Home / Financial Firm (Unknown - Insurer) / Determination 245384

Determination 245384

Denial of claim (Flood)

FirmFinancial Firm (Unknown - Insurer)
Decided2012-09-04
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant claimed for water inundation of her home during the January 2011 Queensland floods, and the FSP denied the claim as flood, which is excluded. AFCA found the inundation was flash flood, but limited cover to 0.1 metres above the benchmark level, applied the monetary caps, and ordered settlement with interest.

Flash flood is a specific covered event that the general flood exclusion does not cancel, and the policy clearly stated the flood exclusion and the flash flood monetary caps.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 245384 Determination Page 1 of 16 Case number: 245384 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim (Flood) 23 August 2012 Background 1. The Applicant holds a home and contents insurance policy with the Financial Services Provider (FSP) for her place of residence. The relevant period of insurance operated between 27 August 2010 and 27 August 2011. During this period, the home was insured up to a sum of $215,000 and the contents for $54,000. The policy also covered two pet dogs. Claims were subject to a general excess of $300. 2. The Applicant lodged a claim with the FSP on 14 January 2011 for water inundation to her property following severe weather events in Queensland. 3. The FSP assessed the claim and engaged a hydrologist to determine the source of the water inundation. Based on the hydrologist‟s report, the FSP denied the claim as it was not caused by any insured event under the policy. 4. The Applicant has disputed this decision. 5. Both the Applicant and the FSP have provided detailed and lengthy submissions on the relevant issues. For the sake of brevity, the Panel will only briefly summarise these submissions given all of the material made available has been exchanged with the other party. Summary of Applicant ’s position 6. The Applicant has appointed a lawyer to represent her. Accordingly, references in this determination to the Applicant will include submissions made on her behalf by the legal representative. 7. The Applicant has argued the FSP misrepresented to her that flood was covered given the following:  Upon arranging a policy with the FSP, she specifically informed them that she wanted to be covered for flood, and Determination Case No: 245384 Determination Page 2 of 16  The person she discussed this with on the phone informed her that a form would need to be sent out in order for this to be arranged. However, this never came. 8. Based on this, she believed she was covered for flood because the premium increased in the second year substantially and she had specifically asked for this cover when first arranging the policy. 9. The Applicant also argues each of the following as alternative grounds:  The FSP has not met its burden under Section 35 of the Insurance Contracts Act 1984 (the Act) to clearly inform her that flood is not covered, or  If it has, the FSP has failed to clearly inform her of the monetary caps regarding “Flash Flood or stormwater run - off”, or  The damage sustained to her property was due to flash flood or stormwater run-off. 10. With respect to her argument that the FSP failed to meet its burden under Section 35 of the Act regarding both the flood exclusion and the monetary caps, the Applicant has relied on the following:  She does not ever recall receiving a policy doc ument;  A report provided by two behavioural physiologists who opined that the PDS could not be understood by a person of average intelligence and education;  The “flood” definition and exclusion overlaps with a number of insured events, such as “Flash flood and stormwater run- off”, which leads to the policy being inherently confusing and ambiguous;  Two previous Determinations issued by the Service (41709 and 40607) that dealt with a flood definition similar to the FSP‟s found it deficient in terms of Section 35 of the Act; and  The monetary caps regarding the insured events are placed in a different part of the policy and in a manner that makes it difficult for an insured to discover. 11. Based on the above and her supporting documentation, the Applicant maintains the FSP is liable to pay her claim. Summary of FSP’s position 12. In relation to the Applicant‟s allegation that there was a misrepresentation that she was covered for flood, the FSP submits the following:  The Applicant has not raised any evidence to support her allegations. Instead, they are vague and unspecific as she does not identify who she spoke to and when. Further, she acknowledges her memory is limited in this regard; Case No: 245384 Determination Page 3 of 16  It obtained a recording of the policy inception and there was no discussion of flood whatsoever in this conversation;  Her reliance on being covered for flood because of a premium increase is unreasonable given she received two Certificates of Insurance which both stated she did not arrange the optional cover for “Flood and storm surge”; and  The Applicant confirmed the FSP‟s normal practice that it only provides the optional cover for “Flood and storm surge” when an insured submits an application, which she acknowledges never having received or completed. 13. In relation to clearly informing her of the policy exclusion for flood and the monetary cap for “Flash flood and stormwater run - off”, the FSP submits the following:  It has provided evidence that the policy was sent to the Applicant at her last known address;  The policy, in the way it is structured and set out, clearly informs the Applicant that she is not covered for “flood” as well as the monetary cap for “Flash flood and stormwater run - off”; and  This position has been corroborated by the Service in a previous Determination, case number 239722. 14. In relation to the behavioural physiologist‟s report, the FSP has provided numerous submissions indicating why this evidence is neither persuasive nor corroborates the Applicant‟s contention that the policy cannot be comprehended by a person of average intelligence and education. 15. The FSP engaged a hydrologist to review the Applicant‟s loss and based on his investigations, it was determined the Applicant‟s loss did not fall within any insured event under the policy. 16. Given the above, the FSP therefore maintains it is entitled to deny the Applicant‟s claim. It also relies on the following policy provisions to substantiate its position: “ FSP Product Disclosure Statement (PDS) Words with special meanings (page 10, 11, 12) Flood Rising water which enters your home as a result of it running off or overflowing from any origin or cause. This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance. Flash flood and stormwater run-off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run- off. Storm A violent disturbance of the atmosphere associated with Case No: 245384 Determination Page 4 of 16 strong winds including a cyclone, lightning, heavy rain, hail or snow, but not continuous bad weather by itself. Insured events you are covered for (page 17,18) Damage caused by weather What is covered What is not covered Storm X caused by rain, hail or snow after it has reached the ground … Flash flood and stormwater run - off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run - off Loss or damage caused: X by flood … The most we will pay for home claims (page 27) What is covered What is not covered Flash flood and stormwater run - off We will pay up to 50% of your home sum insured or $25,000 whichever is higher. Optional covers for extra peace of mind (page 53) What is covered What is not covered Flood and storm surge This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance Issues 17. Whether the FSP misrepresented to the Applicant that she would be covered for flood; 18. Whether the FSP clearly informed the Applicant that she was not covered for flood; 19. Whether the Applicant‟s loss was caused by “flood” or “Flash Flood and stormwater run- off”; and 20. If the Applicant‟s loss was due to “Flash Flood and stormwater run - off”, whether the FSP is entitled to rely on the monetary caps. Case No: 245384 Determination Page 5 of 16 Reasons for decision 21. The Panel is satisfied that a full exchange of information has taken place between each party and that each party has had the opportunity to address any issues raised. 22. As advised to the parties, FOS has considered it appropriate to elevate the dispute in accordance with the FOS Terms of Reference. This is due to the circumstances of the dispute. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 23. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 24. It is appropriate to consider the Applicant‟s issues under these various headings. Misrepresentation 25. The Panel does not accept the Applicant has been able to establish she relied on a representation by the FSP to her detriment or there was any misleading statement made by the FSP. 26. Her submissions in this regard provide no evidence that the FSP made any positive statement she was covered for flood. Although she maintains she asked for flood cover, the Panel notes she acknowledges the FSP never articulated that she was covered for flood. Instead, she admits the representative she spoke to informed her that a form would need to be completed before this cover could be arranged. 27. This corroborates the FSP‟s position that it never represented to her at policy inception that she was covered for flood. 28. The Applicant has indicated that she believed she was covered for flood upon renewal given the increase in premium and the fact she asked for this when first arranging the cover. However, the Panel does not consider this was a reasonable expectation given the following:  She had not ever received or completed a form for the optional “Flood and storm surge” cover;  It is not unusual for insurers to increase premiums year by year, especially if an insured has made a claim during the previous year. In this case, the Applicant acknowledged lodging two claims during her first year of insurance;  The premium increase was relatively small ($134.96), which would be unlikely to reflect the increased risk the FSP would need to absorb in providing flood cover; and Case No: 245384 Determination Page 6 of 16  The renewal notice, which the Applicant must have received to be aware of the amount payable, clearly stated on the third page that “Flood and storm surge” was not covered. 29. Accordingly, the Panel is not satisfied the FSP misrepresented or misled the Applicant into believing she was covered for flood. Clearly Inform 30. Section 35(2) of the Act states that when a claim is made under a “prescribed contract” for a “prescribed event”, an insurer cannot refuse to pay the claim unless it can establish that it clearly informed its insured in writing that it would not cover this event. Section 34 of the Act has defined the terms “prescribed contract” and “prescribed event” by referring to the Insurance Contracts Regulations 1985 . 31. There is no dispute that contracts of insurance covering a person‟s residential home and contents are both “prescribed contracts” and damage due to flood is a “prescribed event”. This is set out under Regulations 10 (a)(xi) and 14(a)(xi) of the Insurance Contracts Regulations 1985 . 32. The onus is therefore on the FSP to establish that it has clearly informed the Applicant prior to the claim that it would not cover damage caused by “flood”. This is generally done by an insurer providing a copy of its policy to its insured which is meant to set out completely the rights and obligations of both parties under the insurance contract. 33. Further, the Courts have supported this and particularly, in the case of Marsh v CGU Insurance Ltd [2004] NTCA 1, Mildren J provided the following comments that is particularly relevant to the operation of section 35(2) of the Act: “ In Hams & Anor v CGU Insurance Ltd(2002) 12 ANZ Insurance Cases 61 - 525, Einstein J held that the provisions of s 35(2) of the Insurance Contracts Act 1984 (Cth) could be met if the insurer provided to the proposed insured a document such as the proposed policy, which contained the relevant wording. I agree. … Whether the policy wording in fact "clearly informed" the insured that there was no cover for flood is a question of fact to be determined by an examination of the document in question. … Furthermore, the language of s 35(2) suggests that the proposed insured can be clearly informed merely by providing the insured with a copy of the policy which shows the exclusion in clear and unambiguous terms. … The answer to the question "is flood covered" is easily ascertainable by any person of average intelligence and education. ” (Panel emphasis) 34. In these circumstances, the FSP has attempted to discharge the requirements of Section 35(2) of the Act by providing both a Certificate of Insurance and a policy document. The Panel, for the reasons already outlined, accepts the Applicant likely received the renewal notice that became her Certificate of Insurance upon payment of the premium. Case No: 245384 Determination Page 7 of 16 35. Further, the Pa nel considers the Applicant‟s evidence regarding whether she received the FSP‟s policy is neutral and somewhat equivocal for the following reasons:  In her solicitor‟s letter to the FSP dated 9 May 2011, the solicitor quoted her saying “I can‟t remember whether the PDS was sent out” and “I do not recall if a new PDS was sent out on renewal”.  There is no categorical statement in any of the materials where the Applicant stated she did not receive the PDS. In particular, the second statement quoted above says she does not recall receiving a new PDS but the Panel notes it is likely any PDS sent with the renewal would have been identical to the one sent out at inception.  Her solicitor later stated in its submissions to the Service dated 28 October 2011 that she never received her PDS and then referred to their letter dated 9 May 2011. However, the letter dated 9 May 2011 contained the above two quotes which, in the Panel‟s opinion, is not the same as saying the Applicant never received the policy. 36. The Applicant is represented by solicitors and it was incumbent on them to provide more clarity on this important issue. Despite this, the Panel notes the FSP has provided substantive submissions and documents to corroborate its position that a policy was sent out both at inception and at renewal. The information it has provided was in compliance with a guideline set out by the Service in a Circular, edition 3. 37. The Applicant has provided minimal information in rebuttal to these submissions. Instead, her submissions have been focused on corroborating her position that the FSP‟s policy is difficult to read and structured in such a way that it does not discharge its obligations under Section 35(2) of the Act. 38. Given this, the Panel accepts that on balance, the FSP has established that it has sent the Applicant a copy of the policy. The next issue is therefore whether the policy was structured in a way that it clearly informed the Applicant she was not covered for “flood”. Does the policy clearly inform the Applicant she was not covered for flood? 39. The Applicant and the FSP have provided numerous submissions on this issue. In particular, the Applicant has referred to a paper commissioned by her solicitors that attempts to report on the capacity of an average person to be able to re ad and comprehend the information contained within the FSP‟s policy. The Panel notes that to achieve this, the paper consists of 23 A4 pages containing 56 references. 40. This paper has been reviewed by the Panel in a previous Determination, case number 245470. The Panel considers the reasoning in that previous Determination was sound and is of the view that it is applicable to this matter. In particular, the Panel finds the following comments significant in relation to the academic paper: Case No: 245384 Determination Page 8 of 16 “As a separate reading, and under ideal conditions, the flood section of each document seems to be placed in a reasonable context and, at face value should be easy to understand.” 41. The Panel notes that in line with Mildred J‟s reasoning in the Marsh case, this comment act ually provides persuasive support to the FSP‟s position. 42. The Applicant has also raised a number of submissions explaining why it considers the policy is confusing and ambiguous and therefore offends Section 35 of the Act. In particular, the Applicant has referred to two previous Determinations. 43. The FSP in contrast has referred to a more recent Determination where it submits the policy and the issues are more relevant to this dispute. 44. However, the Panel has reviewed the policy along with the facts and circumstances present in this issue and has formed a view based on the salient issues. 45. Having reviewed the policy and the form and content of the FSP‟s “Certificate of Insurance”, the Panel is of the view that a person of average intelligence and education would be clearly informed that their insurance contract does not cover flood for the reasons set out below. 46. The policy clearly states it only insures an insured for certain “Insured events” unless that insured has also elected to incept any of the “Optional covers for extra peace of mind”. As a result, any reader would understand the FSP is only required to indemnify them if their claim falls within one of these “Insured events” or optional covers. 47. In these circumstances, a person in the Applicant‟s situatio n who was seeking to ascertain whether their insurance contract covered them in circumstances when their home and/or contents was damaged by water inundation would note the only applicable insured events would be “Storm” or “Flash flood and stormwater run - off” (other than for the optional covers, which the Panel will discuss below). This is due to the fact there is no other corresponding insured event that could possibly apply. 48. In relation to “Storm”, in prominence and alongside this is a provision in clear and unambiguous terms explaining that loss or damage is not covered under this insured event if it is “ caused by rain, hail or sno w after it has reached the ground ”. In the Panel‟s opinion, a person of average intelligence and education would understand they would not be covered for water inundation under this insured event given it would have resulted from rain, hail or snow after it has reached the ground. 49. The only other corresponding insured event is “Flash flood and stormwater run- off”. This term has b een specifically defined by the policy and is easily found by an insured both by reference to the policy‟s index and the fact it is contained within a section titled “Words / terms with special meanings”. This title is appropriate as it informs a reader where they should look to ascertain if a policy term has been given a specific meaning. Case No: 245384 Determination Page 9 of 16 50. Within this section is a definition for the insured event that essentially states that it applies to water inundation caused by heavy rain that fell no more than 24 hours previously. As a result, the Panel accepts that a reader would be clearly informed of the limitation within this insured event regarding damage caused by water inundation. 51. The Panel does note the policy contains “Optional covers for extra peace of mind” w hich expands the cover beyond the insured events. These are options which an insured is required to elect as they do not automatically come within the FSP‟s standard cover. 52. One of these optional covers is “Flood and storm surge”. 53. The Panel accepts that in these circumstances, the Applicant was aware of these optional covers given she elected the optional covers for “Pet cover” and “Motor burnout”, both of which were specified in her Certificate of Insurance. In particular, the former optional cover is of significance given she lodged a number of claims under this optional cover. 54. However, despite her submissions that she requested the optional cover for “Flood or storm surge”, the Panel accepts this was never arranged. The Applicant acknowledged she was informed by the FSP that this can only be arranged by completing an application, which she confirms she never did. Further, the Certificate of Insurance for both her first year of insurance and subsequent renewal clearly and unambiguously stipulated this was not selected. This information was contained in the same section within the Certificate of Insurance as her optional covers for “Motor burnout” and “Pet cover”, which is quoted below: “ Home Contents Motor burnout included included Pet cover n/a included Group Cover n/a not included Selected Personal Items n/a not included Advanced cover not included not included Flood and storm surge not included not included ” 55. Given all of this, the Panel accepts that a person of average intelligence and education and in the Applicant‟s situation, upon taking the time to read the policy and Certificate of Insurance, would have been clearly informed that she was not covered for all types of water inundation. 56. Instead, the Panel accepts that such a perso n would understand her cover is limited to this situation if it fell within the insured event of “Flash flood and stormwater run- off”. Case No: 245384 Determination Page 10 of 16 Monetary caps for “Flash flood or storm water run - off” 57. For similar reasons, the Panel accepts the Applicant was clearly informed about the monetary caps associated with the above insured event. The policy is appropriately indexed and reference is made to “The most we will pay you for home claims”. 58. In the Panel‟s opinion, a reader who was seeking to determine the amount that would be paid, in the event they lodged a claim, would be drawn to this part of the policy. Upon doing so, the reader would find the first section which states: “We will pay up to 50% of your home sum insured or $25,000, whichever is higher”. 59. Given this, the Panel accepts that a person of average intelligence and education would be clearly informed that there is a monetary cap of 50% of the sum insured or $25,000, whichever is higher, if they were seeking to claim under the insured event of “Flash flood an d stormwater run- off.” 60. Accordingly, the Panel accepts the FSP is entitled to rely on these monetary caps. Water Inundation 61. In light of the comments above, the Panel accepts that the only insured event the Applicant‟s claim may fall under is “F lash flood or stormwater run- off”. As a result, i n order for the Applicant to be covered, the Panel must be satisfied that the cause of inundation was due to a sudden flood caused by heavy rain that fell no more than 24 hours prior to the inundation of the risk address. 62. The Applicant has provided limited evidence regarding when and from where the inundation occurred. 63. The Panel is aware of the hydrology report obtained by the Insurance Council of Australia (ICA). The report is very extensive as it relates to an extreme weather event which caused flooding to the Brisbane region. In the report titled “Flooding in the Brisbane River Catchment, January 2011, Volume 2 ” the following information is available within the sub- heading “9.3 Releases from Wivenhoe Dam” :  Large releases were made from Wivenhoe Dam over the period from 06:00, possibly as early as 03:00 on 11 January 2011, until around 03:00 on 12 January 2011.  Releases from Wivenhoe Dam caused a flood wave in the Brisbane River. As the flood wave moved downstream, backwater flooding occurred along the lower reaches of all tributaries through the Brisbane City LGA. Case No: 245384 Determination Page 11 of 16  Floodwaters moving down the Brisbane River were made up of dam release floodwaters from Wivenhoe and floodwaters from Lockyer Creek and the Bremer River.  It was concluded that the dam release flood from Wivenhoe Dam was the immediate cause of flooding along the reach of the Brisbane River downstream of the dam and along tributaries through the Brisbane City LGA. 64. The FSP has also relied upon a hydrologist‟s opinion. The evidence from the hydrologist is in the form of a statement dated 1 July 2011 which includes graphs and photographs. The Panel does not propose to repeat all the findings of the hydrologist in the body of the determination. It is sufficient to reiterate his relevant conclusions as follows: “On the basis of the above matters, I conclude that the cause of the inundation of the Subject Property was the rising level of the Brisbane River, which was itself caused by rain which fell more than 24 hours earlier. I conclude that the Subject Property was not inundated by stormwater or other local run- off.” 65. The hydrologist considered that the overwhelming influence on the rising Brisbane River water level was attributable to the release of water from the Wivenhoe Dam, in particular the significant releases which occurred on 11 January 2011. The hydrologist also attributed, to a lesser extent, inflows from the Bremer River due to the substantial amount of rain that fell over its catchment. 66. His comments in this regard are set out in paragraphs 11 and 12 of his statement which states: “ A substantial amount of rain fell in the Brisbane River catchment above Wivenhoe Dam both before, but particularly over the period 9, 10 and 11 January 2011 commencing at approximately 9.00am on 9 January 2011. The rain caused significant inflows into the Wivenhoe Dam, the level of which peaked late in the evening of 11 January 2011. There were significant discharges of this water from the Wivenhoe Dam which flowed into the Brisbane River. This water worked its way down the Brisbane River towards Brisbane. A substantial amount of rain also fell in the Bremer River catchment from around 6.00am on 11 January 2011. This rain travelled down the Bremer River towards the junction of the B remer River and the Brisbane River.” 67. This appeared to form the basis of his opinion about the likely cause of damage. 68. The Panel is aware of the interim report completed by the Queensland Flood Commission of Inquiry (CoI). In particular, the Panel refers to the comments attributable to Mr Ayre, an operations engineer at the Wivenhoe Dam. 69. The Panel notes at 2.7.7 of the interim report, the Commission found the inflows into the dam continued to decrease until approximately 2.00am on 11 January. In the early hours of 11 January 2011, however, intense rainfall Case No: 245384 Determination Page 12 of 16 again began to fall over the dam ‟s catchments. The intensity of the rainfall was not captured by rain gauges, but the dam‟s operations engineers realised heavy rain must be falling beca use of the increase in Wivenhoe‟s Dam‟s level. Their hydrologic model was not matching well with the Dam level rises. A reverse process was carried out which estimated the rainfall that must have occurred to cause the observed rise in the Dam level. The estimate was over 700mm, an enormous amount. 70. As a result of that rain the inflow estimates increased sharply up to 8,060m 3 by 8.00am. At 7.00am two other operations engineers received advice from the Bureau of Meteorology to confirm that heavy rain being experienced over the D am‟s catchment areas would continue. Given the rate of rise in the Dam level and inflows, along with the confirmation of continuing heavy rain, this ended the hope that the flood could be contained in Strategy W3 and Strategy W4 was invoked. 71. The strategies, in broad terms, state the following:  W3 is to limit the flow in the Brisbane River at Moggill to less than 4,000m 3  W4 is to preserve the integrity of the dam where there are no restrictions on gate opening increments. 72. The interim report confirms that the flood gates were open to 6 metres by 12.00pm then all five gates opened to 7 metres by 1.00pm, 7.5 metres by 2.00pm and 8.5 metres by 3.00pm. This increase continued with the gates being opened at 12 metres from 7.00pm to 9.00pm. 73. The Panel notes that the rainfall between 4.00am and 8.00am on 11 January 2011 was the onset of the second and highest peak of inflow to the Wivenhoe Dam according to Mr Ayre. This is corroborated within the interim report of the CoI where the peak inflow recorded was 11,561m 3 at 1.00pm as compared to 10,095m 3 at 8.00am on 10 January 2011. 74. In particular, the Panel is persuaded by the evidence from the dam operations engineer Mr Ayre, where he stated that the heavy rainfall in the early hours of 11 January 2011 was directly related to the decision to substantially increase the outflows from the Wivenhoe Dam in line with the W4 Strategy. This in turn directly led to the rapid increase in the level of the Brisbane River. 75. This is also consistent with the ICA Hydrology Report‟s findings that the releases from the Wivenhoe Dam caused a flood wave in the Brisbane River and the dam release flood was the immediate cause of flooding along the reaches of the Brisbane River downstream of the dam. This is also consistent with the FSP‟s hydrologist. 76. It is important to consider this in the context of whether the heavy rainfall was the proximate or dominant cause of the loss. The Panel accepts that it is not necessarily the “last in time” that is the proximate ca use, but it is the dominant or effective or operative cause that is relevant. It requires a Case No: 245384 Determination Page 13 of 16 judgement of fact to determine the cause that is proximate in efficiency. Common sense must be applied in determining this. 77. The Panel, in considering this, also refers to the context of the FSP‟s policy. The policy wording is quite broad. It allows for flash flooding subject to showing the sudden flood occurred within 24 hours of heavy rain. 78. There is no doubt that the significant weather events in Queensland in the periods up to 11 January 2011 impacted on the levels of water within the dams and the saturated grounds led to exaggerated storm or rainwater run- off. This cannot be denied. The cumulative effect of the rainfall from 9 January 2011 or earlier would have caused a significant increase in the dam levels, the rivers and ground saturation. 79. Nevertheless, based on the publicly available information (i.e. the interim report which the FSP is aware of and that also has been referred to by the Service in recent Determinations involving the FSP), it is highly unlikely that the release from the Wivenhoe Dam would have been increased, or the W4 Strategy invoked, but for the extreme rainfall that fell from 4.00am on 11 January 2011. The evidence that is not contested is that the inflows into the dam prior to 2.00am had decreased. Mr Ayre‟s evidence, again not contested, is that the heavy rain over the catchment from 4.00am on 11 January 2011 saw a dramatic increase in the inflows and led to the decision to move to Strategy W4 at 8.00am on 11 January 2011. The evidence (again uncontested) is that the increased releases due to W4 was a direct cause of the flooding downstream of the dam. 80. The policy wording provides cover in the event of a flash flood, which is a sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run-off. 81. Accordingly, in the Panel‟s view, as a result of the heavy rain, the dam release strategy increased from W3 to W4 and this was the proximate or dominant cause of the flooding of the Applicant‟s property. In the circumstances, the Panel therefore accepts that the Applicant is entitled to cover in accordance with the terms of the policy for flash flood and stormwater run-off. 82. The above stated conclusions and reasoning is consistent with Determinations in other disputes following consideration of all the material exchanged; namely, a finding that the heavy rainfall commencing around 4.00am on 11 January 2011 was the proximate or dominant cause of the inundation of the properties downstream from the Wivenhoe Dam. 83. Subsequent to issuing those earlier Determinations, the evidence of the dam operating engineers was brought into question resulting in the recall of the CoI. The Service suspended issuing further determinations on this issue until the CoI completed its deliberations in this regard. The parties to this dispute were then given the opportunity to consider the CoI‟s final report and make submissions in respect of the continuing viability of th e Panel‟s approach to the issue of the policy‟s defined event of „flash flood‟. Case No: 245384 Determination Page 14 of 16 84. The FSP has since provided further submissions to the Service including a reference document, two additional hydrology reports and a statement from the hydrologist. Only those parts of the additional material relevant to the current dispute need to be considered. 85. As part of the material presented by the FSP‟s hydrologist, he estimates that the approximate time that the Brisbane River reached the benchmark level of the Applicant ‟s property was 3.59am on Wednesday 12 January 2011. This is consistent with his earlier estimate that the property was likely first inundated at some time between 2.00am and 5.00am on 12 January 2011. As such, the information regarding the events which occurred at the Applicant‟s property is not substantially altered. 86. However, the hydrologist engaged by the FSP continued to maintain that it is not accurate to say that it was only the rain which fell on 11 January 2011 which led to the increase in releases from the Wivenhoe Dam. 87. It is worth noting that whilst some of the evidence earlier given by the Wivenhoe Dam engineers was called into question, the evidence presented in the subsequent hearings, as revealed in the CoI‟s Final Report does not in any way challenge the evidence used to reach the conclusions referred to above in this Determination. 88. Having considered the evidence presented to the further hearings of the CoI, and after having reviewed the further information and submissions provided by the FSP in this matter, the Panel is not satisfied that there is any reason to alter its conclusion that the rain which fell from 4.00am to 8.00am on 11 January 2011 was the proximate cause of the inundation of the Applicant‟s property. 89. The FSP also argues that the decision by the dam‟s operating engineers to change to the W4 release strategy was an intervening cause, not in accordance with the dam manual and thus not covered under the policy. 90. Having considered all of the evidence the Panel is not satisfied that there is any evidence to suggest that the dam‟s operating engineers could have done anything other than change the release strategy to W4, given the circumstances that existed at 8.00am on 11 January 2011. 91. The FSP has also argued that there were two proximate causes, flood and flash flood and given the Wayne Tank principle and the fact that flood does not provide coverage, the FSP is entitled to deny the claim. 92. The Service has previously dealt with this issue and maintains its view that a correct reading of th e FSP‟s policy reveals that flash flood is an exception to the flood exclusion; accordingly, the Wayne Tank principle simply cannot arise when considering „flash flood‟. Finally, the FSP submits that the W4 releases of water after 8.00am on 11 January 2011 had little material impact on the extent of the damage to the property as the same damage would have resulted from releases at the rate which applied before the W4 strategy was implemented, albeit later. Case No: 245384 Determination Page 15 of 16 93. In effect the FSP is saying that had the release strategy not been increased to W4 and had it remained at W3, then the Brisbane River would have inundated the Applicant‟s property but at a later time. In this regard, the FSP‟s hydrologist estimates that the Brisbane River would have first inundated the benchmark level at the property at approximately 7.14am on Wednesday 12 January 2011, had the W3 release strategy remained in place. 94. The reality is that the FSP‟s commentary in this regard is speculation based upon what its hydrologist thinks might have happened had the W3 strategy remained in place. The reality is that the W3 strategy did not remain in place and the W4 release strategy was introduced at 8.00am on 11 January 2011. 95. The Panel is satisfied that it is appropriate to consider the actual circumstances that occurred in this matter. As such, the Panel does not accept the FSP‟s argument in this regard. 96. The final issue with regard to the Applicant‟s claim is the time of inundation and whether it occurs within 24 hours of the heavy rain that led to the f lash flood. 97. The Applicant is unable to provide evidence of when the inundation occurred as she had evacuated her home during the evening of 11 January 2011, prior to the inundation. 98. The original view of the FSP‟s hydrologist was that the property was likel y first inundated at some time between 2.00am and 5.00am on 12 January 2011. 99. In subsequent material, the FSP‟s hydrologist has said that the approximate time the Brisbane River reached the lowest level of the structure of the house on the land (the benchmark level) was 3.59am on 12 January 2011. 100. Further, the FSP‟s hydrologist says that the Brisbane River level at 4.00am on 12 January 2011 would have been at 0m below the lowest point of the structure of the house on the land. 101. The Panel is satisfied that the above calculations are estimates by the hydrologist and as with any hypothesis a margin of tolerance must be respected. 102. Given that the hydrologist is of the view that the Brisbane River reached the benchmark level before 4.00am on 12 January 2011 (albeit only just before) and that the hydrologist originally estimated the property was likely first inundated at some time between 2.00am and 5.00am on 12 January 2011, the Panel is satisfied that it should do what is fair in all the circumstances, pursuant to its mandate under the Terms of Reference. 103. The Panel is satisfied it is appropriate that the FSP provide coverage for inundation to a level of 0.1m above the benchmark level, under the definition of flash flood. Case No: 245384 Determination Page 16 of 16 Determination 104. Accordingly the Panel determines the FSP settle the Applicant‟s claim in accordance with the terms of the policy under the provisions for “Flash flood or stormwater run- off” to a level of 0.1 metres above the benchmark level. For the sake of clarity, the coverage applies to loss arising from a level of inundation of 0.1 metres above ground at the point of the Applicant‟s home. 105. Insofar as the FSP admits it has not conducted a proper assessment of the loss, the parties are asked to work together co-operatively to determine the cost of repair to the building and the loss of contents. 106. Insofar as the FSP is to cash settle this claim, the FSP is to pay interest in accordance with Section 57 of the Insurance Contracts Act from 14 March 2011 being the date of the determination of denial of the claim, to date of payment of the claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.