Home / Financial Firm (Unknown - Insurer) / Determination 245381
Determination 245381
Contents water damage claim declined under flood exclusion
Summary
Contents were water damaged during January 2011 flooding and the FSP declined the claim under the flood exclusion. AFCA found the exclusion clear, notice given, and flood the dominant cause, so the FSP was entitled to decline.
The insured bears the onus of proving a covered loss and the insurer then proves the exclusion, which the site-specific hydrology evidence satisfied on the balance of probabilities.
Issues
- Claim denial primary · not upheld“On the balance of probabilities the Panel considers flood was the dominant cause of any inundation rather than stormwater run-off; the FSP is entitled to decline the claim.”
- Product terms interpretation secondary · not upheld“The Panel does not accept that the FSP's definition of flood rendered the policy incomprehensible; the flood exclusion was clear and the FSP met its notice obligations.”
Subjects and remedies
natural disasterno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 245381 Determination Page 1 of 11
Case number: 245381
General Insurance - Domestic Insurance - Home Contents - Service - Delay in
complaint handling
21 November 2011
Background
1. The Applicant holds a listed event Home Contents Insurance Policy with the
Financial Services Provider (FSP) which covers contents up to $45,000. The
policy provides cover for damage arising from stormwater run-off but not flood.
2. On 11 January 2011, the Applicant’s residence was inundated with water
during severe weather events experienced in the region causing damage to
contents.
3. The Applicant has lodged a claim for damage arising from the inundation.
4. The FSP has declined the claim on the basis of the ICA hydrologist report
which states the damage arose from flood.
5. The Applicant disputes the FSP’s declinature on the basis that the hydrologist
report is too general, the FSP did not comply with Section 35 of the Insurance
Contracts Act 1984 (“the Act”) and the policy terms were unclear.
Summary of Applicant ’ s Position
6. In these circumstances, the Applicant relies on Regulation 14 of the Insurance
Contracts Regulations (1985) (“the Regulations”). Regulation 14 provides
statutory terms for a prescribed contract, such as the insurance contract subject
of the dispute before FOS, which provides cover to contents arising from flood.
7. The Applicant has been insured with the FSP for two years. The policy was
purchased on-line and he does not recall being directed towards a copy of the
relevant PDS during the time the policy was being incepted.
8. As he had no proper notice of the flood exclusion the policy reverts to the
statutory provisions contained in the Regulations. The Applicant is therefore
entitled to flood cover under Regulation 14.
9. In the alternative, the flood exclusion provided under ‘insured events’ is
confusing to consumers who would expect to locate the exclusion under
‘exclusions to cover’. The construction of the policy failed to properly inform him
that flood was excluded and failed to provide clear, concise and effective
disclosure as required under the Corporations Act 2001 .
Determination
Case No: 245381 Determination Page 2 of 11
10. The definition of flood is too broad. The flood definition does not just include
flood, but floodwater combined with run-off and/or rainwater which is normally
covered by the policy. The exclusion is confusing and contradictory and
production of the Product Disclosure Statement (PDS) would not adequately
inform an insured.
11. The Applicant argues that there was inadequate attention drawn to certain
provisions. Further, that an insurer may be required to do more than merely
provide the policy document to discharge their obligations under section 35 of
the Act if:
i. the document provision is complex and confusing; or
ii. the language is unclear and ambiguous so that a person of
average intelligence and education is likely to have difficulty
finding and understanding the clauses.
12. The Applicant relies on previous Determinations of the Service numbered
41709 and 40607. In particular, Determination 40607 considers an identical
flood exclusion as the current matter which the Panel indicated was an unusual
provision and wide. The Panel notes that whilst it may take into consideration
previous Determinations, it is not bound by them.
13. The Applicant contends that the decision to decline liability did not meet good
industry practice or legislative requirements based on the following:
The FSP did not obtain site specific hydrology.
There was a significant rain event in the locale of the Applicant’s
residence which had an observed stormwater, rainwater and run-off effect
on the surrounding area which caused damage to the property.
The effect of the water event on the stormwater drainage on this specific
area of the Applicant’s residential locale.
The report appears to treat the entirety of Ipswich and Brisbane as being
affected in the same way and does not take into account specific
geography or weather experienced in the Applicant’s locale.
14. The soil in the Applicant’s residential locale was waterlogged from months of
rain combined with severe storms on Monday and again on Tuesday which
caused an overflow of water across saturated soil which began to inundate his
property early Tuesday morning.
15. The Applicant has enclosed radar images for the weather from the Bureau of
Meteorology (“BOM”) and the Insurance Council of Australia’s hydrology rep ort.
The images support the Applicant’s contention that the western suburbs of
Brisbane experienced a storm on the morning of 11 January 2011 which
resulted in heavy rain that in turn caused flash flooding that falls within the
definition of storm in the F SP’s policy.
Case No: 245381 Determination Page 3 of 11
16. The data from BOM records rainfalls of 110.8mm next to the date of Monday 10
January 2011, this rainfall relates to the 24 hour period prior to 9.00am on 10
January 2011. The data also states that from 9.00am 10 January 2011 to
9.00am on 11 January 2011 that 15.4mm fell and 40mm fell from 9.00am 11
January 2011 to 9.00am 12 January 2011.
17. The Applicant submits that the BOM data supports his recollection of events
which he states as follows:
“It had been raining heavily on and off in the days le ading up to 11 January 2011.
I remember that it was raining in the morning. I could see the water coming up
the street on Tuesday 11 January 2011 at about 4pm. The water was coming
from Ipswich Motorway and flowing down the street.
The water came from Ipswich Road onto our street and then into my property.
The water first entered my property from the front through the main door.”
18. The Applicant contends that this information supports the view that a storm
occurred in the area and that as the policy covers storm water, rainwater and
run-off that the FSP should meet the claim.
19. The Applicant further submits that his home was affected by multiple events.
Prior to any riverine flooding the home was damaged by stormwater run-off and
rain.
20. The Applicant has provided photographs to show the extent of the damage
suffered.
Summary of FSP’s Position
21. The FSP relies on the following policy terms and conditions (in addition to those
relied upon by the Applicant):
...
Types of loss or damage your contents are covered for
We will cover your contents, when contained in the buildings, against loss or damage caused by one
or more of the insured events occurring during the period of insurance. We will also cover you for the
other benefits listed below. Details of the terms, conditions and exclusions which specifically relate
to each insured event and other benefits are provided on the pages indicated.
Insured events page number
1. Accidental breakage 25
2. Earthquake 26
3. Explosion 26
4. Fire or smoke 26
5. Impact damage 27
6. Lightning or thunderbolt 27
7. Malicious acts 27
8. Riot or civil commotion 28
9. Storm, rainwater or run-off 28
10. Theft, burglary or housebreaking 29
Case No: 245381 Determination Page 4 of 11
11. Water or other liquid damage 30
…
9. Storm, rainwater or run-off
(Applicable whether you have buildings and/or contents cover)
We will pay for loss or damage caused by storm, rainwater or run-off. “storm” means violent wind
(including cyclones and tornadoes), thunderstorms and hail which may be accompanied by rain or
snow.
...
“rainwater” means rain falling naturally from the sky onto the buildings and/or ground.
“run - off” means rainwater that has collected on or has flowed across normally dry ground or has
overflowed from swimming pools or spas.
...
We will not pay for loss or damage:
a. caused by:
• flood, or
• flood water combined with run -off and/or rainwater;
“flood” means the inundation of normally dry land by water that has escaped or has been released
from the normal confines of any natural watercourse, lake or lagoon whether or not altered or
modified, or of any reservoir, canal or dam.
When we will not pay a claim under your policy
2. Unless we state differently in your policy, we will not pay for:
a. flood as defined on page 11;
b. any loss or damage which is not caused directly by one of the insured events;”
22. The FSP relies on Section 69 of the Act. Section 69 (2) provides where if it is
not reasonably practicable to give the information in writing before the contract
is entered into providing the information is given in writing within 14 days after
the contract of insurance (including an interim contract) has been entered into
the information shall be deemed to have been given.
23. Section 77 of the Act provides that a notice or other document that is by the Act
required or permitted to be given, may be given to a body corporate in any way
in which documents may be served on that body corporate, and to a natural
person, personally or by post to that person at his last known address.
24. The FSP relies on a Statutory Declaration from its Technical Compliance
Manager “D”. The Panel notes the following in relation to this Statutory
Declaration:
D is responsible for overseeing guidelines to new business proposals and
renewals of the Direct line of business.
Customers who obtain a home and/or contents insurance quotation
through the FSP website have the option of viewing the Product
Disclosure Statement (PDS) on the quote page. If the customer accepts
the quote and wants to proceed with taking out a policy they then click
‘Buy online now’ or ‘Buy Policy’ buttons.
Case No: 245381 Determination Page 5 of 11
The Customer is asked the following prior to purchasing the policy:
“I have read and agree to the Duty of Disclosure, [FSP name] Privacy Policy and
the Product Disclosure Statement and I confirm I have complied with the Duty of
Disclosure when answering the previous questions.”
If a Customer selects “no” to this statement then a message advising the
transaction cannot proceed is displayed.
In order for customers to complete the policy purchase they must enter in
a valid email address on the Policyholder Details screen. Again if they do
not, then a message is displayed requesting they try again.
Each customer who purchases a policy over the internet receives a
welcome letter, policy schedule and PDS to their nominated email
address.
25. The FSP has further provided information it considers demonstrates the PDS
and policy documentation was sent to the Applicant’s email. The documentation
includes a copy of an email dated 1 April 2010 at 4.43pm from the Applicant to
the FSP attaching a ‘Welcome Pack’ and PDS in PDF format.
26. The FSP has also included a welcome letter and the policy schedule covering
the relevant period. The Panel notes the schedule specifically states:
“Please Note: Flood is not covered by this policy.”
27. The FSP relies on the following from the ICA Report covering Brisbane City
LGA over the period 10-14 January 2011:
“Intense rainfalls that occurred over catchment areas upstream of the Wivenhoe
and Somerset dams. Some parts of the upper catchment experienced rainfalls
with ARI’s greater than 100 -Years for durations between 12 and 72-hours.
...
The soils of the Brisbane River catchment would have been saturated prior to the
9 to 12 January rainfall events, so maximizing the immediacy and volume of
su rface runoff. Antecedent rainfalls had ‘primed’ the catchment for runoff,
resulting in unprecedented inflow volumes into Wivenhoe and Somerset Dams,
especially during the major rainfall event on 10-11 January.
...
The volume of inflows to Wivenhoe Dam from the direct catchment upstream of
the dam, from releases from Somerset Dam and from direct rainfall onto the
surface of Lake Wivenhoe was obviously of concern to SEQWater, the dam
operator. The response was to dramatically increase releases from the Dam over
a period from around 0600 hours on Tuesday 11 to around 0300 hours on
Wednesday 12 January. These releases generated a ‘dam release flood’ in the
Brisbane River downstream of the dam.
...
Floodwaters moving down the Brisbane River in January 2011 were made up of
releases from Wivenhoe Dam and floodwaters from Lockyer Creek and the
Bremer River. The available data is insufficient to quantify the relative
contributions of dam release floodwaters and floodwaters from Lockyer Creek
and the Bremer River to flows in the lower reaches of the Brisbane River.
However, it is clear that the dam release flood from Wivenhoe Dam was the
immediate cause of flooding in Brisbane City LGS.
Case No: 245381 Determination Page 6 of 11
...
High tailwaters levels in the Brisbane River and its tributaries during the passage
of floodwater down the Brisbane River caused backflow up piped drainage
systems into low lying land in urban areas (especially in Brisbane and Ipswich
cities) inundating properties in these areas (pipe backflow flooding).”
28. The FSP relies on its assessor report from which the Panel notes the following:
The rainfall was heaviest on the weekend of 8 January 2011 and 9
January 2011.
The heavy rainfall ceased on the morning of 11 January 2011.
The inundation of the property commenced at 5pm and came up to the
house at 8pm.
The water was dirty.
The assessor opines the inundation occurred as a result of the Brisbane
River flooding.
29. The FSP relies on the following legal principles:
“If a loss has two or more proximate or effective causes and at least one cause is
excluded from cover the insurer is not liable” Wayne Tank and Pump Co Ltd v
Employers Liability Assurance Corporation Ltd [1974] QB 57 ;
30. The FSP submits the evidence demonstrates the damage arose from flood as
defined by the policy.
31. A site specific hydrology report following inspection of the property on 16 June
2011 has now been provided.
Issues
32. Whether the FSP is entitled to rely on the policy terms and conditions.
33. Whether the FSP is entitled to deny the Applicant’s claim.
Reasons for Decision
34. Due to the nature of the dispute, it has been referred to the Panel for
Determination in accordance with the Operational Guidelines to the Financial
Ombudsman Service’s Terms of Reference.
35. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
36. There has been an exchange of material between each party, and the Panel is
satisfied each party has had an opportunity to reply to the issues raised.
Case No: 245381 Determination Page 7 of 11
37. The Panel has read each party’s submissions and materials and will only refer
to the relevant submissions and materials raised.
38. Due to the issues raised the Panel Chair Ombudsman conducted a site
inspection of the property. Although the Applicant was not present the
Ombudsman spoke with the local postal worker who described the water in the
area slowly rising over a two day period coming from the direction of the Oxley
Creek. At the time the water was rising the rain had ceased.
39. The Panel considers there are two issues (as noted above) for it to consider
and it shall address each separately.
Whether the FSP is entitled to rely on the policy terms and conditions
Was the Applicant notified in writing of the exclusion in accordance with Section 35
40. The Applicant has claimed that the FSP has breached its obligations under
section 35 of the Act to provide written notice and therefore the policy should
revert to the standard provisions contained under the Regulations
41. In contrast the FSP states that its system requested the Applicant confirm he
understood the duty of disclosure and he had read the PDS prior to purchasing
the policy. The FSP then sent a copy of the PDS with other policy documents to
his email address. The email provided appears to suggest the policy document
and PDS was sent directly to the Applicant’s emai l address.
42. The Applicant has not provided further evidence to contest the documentary
evidence before the Panel which demonstrates:
The Applicant was required to acknowledge that he had read the PDS
prior to purchasing/entering into the insurance contract; and
The Applicant received an email containing the PDS.
43. On the balance of probabilities the Panel accepts the FSP issued the policy
documentation and PDS to the Applicant.
Whether the exclusion clause was clear and unambiguous
44. The Panel has considered th e Applicant’s submissions relating to the
construction of the policy and the flood exclusion.
45. The Panel notes the following in relation to the construction of the policy:
The policy defines flood in the definition section which includes a notation
that the policy does not cover flood.
The policy provides a statement under storm, rainwater or run-off that
flood or flood water combined with run-off and/or rainwater is not covered.
The general exclusions section of the policy states that damage arising
from flood will not be covered.
The Certificate of Insurance states specifically that flood is not covered.
Case No: 245381 Determination Page 8 of 11
46. The Panel has difficulty accepting that a reasonable person of average
intelligence who read the PDS would not have known that flood was an
excluded event due to its construction. The policy reiterates the exclusion
several times to alert an insured to excluded causes of damage. In the Panel’s
opinion this is more likely to clearly and unambiguously inform the Applicant
that flood is not covered than noting it once under general exclusions.
47. The Panel further notes the Applicant’s contentions regarding the inherent
ambiguity in the exclusion due to its breadth and statement that flood water and
run-off and/or rainwater.
48. The Panel notes this exclusion mirrors common law decisions in flood matters
which suggest the intermingling of flood and rainwater and run-off are excluded.
It is difficult to therefore find that the exclusion is unclear, confusing or
ambiguous.
49. The Panel considers that the term ‘flood’ can m ean many things to different
people. It is important for an FSP to appropriately describe the flood exclusion if
it intends to rely on same. Whilst the Panel acknowledges that the flood
definition does have some breadth to it, the Panel does not agree that the
provision is so wide as to render it unclear what the provision applies to. A flood
may be caused by many different means and the definition addresses the
definition appropriately. The construction of the definition further describes
where water inundating normally dry land must escape or be released from in
order to be deemed flood. The Panel considers a reasonable person of average
intelligence would be aware of what was meant by this definition of flood.
50. Accordingly, the Panel does not accept that t he FSP’s definition of flood has
rendered the policy incomprehensible to an insured. The corollary of this is the
FSP has met its obligations to clearly inform the Applicant of the policy
provisions.
Whether the FSP entitled to decline the claim
51. It is an accepted principle of insurance law that the onus rests with an insured
to prove, upon the balance of probabilities, that they have sustained a loss
caused by an event insured for under the policy in force at the date of loss
[ Regina Fur Co. Ltd v Bossom (1 957) 2 Lloyd’s Rep 466]
52. Where the claimant satisfies the onus of proof as above, the burden then shifts
to the insurer to establish that the claim falls within an exclusion from cover
[ Bond air Services Ltd v Hill (1955) 2 Q.B 417; Legal and General Assurance
Society Ltd v The commonwealth of Australia & Precision Cranes and Hoists
Pty Ltd (1985) 3 ANZ Insurance cases 60-621]
53. The Panel notes that the FSP has subsequently provided a site specific
hydrology report from expert “W”.
54. W reports the Applicant advised:
Heavy rain fell during throughout (sic) Monday 10 January and into Tuesday 11
January 2011.
Case No: 245381 Determination Page 9 of 11
Stormwater runoff was ponding in the road sag at the intersection of the Ipswich
Road service road and Brooke Street during Tuesday afternoon. However, at that
time there was no inundation from these areas to the west of the Ipswich motorway
threatening the property.
At 2000 hours on Tuesday 11 January 2011, [Applicant) noted that the water level
had risen to the level of the entrance door downstairs and was threatening to
inundate the unit floor level. [Applicant] evacuated at that time.
[Applicant] was not at the property during the peak of the water inundation, as he had
already evacuated. [Applicant] understands that the water levels peaked on his
property during the night of Wednesday 12 January 2011 and into the early morning
of Thursday 13 January 2011.
He further reports:
Based on the recorded water level information available for the Brisbane River, Oxley
Creek and Stable Swamp Creek, the time of the initial flood inundation above the
lower floor level of the unit on the subject property is estimated to have occurred at
approximately 1300 hours during the afternoon of Wednesday [12] January 2011.
The estimated peak flood level at the subject property was approximately RL 9.3 m
AHD.
Based on the rainfall recorded at the nearby Inala and Corinda High School/ALERT
gauges, between 130mm and 150mm of rain fell in the vicinity of the subject
property, in the period between 0000 hours on Sunday 9 January 2011 and 1800
hours on Tuesday 11 January 2011. However, the peak rainfall intensity of 15mm/hr
recorded at the Corinda gauge was not exceptional, as it was less severe than the 1
in 1 year average recurrence interval (ARI) rainfall intensity. Much higher localised
rainfall intensities are regularly experienced in Brisbane. No significant rainfall was
recorded in the vicinity of the subject property after 1800 hours on Tuesday 11
January 2011 (refer to Figure 2 for details).
He then concludes:
The peak levels of water inundation of the unit on the subject property were caused
by water overflowing from the nearby Stable Swamp Creek watercourse, which is
located approximately 750 meters to the west of the subject property. The elevated
water levels in Stable Swamp Creek and Oxley Creek were due to backwater
flooding from the Brisbane River, which is located approximately 3.0 kilometres north
west of the subject property (refer to Figure 1 for details).
Stormwater inundation could not have caused the peak levels of water inundation
observed at the unit on the subject property, as there was no significant local
catchment draining through the subject property and the timings of the initial above
floor inundation of the lower floor level and the upper floor level of the unit were
respectively 2 hours and 19 hours (approximately) after the significant rainfall had
ceased (refer to Figure 2 for details).
55. The Panel has also referred itself to satellite maps of the area and note the
Applicant’s property is situated betw een Rocky Waterholes Creek and Stable
Swamp Creek. Further both creeks appear to be tributaries to Oxley Creek. The
advice from the Ombudsman’s site inspection is that the water in the area rose
slowly over two days with the water coming from the direction of Oxley Creek.
Case No: 245381 Determination Page 10 of 11
56. The Panel has also reviewed the ICA hydrology report from which the Panel
notes the following:
A tributary is a waterway that flows into a larger ‘receiving waterway’.
There were a number of minor flood events coming down Oxley Creek
and its tributaries from Sunday to Tuesday 9-11 January 2011.
After about 1pm hours on Tuesday 11 January 2011, water levels at
Marshall Avenue Alert (Oxley Creek), Corinda High Alert (Oxley Creek),
Muriel Avenue Alert (Waterholes Creek) and Oxley Creek Mouth Alert are
determined by backwater flooding from the Brisbane River.
The water levels at Coopers Plains Alert (Stable Swamp Creek) and
Durack King Avenue (Blunder Creek) are determined by backwater
flooding from Brisbane River after about 12am and 6am respectively on
Wednesday 12 January 2011.
There was no effective rainfall on the Oxley Creek catchment and in the
southern suburbs around Rocklea after about 6pm on 11 January 2011
and the maximum hourly rainfall during 9-12 January 2011 period was
less than 10mm. These figures show that any inundation in the southern
suburbs after this time would have been due to backwater flooding from
the Brisbane River.
The report acknowledges uncertainties as to whether properties flooded
by waterflows also suffered initial inundation from overland flow flooding.
Resolving the issue requires investigation of local factors such as local
topography, hydrologic modelling of the storm event and stormwater
drainage systems.
57. The ICA report suggests that the Applicant’s property wo uld have been
inundated by backflow from the Brisbane River.
58. W’s report and the ICA report are consistent in that there was no effective
rainfall in the area after 1800 hours (6.00pm) on 11 January 2011, at which
time the Applicant's unit had not been inundated.
59. The Applicant has relied on rainfall data but not indicated whether the
stormwater run-off was sufficient to inundate the property or how this may have
occurred, or to what level. Further, the Applicant has not supported the
submission that the property was inundated first by rainfall sufficient to damage
all contents before the local watercourses broke their banks.
60. The Applicant has not demonstrated the damage arose from stormwater run-off
or that stormwater run-off was sufficient to cause all the damage.
61. Based on the balance of probabilities, the Panel considers the evidence
indicates that flood was the dominant cause of any inundation to the Applicant’s
property rather than stormwater run-off.
Case No: 245381 Determination Page 11 of 11
Determination
62. On the basis of the available information, the Panel determines that the FSP is
entitled to rely on its policy wording.
63. On the basis of the available information, the Panel determines that the FSP is
entitled to decline the Applicant’s claim.