Emerald flood inundation denied; claimed flood cover was represented at inception
Text of the determination
Case No: 245761 Determination Page 1 of 14
Case number: 245761
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim (Flood)
29 August 2012
Background
1. The Applicant entered into an insurance contract with the Financial Services
Provider (FSP) to cover his home and contents. This policy was arranged to
commence on 9 March 2010 and operate for twelve months. During this
period, the building was insured up to a sum of $270,000 and contents for
$20,000.
2. The Applicant lodged a claim under the policy on 31 December 2010 due to
loss sustained as a result of water inundation. This occurred in the city of
Emerald, Queensland.
3. The FSP denied the claim on the basis the damage was due to “flood”. The
Applicant, through his solicitors, has disputed this.
4. For the sake of simplicity, reference to the Applicant will include his legal
representatives.
5. Both the Applicant and the FSP have provided detailed submissions on the
relevant issues. For the sake of brevity, the Panel will only briefly summarise
these submissions given all of the material made available has been
exchanged with the other party.
Summary of Applicant’s position
6. The Applicant submits the following as alternative arguments in response to
the FSP’s decision:
a. The FSP was involved in misleading and deceptive conduct by
informing him at inception of the policy that he was covered for flood.
Accordingly, the FSP should be bound by this representation.
b. The FSP’s conduct in the arrangement of the policy constituted a
breach of section 945A of the Corporations Act 2001 .
c. The FSP’s policy failed to clearly inform him that “flood” was excluded
as required under Section 35 of the Insurance Contracts Act 1984 (the
Act).
Determination
Case No: 245761 Determination Page 2 of 14
d. The damage was due to “Flash flood and stormwater run - off”, which is
an insured event.
e. The FSP is unable to discharge its onus in establishing the loss was
caused by “flood”.
7. The Applicant therefore seeks to be indemnified for his claim.
Summary of FSP’s position
8. In response to the Applicant’s arguments, the FSP submits the following :
a. It denies that its authorised representative (JM) misled or
misrepresented to the Applicant that he was covered for flood. In this
regard, it has provided a statement from PMJ who sets out the training
and experience of JM.
b. It has not provided “personal advice” as defined by the Corporations
Act 2011 . Accordingly, section 945A of this Act does not apply to these
circumstances.
c. It has provided evidence from an appropriately qualified individual to
corroborate that a PDS was sent to the Applicant prior to the claim.
Further, the policy structure and layout in conjunction with this evidence
enables it to rely on the exclusion clause of “flood” pursuant to Section
35(2) of the Act.
9. The FSP relies on a hydrology report and the following policy provisions to
den y the Applicant’s claim:
“ Words / terms with special meanings
Flood Rising water which enters your home as a result of
it running off or overflowing from any origin or
cause. This policy does not cover flood unless we
have agreed and it is shown on your ce rtificate of
insurance.
Flash flood and
stormwater run-off
A sudden flood caused by heavy rain that fell no
more than 24 hours prior to the flash flood or
stormwater run-off.
…
Storm A violent disturbance of the atmosphere
associated with strong winds including a cyclone,
lightning, heavy rain, hail or snow, but not
continuous bad weather by itself.
…
Insured events you are covered for
Damage caused by weather …
What is
covered
What is not covered
Case No: 245761 Determination Page 3 of 14
Storm Loss or damage:
caused by rain, hail or snow after it has
reached the ground;
Flash flood and
stormwater run - off
A sudden flood caused
by heavy rain that fell no
more than 24 hours prior
to the flash flood or
stormwater run - off
Loss or damage caused:
by flood;
…”
Issues
10. Whether the Applicant is able to establish that:
a. the FSP misrepresented and/or provided misleading and deceptive
advice regarding the extent of flood cover at policy inception, and/or
b. the FSP has breached section 945A of the Corporations Act 2001 .
11. Whether the FSP clearly informed the Applicant, pursuant to Section 35 of
the Act, that he was not covered for flood.
12. Whether the FSP was entitled to deny the claim pursuant to the “flood”
exclusion or the lack of an insured event.
Reasons for decision
13. Due to the nature of the dispute, the parties have been informed that the
matter has been referred to the Panel for Determination in line with the
Operational Guidelines to the Service’s Terms of Reference. This dispute
has not been the subject of a FOS Recommendation and has proceeded
directly to Determination.
14. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
15. It is appropriate to consider the issues under the various headings.
Estoppel and/or Misleading and Deceptive Conduct
Characterising the Applicant’s legal arguments
16. Both parties have provided substantive submissions regarding this issue. In
particular, the Applicant has provided numerous arguments in attempting to
establish the fact the FSP provided him with incorrect information at
Case No: 245761 Determination Page 4 of 14
inception of the policy. However, he (and by he, the Panel means his
solicitors) have not specifically articulated the legal principles they are relying
on.
17. Fo r instance, the Applicant has referred to the principle “estoppel” although
there a numerous categories and variations where such a principle is
applicable. However, having considered the nature of the arguments
presented by the Applicant, the Panel considers the appropriate category
being relied upon is the equitable principle of estoppel, particularly
promissory estoppel.
18. Broadly speaking, there are three elements associated with this equitable
principle that need to be satisfied:
a. A clear representation was made to the Applicant;
b. The Applicant relied on this representation to his detriment; and
c. The extent of the detriment suffered.
19. The Applicant has also referred to the FSP’s conduct being misleading and
deceptive. It is unclear if he is using these terms in the context of this
equitable principle as the Panel notes that such terms are explicitly referred
to in section 12DA(1) of the Australian Securities and Investments
Commission Act 2001 (ASIC Act) which states:
“A person must not, in trade or commerce, engage in conduct in relation to
financial services that is misleading or deceptive or is likely to mislead or
deceive.” (Panel emphasis)
20. Accordingly, if the Applicant’s allegation that the FSP’s conduct was
misleading or deceptive is founded, then it is c lear such conduct would
breach this provision.
21. With respect to both legal grounds, the onus is on the Applicant to establish
the relevant elements on the balance of probabilities.
Inception Conversation
22. The Applicant’s arguments with respect to the above legal principles are
reliant upon one factual issue, namely whether the FSP represented to him
that he was covered for flood. If the Applicant is unable to establish this
occurred, then it is clear estoppel or section 12DA(1) of the ASIC Act would
not assist him.
The Evidence
23. The Applicant has provided a statutory declaration dated 18 March 2011
addressing this issue. This declaration contained the following relevant
comments:
“On 9 th March 2010, I contacted your company by phone to arrange house
and contents insurance for my property at [insured address]. During this
conversation I expressed my desire, on a number of occasions, to ensure that
Case No: 245761 Determination Page 5 of 14
my property and contents were adequately protected by flood insurance. So
much so that the operator felt it necessary to question as to why I was so
concerned. My response was to the effect that Emerald had a 1 in 100 year
flood event in 2008, of which I was aware, and having this knowledge I wished
to ensure that my property and contents were adequately covered. I would
like to add that the consultant who initiated the policy indicated that yes I was
covered, and not once did she explain that there were different classifications
for flooding, or that I was o nly covered for flash flooding.”
24. The FSP was unable to obtain a statement from JM as she was no longer
employed with it. In addition, although the FSP normally records phone
conversations in its call centre, this particular phone conversation had been
diverted to its Gympie branch which does not have such a facility.
25. The Panel considers the explanation behind the absence of the call
recording is reasonable and also corroborated by the Applicant’s policy
schedule which identified JM as his consultant and her address being in
Gympie.
26. The FSP provided two statements from PMJ dated 27 July 2011 and 22
March 2012 regarding the training and experience of JM. In particular, PMJ
states:
Her duties with the FSP include being responsible for the underwriting
and support teams and managing the relationship with the consultant
network (this range of staff includes authorised representatives, of
which JM was one). This latter role involved ensuring the consultants
have appropriate training to sell products in accordance with the FSP’s
regulatory obligations.
PMJ has been working with the FSP since 10 July 2007 and has full
knowledge and understanding of the FSP’s processes and various
products.
JM commenced as an authorised representative in December 2003.
Upon doing so, she undertook a four week training course on the FSP’s
insurance products, in particular the “New Starter Household Insurance
Course”. In order for JM to have been authorised to deal with the FSP’s
products, she had to complete this training course, which she did.
After completing her training, JM spent a few days with a “buddy” at the
Gympie office. A “buddy” is an experienced operator. After this, JM
continued to work as a Sales Consultant.
On 23 January 2008, JM was promoted to the role of Senior Sales
Consultant and continued in that role until she left the FSP’s Gympie
office on 18 February 2011. Such a promotion to Senior Sales
Consultant only occurs if the individual has been a Sales Consultant for
at least 2 years and displays an appropriate level o f performance, skill
and experience.
The FSP also provides ongoing “continuation training”. This generally
involves refresher training on information authorised representatives
Case No: 245761 Determination Page 6 of 14
already received and also provides these representatives with an
opportunity to receive training on new products or systems.
She provided a copy of the training JM completed during her tenure
with the FSP. This included the following:
In 2004, she completed three training courses. This included a
session on the FSP’s computer system as it specifically relates
to insurance, a session of continuation training for household
insurance and updates of the underwriting manual.
In 2005, she completed two continuation training courses, both
specifically relating to insurance. She also completed a
Certificate III in Financial Services in September 2005.
In 2006, she completed three continuation training courses and
an assessment on the General Insurance Code of Practice.
In 2007, she completed two continuation training courses.
In 2008, she completed three continuation training courses,
including a Privacy Refresher course.
In 2009, she completed two continuation training courses.
In 2010, she completed four training courses, including a
session on the FSP’s sales approach, a session on the
Insurance Sales and Service Framework and a session on the
General Insurance Code of Practice.
In particular, as part of an authorised representative’s training, they are
instructed that flood cover is not part of the standard home insurance
cover and if customers require more comprehensive flood cover, they
must apply for it separately. In cases where such a request is made,
this is recorded on the FSP’s system.
A key document titled “Sales and Service Framework” is utilised by
authorised representatives when selling the home insurance policy.
JM’s training schedule shows she had received training on this
document on 2 March 2010, approximately one week prior to the
Applicant’s call.
27. PMJ has also provided a copy of the training material used in the initial four
week course, which the Panel acknowledges is quite extensive and detailed.
Previous Determinations
28. The Applicant, in rebutting the FSP’s evidence, has referred to numerous
Determinations issued by this Service regarding disputes that involved an
issue of an FSP misrepresenting the extent of cover.
29. The Panel accepts that pursuant to the Terms of Reference, it is to have
regard to previous Determinations. However, it is not bound by them. In
particular, the Panel considers previous Determinations provide little to no
probative value when determining a factual issue in dispute.
Case No: 245761 Determination Page 7 of 14
30. The reason is that a finding of fact is substantively reliant upon the specific
individual circumstances in the dispute. It is not an issue upon which
previous Determinations can assist. As a result, the Panel is required to
consider the evidence as a whole regarding the specific circumstances of the
dispute in order to make a finding, on the balance of probabilities, as to
whether the factual issue alleged is found.
31. In addition, the previous Determinations relied upon by the Applicant all
operated on the basis the decision-makers were satisfied that a
representation occurred. This has yet to be established by the Applicant.
Has the representation occurred?
32. The Applicant has provided a number of submissions arguing fine points
about the FSP’s evidence, such as the fact the training d oes not specifically
set out in detail the difference between flash flood and flood, whether JM’s
conduct was closely monitored for quality control or the fact the Sales and
Service Framework document does not require a consultant to discuss flood.
33. Despite these points, the Panel considers the onus is still on the Applicant to
establish that a representation occurred. In this regard, his statutory
declaration only attributes the following comments to JM:
“I would like to add that the consultant who initiat ed the policy indicated that
yes I was covered, and not once did she explain that there were different
classifications for flooding, or that I was only covered for flash flooding”.
34. Prior to this, his statutory declaration refers to his communications to JM
about his desire for flood insurance and the reasons why. There is nothing in
that aspect of his declaration to indicate a statement was made by JM that
he was covered for flood.
35. The Panel considers the Applicant’s evidence to be somewhat equivocal and
l acking in detail. For instance, he states the consultant “indicated” he was
covered. Use of the phrase “indicated” as opposed to something more direct,
such as “stated” or “responded”, appears to infer that JM did not provide a
specific statement to this effect. Instead, it appears to be an implication he
drew based on his reconstruction of this conversation.
36. In addition, his use of the phrase “I would like to add” is disjointed to the
comments preceding it. That is, the preceding comments flowed in a
chronological manner about how the flood issue was discussed. For
instance:
“During this conversation I expressed my desire, on a number of occasions, to
ensure that my property and contents were adequately protected by flood
insurance. So much so that the operator felt it necessary to question as to
why I was so concerned. My response was to the effect that Emerald had a 1
in 100 year flood event in 2008 of which I was aware, and having this
knowledge I wished to ensure that my property and contents were adequately
covered. I would like to add …”
Case No: 245761 Determination Page 8 of 14
37. Accordingly, the use of the phrase “I would like to add” at this point
introduces a level of ambiguity as to where and in what manner JM’s
comments about flood fits in the chronology. That is, it implies this aspect o f
his recollection is something he recalls was discussed at some point but he
is unclear as to when.
38. Given the principle basis of this conversation was for the Applicant to
arrange an insurance contract with the FSP, it is unlikely the issue of flood
was the sole or even substantive topic of discussion. JM would have likely
asked various underwriting questions of the Applicant, discussed the sum
insured, recorded personal information (such as address and phone
numbers) and provided the Applicant with information as to what had been
arranged.
39. As a result, the ambiguity behind when or how JM allegedly responded to
the issue of flood raises a number of concerns.
40. Although the Panel acknowledges that it is making a number of fine points in
assessing the Applican t’s statutory declaration, it considers this is necessary
given the lack of detail about the actual representation. For instance, the
Applicant provides no specific wording or phrases used by JM. His statutory
declaration only provides a general description.
41. In particular, the Panel considers context and wording are essential in
reviewing this substantive factual issue. The reason being is that it is entirely
possible for a party to misconstrue a statement provided by another because
they paid particular attention to one aspect of a statement whilst ignoring the
balance. This therefore leads them to make an assumption that was not
necessarily reasonable when considering the other party’s statement as a
whole.
42. In the Applicant’s case for example, if the Pane l was to accept that flood was
discussed, it is possible JM may have informed the Applicant at some point
that flood is covered under the policy if it is due to heavy rain that fell within
24 hours previously.
43. If such a statement was made, the Panel considers it is likely the Applicant
would have inferred he was covered for flood given:
There was no indication JM was describing this situation as a
classification of flood;
The term “flash flood” was not required to be used because the
description provided by JM is consistent to the policy definition of this
term; and
The Applicant would have attributed little significance to the heavy rain
and 24 hour period given he would have presumed any flood would
occur during a period of heavy rain.
44. This would also be consistent with the general description contained in his
statutory declaration.
Case No: 245761 Determination Page 9 of 14
45. In such a situation, the Panel would not consider JM’s comments to be
misleading or deceptive given it is consistent with the insured event of “Flash
flood and stormwater runof f.”
46. It is for this reason that the words and context of a conversation are
significant. In the absence of same, it is difficult for the Panel to determine
whether it was reasonable for the Applicant to attribute a representation
made by the FSP that he was covered for flood.
47. In addition, the Panel also considers it unusual that after making numerous
enquiries about whether he was covered for flood, the Applicant omitted to
review his policy documents in any way to ensure his understanding was
consistent with the document.
48. If he had merely consulted the policy schedule, the Panel is satisfied he
would have identified at page 3 that he was not covered for flood given the
following:
“ What optional covers are included and not included
…
Flood and storm surge Not included”
49. The Panel also accepts that it would appear unusual, on the face of it, that a
Senior Sales Consultant who had more than six years experience handling
the FSP’s home insurance policy would make such a significant error.
Although the Panel accepts it is possible for this to occur, it is, however,
improbable when considering JM’s extensive training and position.
50. After considering the evidence as a whole and for the reasons discussed,
the Panel is not satisfied the Applicant has established, on the balance of
probabilities, that the FSP represented to him during the inception call that
he was covered for flood.
51. As the Applicant is unable to establish the representation occurred, then an
essential ingredient to the equitable principle of estoppel cannot be satisfied.
As such, he is not entitled to any remedy in that regard.
52. With respect to the misleading or deceptive conduct, this was contingent on
the Applicant establishing the representation. In the absence of same, such
an allegation has no foundation and accordingly, the Panel does not accept
the Applicant has established the FSP breached section 12DA(1) of the
ASIC Act.
Section 945A of the Corporations Act
53. The Panel does not propose to review this issue at length because this
allegation was substantively based on the Applicant’s allegation that the FSP
represented to him that he was covered for flood.
Case No: 245761 Determination Page 10 of 14
54. For reasons already explained, the Panel has not accepted the Applicant
has established this fact and as such, his allegation in this regard is not
substantiated.
Clearly Inform
55. Section 35(2) of the Act states that when a claim is made under a
“prescribed contract” for a “prescribed event”, an insurer cannot refuse to
pay the claim unless it can establish that it clearly informed its insured in
writing that it would not cover this event. Section 34 of the Act has defined
the terms “prescribed contract” and “prescribed event” by referring to the
Insurance Contracts Regulations 1985.
56. There is no dispute that contracts of insurance covering a person’s home
and contents are a “prescribed contract” and damage due to flood is a
“prescribed event”.
57. The onus is therefore on the FSP to establish that it has clearly informed the
Applicant prior to the claim that it would not cover damage caused by “flood”.
This is generally done by an insurer providing a copy of its policy to its
insured which is meant to set out completely the rights and obligations of
both parties under the insurance contract.
58. Further, the Courts have supported this and particularly, in the case of Marsh
v CGU Insurance Ltd [2004] NTCA 1, Mildren J provided the following
comments that is particularly relevant to the operation of Section 35(2) of the
Act:
“In Hams & Anor v CGU Insurance Ltd(2002) 12 ANZ Insurance Cases 61 -
525, Einstein J held that the provisions of s 35(2) of the Insurance Contracts
Act 1984 (Cth) could be met if the insurer provided to the proposed insured a
document such as the proposed policy, which contained the relevant wording.
I agree. … Whether the policy wording in fact "clearly informe d" the insured
that there was no cover for flood is a question of fact to be determined by an
examination of the document in question. … Furthermore, the language of s
35(2) suggests that the proposed insured can be clearly informed merely by
providing the insured with a copy of the policy which shows the exclusion in
clear and unambiguous terms. … The answer to the question "is flood
covered" is easily ascertainable by any person of average intelligence
and education. ” (Panel emphasis)
59. In his initial submissions, the Applicant stated the FSP omitted to provide
evidence that he was sent a copy of the policy. The Panel notes the
Applicant does not state he did not receive the policy or that he did not
receive the policy before the loss occurred.
60. Following this initial submission, the FSP provided evidence explaining its
processes of dispatching documents and how it was applied in the
Applicant’s case. The Applicant has provided no submission to rebut this
evidence.
Case No: 245761 Determination Page 11 of 14
61. Given the FSP’s evidence and the fact the A pplicant has never refuted in
any manner that he did not receive the policy, the Panel is satisfied on the
balance of probabilities that the Applicant did receive the policy before the
claim arose.
The policy structure
62. In relation to the policy structure itself, the Applicant has provided numerous
submissions to argue that the relevant terms relied upon by the FSP are
ambiguous. In particular, the Applicant has highlighted the fact the definition
of “flood” is so wide that it encompasses the definition of “Flash flood and
stormwater run- off”.
63. In addition, the Applicant has also stated the definitions of “Flash flood and
stormwater run- off”, “Flood” and “Storm” are overlapping and create
confusion and uncertainty.
64. The FSP has rebutted this with a number of arguments, one of which is to
refer to a previous Determination issued by the Service that considered a
very similar issue. The relevant case number is 245470.
65. The Applicant has also referred to a previous Determination which was
issued by the Service’s Pre decessor Scheme, namely case number 41709.
However, the Panel prefers to rely on the reasoning contained in case
number 245470 for the following reasons:
It is more contemporaneous;
It involves policy provisions that are essentially identical to the policy in
this dispute;
It considered arguments that are substantively similar to the Applicant’s
submissions;
The reasoning and analysis contained in the previous Determination
has clear applicability to this dispute, in particular paragraphs 39 to 52;
and
Subject to the Applicant alleging the FSP represented he was covered
for flood, which the Panel has not accepted is substantiated, the
Applicant has not introduced any new substantive arguments that
would imply the Panel’s previous reasoning is i ncorrect either in law or
fact.
66. Given this, the Panel intends to adopt the rationale contained in case
number 245470 in finding that the policy clearly informed the Applicant that
he was not covered for “flood” pursuant to Section 35(2) of the Act.
Water Inundation
67. The FSP has relied on a statement by hydrologist SC dated 12 July 2011. In
this statement, SC analysed the Emerald region and provided comments
Case No: 245761 Determination Page 12 of 14
based both on a regional basis and specific to the Applicant’s home. His
statement contained the following relevant information:
He carried out extensive investigations into the Emerald area for the
inundations over December 2010 / January 2011. The area included
the Nogoa River catchment in Emerald, which is quite large.
There was heavy rainfall in the Nogoa River catchment upstream of the
Fairbairn Dam on 26 December 2010. Water from this catchment takes
several days to travel down to Fairbairn Dam.
At approximately 10.30pm on 30 December 2010, the Dam was at full
capacity. As it did not have the capacity to mitigate the downstream
effect of the water flowing into it, water flowed down the Nogoa River
towards Emerald.
There was little rainfall in Emerald in the three days leading up to the
peak water level of the Nogoa River.
The peak water level in Nogoa River was attributable to the rain which
fell in the catchment upstream of Fairbairn Dam on 26 December 2010.
In the Applicant’s case, minimal rain fell in the 24 hours preceding 30
December 2010. In particular, minimal rain fell in the catchment area
after 9.00am on 28 December 2010.
68. Based on this, SC concluded the following:
“… I conclude that the cause of the inundation of the Subject Property was the
rising level of the Nogoa River, which was itself caused by rain which fell more
than 24 hours earlier .”
69. One of the factors that SC took into consideration was the fact the Applicant
indicated his property was inundated on 30 or 31 December 2010. However,
following a number of submissions between the parties, the Applicant later
submitted that his property was likely inundated on 29 December 2010
based on the following:
Other people in the immediate area who stated water was backing up
from drains due to the storm event.
A report titled “The Hydrology Report - Overview of the December 2010
/ January 2011 Fl ood at Emerald Qld” which stated:
“During the afternoon and evening of the 29 th December 2010, the Nogoa
River overflowed into low-lying areas and properties adjacent to the
riverbank to the south and north of the Capricorn Highway.
The Nogoa River continued to rise throughout the night of 29 th December
eventually backing up a number of stormwater drains to inundated low-lying
roads and properties.”
Rainfall gauges, including Emerald Radar and Emerald Airport, which
indicated there was rainfall on 28 December 2010.
70. The Applicant did not observe the inundation nor has he provided any
witness evidence. The witness evidence he referred to only provided
Case No: 245761 Determination Page 13 of 14
evidence that water was backing up from drains. This evidence does not
describe where they observed this phenomenon, whether this water
inundated properties and one of the properties which were inundated
included the Applicant’s home.
71. The hydrology report he has referred to was not provided and the comments
quoted are general in nature.
72. The Panel therefore considers the Applicant’s evidence about the timing of
initial inundation is necessarily speculative.
73. Regardless if the Panel was inclined to accept the date of inundation as 29
December 2010, there is only one insured event that can respond to the
Applica nt’s circumstances, namely “Flash flood and stormwater runoff”. A
key ingredient to satisfy this event is for the Applicant to establish the
inundation was caused by heavy rain which fell within 24 hours.
74. Although the policy also covers “Storm”, this exclu des any rain that reaches
the ground. As it is clear rain that reached the ground has been a causative
factor to the Applicant’s loss, this insured event has no applicability to his
circumstances.
75. The Applicant has relied on the fact that there was rainfall recorded in
Emerald within the 24 hours as evidence that the insured event has been
satisfied. However, the policy clearly states it has to be heavy rain and it was
this heavy rain that caused the inundation.
76. The FSP’s hydrologist’s report provided grap hs of the rainfall recorded from
various gauges within the Nogoa River catchment. With respect to the
Emerald gauge, which appears the closest in proximity to the Applicant’s
property, he provided a graph that contained hourly rainfall recorded.
77. It is clear from these graphs that a significant amount of rainfall fell in the
Nogoa River catchment in the 24 hours leading to 9.00am on 27 December
2010. However, there was minimal rainfall following this and almost no
rainfall after 9.00am on 28 December 2010. Although some rain was
recorded on 30 and 31 December 2010, this was minimal compared to the
amounts that fell prior to 9.00am on 27 December 2010. In addition, the two
gauges that recorded this rainfall were located 67 and 143km from the
Applicant’s proper ty.
78. Accordingly, there is no evidence that any rainfall that fell from 28 December
2010 onwards could be considered heavy, let alone have a causal link to the
inundation.
79. Further, if the Panel was to accept the Applicant’s proposition that water
surcharged from stormwater drains to inundate his property, it is unlikely this
resulted from the minimal rainfall. Such an event would be more consistent
with elevated levels of the Nogoa River backing up through the stormwater
system and then surcharging through drains.
Case No: 245761 Determination Page 14 of 14
80. This scenario is consistent with the hydrologist’s conclusion and is both
logical and reasonable in the context of the empirical evidence.
81. Based on this, the Panel considers it is improbable that the cause of the
elevated waters in the Nogoa River would be attributable to the minimal
rainfall that fell from 28 December 2010 onwards. Instead, the Panel is
inclined to accept it is probable these elevated levels were due to the
substantial rainfall that fell prior to 9.00am on 27 December 2010 and was
collecting into Fairbairn Dam.
82. Accordingly, the Panel accepts that on the balance of probabilities, it was
rainfall that fell more than 24 hours previously that caused the inundation to
the Applicant’s property. The Panel is therefore not satisfied, on the balance
of probabilities the Applicant’s property sustained damage pursuant to the
insured event of “Flash flood and stormwater runoff” or any other insured
event under the policy.
Determination
83. On the basis of the available information the Panel determines the FSP is
entitled to deny the Applicant’s claim.