Home / Financial Firm (Unknown - Insurer) / Determination 245332

Determination 245332

Denial of water inundation claim under flood exclusion, with delayed handling

FirmFinancial Firm (Unknown - Insurer)
Decided2012-02-10
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$1,500
Amount claimed—
SourceAFCA PDF

Summary

The applicant's home was inundated in February 2011 and the FSP denied the building and contents claim under the flood exclusion after a hydrologist report. AFCA agreed the flood exclusion applied but found the claim handling was less than ideal and ordered $1,500 compensation for non-financial loss.

The FSP proved on the balance of probabilities that the inundation was flood water from Blind Creek or a mixture of flood and run-off, and compensation for non-financial loss was ordered under clause 9.3 of the FOS Terms of Reference for unreasonable delay and indecision.

Issues

Subjects and remedies

home or building damagenatural disasterpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 245332 Determination Page 1 of 9 Case Number: 245332 General Insurance – Home Building & Contents – Water inundation - Stormwater runoff – Policy exclusion flood – Terms of Reference Clause 9.3 30 January 2012 Background 1. The Applicant insured his home building and contents against loss or damage caused by insured events for $380,000 and $100,000 respectively with a $500 policy excess. 2. On 5 February 2011, the Applicant reported that his home building and contents had been damaged by water inundation. His telephone call to the Financial Services provider (FSP) was noted: ‘Excessive rain in the hills have caused storm water drains not to cope and have found a new course into their house. The creek near our house has burst its banks.’ 3. The FSP initially engaged a loss assessor to inspect and report on the damage. The loss assessor’s report dated 17 February 2011stated that a valid claim existed under the policy and recommended liability be accepted. 4. The Applicant obtained three quotations to repair the damage to his property. The quotes ranged between $60,000 to $65,000 5. On 10 March 2011, the FSP requested an engineering and building consultant (consultant) to assess damage consistent with storm damage to stumps; report on building defects; and provide a scope of works. 6. Due to the consultant’s concerns as to the damage to the stumps of his house, the Applicant engaged a re-blocking company to inspect and quote on replacing all of the timber stumps. The cost of repairs submitted was $12,030 including GST. 7. On 2 May 2011, the FSP requested a building services firm, ‘BB’, to inspect the damage to the Applicant ’s house and provide a quote and report. 8. On 5 May 2011, ‘ BB ’ submitted its report and a Scope of Works (SOW) from the engineering and building consultant. The SOW included was costed at $10,362. Determination Case No: 245332 Determination Page 2 of 9 9. On 13 May 2011, the FSP decided to appoint a hydrologist to provide a flood assessment report. 10. In the summary of the hy drologist’s report dated 3 June 2011, he stated that the damage was a result of flooding of a local creek. ’10. SUMMARY Following investigation of this property it can be stated that: Flood damage [Applicant ’s address] was a result of overflows from Blind Creek over Forrest road (sic) upstream of the site. The culvert capacity at Forrest road (sic) was not large enough to convey the flood flows and as such is the direct flooding mechanism.’ 11. In a letter dated 14 June 2011, the FSP informed the Applicant that it was unable to accept his claim for the flood damage due to the policy excluding loss or damage caused by ‘flood’. This decision was upheld by the FSP’s Internal Dispute Resolution committee on 4 July 2011. Summary of Applicant ’s Position 12. The Applicant ’s property suffered water inundation in February 2011. Since that time there have been numerous assessors assigned to his case, delays with the appointed builder by not showing up, and the FSP being slow in passing on information. 13. He has had numerous FSP staff allocated to his case and every time the FSP is close to a decision a new account person is appointed and they have to start all over again, each deeming another report on the house to be necessary. 14. It has taken the FSP four months to come to a decision to deny his claim. 15. This should have been the first decision. The FSP appointed a hydrologist and now is requesting another building report even though these have been submitted. 16. The longer the FSP has delayed the matter, the further his house is subsiding and damage increasing. This is increasing the repair costs that he is now being held responsible for. 17. The water that damaged his property was released from a natural waterway and not from a reservoir, canal or dam as excluded by the policy. 18. While the water was inundating his property, he was speaking with the FSP’s call centre. The person who took the call asked if there was a lake or body of water above his property. When he advised ‘no’, he was assured he was covered. Case No: 245332 Determination Page 3 of 9 19. By this he understands that the FSP believes the water, as long as it did not originate from a body of water (such as a reservoir, canal of dam) is still covered by his policy. 20. He believes that under the policy definition he is covered fully for the damage to his property. Summary of FSP’s Position 21. Upon receipt of a report from an external loss adjuster, the FSP instructed the adjuster to engage the services of an engineer due to the extent of the damage. 22. On 10 March 2011, an engineering and building consultant (consultant) was requested to check and report on the following: Assess damage consistent with storm damage to stumps; Report on building defects; and Provide a scope of works. 23. In the conclusion to the its report dated 17 March 2011 the consultant stated: ‘With reference to the body of this Report, we make the following comments: The storm on 4 – 5 February 2011 caused flooding in the Insured’s property. Runoff has flowed under the house and undermined timber stumps along the southern wall. It may have undermined other stumps along the eastern wall and some internal stumps under the Family Room. The stumps along the southern wall need to be replaced or otherwise repaired so that the wall can return to full structural function. The stumps along the northern wall and some internal stumps in this area may need to be examined and possibly re-set. These could not be inspected because of a corrugated iron “retaining wall” that had been placed in front of them. This retaining wall structure should be removed and cutoff drains installed along the eastern wall to prevent water flowing under the house. Damage in the house itself is slight and easily repaired. None of this repair work should be undertaken until the moisture contents of the soil under the house has dried and reached a stable le vel.’ 24. In the loss adjuster’s second report dated 10 May 2011, he stated: The Applicant was of the opinion that all of the stumps were affected by the water; Builder DBG confirmed that a stump inspection is required to determine the extent the stumps had deteriorated prior to the storm; Case No: 245332 Determination Page 4 of 9 DGB also stated the Applicant ’s house is approximately 60 years old and timber stumps generally show signs of deterioration from 30 years onwards; and A recent extension to the Applicant ’s home had concrete stumps that did not show any sign of damage which supports that the original stumps were compromised somewhat before the storm event. 25. The loss adjuster recommended that builder BB arranged to have the stumps inspected to determine the condition of the stumps. The adjuster also recommended the Applicant be cash settled for the cost of repairs as noted by builder BB minus the stump works until a stumpers report had been received. 26. Following receipt of the adjuster’s report, the FSP requested the adjuster appoint a hydrologist to determine the cause of water inundation. 27. The hydrologist submitted its report dated 3 June 2011 to the FSP. Following discussions with the Applicant the hydrologist noted: Flooding of the backyard was first noticed around 6.30am on 5 February 2011. Water initially began to seep under the rear fence of the property, later resulting in significant flows. The Applicant tried to divert the water back into Blind Creek by opening a southern boundary gate. Water was not directly coming from the piped section of Blind Creek, water from the piped section stayed within the banks of the creek and did not flood the Applicant ’s property. The Applicant has video footage to attest to this. There are retirement units to the east of the Applicant ’s property and significant flows were travelling down the driveway to the east of the site. Water was flowing over the land on the east and southern side of the creek. Water began to recede from the property around lunchtime of 5 February. 28. The hydrologist reported: Evidence of fast moving flows on site; Video footage and evidence of flows from the piped section staying within banks and not affecting the site are consistent with the topography; Driveway from units to the east of the site acted as a conveyance path for flows; Evidence of significant scour on the upstream side of Forrest Road, indicating that the flows broke over the road at this point; Evidence that the flow was greater than the capacity of the piped section; Evidence of flow breaking over Forrest Road and flowing down the vacant block adjacent to the retirement units. Case No: 245332 Determination Page 5 of 9 29. The hydrologist further reported: ‘Based on discussions with the owner, direct site observations at the time of inspection and a review of the available hydrological data, it is believed that flooding on the site occurred due to Blind Creek flows overtopping Forrest road (sic). Flows upstream of Forrest road (sic) were of a greater magnitude than the capacity of the piped section of Blind Creek. Flows subsequently over topped Forrest road (sic) making their way west in two main flow paths; down the retirement village driveway; and across the vacant block adjacent to the retirement village. Flows from the retirement village flow path continued to move in a westerly direction through the subject property before re-entering the creek. Given the physical barrier on at the rear of the property (wooded fence) it is unlikely that any significant rainfall induced flows (as opposed to Blind Creek overtopping at Forrest Road flows) damaged the property, with f low depths limited to less than 50mm.’ 10. SUMMARY Following investigation of this property it can be stated that: Flood damage [Applicant ’s address] was a result of overflows from the Blind Creek over Forrest road (sic) upstream of the site. The culvert capacity at Forrest road (sic) was not large enough to convey the flood flows and as such is the direct flooding mechanism.’ 30. Based on the hydrologist’s report, the FSP denied the Applicant ’s claim on the basis that the majority of the damage was due to the property being inundated by floodwater as defined in the policy. 31. The FSP relies on the following policy/contract provisions: “ Words with special meanings Some of the words in this policy have special meanings wherever they appear. These words and their meanings are defined below. ... “flood” means the inundation of normally dry land by water that has escaped or has been released from the normal confines of any natural watercourse, lake or lagoon whether or not altered or modified from any reservoir, canal or dam. Note: This policy does not cover loss, liability, injury or damage caused by or arising from flood to buildings and/or contents ... Insured events we will pay ... 5. Storm, rainwater or run-off (Applicable whether you have buildings and/or contents cover) We will pay for loss or damage caused by storm, rainwater or run-off. ‘storm’ means violent wind (including cyclones and tornadoes), thunderstorms and hail which may be accompanied by rain or snow. ‘rainwater’ means rain falling naturally from the sky onto the buildings and/or ground. ‘run - off’ means rainwater that has collected on or has flowed across normally dry ground or has overflowed from swimming pools or spas. We will not pay for loss or damage: Case No: 245332 Determination Page 6 of 9 a. caused by: flood, or flood water combined with run-off and/or rainwater; ‘flood’ means the inundation of normally dry land by water that has escaped or has been released from the normal confines of any natural watercourse, lake or lagoon whether or not altered or modified, from any reservoir, canal or dam. ... When we will not pay a claim under your policy ... 2. Unless we state differently in your policy, we will not pay for: a. flood as defined on page 5 b. any loss or damage which is not caused directly by one of the insured events; ....’ Issues 32. Whether the damage to the Applicant ’s property is covered by the terms and conditions of the policy. 33. Whether the FSP is entitled to rely upon the policy exclusion in respect to flood to deny indemnity to the Applicant. 34. Whether the FSP, after previously indicating acceptance of his claim is entitled to reverse its decision. 35. Whether the FSP’s undue delays in making a decision has contributed to the increased cost of repairing his home. Reasons for Decision 36. FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the complex nature of the issues. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 37. This decision has been made by a Panel consisting of an Ombudsman, a Panel member with extensive experience in insurance industry matters and a Panel member with extensive experience in consumer claims. Case No: 245332 Determination Page 7 of 9 38. The onus of proof is on the Applicant to establish, on the balance of probabilities, that he has suffered a loss caused by a risk insured against. Once the Applicant has established that the loss was prima facie caused by a risk insured against, the onus shifts to the FSP to show, on the balance of probabilities, that the loss falls within an exclusion in the contract of insurance. 39. There has been an exchange of material which the parties rely on. Each party has had access to the material on which the other party bases its case. As a consequence it is not necessary to recite all of this material. 40. On the 5 February 2011, the Applicant ’s property was inundated by water run - off following severe and heavy rainfall in the nearby hills. Therefore, prima facie, the Applicant has a claim that falls within the cover provided by the policy. 41. Accordingly, the onus shifts to the FSP to establish that, on the balance of probabilities, the loss or damage to the Applicant ’s property was caused by an event that is excluded from the cover provided by the policy. 42. On 5 February 2011, there were wide spread storms in the Melbourne Metropolitan Area. Three recording stations within a reasonable proximity to the Applicant ’s location in Ferntree Gully recorded the following rainfall totals for that day; Ferny Creek 136.0mm Lilydale 90.6mm Scoresby Research Institute 115.6mm 43. The Applicant ’s property is adjacent to Blind Creek which flows down from the nearby hills to the east of the Applicant ’s property. The creek is a natural open watercourse until it reaches Forest Road at the bottom of the hills. 44. The creek then travels through a large pipe under Forest Road and exits approximately 20 metres to the rear of the Applicant ’s property. However, creek water did not overflow the banks of the creek at this point. 45. The FSP’s hydrologist reported th at Blind Creek overtopped Forest Road due to the upstream flows being of greater magnitude than the capacity of the piped section under Forest Road could cope with. 46. The excess water from Blind Creek flowed over Forest Road and continued westwards down the driveway of a retirement village to the rear of the Applicant ’s property. The overflow also flowed through a grassed reserve adjacent to the retirement village. 47. The water that flowed down the driveway banked up at a timber fence at the rear of the village causing the fence to collapse and a wall of water to inundate the Applicant ’s property. Case No: 245332 Determination Page 8 of 9 48. Further, immediately opposite the reserve adjacent to the retirement village, a street intersects with Forest Road. This street, R Street, runs in an easterly direction uphill, with a steep gradient, towards the close-by hills. This street would also have acted as a carrier of stormwater, independent of Blind Creek, when it crossed Forest Road and continued downhill towards the Applicant ’s property. 49. However, this stormwater would likely have mixed with the overflow from Blind Creek. 50. The Applicant ’s policy of insurance covers loss or damage caused by rainwater or run-off. However, the run-off cover excludes loss or damage caused by flood water combined with run-off and/or rainwater. 51. The policy defines ‘flood’ as the inundation of normally dry land by water that has escaped or has been released from the normal confines of any natural watercourse whether or not altered or modified. 52. In this instance, the hydrologist has stated the magnitude of the water flowing down Blind Creek was such that it was not able to flow through the piped section of the creek and overflowed Forest Road and eventually flowed into and damaged, the Applicant ’s property. Determination 53. On the evidence presented, the Panel finds that the FSP has met the onus on it to establish that, on the balance of probabilities, the water inundation of the Applicant ’s property was flood water from Blind Creek and/or a mixture of flood and run-off water. 54. Accordingly, the Panel determines that the FSP is entitled to deny indemnity to the Applicant for the damage to his property. 55. However, handling of this claim has been less than ideal and the FSP has caused the Applicant much grief, waste of time and disappointment. 56. The most glaring error was the appointment of a hydrologist four months after the flood event. The FSP was put on notice that it was faced with a large claim from the Applicant. However, over the months there was a great deal of indecision on the part of the FSP resulting in frustration to the Applicant. 57. Clause 9.3 of the Financial Ombudsman Service (FOS) provides: ‘9.3 Other compensation ... b) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the Financial Services Provider compensate the Applicant for non-financial loss but only where: (i) an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the Applicant ’s expectations of enjoyment or peace of mind has occurred; Case No: 245332 Determination Page 9 of 9 ... The maximum amount of compensation for non-financial loss will be $3,000. 58. Therefore, in accordance with clause 9.3 b), the Panel determines the FSP pay compensation to the Applicant in the amount of $1,500.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.