Home / Financial Firm (Unknown - Insurer) / Determination 245665

Determination 245665

claim_denial

FirmFinancial Firm (Unknown - Insurer)
Decided2012-02-03
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A retirement village resident's home and contents claim for 2011 Bremer River inundation was declined under the flood exclusion. AFCA found the inundation was riverine flood, the exclusion was clearly informed, and the investigation was adequate.

The insurer posted the PDS and policy documents within 14 days of inception under section 69, and the policy wording clearly excludes flood, so section 35 is satisfied.

Issues

Subjects and remedies

health or medicalhome or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 245665 Determination Page 1 of 6 Case number: 245665 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim 03 February 2012 Background 1. The Applicant holds a Home Building and Contents Policy of insurance with the Financial Services Provider (FSP). The policy covers the building for replacement cover and contents up to $40,000. The policy is subject to an excess of $500. 2. On 11 January 2011 loss and damage occurred to the Applicant’s home and contents as a result of water inundation. 3. The FSP declined the claim on the basis that the damage had arisen from flood water which was excluded from cover under the policy. 4. The Applicant disputes the FSP’s declinature on the basis that the inundation was from stormwater run-off which is covered by the policy. Further that the FSP failed to properly inform of the flood exclusion under section 35 of the Insurance Contracts Act 1984. Summary of Applicant’s Position 5. The Applicant has been assisted in making a submission by his legal representative. 6. The Applicant submits that at the time of inception of his policy he was not experienced in insurance matters. He did not know and was not aware that the policy did not extend to cover flood. Within a month of taking up the policy, he had suffered a stroke and suffered short term memory loss. He did not keep an eye out for the policy and his daughter who acted as his carer, did not remember to look out for the policy document. 7. The Applicant argues in order for the FSP to rely upon the flood exclusion, the FSP must establish that the Applicant had been clearly informed of the exclusion in accordance with section 35 of the Insurance Contracts Act. As the Applicant had not received a copy of the PDS, the Applicant argues the FSP has failed to comply with section 35 of the Insurance Contracts Act. Determination Case No: 245665 Determination Page 2 of 6 8. The Applicant further argues that the policy does not clearly inform that flood is excluded and that the definition of flood when read with the definition of storm and stormwater run-off causes confusion for a reasonable consumer. 9. In the alternative, the Applicant argues that the property damage was caused as a result of run-off from storm and/or rainwater and therefore the Applicant is entitled to cover under the terms of the policy. In support of this, the Applicant relies upon information from the Bureau of Meteorology. 10. In a further submission dated 27 October 2011, the Applicant has argued that the FSP cannot rely upon section 69 of the Insurance Contracts Act to discharge their obligation to clearly inform as it was reasonable and practical for the FSP to inform the Applicant prior to taking out the policy that flood was an excluded event. The Applicant further argues that prior to any riverine flooding, stormwater run- off and rain caused damage to the Applicant’s hom e. Summary of FSP’s Position 11. The FSP maintains the Applicant’s policy is a defined events policy which does not cover all types of risks and specifically excludes cover for flood. The FSP relies upon the terms and conditions of the policy and in particular on page 13 of the Home Building Insurance policy and page 19 of the Home Contents Insurance policy which states that damage or loss caused by flood is excluded under the terms of the policy. 12. The FSP further relies upon area hydrology together with interactive flood mapping of the Bremer River and its surrounds and the site specific assessment report of the property to determine that loss or damage sustained was sustained as a result of flood. 13. Insofar as having provided written information as to the extent of policy coverage, the FSP relies upon evidence provided by CDS to confirm that the policies were printed and posted to the Applicant with the insurance quote. The FSP argues this establishes the FSP has a process for document printing reconciliation and despatch and most likely the policy documentation had been provided to the Applicant following inception of the policy. 14. The FSP relies upon section 69 of the Insurance Contracts Act to maintain the provision of the written documentation within 14 days of inception of the policy meets the FSP’s obligations to clearly inform. 15. Insofar as the Applicant’s property may have been inundated by stormwater back-flow, the FSP has carefully considered the circumstances of the event including the timing and height of any overland flood waters that has affected the Applicant’s property. The FSP rejects the argument that the high rainfall in the area is evidence of initial inundation by stormwater. It relies on the hydrology and information provided by its assessor to determine that the inundation was due to flood. Case No: 245665 Determination Page 3 of 6 Issues 16. Whether the FSP is entitled to deny liability of the Applicant’s claim. 17. Whether the FSP can demonstrate that it has met the obligations of section 35 of the Insurance Contracts Act to clearly inform the Applicant of the flood exclusion. Reasons for Decision 18. Due to the nature of the dispute the Financial Ombudsman Service (FOS) has considered it appropriate to expedite the dispute in accordance with the operational guidelines in the FOS Terms of Reference. This dispute has not been subject to a FOS recommendation and has proceeded directly to determination. The parties had previously been advised that a determination will be issued in this case. 19. The decision is being made by a Panel consisting of an Ombudsman, a representative with extensive experience in insurance industry matters and a representative with extensive experience in consumer claims. 20. In view of the nature of the issues in dispute, the Ombudsman conducted a site inspection of the property on 17 January 2012. Present at the site inspection were the Applicant and two representatives from the insurance company. 21. The Applicant’s residence is part of a retirement village development. The unit in which the Applicant lives overlooks the Bremer River. The unit is built on a sloping section of the block with the main residence on the upper level. 22. The Applicant was at the property on the day of the inundation and saw the water rising. At about 3:00pm water was starting to lap at the ground level of the property. By 6:00pm it started coming in underneath the property. Water steadily rose to reach a height of approximately two metres above floor height on the second level. The Applicant described the inundation to the height of the air-conditioning on the second level. 23. Following the inundation, the property required gutting and complete rebuilding. 24. The Applicant was not aware of any inundation reaching the property from the stormwater drains although he did observe the lids of the drains popping. He was not aware of any water entering the property from these drains. 25. The Panel notes the following comments from the Assessor’s report:  The Applicant’s property is situated near the Bremer River.  The Bremer River peaked at a near record height of 19.4 metres.  The Applicant was evacuated around lunchtime 11 January 2011 due to the rising water levels of the Bremer River. Case No: 245665 Determination Page 4 of 6  The Applicant returned on 14 January 2011 to discover water had risen to a height of approximately 2 metres throughout his home damaging the home and contents.  The Applicant’s property footings are stumps and C has designated it as ‘low set’.  The habitable floor level is above the surrounding ground level by about 1-2 metres. The ground level of the house is higher than street level.  The rain was heaviest on 11 January 2011 and stopped at approximately 4.00pm.  The inundation of the property commenced at approximately 10.00am on 11 January 2011 with the water inundating the house at approximately 1.00pm. An estimated time for the peak of the water levels in the property was 10.00pm on 11 January 2011.  The water entering the property was dirty.  There was no damage caused by rainwater through the roof or overflowing from the gutters. 26. The ICA hydrology report Volume 3 provides the following information:  Over the period of 9-14 January 2011 severe flooding occurred in many areas of the Brisbane River Catchment, including Ipswich City Council local government area.  The intense rainfall occurred over the south-western and western parts of the Bremer River catchment before and during the subsequent waterway flooding. However, the severity of short duration rainfall was generally less than 10-Year ARI. The severity of the rainfall across other areas of Ipswich was generally inconsequential, being 1-Year ARI.  The severity of short term rainfall events over the lower Brisbane River and its tributaries was generally very low (less than 1-Year ARI) and it is considered unlikely that overland flow inundation occurred in these catchments.  The nearest Pluviograph Stat ion to the Applicant’s property was Bundamba Alert. It demonstrates the heavier rainfall at the relevant time fell to the north and west of the locale, with the Applicant’s property being located in the East and consequently subject to lesser rainfall.  After 9.00am on 11 January 2011 water levels at One Mile Bridge Alert and Ipswich Alert began to rise rapidly due to Brisbane River water flowing back up along the Bremer River (backwater flooding). The peak water level at these stations occurred on Wednesday 12 January 2011. The Panel notes the graph of water levels indicates a substantial rise to the peak level between the afternoon of 11 January 2011 and midnight 12 January 2011. 27. The Panel notes that in Volume 1 of the ICA Hydrology Report, the report commented that the principal cause of flooding along the lower Brisbane River Case No: 245665 Determination Page 5 of 6 downstream of the Wivenhoe Dam was the releases from the Dam especially over a period from 6:00am on Tuesday, 11 January 2011. The report concludes that the releases caused flooding a long the Brisbane River and backwater flooding along the Lockyer Creek, the Bremer River and all other downstream tributaries. 28. Aerial flood mapping provided by the Queensland Reconstruction Authority shows the flood lines associated with the Bremer River. The map indicates the flood lines extend from the Bremer River to the Applicant’s property. 29. There is no dispute that there were severe weather warnings on the morning of 11 January 2011; nor is it disputed that there were storms accompanied by heavy rain on that day. The Applicant maintains that there was heavy rain in the morning but after 11:00am the rain eased. 30. It would appear based on the information provided that there is no dispute that the rainfall lightened in the afternoon. 31. The Panel accepts that the policy covers an insured for storm and rainwater run-off but not for flood. 32. The Applicant’s property is adjacent to the Bremer River which experienced significant backflow from the Brisbane River. The Bremer River has been listed as a principal cause of flooding over the period from 6:00am on Tuesday, 11 January 2011 to 3:00am on 12 January 2011. The evidence as presented, in particular the area hydrology and assessor’s information, considered together with the Applicant’s information indicates that the Applicant’s property was most likely inundated by floodwaters from the Bremer River. 33. There is no evidence that stormwater run-off from the 40 mm rainfall was sufficient to inundate the property to the habitable floor level of 1-2 metres. There is no evidence that the rainfall at the time was sufficient to cause inundation of the habitable floor level by up to 2 metres. 34. The rainfall data and hydrology reports provided suggest that it was riverine flooding rather than rainfall or stormwater run-off, which would have inundated the property over this time period. 35. Based on the evidence before it, the Panel accepts that on the balance of probabilities, the source of inundation at the insured property was water inundation from the local watercourse, the Bremer River. 36. The Panel has noted the allegations by the Applicant that the FSP failed to properly investigate the claim. The Panel notes the FSP obtained hydrology reports, mapping date and an assessor report. Accordingly the Panel does not consider the FSP failed to adequately investigate the claim. 37. There remains to be considered the question of whether the FSP had clearly informed the Applicant of the policy terms and conditions. Case No: 245665 Determination Page 6 of 6 38. The Panel notes that under section 69 of the Act the FSP is entitled to provide the PDS to the Applicant, where it was not reasonably practicable to provide it prior to the entering into of the contract within 14 days of entering the contract. 39. The Panel accepts there is sufficient documentary evidence to demonstrate the posting of the PDS to the Applicant, in accordance with the requirements of section 69 of the Act. That is, the PDS and other policy documents were posted within 14 days of policy inception. 40. The Panel has considered the policy wording. The policies are indexed with clear reference to exclusions and the defined events that are covered. The policy wording is set out simply and in the Panel’s opinion, is sufficient to clearly inform an insured as to the limitations within the policy. 41. The Applicant has commented that due to his ill health, he did not look out for the policy and his daughter has commented that she, being occupied as his carer at the time, could not look out for the policy. Nonetheless, the Panel accepts that the policy documentation had been posted to the Applicant within 14 days. The Panel is satisfied that the FSP has properly provided the policy documentation to the Applicant in accordance with section 35 and section 39 of the Act. The Panel is satisfied based on the construction of the policy, the plain English writing and the definitions contained within the policy that by providing the policy documentation to the Applicant, the FSP has in this case discharged the onus on it to clearly inform the terms of the exclusion pursuant to section 35 of the Act. Determination 42. Whilst the Panel sympathises with the Applicant’s position, the Panel is satisfied, based on the information available, that the FSP is entitled to decline the Applicant’s claim for damage arising from water inundation due to flood.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.