Text of the determination
Case No: 245366 Determination Page 1 of 12
Case number: 245366
General Insurance - Domestic Insurance - Home Contents - FSP Decision -
Denial of claim
27 February 2012
Background
1. The Applicant held a Home Contents insurance policy with the Financial
Services Provider (FSP). The policy covers the Applicant‟s contents up to
$41,200 and is subject to a $300 excess.
2. The Applicant lodged a claim on 17 January 2011 for contents damage
arising from inundation.
3. The FSP received a site specific report for the insured premise and declined
the claim on the basis that flood water, an excluded policy event, was the
cause of the damage.
4. The Applicant disputes the FSP‟s declinature on the basis water from the
stormwater drains inundated the property.
Summary of Applicant’s position
5. The App licant relies on a hydrologist‟s “SC” Report from which the Panel
notes the following:
SC conducted a site inspection at which time informal interviews with
members of the community were undertaken and photographs taken at
the time of the flood, obtained.
The area, including the locale of the Applicant‟s residence “B Street” is
in a low lying area, adjacent to “BK S treet” which is on higher ground.
A 100 ARI has been assumed over a 2-3 hour period although not
specifically rated this, the evidence suggests same. The west drainage
channel could not convey these peak flows.
Some residents believed the flood peak occurred at 11.33am on 14
January 2011 which showed water flowing along the south drain to
McCallum Creek.
The rainfall data shows that the majority of rain fell on 14 January 2011,
however heavy rain was noted in the catchment in the early hours of 14
Determination
Case No: 245366 Determination Page 2 of 12
January 2011 before 9.00am. This may mean that the rainfall may
technically be recorded as rainfall for 13 January 2011.
SC concluded that the local catchment exceeded the town‟s drainage
system capacity which resulted in overtopping of the west and south
drains flowing into the township.
The low lying areas observed in the township would likely have
commenced inundation on the south side of the highway within a few
hours of the drains overtopping at 6.00am. Property adjacent to BK
Street experienced considerable flooding at 8.00am.
Stormwater draining into the town from overtopping channels would
likely have been impeded in its escape by the rising waters in
McCallum Creek. McCallum Creek is recorded as overtopping the
Highway and “C” and “G” Streets between 9.00am -9.30am.
It is difficult to prove the insured property was inundated by stormwater;
however it is also difficult to prove that this was not inundated by
stormwater. The evidence suggests there was some level of
stormwater inundation in the township prior to the creek flooding but no
one can accurately and categorically specify the levels of inundation.
The insured property could have been inundated initially to a shallow
depth (potentially floor level only) with stormwater. There is no doubt
that the creek flood flows inundated the property to a far greater depth.
6. The Applicant relies on a letter dated 28 February 2011 from a Municipal
Resource Officer “D” from which the Panel notes the following:
D inspected the creek around 7.00am and drove past the insured
premise at 7.30am on 14 January 2011.
D saw the main drain from “BF” Street to the Highway overflo w into the
road reserve table drain. The overland flow from the reservoir was
greater than the capacity of the existing town cut off drains.
D notes that the town was threatened by two flood risks. The first being
the overland flow from the direction of the reservoir which is picked up
in a bluestone drain running down BF Street. The second being Creek
flow from two creeks in the township.
The Council is currently seeking funding from State and Federal
governments to determine ways to manage the overland flow from the
reservoir in the future to reduce flooding.
D believes the rainfall between 4.00am-6.00am on 14 January 2011
was a 1 in 200 year event magnitude.
The water was in excess of any drainage capacity.
7. The Applicant relies on a letter from another FSP to his landlord which states
the following:
“I confirm that [FSP name] has carried out a reassessment of your claim and
as a result has accepted your claim for the damage caused to your property
by stormwater in January 2011.”
Case No: 245366 Determination Page 3 of 12
8. The Applicant believes that a certain amount of storm damage caused his
loss and therefore his claim should be accepted by the FSP.
9. The Applicant notes there was 600mm of water in the property and he is
prepared to compromise up to 200mm-400mm given the inability to ascertain
the depth of flooding caused by each source of inundation.
Summary of FSP’s position
10. The FSP relies on section 35 of the Insurance Contracts Act (1984). Section
35 of the Act provides that, where a claim is made under a prescribed
contract and the event giving rise to the claim is a prescribed event in
relation to the contract, an insurer may not refuse to pay an amount equal to
the minimum amount of cover set out in the regulations made pursuant to
the Act unless it can prove that before the contract was ente red into, the
insurer clearly informed the insured in writing of the relevant provisions of the
contract, or that the insured knew or a reasonable person in the
circumstances could be expected to have known of such provision.
11. The FSP relies on the following policy terms and conditions:
“flood – is the covering of normally dry land by water which has overflowed,
escaped or been released from the confines of any natural or artificial
watercourse, lake, reservoir, canal or dam
...
COVER PART 1 – INSURED EVENTS
...
Insured event
6. Storm and rainwater
Including loss or damage from:
the escape of rainwater from any water pipe, drain or gutter
surface run-off rainwater from surrounding areas that occurs within
24 hours of a storm or heavy rain.
Including loss or damage caused by erosion, subsidence, landslide, mudslide
or any other earth movement that occurs within 72 hours of a storm or heavy
rain and as a result of that storm or heavy rain.
We Will NOT cover:
loss or damage caused by flood
loss or damage caused by rain, hail or wind entering your home due to:
. a design fault, structural defect or faulty workmanship
i. lack of maintenance (a defect that you knew about or should reasonably
have known about and did not fix)
ii. an opening that was not created by the storm
iii. building additions, renovation or alteration work.
Case No: 245366 Determination Page 4 of 12
loss or damage to:
iv. fences and gates and retaining walls
v. garden borders, driveways, paths or gardens
vi. the liner and/or cover of a swimming pool or spa
vii. water in a swimming pool or spa
viii. the surface of a tennis court
ix. jetties, wharves and pontoons.
...
GENERAL EXCLUSIONS APPLYING TO THE WHOLE POLICY
We will not cover:
Action of the sea, high water or underground water
X loss or damage caused by flood.”
12. The FSP relies on a hydrologist‟s “WT” report from which the Panel notes
the following:
Due to a wet September to December 2010 rainfall, this resulted in a
higher than average conversion of rainfall to run-off, increasing water
flowing directly to streams and resulting in flooding.
The township had a flood study prepared (date unknown) which
marked land subject to inundation and marking the 100 year ARI flood
extent. The flood in January 2011 exceeded the mapped extent
encompassing the whole western portion of the town. There is a media
reference to the storm being a 1 in 200 year storm event. The
hydrologist accepts that the storm was larger than a 1 in 100 year event
based on the data.
Reports from residents detailed a rapid rise in the floodwater within the
town from 8.00am on Friday 14 January 2011. There were reports that
flooding emanated from the stormwater drains that run through the
town and not the creek.
The rainfall data for the relevant areas only records rainfall at 3pm and
9am daily. The largest rainfall event of 90mm was recorded on 14
January 2011 and this rainfall was preceded by 49.6mm on 11 January
2011 and 59.7mm on 12 January 2011.
Flooding in the township occurred in September 2010 from 79.6mm
rainfall recorded on 4 September 2010.
The rainfall in January 2011 exceeded that recorded in the September
2010 flood. The rainfall recorded on 14 January 2011 was the highest
total recorded in 131 years.
Two processes could cause the flood damage viewed in the township.
These are overflows from two creeks or local run-off as a result of
heavy rainfall and inadequate drainage infrastructure.
Case No: 245366 Determination Page 5 of 12
There is no flow data for either the McCallum or Tullaroop Creeks
during the event at the township. However, other data sources indicate
that the water level was rising on 12-13 January 2011 but rose sharply
on 14 January 2011. The peak occurred at 4.45pm on Friday 14
January 2011.
The peak of water within the town was estimated to be 10.30am on 14
January 2011. The inundation depth throughout the town was
approximately 0.5m.
The McCallum Creek would have been backing up the drainage system
to the south of town early on Friday morning. The McCallum Creek
gauge failed during the January event. The flooding is therefore
inferred by the nearby Tullaroop Creek. Tullaroop Creek had risen 2m
by approximately 6.30am on 14 January 2011. The hydrologist
considers that it is not unreasonable to presume the McCallum Creek
rose in a similar manner. Accordingly, at 7.30am the McCallum Creek
was in flood and backing up the local drainage system.
The hydrologist opines that the stormwate r drains surcharged due to
overflows from the McCallum‟s Creek back flooding the stormwater
drains.
13. In addition to the SC Report relied on by the Applicant, the FSP has further
enclosed a second report dated 5 August 2011 from SC. The Panel notes
the following in relation to same:
SC has been provided with information from “Ms F”, photographs and
additional material from the local SES.
The flood peak occurred downstream in the township 6 hours before
the peak flood in the reservoir approximately 6km upstream. This is
unusual but three possible explanations exist being as follows:
– The hydrologist was not referring to peak flow but perhaps peak
dam levels.
– Rainfall in the tributary of Tullaroop Creek experienced extreme
rainfall intensity that created the peak flow in the township at
10.30am. This is not likely to cause floods of the magnitude
experienced as the tributary catchment is relatively small
compared to Tullaroop Creek.
– There is an error in the hydrologist‟s (WT) report.
The observation of Ms F that the peak river flooding occurred much
later in the day after evacuation (warning received at 11.30am) is
consistent with peak flood flows observed at Tullaroop Creek
Reservoir.
SC concludes on the basis of materials that the insured premise was
initially inundated with overland flows from the local catchment to the
West of the township prior to being inundated by flood levels
experienced later in the day from Tullaroop Creek.
Case No: 245366 Determination Page 6 of 12
14. The FSP also relies on an email from its hydrologist WT, from which the
Panel notes the following:
The SES was unaware of the flooding and did not raise the warning
until well after the township flooded. The timing of this is not relevant to
the flooding of the township and personal communications with the
members of the control centre have confirmed this.
Catchments to the South West of town are classified as streams in their
own right and the reservoir is located on one of these streams.
Without any influence from the McCallums/Tullaroop Creek systems
the flows from the south west preferentially head down the drainage
system with the overflow filling in the area behind “V Street”. To
produce the flooding seen in this area on the day, an influence from the
creek is required.
15. The FSP has enclosed copy of the local SES Evacuation Warning issued at
11.30am on 14 January 2011 from which the Panel notes that the SES
stated “Riverine flooding is causing a threat to properties..”
16. The FSP has enclosed transcript of a telephone call with the Applicant on
the inception of the policy. The Panel notes the Applicant was informed flood
was not covered.
17. The FSP has enclosed a transcript of a telephone call with the Applicant at
the time of lodging the claim. The Panel notes the Applicant states the
following:
The Applicant was not at the township at the time of the floods.
The water in the property was from rainwater.
The SES stated that it was storm damage caused by substantial
downpours which could not be handled by the stormwater drains.
The inundation occurred at 9.30-10am on 14 January 2011.
18. The FSP contends that the Applicant has not provided evidence regarding
what part of the damage at the insured premise was caused by surface
rainwater run-off from surrounding areas within 24 hours of a storm or heavy
rain, rather than flooding from nearby McCallum Creek. There is no evidence
of what property was damaged and the items respective values.
19. The site specific report from WT indicates the flooding at the insured
property would not have occurred without the influence of flood water from
McCallum Creek. Based on the information the damage falls within the policy
definition of flood and is therefore excluded.
20. The flows reported by the hydrologist (10.30am) would not be significantly
different to that much later in the afternoon (4.45pm). The actual stage of
discharge of the Creek does not change greatly. While the peak was stated
as being at 10.30am this was based on anecdotal evidence, with the largest
rise in Tullaroop Creek occurring much earlier at 1am on 14 January 2011.
Case No: 245366 Determination Page 7 of 12
21. The hydraulic modelling indicates McCallum Creek could be expected to be
around 2m above its normal water level by 6.30-7.00am Friday morning 14
January 2011 and is likely to have been backing up the local drainage
system around the same time.
22. The drains on the south side of the towns hip are noted as „streams‟ by the
Victorian Water Resources website. For the purpose of the policy definition it
follows they are also both natural watercourses. The streams tend to drain
through constructed drainage channels back into McCallum Creek. Howe ver
as the McCallum Creek was already in flood, the two streams continued on
their natural path through the township. The rainfall leading up to the
inundation of the town continued for a number of days, flooding McCallum
Creek before the local streams beg an to flood. It is the hydrologist‟s finding
that any source of water from this area is riverine flooding and not surface
run-off rainwater. Therefore in terms of the policy definition of flood,
breaches in the SES sandbags along V Street are still regarded as being
caused by flooding.
23. The FSP considers any reliance on the desktop assessment of SC was a
preliminary finding and therefore should not be relied on.
24. The second SC report does not draw definitive conclusions. The FSP
submits the report does not indicate that any stormwater inundation of the
property exceeded the floor level of the home prior to arrival of floodwaters.
Further, the previous report concluded the loss was caused by floodwater
with no prior inundation by stormwater run-off and the subsequent report
does not find otherwise. The FSP further submits the WT report should be
preferred.
25. The FSP notes other insured parties in the township were assessed
differently due to other considerations. Due to privacy reasons the FSP
cannot provide a detailed explanation, however it does confirm that the
reasons had no bearing on the Applicant‟s matter.
26. The FSP submits that in the absence of any proof of damage to the insured
property from surface rainwater run-off prior to floodwater damage, it is not
obligated to indemnify the Applicant. The surcharging of water from the
stormwater drainage channel was the result of backflow flooding in the
McCallum‟s Creek which falls under the policy definition of flood.
Alternatively, the backflow flooding occurred due to flood and is still
excluded. The FSP relies on the case of Peterson & ors v Union des
Assurances de Paris to support its position.
27. The FSP is not bound by other FSP‟s claims decisions. It has no knowledge
of the considerations leading to an acceptance of the claim.
28. The FSP relies on a legal advice regarding the flood exclusion from which
the Panel notes the following:
The backflow flooding by itself or mixed with stormwater run-off ought
properly to be considered as excluded by the flood policy exclusion.
Case No: 245366 Determination Page 8 of 12
However, if backflow flooding passes through drains and cannot be
said to have mixed with stormwater the flood exclusion will apply unless
there is a break in the chain of causation so that the stormwater
becomes the sole cause of loss.
If backflow flooding mixes with stormwater run-off the position may be
different depending on the extent to which each type of water
contributes to the loss and matters of timing.
The flood exclusions in the policy may not apply if the water from the
backflow flooding is an insignificant component of the overall water
that causes loss or damage that it could not be said to have caused the
loss or damage (at least partially) itself.
To the extent that loss or damage has occurred prior to water from
backflow flooding being a cause (at least in part) of the loss or damage,
the flood exclusions in the policy will not apply to that loss or damage.
However, after the time the water from backflow flooding starts to
contribute to the loss or damage, the flood exclusions in the policy will
apply so as to exclude all loss or damage occurring after that point.
If the cause of loss or damage is both backflow flooding and
stormwater flooding then the Wayne Tank principle applies.
The advice considers the concerns raised by the Panel i n
Determination numbered 245962 that the policy did not operate to
exclude inundation from drains. The policy however includes the
exclusion of flood and the action of underground water.
The escape of riverine water from manmade structures such as drains
can be considered to be water that has overflowed, escaped or been
released from the original watercourse. Further, it can still be
considered as overflowing normally dry land – albeit not in the
immediate vicinity of the Creek.
The advice refers to the general principles of law held by the cases of
Elilade Pty Ltd v Nonpareil Pty Ltd (2002), K Sika Plastics Limited v
Cornhill Insurance Co Limited [1982], Provincial Insurance Australia Pty
Ltd v Consolidated Wood Products Pty Ltd (1991), Hams v CGU
Insurance Ltd [2002], Eastern Suburbs Leagues Club Ltd v Royal &
Sun Alliance Insurance Australia Ltd [2003] and Person v Union des
Assurances de Paris IARD (1997 ).
The case law indicates that backflow flooding falls within the definition
of flood. It does not matter that the cover for stormwater run-off
(emanating from drains) makes express reference to drains and the
definition of flood does not deal in express terms with backflow flooding
(being flood water which discharges from drains). The policy must be
read as a whole and the words used in covering and excluding clauses
as well as policy definitions be given their plain meaning. As a matter of
principle backflow flooding can be excluded from cover under the
policy.
Case No: 245366 Determination Page 9 of 12
Issues
29. Whether the FSP has appropriately declined the claim on the basis of the
policy excluded event of flood.
Reasons for decision
30. There has been an exchange of material between each party, and the Panel
is satisfied each party has had an opportunity to reply to the issues raised.
31. The Panel has r ead each party‟s submissions and materials and will only
refer to the relevant submissions and materials raised.
32. Due to the nature and urgency of the dispute, it has been directly referred to
the Panel for Determination in accordance with the Operational Guidelines to
the Financial Ombudsman Service‟s (FOS) Terms of Reference.
33. The Panel consists of an Ombudsman, a representative with extensive
experience in the insurance industry and a representative with extensive
experience in consumer claims.
34. In respect of the appropriate interpretation of this policy‟s terms the FSP has
relied extensively on a written advice provided by an eminently qualified
lawyer; that advice related to a prior determination of a Panel in respect of
another flood dispute involving this FSP. The Panel notes the written advice
included the following salient observation: „The particular outcome of the
case may have been influenced by questions of evidence and argument‟.
Suffice to say, this Panel agrees with the sagacity of that comment; it also
has no difficulty in accepting the writer‟s conclusion that current Australian
case law supports the following proposition: „backflow flooding ( as in the
policy defined event of: escape of rainwater from a drain – Panel added) falls
within the definition of “flood”. It does not matter that the cover for
stormwater run-off (emanating from drains) makes express reference to
drains and the definition of “flood” does not deal in express terms with
backflow flooding (being flood water which discharges from drains). The
provisions of the Policy must be read as a whole, and the words used in
clauses and definitions must be given their plain meaning‟.
35. As an inundation of the home from rainwater escaping from a drain, would
potentially entitle the Applicant to cover, and floodwater excludes him from
it, the attention turns to how the Applicant‟s cover is affected by two
competing causes of the loss. It is essentially a matter of evidence regarding
the dominant mechanism of inundation affecting the insured property.
The mechanism of inundation of the insured property
36. The following is not in dispute between the hydrologists:
The insured premise was in a low lying area of the township and is at or
close to ground level.
Case No: 245366 Determination Page 10 of 12
The township had been subject to significant rains in the September
2010 – December 2010 period. This higher than average conversion of
rainfall to run-off, increased water flowing directly to streams and
resulting in flooding.
The rainfall during the January 2011 event was a greater than 1 in 100
year storm. Some reports suggest a 1 in 200 year storm occurred.
The heaviest rainfall is reported as occurring prior to 9.00am.
There appears to be no dispute that the rainfall exceeded the drainage
capacity of the township.
There are reports of the inundation commencing within a few hours of
the drains overtopping at 6.00am.
There is no flow data for either the McCallum or Tullaroop Creeks.
The peak of water within the town was estimated to be 10.30am on 14
January 2011. The inundation depth throug hout the town was
approximately 0.5m.
The peak in the natural waterways occurred at 4.45pm on Friday 14
January 2011.
Both hydrologists confirmed there were two potential sources of water,
being the overflows from two creeks or local run-off as a result of heavy
rainfall and inadequate drainage infrastructure.
37. The hydrologists however provide differing opinions as to precisely which
data should be relied upon in considering the mechanism of inundation. The
hydrologists have used different data on which to provide a modelling of the
inundation.
38. The key issue appears to be the failure of the gauges in the McCallum Creek
and the use of data for a tributary of the Tullaroop Creek. WT determined
this creek rose by 2 metres and it was presumed the McCallum Creek would
rise in a similar manner creating a backflow of the local drainage system by
approximately 7.30am.
39. SC considered this constituted an incorrect basis for WT‟s conclusion, as
the rainfall in the tributary of Tullaroop Creek was of extreme intensity; that
created the peak flow in the township at 10.30am but this was not likely to
cause floods of the magnitude experienced, as the tributary catchment is
relatively small compared to Tullaroop Creek. Significantly, SC believed the
observation of Ms F, that the peak river flooding occurred much later in the
day after evacuation, is consistent with the peak flood flows observed at
Tullaroop Creek Reservoir.
40. The Panel considers the argument of SC reasonable; the intense rainfall in a
smaller catchment would result in a different effect than on a larger
catchment area. There is also a disconnect between the flood peaks noted in
the township and elsewhere in the waterways.
Case No: 245366 Determination Page 11 of 12
41. The Panel is further attracted to the logic that flood peak downstream of the
township would not occur 6 hours before the peak flood in the reservoir
upstream.
42. The evidence is that there was substantive rain falling between 6am-9am but
the flood gauge evidence regarding the peak of the Creeks is disputed.
Further, there was water noted surcharging from drains around 7.30am at
the time rain was supposed to still be falling.
43. Although there is some evidence of a higher conversion of surface run-off
due to the sodden ground, there is minimal evidence on the important issue
of how high the surface run-off conversion would have been.
44. Whilst, Municipal Resource Officer D has provided clear evidence of the
drainage system inadequacies, there is no evidence of whether the higher
rainfall and surface run-off was even capable of draining into the systems.
The Panel does note that WT has stated to produce the flooding seen on the
day an influence from the creek is required. However, it is unclear whether
this refers to the entire day‟s flooding which both parties agree did include
water from the creek at some stage.
45. D has provided independent evidence that he observed the water
overflowing the drains causing inundation of properties in the area around
7.30am.
46. The evidence leads to a reasonable conclusion that stormwater inundation
occurred prior to the peaking in the Creeks and then further inundation
occurred.
47. The water, that first inundated the Applicant‟s home was not “escaping or
released from the normal confines of a watercourse” (as in the policy
excluded event of flood), but, on the balance of probabilities, was birthed by
the inability of the land to cope with the stormwater run-off and the overflow
of the drains.
48. Whilst floodwater arguably subsequently overtook the land and may have
exacerbated the damage caused to the property, the onus is on the FSP (in
applying its exclusion) to establish that these two events occurred
contemporaneously. The Panel is not satisfied that the expert evidence
establishes this to be the case, such that all the damage falls prey to the
excluding clause.
49. The Panel notes there is evidence of 600mm inundation entering the
property. The Panel accepts however that the total inundation of the property
is unlikely to have been caused by stormwater run-off alone. The evidence
indicates that the flood waters did have a later effect on the property, such
as to reach that height.
50. The Panel therefore determines that it is fair and reasonable in all the
circumstances to allow up to the level of 300mm of the inundation into the
Applicant‟s property.
Case No: 245366 Determination Page 12 of 12
Determination
51. On the basis of the available information the Panel determines the FSP
should be liable to make payment for the loss sustained as a result of the
property being inundated to up to 300mm. Whilst the Panel accepts this
would be the majority of the damage, the information on file does not allow
for a monetary amount to be determined at this stage.
52. Once the Applicant has indicated his acceptance of this Determination, the
FSP is directed to urgently enter into discussions/assessment as to the final
quantum. Recognising the elapse of time since the inundation, the Panel
further determines the Applicant is to be cash settled, as soon as a final
figure has been mutually agreed.
53. The FSP is to pay interest on the agreed cash settlement in accordance with
section 57 of the Insurance Contracts Act 1984 from 13 September 2011 to
date of payment of the claim.
54. Should the parties be unable to agree on the settlement amount, then the
matter can revert to the Panel for final determination.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.