurs sooner than the arrival
of individual water particles.
Case No: 245989 Determination Page 8 of 15
The property had a height of 10.4 – 12mAHD. The approximate
benchmark level is 11mAHD.
The property at bench mark level would have been first inundated at
7.06pm on 11 January 2011.
The W4 releases commenced at 8am on 11 January 2011. There is a
distance of 82.4km between the Wivenhoe Dam and the property.
The effect of the W4 releases first reached the vicinity of the property at
12.50pm on 11 January 2011.
The W4 releases at the time of benchmark inundation would have
contributed 0.2m of it and the approximate peak contribution of W4
releases to the inundation would have been of 2.2m.
The approximate peak contribution of the W4 releases to the Brisbane
River water level before 4am on 12 January 2012 would have been
1.6m.
Had discharge from the Wivenhoe Dam continued at the W3 rates, the
river level would have first inundated the benchmark level at
approximately 7.50pm on 11 January 2011 and the river level at 4am
on 12 January 2011 would have been at 12.9mAHD, 1.9m above the
benchmark level.
With the W4 releases, the river level at 4am on 12 January would have
been at approximately 14.5mAHD, 3.5m above the benchmark level.
The peak of the Brisbane River’s level in the vicinity of the property was
16.6mAHD. The peak height above the benchmark level was 5.6m.
The peak flood level in the vicinity of the property occurred at 4.56pm
on 12 January 2011.
30. SC has presented a second statement dated 7 June 2012, which in
summary says the following:
Heavy rain that fell on 11 January 2011 was not the only cause of the
substantial releases from the Wivenhoe Dam later that same day,
causing the Brisbane River to become vastly elevated.
Levels of water at the dam started increasing rapidly from around
midday on 9 January 2011. As a result of rain between 6 – 9 January,
the dam’s level was at 68.54mAHD, which is 1.54m above the Full
Supply Level.
The rainfall on 9 – 10 January 2011 contributed roughly 71% of the
increase in the Wivenhoe Dam levels.
The elevated water levels of the dam on the mo rning of 11 January
2011 were a result of substantial rain that fell over the Wivenhoe Dam
catchment between 9 – 11 January 2011 and earlier.
As such, what caused the identified rises in the Brisbane River was
water that had been released from the dam earlier than 11 January
2011 and inflows from other parts of the Brisbane River catchment.
Case No: 245989 Determination Page 9 of 15
31. The loss assessor’s report says the following:
The entire building is damaged and all contents are destroyed.
Flood waters fully inundated both levels above the roof, engulfing the
entire property. The water peaked at 6.1m, above roof level.
Water inundated the property for 24 hours.
32. The female Applicant has provided a Statutory Declaration, which in
summary says:
On 11 January 2011, while on holidays, she received a text from
SEQWater, saying there was a flash flood warning.
She was eventually able to get to her house at about 5 -6am on 12
January 2011. At that time the water was already halfway up the roof.
When she lodged her claim, the FSP told her all customers were
covered for flash flooding. Based on that information, she thought she
would be covered and rejected donations and made decisions based
on the belief she would be paid out.
33. The Applicants have also relied on:
daily weather observations and radar images from the Bureau of
Meteorology (BOM) for the period 9 – 13 January 2011;
the hydrology report commissioned by the Insurance Council of
Australia (ICA report);
the supplementary witness statement of RA;
the Queensland Floods Commission of Inquiry’s Interim Report;
SEQWater’s report on the operation of Somerset Dam and Wivenhoe
Dam, and
an extract of the transcript of proceedings of the Queensland Flood
Commission of Inquiry.
Releases from Wivenhoe Dam & Proximate Cause
34. The central issue for Determination in this dispute is whether the inundation
of the Applicants’ home was due to flash flood as defined within the terms of
the policy. That is, whether rain that fell no more than 24 hours prior to the
inundation of the Applicants’ property was the proximate cause of t he
inundation.
35. The Panel suspended issuing Determinations relating to this question after
the Queensland Flood Commission of Inquiry had been recalled to hear
further evidence from the Wivenhoe Dam flood engineers.
36. Once the final report was released, all relevant stakeholders were invited to
put further submissions to the Panel relating to the impact of the heavy
rainfall that commenced falling over the Wivenhoe Dam around 4am on 11
Case No: 245989 Determination Page 10 of 15
January 2011 and in particular the impact this had on the decision to adopt
the W4 release strategy.
37. On 21 May 2012, the Financial Ombudsman Service (FOS) issued a
memorandum to all relevant stakeholders advising that after considerable
deliberation of all material available to it, the Panel formed a view that the
heavy rain occurring from approximately 4am on 11 January 2011 and in
particular the heavy rain between 4am and 8am on 11 January 2011 was a
proximate cause of the W4 strategy being invoked and therefore a proximate
cause or trigger that led to the flooding of many of the properties along the
Brisbane River.
38. At that time, the Panel noted that the approach that each dispute would take
depended upon the individual and unique factors relevant to the dispute and
in that regard the parties were invited to make further submissions in relation
to disputes before FOS.
39. In view of this, the FSP provided detailed further submissions to FOS on 14
June 2012 in relation to this dispute. Included with the submissions were the
following documents:
A reference document for disputes relating to Queensland Floods (this
is a general reference document) relating to the various submissions
the FSP makes in relation to a number of issues. Not all issues raised
in the reference document appear in the current dispute; The reference
document has been updated;
Letter from SC attaching a key information sheet for the Applicants’
property;
Hydrologist report “Investigations of the January 2011 Inundation Event
- Brisbane” dated March 2011;
Statements from SC dated 1 August 2011 and 7 June 2012.
40. The Panel has reviewed the reference documents. Insofar as the reference
documents relate to the current issues in dispute, those matters have been
considered.
41. In summary, the FSP argues that the proximate cause of the inundation of
the property, that is the real or effective cause of the damage caused to the
properties downstream of the dam, is not simply the rain that occurred from
4am on 11 January 2011.
42. The FSP maintains that on any reasonable view, the damage sustained to
the downstream properties was the combined effect of all of the rainfall and
not just the rain that had fallen from 4am on 11 January 2011, leading to the
implementation of the W4 strategy from 8am that day.
43. There is no dispute that heavy rain fell over the Wivenhoe Dam catchment
area and in fact parts of the Brisbane River, from approximately 4am on 11
January 2011.
Case No: 245989 Determination Page 11 of 15
44. SC has relied on data from SEQWater dated 2 March 2011 which confirms
the rapid increase in releases from the Wivenhoe Dam from 8am on 11
January 2011.
45. Examination of the SEQWater report identifies the rapid increase in the
inflows to the Wivenhoe Dam commencing from about 4am, 11 January
2011. The report confirms the inflows into the dam had been decreasing
from as early as 8am from 10 January 2011, with steady decreases from
approximately 3pm on 10 January 2011 to 2am on 11 January 2011.
46. The Queensland Flood Commission of Inquiry report confirms that prior to
4am on 11 January 2011 and in fact prior to 8am on 11 January 2011, the
dam releases were being managed at the W3 strategy.
47. Whilst it is accepted that the W3 strategy had led to an increase in the levels
of the Brisbane River, the W3 strategy was designed to avoid, where
possible, inundation of the properties below the Wivenhoe Dam by flooding
from the Brisbane River.
48. There is no dispute that there were two significant rainfall spikes with rain
that fell from 9 to 10 January 2011 being considered the first spike and rain
that commenced falling from approximately 4am on 11 January 2011 being
the second spike.
49. There is no dispute that the W4 strategy was adopted following the second
spike. The FSP has argued that the switch to strategy W4 was not the
natural and ordinary consequence of the rain that fell and in fact the move to
W4 strategy was not taken in accordance with the Wivenhoe Dam manual.
50. In the Panel’s view, the Queensland Flood Commission of Inquiry final report
does not find the adoption of W4 strategy at 8am on 11 January 2011 was
inconsistent with the manual.
51. Although there may be issues as to how the Wivenhoe Dam had been
managed prior to this time, there is nothing in the material that has been
provided to the Panel to suggest that the earlier management of the
Wivenhoe Dam influenced to any significant degree the adoption of the W4
release strategy at 8am on 11 January 2011.
52. The ICA hydrology and the information provided by the FSP’s hydrologist
confirms that the increased releases from the Wivenhoe Dam after the
adoption of the W4 strategy led to the development of a flood wave that
ultimately caused the flooding of many properties downstream of the
Wivenhoe Dam.
53. The question arises as to what was the proximate cause of this inundation.
In determining the proximate cause of the inundation it is necessary to look
at the effective or dominant cause of the inundation.
Case No: 245989 Determination Page 12 of 15
54. The Panel agrees with the FSP’s general submission that the proximate
cause is a cause determined by common sense evaluation of the relevant
facts.
55. In the event that there are two or more proximate causes, one within the
policy and the other excluded, the policy does not respond. The proximate
cause is not determined by identifying the last event or final trigger but by
determining what is the dominant, effective, direct or efficient cause of the
loss.
56. The FSP has maintained that the impact on the Wivenhoe Dam from the
rainfall that fell in the early hours of 11 January 2011 was only 29%, while
71% of the volume of the inflow came from the rain that fell on 9 and 10
January 2011 or earlier. The FSP maintains that to find the rainfall which had
fallen from 4am on 11 January 2011 is the proximate cause is without
foundation as such an approach produces an entirely artificial outcome.
57. With respect to the FSP’s argument the Panel disagrees. Whilst the Panel
accepts there has been a significant impact on the levels of the Wivenhoe
Dam by the rainfall that commenced falling on or about 9 January 2011 or
earlier, the Panel is satisfied having regard to the information that has been
exchanged and the relevant legal principles, that the heavy rain that
commenced falling on or about 4am on 11 January 2011 was the proximate
or effective cause of the adoption of the W4 strategy.
58. The Panel is also satisfied that whilst the level of the Brisbane River may
have been increasing under the W3 strategy, it was the heavy rainfall from
approximately 4am on 11 January 2011 that caused the need to adopt the
W4 strategy at 8am on the same day.
59. As such the Panel is satisfied that the Wayne Tank principle has no
application as the rain that fell over the Wivenhoe Dam from 4.00am on 11
January 2011, is the proximate cause of the loss.
The Applicants’ Inundation
60. SC’s statement indicates the effect of the W4 releases first reached the
vicinity of the Applicants’ property at 12.50pm on 11 January 2011. He
estimated that the property was first inundated by the Brisbane River at
7.06pm on 11 January 2011 and by 4am on 12 January 2011, the river level
would have been up to 3.5m above the relevant benchmark level.
61. The relevant benchmark level was SC’s estimate of the lowest point of the
structure of the house on the land. This evidence has not been refuted by
the Applicants in any manner.
62. The Panel notes that the ultimate inundation of the property would have
been 5.6m above the benchmark level. SC identified this peak inundation
occurred at approximately 4.56pm on 12 January 2011.
Case No: 245989 Determination Page 13 of 15
63. The Panel accepts the possibility that these assessments may not be
entirely accurate. The Panel notes that SC has variously described the
property as being 10.5m to 11.5m AHD and also 10.4m to 12m AHD.
64. The FSP hydrologist has speculated that if the W3 strategy had been
maintained, then, according to the key conclusion statement, the Applicants’
property would still have been inundated by approximately 7.50pm on 11
January 2011 and by 4am on 12 January 2011 it would have been inundated
to a level of 1.9m above the benchmark level.
65. The Panel is concerned, however, that to reach such a conclusion it must be
speculated that the releases from the dam would have continued at the
same rate at the W3 level in the absence of any additional rainfall. The
report does not address the possibility of the inflow into the Wivenhoe Dam
decreasing.
66. The available information indicates the W3 strategy that was in place prior to
8am on 11 January 2011 had been successful in limiting the outflows and
flooding below the Wivenhoe Dam. Whether the outflows would have
continued at the same rate had the inflows continued to reduce is not known.
67. Instead, the Panel is satisfied that on the facts of what actually occurred on
11 January 2011, it was the heavy rainfall from approximately 4am on 11
January 2011 that caused the need to adopt the W4 strategy at 8am on the
same day. This led to the inundation of the Applicants ’ property .
68. The only available information as to at what level the property was inundated
by 4am on 12 January has been provided by SC (3.5m above the
benchmark level). The Applicants have indicated that at approximately 5-
6am on that same day, the water was halfway up the roof.
69. Considering the property is a two-storey building, the Panel is of the view
that SC’s conclusions and the Applicant s ’ observations are broadly
consistent with the extent of damage that occurred by 4am on 12 January.
The Panel also notes that the loss assessor’s statement that water peaked
at 6.1m above roof level is not supported by any evidence and is not
consistent with any available data.
70. The Panel is satisfied that the inundation of the Applicants ’ property to the
level of 3.5m above benchmark level (which is the estimated level as at
4.00am on 12 January 2011) was caused by flash flood that occurred within
24 hours of the heavy rainfall and therefore falls within the coverage
provided by the policy. Further, given the extent of the inundation, the Panel
is satisfied that at 4.00am on 11 January 2011, the Applicants ’ entire loss is
covered by the policy definition of flash flood.
Quantum
71. The Renewal Certificate of Insurance for the relevant period provides a sum
insured of $175,000 for the home with contents cover of $117,000. The
Panel notes that cover for Flash flood is limited to 50% of the sum insured or
Case No: 245989 Determination Page 14 of 15
$25,000 (whichever is greater) for each of the building and contents.
Pursuant to the policy cap the FSP is therefore liable up to an amount of
$87,500 for the damage to the building and $58,500 for the contents.
72. Given the time since the loss was sustained, the Panel accepts that the
parties may be unable to provide an exact estimate of the total loss
sustained, or a breakdown of that loss.
73. The Applicants and the FSP are asked to work cooperatively together to
establish the extent of the loss sustained to the property and to reach an
agreement as to cost of repairs or replacement of the various contents lost.
74. Insofar as the FSP may have made payment of a compassionate sum to the
Applicants, FOS does not have jurisdiction to deal with this payment but
acknowledges that the FSP, given the terms on which the compassionate
payment was made, may be entitled to deduct this payment from any
settlement sum.
75. The Panel has also considered the question of interest.
76. The FSP has argued that interest is only payable from the date from which it
was unreasonable to withhold payment. The FSP maintains that it is entitled
to a reasonable period to investigate and determine its position, and given
the complex nature of the flood disputes, the delays are not unreasonable.
Further complex situations require substantial periods of time for
independent bodies such as the Queensland Flood Commission of Inquiry
and FOS, to make conclusions on the issues in dispute.
77. The FSP maintains that it did not act unreasonably in this dispute and
therefore interest is not payable. Alternatively if some period of interest is to
be awarded it should be reduced to account for the substantial delays
through the course of the process which were not the FSP’s fault.
78. Section 57 of the Insurance Contracts Act requires interest be paid when it
becomes “unreasonable for the insurer to have withheld payment”. An
examination of relevant case law indicates that most probably, interest will
be awarded from either when an insurer first emphatically denied liability or
disputed a matter, or from when in the normal course of events the claim
should have been paid if liability had not been disputed.
79. In this dispute the Panel accepts that the FSP was entitled to withhold
payment of the settlement monies until such time as it had properly
investigated the dispute and made its decision as to liability.
80. The FSP made its original decision to deny the claim after receiving relevant
assessment reports, hydrology reports and other information. The FSP was
aware of the terms of its policy and aware of the relevant provisions under
which liability might arise and chose to deny the claim having reviewed those
relevant provisions and the evidence available to it.
Case No: 245989 Determination Page 15 of 15
81. In the Panel’s view, at that point the FSP has made its decision on the claim
and it is appropriate that from that time interest be paid unless it can be
established that the Applicant had withheld informa tion from the FSP that
would have led to an alteration of its decision.
Determination
82. The FSP is to meet the cost of repairs incurred by the Applicants and the
cost of the replacement of items damaged as a result of the inundation of the
property. Any payment is subject to the policy limitations referred to in this
Determination.
83. Insofar as the FSP is to cash settle the claim, the FSP is to pay interest from
30 March 2011 (being the date of rejection of the claim) to date of payment
of the claim, in accordance with section 57 of the Act.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.