Home / Financial Firm (Unknown - Insurer) / Determination 245665
Determination 245665
claim_denial
Summary
A retirement village resident's home and contents claim for 2011 Bremer River inundation was declined under the flood exclusion. AFCA found the inundation was riverine flood, the exclusion was clearly informed, and the investigation was adequate.
The insurer posted the PDS and policy documents within 14 days of inception under section 69, and the policy wording clearly excludes flood, so section 35 is satisfied.
Issues
- Claim denial primary · not upheld“the FSP is entitled to decline the Applicant's claim for damage arising from water inundation due to flood”
- Inadequate claim investigation secondary · not upheld“the Panel does not consider the FSP failed to adequately investigate the claim”
- Failure to disclose secondary · not upheld“the FSP has in this case discharged the onus on it to clearly inform the terms of the exclusion pursuant to section 35”
Subjects and remedies
health or medicalhome or building damagenatural disasterno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 245665 Determination Page 1 of 6
Case number: 245665
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
03 February 2012
Background
1. The Applicant holds a Home Building and Contents Policy of insurance with the
Financial Services Provider (FSP). The policy covers the building for
replacement cover and contents up to $40,000. The policy is subject to an
excess of $500.
2. On 11 January 2011 loss and damage occurred to the Applicant’s home and
contents as a result of water inundation.
3. The FSP declined the claim on the basis that the damage had arisen from flood
water which was excluded from cover under the policy.
4. The Applicant disputes the FSP’s declinature on the basis that the inundation
was from stormwater run-off which is covered by the policy. Further that the
FSP failed to properly inform of the flood exclusion under section 35 of the
Insurance Contracts Act 1984.
Summary of Applicant’s Position
5. The Applicant has been assisted in making a submission by his legal
representative.
6. The Applicant submits that at the time of inception of his policy he was not
experienced in insurance matters. He did not know and was not aware that the
policy did not extend to cover flood. Within a month of taking up the policy, he
had suffered a stroke and suffered short term memory loss. He did not keep an
eye out for the policy and his daughter who acted as his carer, did not
remember to look out for the policy document.
7. The Applicant argues in order for the FSP to rely upon the flood exclusion, the
FSP must establish that the Applicant had been clearly informed of the
exclusion in accordance with section 35 of the Insurance Contracts Act. As the
Applicant had not received a copy of the PDS, the Applicant argues the FSP
has failed to comply with section 35 of the Insurance Contracts Act.
Determination
Case No: 245665 Determination Page 2 of 6
8. The Applicant further argues that the policy does not clearly inform that flood is
excluded and that the definition of flood when read with the definition of storm
and stormwater run-off causes confusion for a reasonable consumer.
9. In the alternative, the Applicant argues that the property damage was caused
as a result of run-off from storm and/or rainwater and therefore the Applicant is
entitled to cover under the terms of the policy. In support of this, the Applicant
relies upon information from the Bureau of Meteorology.
10. In a further submission dated 27 October 2011, the Applicant has argued that
the FSP cannot rely upon section 69 of the Insurance Contracts Act to
discharge their obligation to clearly inform as it was reasonable and practical for
the FSP to inform the Applicant prior to taking out the policy that flood was an
excluded event. The Applicant further argues that prior to any riverine flooding,
stormwater run- off and rain caused damage to the Applicant’s hom e.
Summary of FSP’s Position
11. The FSP maintains the Applicant’s policy is a defined events policy which does
not cover all types of risks and specifically excludes cover for flood. The FSP
relies upon the terms and conditions of the policy and in particular on page 13
of the Home Building Insurance policy and page 19 of the Home Contents
Insurance policy which states that damage or loss caused by flood is excluded
under the terms of the policy.
12. The FSP further relies upon area hydrology together with interactive flood
mapping of the Bremer River and its surrounds and the site specific
assessment report of the property to determine that loss or damage sustained
was sustained as a result of flood.
13. Insofar as having provided written information as to the extent of policy
coverage, the FSP relies upon evidence provided by CDS to confirm that the
policies were printed and posted to the Applicant with the insurance quote. The
FSP argues this establishes the FSP has a process for document printing
reconciliation and despatch and most likely the policy documentation had been
provided to the Applicant following inception of the policy.
14. The FSP relies upon section 69 of the Insurance Contracts Act to maintain the
provision of the written documentation within 14 days of inception of the policy
meets the FSP’s obligations to clearly inform.
15. Insofar as the Applicant’s property may have been inundated by stormwater
back-flow, the FSP has carefully considered the circumstances of the event
including the timing and height of any overland flood waters that has affected
the Applicant’s property. The FSP rejects the argument that the high rainfall in
the area is evidence of initial inundation by stormwater. It relies on the
hydrology and information provided by its assessor to determine that the
inundation was due to flood.
Case No: 245665 Determination Page 3 of 6
Issues
16. Whether the FSP is entitled to deny liability of the Applicant’s claim.
17. Whether the FSP can demonstrate that it has met the obligations of section 35
of the Insurance Contracts Act to clearly inform the Applicant of the flood
exclusion.
Reasons for Decision
18. Due to the nature of the dispute the Financial Ombudsman Service (FOS) has
considered it appropriate to expedite the dispute in accordance with the
operational guidelines in the FOS Terms of Reference. This dispute has not
been subject to a FOS recommendation and has proceeded directly to
determination. The parties had previously been advised that a determination
will be issued in this case.
19. The decision is being made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
20. In view of the nature of the issues in dispute, the Ombudsman conducted a site
inspection of the property on 17 January 2012. Present at the site inspection
were the Applicant and two representatives from the insurance company.
21. The Applicant’s residence is part of a retirement village development. The unit
in which the Applicant lives overlooks the Bremer River. The unit is built on a
sloping section of the block with the main residence on the upper level.
22. The Applicant was at the property on the day of the inundation and saw the
water rising. At about 3:00pm water was starting to lap at the ground level of
the property. By 6:00pm it started coming in underneath the property. Water
steadily rose to reach a height of approximately two metres above floor height
on the second level. The Applicant described the inundation to the height of the
air-conditioning on the second level.
23. Following the inundation, the property required gutting and complete rebuilding.
24. The Applicant was not aware of any inundation reaching the property from the
stormwater drains although he did observe the lids of the drains popping. He
was not aware of any water entering the property from these drains.
25. The Panel notes the following comments from the Assessor’s report:
The Applicant’s property is situated near the Bremer River.
The Bremer River peaked at a near record height of 19.4 metres.
The Applicant was evacuated around lunchtime 11 January 2011 due to
the rising water levels of the Bremer River.
Case No: 245665 Determination Page 4 of 6
The Applicant returned on 14 January 2011 to discover water had risen to
a height of approximately 2 metres throughout his home damaging the
home and contents.
The Applicant’s property footings are stumps and C has designated it as
‘low set’.
The habitable floor level is above the surrounding ground level by about
1-2 metres. The ground level of the house is higher than street level.
The rain was heaviest on 11 January 2011 and stopped at approximately
4.00pm.
The inundation of the property commenced at approximately 10.00am on
11 January 2011 with the water inundating the house at approximately
1.00pm. An estimated time for the peak of the water levels in the property
was 10.00pm on 11 January 2011.
The water entering the property was dirty.
There was no damage caused by rainwater through the roof or
overflowing from the gutters.
26. The ICA hydrology report Volume 3 provides the following information:
Over the period of 9-14 January 2011 severe flooding occurred in many
areas of the Brisbane River Catchment, including Ipswich City Council
local government area.
The intense rainfall occurred over the south-western and western parts of
the Bremer River catchment before and during the subsequent waterway
flooding. However, the severity of short duration rainfall was generally less
than 10-Year ARI. The severity of the rainfall across other areas of
Ipswich was generally inconsequential, being 1-Year ARI.
The severity of short term rainfall events over the lower Brisbane River
and its tributaries was generally very low (less than 1-Year ARI) and it is
considered unlikely that overland flow inundation occurred in these
catchments.
The nearest Pluviograph Stat ion to the Applicant’s property was
Bundamba Alert. It demonstrates the heavier rainfall at the relevant time
fell to the north and west of the locale, with the Applicant’s property being
located in the East and consequently subject to lesser rainfall.
After 9.00am on 11 January 2011 water levels at One Mile Bridge Alert
and Ipswich Alert began to rise rapidly due to Brisbane River water
flowing back up along the Bremer River (backwater flooding). The peak
water level at these stations occurred on Wednesday 12 January 2011.
The Panel notes the graph of water levels indicates a substantial rise to the
peak level between the afternoon of 11 January 2011 and midnight 12 January
2011.
27. The Panel notes that in Volume 1 of the ICA Hydrology Report, the report
commented that the principal cause of flooding along the lower Brisbane River
Case No: 245665 Determination Page 5 of 6
downstream of the Wivenhoe Dam was the releases from the Dam especially
over a period from 6:00am on Tuesday, 11 January 2011. The report concludes
that the releases caused flooding a long the Brisbane River and backwater
flooding along the Lockyer Creek, the Bremer River and all other downstream
tributaries.
28. Aerial flood mapping provided by the Queensland Reconstruction Authority
shows the flood lines associated with the Bremer River. The map indicates the
flood lines extend from the Bremer River to the Applicant’s property.
29. There is no dispute that there were severe weather warnings on the morning of
11 January 2011; nor is it disputed that there were storms accompanied by
heavy rain on that day. The Applicant maintains that there was heavy rain in the
morning but after 11:00am the rain eased.
30. It would appear based on the information provided that there is no dispute that
the rainfall lightened in the afternoon.
31. The Panel accepts that the policy covers an insured for storm and rainwater
run-off but not for flood.
32. The Applicant’s property is adjacent to the Bremer River which experienced
significant backflow from the Brisbane River. The Bremer River has been listed
as a principal cause of flooding over the period from 6:00am on Tuesday, 11
January 2011 to 3:00am on 12 January 2011. The evidence as presented, in
particular the area hydrology and assessor’s information, considered together
with the Applicant’s information indicates that the Applicant’s property was most
likely inundated by floodwaters from the Bremer River.
33. There is no evidence that stormwater run-off from the 40 mm rainfall was
sufficient to inundate the property to the habitable floor level of 1-2 metres.
There is no evidence that the rainfall at the time was sufficient to cause
inundation of the habitable floor level by up to 2 metres.
34. The rainfall data and hydrology reports provided suggest that it was riverine
flooding rather than rainfall or stormwater run-off, which would have inundated
the property over this time period.
35. Based on the evidence before it, the Panel accepts that on the balance of
probabilities, the source of inundation at the insured property was water
inundation from the local watercourse, the Bremer River.
36. The Panel has noted the allegations by the Applicant that the FSP failed to
properly investigate the claim. The Panel notes the FSP obtained hydrology
reports, mapping date and an assessor report. Accordingly the Panel does not
consider the FSP failed to adequately investigate the claim.
37. There remains to be considered the question of whether the FSP had clearly
informed the Applicant of the policy terms and conditions.
Case No: 245665 Determination Page 6 of 6
38. The Panel notes that under section 69 of the Act the FSP is entitled to provide
the PDS to the Applicant, where it was not reasonably practicable to provide it
prior to the entering into of the contract within 14 days of entering the contract.
39. The Panel accepts there is sufficient documentary evidence to demonstrate the
posting of the PDS to the Applicant, in accordance with the requirements of
section 69 of the Act. That is, the PDS and other policy documents were posted
within 14 days of policy inception.
40. The Panel has considered the policy wording. The policies are indexed with
clear reference to exclusions and the defined events that are covered. The
policy wording is set out simply and in the Panel’s opinion, is sufficient to clearly
inform an insured as to the limitations within the policy.
41. The Applicant has commented that due to his ill health, he did not look out for
the policy and his daughter has commented that she, being occupied as his
carer at the time, could not look out for the policy. Nonetheless, the Panel
accepts that the policy documentation had been posted to the Applicant within
14 days. The Panel is satisfied that the FSP has properly provided the policy
documentation to the Applicant in accordance with section 35 and section 39 of
the Act. The Panel is satisfied based on the construction of the policy, the plain
English writing and the definitions contained within the policy that by providing
the policy documentation to the Applicant, the FSP has in this case discharged
the onus on it to clearly inform the terms of the exclusion pursuant to section 35
of the Act.
Determination
42. Whilst the Panel sympathises with the Applicant’s position, the Panel is
satisfied, based on the information available, that the FSP is entitled to decline
the Applicant’s claim for damage arising from water inundation due to flood.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.