Declined contents flood/inundation claim

FirmFinancial Firm (Unknown - Insurer)
Decided2012-03-08
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The insurer declined a contents claim for January 2011 flood damage as excluded flood. The Panel found the first inundation was stormwater, not excluded flood, and ordered the insurer to cash settle the loss up to 300mm of inundation, with interest, the final amount to be agreed.

The onus was on the insurer to prove the flood exclusion applied to all the damage, and the evidence did not establish that stormwater inundation was contemporaneous with excluded flood water.

Issues

Subjects and remedies

natural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 245366 Determination Page 1 of 12 Case number: 245366 General Insurance - Domestic Insurance - Home Contents - FSP Decision - Denial of claim 27 February 2012 Background 1. The Applicant held a Home Contents insurance policy with the Financial Services Provider (FSP). The policy covers the Applicant‟s contents up to $41,200 and is subject to a $300 excess. 2. The Applicant lodged a claim on 17 January 2011 for contents damage arising from inundation. 3. The FSP received a site specific report for the insured premise and declined the claim on the basis that flood water, an excluded policy event, was the cause of the damage. 4. The Applicant disputes the FSP‟s declinature on the basis water from the stormwater drains inundated the property. Summary of Applicant’s position 5. The App licant relies on a hydrologist‟s “SC” Report from which the Panel notes the following:  SC conducted a site inspection at which time informal interviews with members of the community were undertaken and photographs taken at the time of the flood, obtained.  The area, including the locale of the Applicant‟s residence “B Street” is in a low lying area, adjacent to “BK S treet” which is on higher ground.  A 100 ARI has been assumed over a 2-3 hour period although not specifically rated this, the evidence suggests same. The west drainage channel could not convey these peak flows.  Some residents believed the flood peak occurred at 11.33am on 14 January 2011 which showed water flowing along the south drain to McCallum Creek.  The rainfall data shows that the majority of rain fell on 14 January 2011, however heavy rain was noted in the catchment in the early hours of 14 Determination Case No: 245366 Determination Page 2 of 12 January 2011 before 9.00am. This may mean that the rainfall may technically be recorded as rainfall for 13 January 2011.  SC concluded that the local catchment exceeded the town‟s drainage system capacity which resulted in overtopping of the west and south drains flowing into the township.  The low lying areas observed in the township would likely have commenced inundation on the south side of the highway within a few hours of the drains overtopping at 6.00am. Property adjacent to BK Street experienced considerable flooding at 8.00am.  Stormwater draining into the town from overtopping channels would likely have been impeded in its escape by the rising waters in McCallum Creek. McCallum Creek is recorded as overtopping the Highway and “C” and “G” Streets between 9.00am -9.30am.  It is difficult to prove the insured property was inundated by stormwater; however it is also difficult to prove that this was not inundated by stormwater. The evidence suggests there was some level of stormwater inundation in the township prior to the creek flooding but no one can accurately and categorically specify the levels of inundation.  The insured property could have been inundated initially to a shallow depth (potentially floor level only) with stormwater. There is no doubt that the creek flood flows inundated the property to a far greater depth. 6. The Applicant relies on a letter dated 28 February 2011 from a Municipal Resource Officer “D” from which the Panel notes the following:  D inspected the creek around 7.00am and drove past the insured premise at 7.30am on 14 January 2011.  D saw the main drain from “BF” Street to the Highway overflo w into the road reserve table drain. The overland flow from the reservoir was greater than the capacity of the existing town cut off drains.  D notes that the town was threatened by two flood risks. The first being the overland flow from the direction of the reservoir which is picked up in a bluestone drain running down BF Street. The second being Creek flow from two creeks in the township.  The Council is currently seeking funding from State and Federal governments to determine ways to manage the overland flow from the reservoir in the future to reduce flooding.  D believes the rainfall between 4.00am-6.00am on 14 January 2011 was a 1 in 200 year event magnitude.  The water was in excess of any drainage capacity. 7. The Applicant relies on a letter from another FSP to his landlord which states the following: “I confirm that [FSP name] has carried out a reassessment of your claim and as a result has accepted your claim for the damage caused to your property by stormwater in January 2011.” Case No: 245366 Determination Page 3 of 12 8. The Applicant believes that a certain amount of storm damage caused his loss and therefore his claim should be accepted by the FSP. 9. The Applicant notes there was 600mm of water in the property and he is prepared to compromise up to 200mm-400mm given the inability to ascertain the depth of flooding caused by each source of inundation. Summary of FSP’s position 10. The FSP relies on section 35 of the Insurance Contracts Act (1984). Section 35 of the Act provides that, where a claim is made under a prescribed contract and the event giving rise to the claim is a prescribed event in relation to the contract, an insurer may not refuse to pay an amount equal to the minimum amount of cover set out in the regulations made pursuant to the Act unless it can prove that before the contract was ente red into, the insurer clearly informed the insured in writing of the relevant provisions of the contract, or that the insured knew or a reasonable person in the circumstances could be expected to have known of such provision. 11. The FSP relies on the following policy terms and conditions: “flood – is the covering of normally dry land by water which has overflowed, escaped or been released from the confines of any natural or artificial watercourse, lake, reservoir, canal or dam ... COVER PART 1 – INSURED EVENTS ... Insured event 6. Storm and rainwater Including loss or damage from: the escape of rainwater from any water pipe, drain or gutter surface run-off rainwater from surrounding areas that occurs within 24 hours of a storm or heavy rain. Including loss or damage caused by erosion, subsidence, landslide, mudslide or any other earth movement that occurs within 72 hours of a storm or heavy rain and as a result of that storm or heavy rain. We Will NOT cover: loss or damage caused by flood loss or damage caused by rain, hail or wind entering your home due to: . a design fault, structural defect or faulty workmanship i. lack of maintenance (a defect that you knew about or should reasonably have known about and did not fix) ii. an opening that was not created by the storm iii. building additions, renovation or alteration work. Case No: 245366 Determination Page 4 of 12 loss or damage to: iv. fences and gates and retaining walls v. garden borders, driveways, paths or gardens vi. the liner and/or cover of a swimming pool or spa vii. water in a swimming pool or spa viii. the surface of a tennis court ix. jetties, wharves and pontoons. ... GENERAL EXCLUSIONS APPLYING TO THE WHOLE POLICY We will not cover: Action of the sea, high water or underground water X loss or damage caused by flood.” 12. The FSP relies on a hydrologist‟s “WT” report from which the Panel notes the following:  Due to a wet September to December 2010 rainfall, this resulted in a higher than average conversion of rainfall to run-off, increasing water flowing directly to streams and resulting in flooding.  The township had a flood study prepared (date unknown) which marked land subject to inundation and marking the 100 year ARI flood extent. The flood in January 2011 exceeded the mapped extent encompassing the whole western portion of the town. There is a media reference to the storm being a 1 in 200 year storm event. The hydrologist accepts that the storm was larger than a 1 in 100 year event based on the data.  Reports from residents detailed a rapid rise in the floodwater within the town from 8.00am on Friday 14 January 2011. There were reports that flooding emanated from the stormwater drains that run through the town and not the creek.  The rainfall data for the relevant areas only records rainfall at 3pm and 9am daily. The largest rainfall event of 90mm was recorded on 14 January 2011 and this rainfall was preceded by 49.6mm on 11 January 2011 and 59.7mm on 12 January 2011.  Flooding in the township occurred in September 2010 from 79.6mm rainfall recorded on 4 September 2010.  The rainfall in January 2011 exceeded that recorded in the September 2010 flood. The rainfall recorded on 14 January 2011 was the highest total recorded in 131 years.  Two processes could cause the flood damage viewed in the township. These are overflows from two creeks or local run-off as a result of heavy rainfall and inadequate drainage infrastructure. Case No: 245366 Determination Page 5 of 12  There is no flow data for either the McCallum or Tullaroop Creeks during the event at the township. However, other data sources indicate that the water level was rising on 12-13 January 2011 but rose sharply on 14 January 2011. The peak occurred at 4.45pm on Friday 14 January 2011.  The peak of water within the town was estimated to be 10.30am on 14 January 2011. The inundation depth throughout the town was approximately 0.5m.  The McCallum Creek would have been backing up the drainage system to the south of town early on Friday morning. The McCallum Creek gauge failed during the January event. The flooding is therefore inferred by the nearby Tullaroop Creek. Tullaroop Creek had risen 2m by approximately 6.30am on 14 January 2011. The hydrologist considers that it is not unreasonable to presume the McCallum Creek rose in a similar manner. Accordingly, at 7.30am the McCallum Creek was in flood and backing up the local drainage system.  The hydrologist opines that the stormwate r drains surcharged due to overflows from the McCallum‟s Creek back flooding the stormwater drains. 13. In addition to the SC Report relied on by the Applicant, the FSP has further enclosed a second report dated 5 August 2011 from SC. The Panel notes the following in relation to same:  SC has been provided with information from “Ms F”, photographs and additional material from the local SES.  The flood peak occurred downstream in the township 6 hours before the peak flood in the reservoir approximately 6km upstream. This is unusual but three possible explanations exist being as follows: – The hydrologist was not referring to peak flow but perhaps peak dam levels. – Rainfall in the tributary of Tullaroop Creek experienced extreme rainfall intensity that created the peak flow in the township at 10.30am. This is not likely to cause floods of the magnitude experienced as the tributary catchment is relatively small compared to Tullaroop Creek. – There is an error in the hydrologist‟s (WT) report.  The observation of Ms F that the peak river flooding occurred much later in the day after evacuation (warning received at 11.30am) is consistent with peak flood flows observed at Tullaroop Creek Reservoir.  SC concludes on the basis of materials that the insured premise was initially inundated with overland flows from the local catchment to the West of the township prior to being inundated by flood levels experienced later in the day from Tullaroop Creek. Case No: 245366 Determination Page 6 of 12 14. The FSP also relies on an email from its hydrologist WT, from which the Panel notes the following:  The SES was unaware of the flooding and did not raise the warning until well after the township flooded. The timing of this is not relevant to the flooding of the township and personal communications with the members of the control centre have confirmed this.  Catchments to the South West of town are classified as streams in their own right and the reservoir is located on one of these streams.  Without any influence from the McCallums/Tullaroop Creek systems the flows from the south west preferentially head down the drainage system with the overflow filling in the area behind “V Street”. To produce the flooding seen in this area on the day, an influence from the creek is required. 15. The FSP has enclosed copy of the local SES Evacuation Warning issued at 11.30am on 14 January 2011 from which the Panel notes that the SES stated “Riverine flooding is causing a threat to properties..” 16. The FSP has enclosed transcript of a telephone call with the Applicant on the inception of the policy. The Panel notes the Applicant was informed flood was not covered. 17. The FSP has enclosed a transcript of a telephone call with the Applicant at the time of lodging the claim. The Panel notes the Applicant states the following:  The Applicant was not at the township at the time of the floods.  The water in the property was from rainwater.  The SES stated that it was storm damage caused by substantial downpours which could not be handled by the stormwater drains.  The inundation occurred at 9.30-10am on 14 January 2011. 18. The FSP contends that the Applicant has not provided evidence regarding what part of the damage at the insured premise was caused by surface rainwater run-off from surrounding areas within 24 hours of a storm or heavy rain, rather than flooding from nearby McCallum Creek. There is no evidence of what property was damaged and the items respective values. 19. The site specific report from WT indicates the flooding at the insured property would not have occurred without the influence of flood water from McCallum Creek. Based on the information the damage falls within the policy definition of flood and is therefore excluded. 20. The flows reported by the hydrologist (10.30am) would not be significantly different to that much later in the afternoon (4.45pm). The actual stage of discharge of the Creek does not change greatly. While the peak was stated as being at 10.30am this was based on anecdotal evidence, with the largest rise in Tullaroop Creek occurring much earlier at 1am on 14 January 2011. Case No: 245366 Determination Page 7 of 12 21. The hydraulic modelling indicates McCallum Creek could be expected to be around 2m above its normal water level by 6.30-7.00am Friday morning 14 January 2011 and is likely to have been backing up the local drainage system around the same time. 22. The drains on the south side of the towns hip are noted as „streams‟ by the Victorian Water Resources website. For the purpose of the policy definition it follows they are also both natural watercourses. The streams tend to drain through constructed drainage channels back into McCallum Creek. Howe ver as the McCallum Creek was already in flood, the two streams continued on their natural path through the township. The rainfall leading up to the inundation of the town continued for a number of days, flooding McCallum Creek before the local streams beg an to flood. It is the hydrologist‟s finding that any source of water from this area is riverine flooding and not surface run-off rainwater. Therefore in terms of the policy definition of flood, breaches in the SES sandbags along V Street are still regarded as being caused by flooding. 23. The FSP considers any reliance on the desktop assessment of SC was a preliminary finding and therefore should not be relied on. 24. The second SC report does not draw definitive conclusions. The FSP submits the report does not indicate that any stormwater inundation of the property exceeded the floor level of the home prior to arrival of floodwaters. Further, the previous report concluded the loss was caused by floodwater with no prior inundation by stormwater run-off and the subsequent report does not find otherwise. The FSP further submits the WT report should be preferred. 25. The FSP notes other insured parties in the township were assessed differently due to other considerations. Due to privacy reasons the FSP cannot provide a detailed explanation, however it does confirm that the reasons had no bearing on the Applicant‟s matter. 26. The FSP submits that in the absence of any proof of damage to the insured property from surface rainwater run-off prior to floodwater damage, it is not obligated to indemnify the Applicant. The surcharging of water from the stormwater drainage channel was the result of backflow flooding in the McCallum‟s Creek which falls under the policy definition of flood. Alternatively, the backflow flooding occurred due to flood and is still excluded. The FSP relies on the case of Peterson & ors v Union des Assurances de Paris to support its position. 27. The FSP is not bound by other FSP‟s claims decisions. It has no knowledge of the considerations leading to an acceptance of the claim. 28. The FSP relies on a legal advice regarding the flood exclusion from which the Panel notes the following:  The backflow flooding by itself or mixed with stormwater run-off ought properly to be considered as excluded by the flood policy exclusion. Case No: 245366 Determination Page 8 of 12 However, if backflow flooding passes through drains and cannot be said to have mixed with stormwater the flood exclusion will apply unless there is a break in the chain of causation so that the stormwater becomes the sole cause of loss.  If backflow flooding mixes with stormwater run-off the position may be different depending on the extent to which each type of water contributes to the loss and matters of timing.  The flood exclusions in the policy may not apply if the water from the backflow flooding is an insignificant component of the overall water that causes loss or damage that it could not be said to have caused the loss or damage (at least partially) itself.  To the extent that loss or damage has occurred prior to water from backflow flooding being a cause (at least in part) of the loss or damage, the flood exclusions in the policy will not apply to that loss or damage. However, after the time the water from backflow flooding starts to contribute to the loss or damage, the flood exclusions in the policy will apply so as to exclude all loss or damage occurring after that point.  If the cause of loss or damage is both backflow flooding and stormwater flooding then the Wayne Tank principle applies.  The advice considers the concerns raised by the Panel i n Determination numbered 245962 that the policy did not operate to exclude inundation from drains. The policy however includes the exclusion of flood and the action of underground water.  The escape of riverine water from manmade structures such as drains can be considered to be water that has overflowed, escaped or been released from the original watercourse. Further, it can still be considered as overflowing normally dry land – albeit not in the immediate vicinity of the Creek.  The advice refers to the general principles of law held by the cases of Elilade Pty Ltd v Nonpareil Pty Ltd (2002), K Sika Plastics Limited v Cornhill Insurance Co Limited [1982], Provincial Insurance Australia Pty Ltd v Consolidated Wood Products Pty Ltd (1991), Hams v CGU Insurance Ltd [2002], Eastern Suburbs Leagues Club Ltd v Royal & Sun Alliance Insurance Australia Ltd [2003] and Person v Union des Assurances de Paris IARD (1997 ).  The case law indicates that backflow flooding falls within the definition of flood. It does not matter that the cover for stormwater run-off (emanating from drains) makes express reference to drains and the definition of flood does not deal in express terms with backflow flooding (being flood water which discharges from drains). The policy must be read as a whole and the words used in covering and excluding clauses as well as policy definitions be given their plain meaning. As a matter of principle backflow flooding can be excluded from cover under the policy. Case No: 245366 Determination Page 9 of 12 Issues 29. Whether the FSP has appropriately declined the claim on the basis of the policy excluded event of flood. Reasons for decision 30. There has been an exchange of material between each party, and the Panel is satisfied each party has had an opportunity to reply to the issues raised. 31. The Panel has r ead each party‟s submissions and materials and will only refer to the relevant submissions and materials raised. 32. Due to the nature and urgency of the dispute, it has been directly referred to the Panel for Determination in accordance with the Operational Guidelines to the Financial Ombudsman Service‟s (FOS) Terms of Reference. 33. The Panel consists of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 34. In respect of the appropriate interpretation of this policy‟s terms the FSP has relied extensively on a written advice provided by an eminently qualified lawyer; that advice related to a prior determination of a Panel in respect of another flood dispute involving this FSP. The Panel notes the written advice included the following salient observation: „The particular outcome of the case may have been influenced by questions of evidence and argument‟. Suffice to say, this Panel agrees with the sagacity of that comment; it also has no difficulty in accepting the writer‟s conclusion that current Australian case law supports the following proposition: „backflow flooding ( as in the policy defined event of: escape of rainwater from a drain – Panel added) falls within the definition of “flood”. It does not matter that the cover for stormwater run-off (emanating from drains) makes express reference to drains and the definition of “flood” does not deal in express terms with backflow flooding (being flood water which discharges from drains). The provisions of the Policy must be read as a whole, and the words used in clauses and definitions must be given their plain meaning‟. 35. As an inundation of the home from rainwater escaping from a drain, would potentially entitle the Applicant to cover, and floodwater excludes him from it, the attention turns to how the Applicant‟s cover is affected by two competing causes of the loss. It is essentially a matter of evidence regarding the dominant mechanism of inundation affecting the insured property. The mechanism of inundation of the insured property 36. The following is not in dispute between the hydrologists:  The insured premise was in a low lying area of the township and is at or close to ground level. Case No: 245366 Determination Page 10 of 12  The township had been subject to significant rains in the September 2010 – December 2010 period. This higher than average conversion of rainfall to run-off, increased water flowing directly to streams and resulting in flooding.  The rainfall during the January 2011 event was a greater than 1 in 100 year storm. Some reports suggest a 1 in 200 year storm occurred.  The heaviest rainfall is reported as occurring prior to 9.00am.  There appears to be no dispute that the rainfall exceeded the drainage capacity of the township.  There are reports of the inundation commencing within a few hours of the drains overtopping at 6.00am.  There is no flow data for either the McCallum or Tullaroop Creeks.  The peak of water within the town was estimated to be 10.30am on 14 January 2011. The inundation depth throug hout the town was approximately 0.5m.  The peak in the natural waterways occurred at 4.45pm on Friday 14 January 2011.  Both hydrologists confirmed there were two potential sources of water, being the overflows from two creeks or local run-off as a result of heavy rainfall and inadequate drainage infrastructure. 37. The hydrologists however provide differing opinions as to precisely which data should be relied upon in considering the mechanism of inundation. The hydrologists have used different data on which to provide a modelling of the inundation. 38. The key issue appears to be the failure of the gauges in the McCallum Creek and the use of data for a tributary of the Tullaroop Creek. WT determined this creek rose by 2 metres and it was presumed the McCallum Creek would rise in a similar manner creating a backflow of the local drainage system by approximately 7.30am. 39. SC considered this constituted an incorrect basis for WT‟s conclusion, as the rainfall in the tributary of Tullaroop Creek was of extreme intensity; that created the peak flow in the township at 10.30am but this was not likely to cause floods of the magnitude experienced, as the tributary catchment is relatively small compared to Tullaroop Creek. Significantly, SC believed the observation of Ms F, that the peak river flooding occurred much later in the day after evacuation, is consistent with the peak flood flows observed at Tullaroop Creek Reservoir. 40. The Panel considers the argument of SC reasonable; the intense rainfall in a smaller catchment would result in a different effect than on a larger catchment area. There is also a disconnect between the flood peaks noted in the township and elsewhere in the waterways. Case No: 245366 Determination Page 11 of 12 41. The Panel is further attracted to the logic that flood peak downstream of the township would not occur 6 hours before the peak flood in the reservoir upstream. 42. The evidence is that there was substantive rain falling between 6am-9am but the flood gauge evidence regarding the peak of the Creeks is disputed. Further, there was water noted surcharging from drains around 7.30am at the time rain was supposed to still be falling. 43. Although there is some evidence of a higher conversion of surface run-off due to the sodden ground, there is minimal evidence on the important issue of how high the surface run-off conversion would have been. 44. Whilst, Municipal Resource Officer D has provided clear evidence of the drainage system inadequacies, there is no evidence of whether the higher rainfall and surface run-off was even capable of draining into the systems. The Panel does note that WT has stated to produce the flooding seen on the day an influence from the creek is required. However, it is unclear whether this refers to the entire day‟s flooding which both parties agree did include water from the creek at some stage. 45. D has provided independent evidence that he observed the water overflowing the drains causing inundation of properties in the area around 7.30am. 46. The evidence leads to a reasonable conclusion that stormwater inundation occurred prior to the peaking in the Creeks and then further inundation occurred. 47. The water, that first inundated the Applicant‟s home was not “escaping or released from the normal confines of a watercourse” (as in the policy excluded event of flood), but, on the balance of probabilities, was birthed by the inability of the land to cope with the stormwater run-off and the overflow of the drains. 48. Whilst floodwater arguably subsequently overtook the land and may have exacerbated the damage caused to the property, the onus is on the FSP (in applying its exclusion) to establish that these two events occurred contemporaneously. The Panel is not satisfied that the expert evidence establishes this to be the case, such that all the damage falls prey to the excluding clause. 49. The Panel notes there is evidence of 600mm inundation entering the property. The Panel accepts however that the total inundation of the property is unlikely to have been caused by stormwater run-off alone. The evidence indicates that the flood waters did have a later effect on the property, such as to reach that height. 50. The Panel therefore determines that it is fair and reasonable in all the circumstances to allow up to the level of 300mm of the inundation into the Applicant‟s property. Case No: 245366 Determination Page 12 of 12 Determination 51. On the basis of the available information the Panel determines the FSP should be liable to make payment for the loss sustained as a result of the property being inundated to up to 300mm. Whilst the Panel accepts this would be the majority of the damage, the information on file does not allow for a monetary amount to be determined at this stage. 52. Once the Applicant has indicated his acceptance of this Determination, the FSP is directed to urgently enter into discussions/assessment as to the final quantum. Recognising the elapse of time since the inundation, the Panel further determines the Applicant is to be cash settled, as soon as a final figure has been mutually agreed. 53. The FSP is to pay interest on the agreed cash settlement in accordance with section 57 of the Insurance Contracts Act 1984 from 13 September 2011 to date of payment of the claim. 54. Should the parties be unable to agree on the settlement amount, then the matter can revert to the Panel for final determination.