Home / Financial Firm (Unknown - Insurer) / Determination 245761

Determination 245761

Emerald flood inundation denied; claimed flood cover was represented at inception

FirmFinancial Firm (Unknown - Insurer)
Decided2012-08-31
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A homeowner in Emerald claimed for water inundation in December 2010 and January 2011 after the insurer denied the claim as flood. He argued the sales consultant represented that he had flood cover. AFCA found the representation was not established and the policy clearly excluded flood.

The applicant did not establish the alleged inception representation, and the policy wording clearly informed him under section 35(2) of the Insurance Contracts Act that flood was not covered, while the inundation was caused by rain more than 24 hours earlier.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 245761 Determination Page 1 of 14 Case number: 245761 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim (Flood) 29 August 2012 Background 1. The Applicant entered into an insurance contract with the Financial Services Provider (FSP) to cover his home and contents. This policy was arranged to commence on 9 March 2010 and operate for twelve months. During this period, the building was insured up to a sum of $270,000 and contents for $20,000. 2. The Applicant lodged a claim under the policy on 31 December 2010 due to loss sustained as a result of water inundation. This occurred in the city of Emerald, Queensland. 3. The FSP denied the claim on the basis the damage was due to “flood”. The Applicant, through his solicitors, has disputed this. 4. For the sake of simplicity, reference to the Applicant will include his legal representatives. 5. Both the Applicant and the FSP have provided detailed submissions on the relevant issues. For the sake of brevity, the Panel will only briefly summarise these submissions given all of the material made available has been exchanged with the other party. Summary of Applicant’s position 6. The Applicant submits the following as alternative arguments in response to the FSP’s decision: a. The FSP was involved in misleading and deceptive conduct by informing him at inception of the policy that he was covered for flood. Accordingly, the FSP should be bound by this representation. b. The FSP’s conduct in the arrangement of the policy constituted a breach of section 945A of the Corporations Act 2001 . c. The FSP’s policy failed to clearly inform him that “flood” was excluded as required under Section 35 of the Insurance Contracts Act 1984 (the Act). Determination Case No: 245761 Determination Page 2 of 14 d. The damage was due to “Flash flood and stormwater run - off”, which is an insured event. e. The FSP is unable to discharge its onus in establishing the loss was caused by “flood”. 7. The Applicant therefore seeks to be indemnified for his claim. Summary of FSP’s position 8. In response to the Applicant’s arguments, the FSP submits the following : a. It denies that its authorised representative (JM) misled or misrepresented to the Applicant that he was covered for flood. In this regard, it has provided a statement from PMJ who sets out the training and experience of JM. b. It has not provided “personal advice” as defined by the Corporations Act 2011 . Accordingly, section 945A of this Act does not apply to these circumstances. c. It has provided evidence from an appropriately qualified individual to corroborate that a PDS was sent to the Applicant prior to the claim. Further, the policy structure and layout in conjunction with this evidence enables it to rely on the exclusion clause of “flood” pursuant to Section 35(2) of the Act. 9. The FSP relies on a hydrology report and the following policy provisions to den y the Applicant’s claim: “ Words / terms with special meanings Flood Rising water which enters your home as a result of it running off or overflowing from any origin or cause. This policy does not cover flood unless we have agreed and it is shown on your ce rtificate of insurance. Flash flood and stormwater run-off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run-off. … Storm A violent disturbance of the atmosphere associated with strong winds including a cyclone, lightning, heavy rain, hail or snow, but not continuous bad weather by itself. … Insured events you are covered for Damage caused by weather … What is covered What is not covered Case No: 245761 Determination Page 3 of 14 Storm Loss or damage:  caused by rain, hail or snow after it has reached the ground; Flash flood and stormwater run - off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run - off Loss or damage caused:  by flood; …” Issues 10. Whether the Applicant is able to establish that: a. the FSP misrepresented and/or provided misleading and deceptive advice regarding the extent of flood cover at policy inception, and/or b. the FSP has breached section 945A of the Corporations Act 2001 . 11. Whether the FSP clearly informed the Applicant, pursuant to Section 35 of the Act, that he was not covered for flood. 12. Whether the FSP was entitled to deny the claim pursuant to the “flood” exclusion or the lack of an insured event. Reasons for decision 13. Due to the nature of the dispute, the parties have been informed that the matter has been referred to the Panel for Determination in line with the Operational Guidelines to the Service’s Terms of Reference. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 14. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 15. It is appropriate to consider the issues under the various headings. Estoppel and/or Misleading and Deceptive Conduct Characterising the Applicant’s legal arguments 16. Both parties have provided substantive submissions regarding this issue. In particular, the Applicant has provided numerous arguments in attempting to establish the fact the FSP provided him with incorrect information at Case No: 245761 Determination Page 4 of 14 inception of the policy. However, he (and by he, the Panel means his solicitors) have not specifically articulated the legal principles they are relying on. 17. Fo r instance, the Applicant has referred to the principle “estoppel” although there a numerous categories and variations where such a principle is applicable. However, having considered the nature of the arguments presented by the Applicant, the Panel considers the appropriate category being relied upon is the equitable principle of estoppel, particularly promissory estoppel. 18. Broadly speaking, there are three elements associated with this equitable principle that need to be satisfied: a. A clear representation was made to the Applicant; b. The Applicant relied on this representation to his detriment; and c. The extent of the detriment suffered. 19. The Applicant has also referred to the FSP’s conduct being misleading and deceptive. It is unclear if he is using these terms in the context of this equitable principle as the Panel notes that such terms are explicitly referred to in section 12DA(1) of the Australian Securities and Investments Commission Act 2001 (ASIC Act) which states: “A person must not, in trade or commerce, engage in conduct in relation to financial services that is misleading or deceptive or is likely to mislead or deceive.” (Panel emphasis) 20. Accordingly, if the Applicant’s allegation that the FSP’s conduct was misleading or deceptive is founded, then it is c lear such conduct would breach this provision. 21. With respect to both legal grounds, the onus is on the Applicant to establish the relevant elements on the balance of probabilities. Inception Conversation 22. The Applicant’s arguments with respect to the above legal principles are reliant upon one factual issue, namely whether the FSP represented to him that he was covered for flood. If the Applicant is unable to establish this occurred, then it is clear estoppel or section 12DA(1) of the ASIC Act would not assist him. The Evidence 23. The Applicant has provided a statutory declaration dated 18 March 2011 addressing this issue. This declaration contained the following relevant comments: “On 9 th March 2010, I contacted your company by phone to arrange house and contents insurance for my property at [insured address]. During this conversation I expressed my desire, on a number of occasions, to ensure that Case No: 245761 Determination Page 5 of 14 my property and contents were adequately protected by flood insurance. So much so that the operator felt it necessary to question as to why I was so concerned. My response was to the effect that Emerald had a 1 in 100 year flood event in 2008, of which I was aware, and having this knowledge I wished to ensure that my property and contents were adequately covered. I would like to add that the consultant who initiated the policy indicated that yes I was covered, and not once did she explain that there were different classifications for flooding, or that I was o nly covered for flash flooding.” 24. The FSP was unable to obtain a statement from JM as she was no longer employed with it. In addition, although the FSP normally records phone conversations in its call centre, this particular phone conversation had been diverted to its Gympie branch which does not have such a facility. 25. The Panel considers the explanation behind the absence of the call recording is reasonable and also corroborated by the Applicant’s policy schedule which identified JM as his consultant and her address being in Gympie. 26. The FSP provided two statements from PMJ dated 27 July 2011 and 22 March 2012 regarding the training and experience of JM. In particular, PMJ states:  Her duties with the FSP include being responsible for the underwriting and support teams and managing the relationship with the consultant network (this range of staff includes authorised representatives, of which JM was one). This latter role involved ensuring the consultants have appropriate training to sell products in accordance with the FSP’s regulatory obligations.  PMJ has been working with the FSP since 10 July 2007 and has full knowledge and understanding of the FSP’s processes and various products.  JM commenced as an authorised representative in December 2003. Upon doing so, she undertook a four week training course on the FSP’s insurance products, in particular the “New Starter Household Insurance Course”. In order for JM to have been authorised to deal with the FSP’s products, she had to complete this training course, which she did.  After completing her training, JM spent a few days with a “buddy” at the Gympie office. A “buddy” is an experienced operator. After this, JM continued to work as a Sales Consultant.  On 23 January 2008, JM was promoted to the role of Senior Sales Consultant and continued in that role until she left the FSP’s Gympie office on 18 February 2011. Such a promotion to Senior Sales Consultant only occurs if the individual has been a Sales Consultant for at least 2 years and displays an appropriate level o f performance, skill and experience.  The FSP also provides ongoing “continuation training”. This generally involves refresher training on information authorised representatives Case No: 245761 Determination Page 6 of 14 already received and also provides these representatives with an opportunity to receive training on new products or systems.  She provided a copy of the training JM completed during her tenure with the FSP. This included the following:  In 2004, she completed three training courses. This included a session on the FSP’s computer system as it specifically relates to insurance, a session of continuation training for household insurance and updates of the underwriting manual.  In 2005, she completed two continuation training courses, both specifically relating to insurance. She also completed a Certificate III in Financial Services in September 2005.  In 2006, she completed three continuation training courses and an assessment on the General Insurance Code of Practice.  In 2007, she completed two continuation training courses.  In 2008, she completed three continuation training courses, including a Privacy Refresher course.  In 2009, she completed two continuation training courses.  In 2010, she completed four training courses, including a session on the FSP’s sales approach, a session on the Insurance Sales and Service Framework and a session on the General Insurance Code of Practice.  In particular, as part of an authorised representative’s training, they are instructed that flood cover is not part of the standard home insurance cover and if customers require more comprehensive flood cover, they must apply for it separately. In cases where such a request is made, this is recorded on the FSP’s system.  A key document titled “Sales and Service Framework” is utilised by authorised representatives when selling the home insurance policy. JM’s training schedule shows she had received training on this document on 2 March 2010, approximately one week prior to the Applicant’s call. 27. PMJ has also provided a copy of the training material used in the initial four week course, which the Panel acknowledges is quite extensive and detailed. Previous Determinations 28. The Applicant, in rebutting the FSP’s evidence, has referred to numerous Determinations issued by this Service regarding disputes that involved an issue of an FSP misrepresenting the extent of cover. 29. The Panel accepts that pursuant to the Terms of Reference, it is to have regard to previous Determinations. However, it is not bound by them. In particular, the Panel considers previous Determinations provide little to no probative value when determining a factual issue in dispute. Case No: 245761 Determination Page 7 of 14 30. The reason is that a finding of fact is substantively reliant upon the specific individual circumstances in the dispute. It is not an issue upon which previous Determinations can assist. As a result, the Panel is required to consider the evidence as a whole regarding the specific circumstances of the dispute in order to make a finding, on the balance of probabilities, as to whether the factual issue alleged is found. 31. In addition, the previous Determinations relied upon by the Applicant all operated on the basis the decision-makers were satisfied that a representation occurred. This has yet to be established by the Applicant. Has the representation occurred? 32. The Applicant has provided a number of submissions arguing fine points about the FSP’s evidence, such as the fact the training d oes not specifically set out in detail the difference between flash flood and flood, whether JM’s conduct was closely monitored for quality control or the fact the Sales and Service Framework document does not require a consultant to discuss flood. 33. Despite these points, the Panel considers the onus is still on the Applicant to establish that a representation occurred. In this regard, his statutory declaration only attributes the following comments to JM: “I would like to add that the consultant who initiat ed the policy indicated that yes I was covered, and not once did she explain that there were different classifications for flooding, or that I was only covered for flash flooding”. 34. Prior to this, his statutory declaration refers to his communications to JM about his desire for flood insurance and the reasons why. There is nothing in that aspect of his declaration to indicate a statement was made by JM that he was covered for flood. 35. The Panel considers the Applicant’s evidence to be somewhat equivocal and l acking in detail. For instance, he states the consultant “indicated” he was covered. Use of the phrase “indicated” as opposed to something more direct, such as “stated” or “responded”, appears to infer that JM did not provide a specific statement to this effect. Instead, it appears to be an implication he drew based on his reconstruction of this conversation. 36. In addition, his use of the phrase “I would like to add” is disjointed to the comments preceding it. That is, the preceding comments flowed in a chronological manner about how the flood issue was discussed. For instance: “During this conversation I expressed my desire, on a number of occasions, to ensure that my property and contents were adequately protected by flood insurance. So much so that the operator felt it necessary to question as to why I was so concerned. My response was to the effect that Emerald had a 1 in 100 year flood event in 2008 of which I was aware, and having this knowledge I wished to ensure that my property and contents were adequately covered. I would like to add …” Case No: 245761 Determination Page 8 of 14 37. Accordingly, the use of the phrase “I would like to add” at this point introduces a level of ambiguity as to where and in what manner JM’s comments about flood fits in the chronology. That is, it implies this aspect o f his recollection is something he recalls was discussed at some point but he is unclear as to when. 38. Given the principle basis of this conversation was for the Applicant to arrange an insurance contract with the FSP, it is unlikely the issue of flood was the sole or even substantive topic of discussion. JM would have likely asked various underwriting questions of the Applicant, discussed the sum insured, recorded personal information (such as address and phone numbers) and provided the Applicant with information as to what had been arranged. 39. As a result, the ambiguity behind when or how JM allegedly responded to the issue of flood raises a number of concerns. 40. Although the Panel acknowledges that it is making a number of fine points in assessing the Applican t’s statutory declaration, it considers this is necessary given the lack of detail about the actual representation. For instance, the Applicant provides no specific wording or phrases used by JM. His statutory declaration only provides a general description. 41. In particular, the Panel considers context and wording are essential in reviewing this substantive factual issue. The reason being is that it is entirely possible for a party to misconstrue a statement provided by another because they paid particular attention to one aspect of a statement whilst ignoring the balance. This therefore leads them to make an assumption that was not necessarily reasonable when considering the other party’s statement as a whole. 42. In the Applicant’s case for example, if the Pane l was to accept that flood was discussed, it is possible JM may have informed the Applicant at some point that flood is covered under the policy if it is due to heavy rain that fell within 24 hours previously. 43. If such a statement was made, the Panel considers it is likely the Applicant would have inferred he was covered for flood given:  There was no indication JM was describing this situation as a classification of flood;  The term “flash flood” was not required to be used because the description provided by JM is consistent to the policy definition of this term; and  The Applicant would have attributed little significance to the heavy rain and 24 hour period given he would have presumed any flood would occur during a period of heavy rain. 44. This would also be consistent with the general description contained in his statutory declaration. Case No: 245761 Determination Page 9 of 14 45. In such a situation, the Panel would not consider JM’s comments to be misleading or deceptive given it is consistent with the insured event of “Flash flood and stormwater runof f.” 46. It is for this reason that the words and context of a conversation are significant. In the absence of same, it is difficult for the Panel to determine whether it was reasonable for the Applicant to attribute a representation made by the FSP that he was covered for flood. 47. In addition, the Panel also considers it unusual that after making numerous enquiries about whether he was covered for flood, the Applicant omitted to review his policy documents in any way to ensure his understanding was consistent with the document. 48. If he had merely consulted the policy schedule, the Panel is satisfied he would have identified at page 3 that he was not covered for flood given the following: “ What optional covers are included and not included … Flood and storm surge Not included” 49. The Panel also accepts that it would appear unusual, on the face of it, that a Senior Sales Consultant who had more than six years experience handling the FSP’s home insurance policy would make such a significant error. Although the Panel accepts it is possible for this to occur, it is, however, improbable when considering JM’s extensive training and position. 50. After considering the evidence as a whole and for the reasons discussed, the Panel is not satisfied the Applicant has established, on the balance of probabilities, that the FSP represented to him during the inception call that he was covered for flood. 51. As the Applicant is unable to establish the representation occurred, then an essential ingredient to the equitable principle of estoppel cannot be satisfied. As such, he is not entitled to any remedy in that regard. 52. With respect to the misleading or deceptive conduct, this was contingent on the Applicant establishing the representation. In the absence of same, such an allegation has no foundation and accordingly, the Panel does not accept the Applicant has established the FSP breached section 12DA(1) of the ASIC Act. Section 945A of the Corporations Act 53. The Panel does not propose to review this issue at length because this allegation was substantively based on the Applicant’s allegation that the FSP represented to him that he was covered for flood. Case No: 245761 Determination Page 10 of 14 54. For reasons already explained, the Panel has not accepted the Applicant has established this fact and as such, his allegation in this regard is not substantiated. Clearly Inform 55. Section 35(2) of the Act states that when a claim is made under a “prescribed contract” for a “prescribed event”, an insurer cannot refuse to pay the claim unless it can establish that it clearly informed its insured in writing that it would not cover this event. Section 34 of the Act has defined the terms “prescribed contract” and “prescribed event” by referring to the Insurance Contracts Regulations 1985. 56. There is no dispute that contracts of insurance covering a person’s home and contents are a “prescribed contract” and damage due to flood is a “prescribed event”. 57. The onus is therefore on the FSP to establish that it has clearly informed the Applicant prior to the claim that it would not cover damage caused by “flood”. This is generally done by an insurer providing a copy of its policy to its insured which is meant to set out completely the rights and obligations of both parties under the insurance contract. 58. Further, the Courts have supported this and particularly, in the case of Marsh v CGU Insurance Ltd [2004] NTCA 1, Mildren J provided the following comments that is particularly relevant to the operation of Section 35(2) of the Act: “In Hams & Anor v CGU Insurance Ltd(2002) 12 ANZ Insurance Cases 61 - 525, Einstein J held that the provisions of s 35(2) of the Insurance Contracts Act 1984 (Cth) could be met if the insurer provided to the proposed insured a document such as the proposed policy, which contained the relevant wording. I agree. … Whether the policy wording in fact "clearly informe d" the insured that there was no cover for flood is a question of fact to be determined by an examination of the document in question. … Furthermore, the language of s 35(2) suggests that the proposed insured can be clearly informed merely by providing the insured with a copy of the policy which shows the exclusion in clear and unambiguous terms. … The answer to the question "is flood covered" is easily ascertainable by any person of average intelligence and education. ” (Panel emphasis) 59. In his initial submissions, the Applicant stated the FSP omitted to provide evidence that he was sent a copy of the policy. The Panel notes the Applicant does not state he did not receive the policy or that he did not receive the policy before the loss occurred. 60. Following this initial submission, the FSP provided evidence explaining its processes of dispatching documents and how it was applied in the Applicant’s case. The Applicant has provided no submission to rebut this evidence. Case No: 245761 Determination Page 11 of 14 61. Given the FSP’s evidence and the fact the A pplicant has never refuted in any manner that he did not receive the policy, the Panel is satisfied on the balance of probabilities that the Applicant did receive the policy before the claim arose. The policy structure 62. In relation to the policy structure itself, the Applicant has provided numerous submissions to argue that the relevant terms relied upon by the FSP are ambiguous. In particular, the Applicant has highlighted the fact the definition of “flood” is so wide that it encompasses the definition of “Flash flood and stormwater run- off”. 63. In addition, the Applicant has also stated the definitions of “Flash flood and stormwater run- off”, “Flood” and “Storm” are overlapping and create confusion and uncertainty. 64. The FSP has rebutted this with a number of arguments, one of which is to refer to a previous Determination issued by the Service that considered a very similar issue. The relevant case number is 245470. 65. The Applicant has also referred to a previous Determination which was issued by the Service’s Pre decessor Scheme, namely case number 41709. However, the Panel prefers to rely on the reasoning contained in case number 245470 for the following reasons:  It is more contemporaneous;  It involves policy provisions that are essentially identical to the policy in this dispute;  It considered arguments that are substantively similar to the Applicant’s submissions;  The reasoning and analysis contained in the previous Determination has clear applicability to this dispute, in particular paragraphs 39 to 52; and  Subject to the Applicant alleging the FSP represented he was covered for flood, which the Panel has not accepted is substantiated, the Applicant has not introduced any new substantive arguments that would imply the Panel’s previous reasoning is i ncorrect either in law or fact. 66. Given this, the Panel intends to adopt the rationale contained in case number 245470 in finding that the policy clearly informed the Applicant that he was not covered for “flood” pursuant to Section 35(2) of the Act. Water Inundation 67. The FSP has relied on a statement by hydrologist SC dated 12 July 2011. In this statement, SC analysed the Emerald region and provided comments Case No: 245761 Determination Page 12 of 14 based both on a regional basis and specific to the Applicant’s home. His statement contained the following relevant information:  He carried out extensive investigations into the Emerald area for the inundations over December 2010 / January 2011. The area included the Nogoa River catchment in Emerald, which is quite large.  There was heavy rainfall in the Nogoa River catchment upstream of the Fairbairn Dam on 26 December 2010. Water from this catchment takes several days to travel down to Fairbairn Dam.  At approximately 10.30pm on 30 December 2010, the Dam was at full capacity. As it did not have the capacity to mitigate the downstream effect of the water flowing into it, water flowed down the Nogoa River towards Emerald.  There was little rainfall in Emerald in the three days leading up to the peak water level of the Nogoa River.  The peak water level in Nogoa River was attributable to the rain which fell in the catchment upstream of Fairbairn Dam on 26 December 2010.  In the Applicant’s case, minimal rain fell in the 24 hours preceding 30 December 2010. In particular, minimal rain fell in the catchment area after 9.00am on 28 December 2010. 68. Based on this, SC concluded the following: “… I conclude that the cause of the inundation of the Subject Property was the rising level of the Nogoa River, which was itself caused by rain which fell more than 24 hours earlier .” 69. One of the factors that SC took into consideration was the fact the Applicant indicated his property was inundated on 30 or 31 December 2010. However, following a number of submissions between the parties, the Applicant later submitted that his property was likely inundated on 29 December 2010 based on the following:  Other people in the immediate area who stated water was backing up from drains due to the storm event.  A report titled “The Hydrology Report - Overview of the December 2010 / January 2011 Fl ood at Emerald Qld” which stated: “During the afternoon and evening of the 29 th December 2010, the Nogoa River overflowed into low-lying areas and properties adjacent to the riverbank to the south and north of the Capricorn Highway. The Nogoa River continued to rise throughout the night of 29 th December eventually backing up a number of stormwater drains to inundated low-lying roads and properties.”  Rainfall gauges, including Emerald Radar and Emerald Airport, which indicated there was rainfall on 28 December 2010. 70. The Applicant did not observe the inundation nor has he provided any witness evidence. The witness evidence he referred to only provided Case No: 245761 Determination Page 13 of 14 evidence that water was backing up from drains. This evidence does not describe where they observed this phenomenon, whether this water inundated properties and one of the properties which were inundated included the Applicant’s home. 71. The hydrology report he has referred to was not provided and the comments quoted are general in nature. 72. The Panel therefore considers the Applicant’s evidence about the timing of initial inundation is necessarily speculative. 73. Regardless if the Panel was inclined to accept the date of inundation as 29 December 2010, there is only one insured event that can respond to the Applica nt’s circumstances, namely “Flash flood and stormwater runoff”. A key ingredient to satisfy this event is for the Applicant to establish the inundation was caused by heavy rain which fell within 24 hours. 74. Although the policy also covers “Storm”, this exclu des any rain that reaches the ground. As it is clear rain that reached the ground has been a causative factor to the Applicant’s loss, this insured event has no applicability to his circumstances. 75. The Applicant has relied on the fact that there was rainfall recorded in Emerald within the 24 hours as evidence that the insured event has been satisfied. However, the policy clearly states it has to be heavy rain and it was this heavy rain that caused the inundation. 76. The FSP’s hydrologist’s report provided grap hs of the rainfall recorded from various gauges within the Nogoa River catchment. With respect to the Emerald gauge, which appears the closest in proximity to the Applicant’s property, he provided a graph that contained hourly rainfall recorded. 77. It is clear from these graphs that a significant amount of rainfall fell in the Nogoa River catchment in the 24 hours leading to 9.00am on 27 December 2010. However, there was minimal rainfall following this and almost no rainfall after 9.00am on 28 December 2010. Although some rain was recorded on 30 and 31 December 2010, this was minimal compared to the amounts that fell prior to 9.00am on 27 December 2010. In addition, the two gauges that recorded this rainfall were located 67 and 143km from the Applicant’s proper ty. 78. Accordingly, there is no evidence that any rainfall that fell from 28 December 2010 onwards could be considered heavy, let alone have a causal link to the inundation. 79. Further, if the Panel was to accept the Applicant’s proposition that water surcharged from stormwater drains to inundate his property, it is unlikely this resulted from the minimal rainfall. Such an event would be more consistent with elevated levels of the Nogoa River backing up through the stormwater system and then surcharging through drains. Case No: 245761 Determination Page 14 of 14 80. This scenario is consistent with the hydrologist’s conclusion and is both logical and reasonable in the context of the empirical evidence. 81. Based on this, the Panel considers it is improbable that the cause of the elevated waters in the Nogoa River would be attributable to the minimal rainfall that fell from 28 December 2010 onwards. Instead, the Panel is inclined to accept it is probable these elevated levels were due to the substantial rainfall that fell prior to 9.00am on 27 December 2010 and was collecting into Fairbairn Dam. 82. Accordingly, the Panel accepts that on the balance of probabilities, it was rainfall that fell more than 24 hours previously that caused the inundation to the Applicant’s property. The Panel is therefore not satisfied, on the balance of probabilities the Applicant’s property sustained damage pursuant to the insured event of “Flash flood and stormwater runoff” or any other insured event under the policy. Determination 83. On the basis of the available information the Panel determines the FSP is entitled to deny the Applicant’s claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.