Home / Financial Firm (Unknown - Insurer) / Determination 245330
Determination 245330
Denial of inundation claim under flood exclusion after sales representation
Summary
The FSP declined a home building claim for water inundation as flood, which is excluded. AFCA found a misrepresentation about flood cover estopped the FSP from relying on the exclusion and directed cash settlement with interest.
A misrepresentation by the FSP's representative, relied on to the applicant's detriment, estops the insurer from relying on a policy exclusion despite the PDS.
Issues
- Claim denial primary · upheld“FSP was not entitled to decline the claim; the applicant is to be cash settled once a final figure is agreed.”
- Failure to disclose secondary · not upheld“Panel determines the FSP provided its PDS and was not in breach of sections 35 and 69 of the Act.”
- Misleading conduct secondary · upheld“Representative's statements that flood was covered constituted a misrepresentation, creating estoppel against the flood exclusion.”
Subjects and remedies
natural disasterpay claimpay interest
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 245330 Determination Page 1 of 15
Case number: 245330
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
8 February 2012
Background
1. The Applicant holds a Home Building and Contents Insurance Policy with the
Financial Services Provider (FSP). The policy was incepted on 1 December
2009 at a local branch office of the FSP.
2. On 14 January 2011 the Applicant contacted the FSP to lodge a claim for
water inundation to his home on 12 January 2011. The FSP arranged for an
assessment and a desk-top site specific hydrology report.
3. The FSP subsequently declined the claim on the basis the inundation was
the result of flood which is not covered by the policy.
4. The Applicant disputes the claim declinature on the basis that the inundation
was the result of stormwater run- off. Further, that the FSP‟s branch
representative had represented flood was covered and the FSP failed to
meet its obligations to clearly inform the Applicant of the terms of its policy
as required under section 35 of the Insurance Contracts Act (1984) (“the
Act”).
Summary of Applicant’s position
5. The Applicant relies on the following policy terms and conditions:
“What we cover - insured events
This section describes under the heading:
Yes - the insured events you are covered for,
No - the conditions and exclusions that specifically apply to particular insured
events.
...
Yes
Storm and rainwater including stormwater run-off from areas surrounding the
site, or water escaping from any water main, drain, pipe, street gutter,
guttering or surface.
Determination
Case No: 245330 Determination Page 2 of 15
Storm means violent wind (including a cyclone or tornado), thunderstorm or a
heavy fall of rain, snow or hail.
No
Damage or loss caused by flood. Flood means the inundation or covering of
normally dry land by water which:
escapes or overflows from, or
cannot enter, because it is full or has overflowed, or
is prevented from entering, because other water has already escaped or been
released from it,
the normal confines of any watercourse or lake, including any that may have
been modified by human intervention, or reservoir, canal, dam or stormwater
channel.
Flood does not mean stormwater run-off from areas surrounding the site, or
water escaping from any water main, drain, pipe, street gutter, guttering or
surface.
...
What we do not cover – general exclusions
You are not covered under any section of the policy for damage, loss, cost or
liability caused by or arising from or involving:
...
Flood”
6. The Applicant relies on section 35 of the Act. The Panel notes that section
35 of the Act provides that, where a claim is made under a prescribed
contract and the event giving rise to the claim is a prescribed event in
relation to the contract, an insurer may not refuse to pay an amount equal to
the minimum amount of cover set out in the regulations made pursuant to
the Act unless it can prove that before the contract was entered into, the
insurer clearly informed the insured in writing of the relevant provisions of the
contract, or that the insured knew or a reasonable person in the
circumstances could be expected to have known of such provision.
7. The Applicant notes section 69 of the Act. Section 69 provides that section
35 will be deemed to have been complied with if it is not reasonably
practicable to give the information in writing before the contract is entered
into but it is reasonably practical to give the information orally. If the insurer
gives the information orally, the insurer is deemed to have complied with
section 35 if the information is given in writing within 14 days after the
contract of insurance (including an interim contract) has been entered into.
Provided the oral information is confirmed in writing within 14 days,
compliance with section 35 will be established.
8. The Applicant relies on a statutory declaration sworn by him on 4 November
2011. The Panel notes the following from this statutory declaration:
The Applicant took out the policy with the FSP on 1 December 2009 at
the local branch.
Case No: 245330 Determination Page 3 of 15
The Applicant was assisted by “GR”. The Applicant informed GR that
he was looking for a home and contents insurance policy which
specifically covered all forms and definitions of flood.
The Applicant was particularly interested in this cover as the insured
property had sustained a „flash storm‟ and water damage whilst insured
with another FSP. That FSP then discussed with him different types of
water which could get into the home and refused to insure the home
after that point.
The Applicant states that GR provided a positive response in relation to
flood cover under this particular FSP‟s PDS. He was informed that
another insurer (associated company) which is within the same
company group as the current FSP also covered flood.
The Applicant considered going to the associated company for
insurance but was reassured by GR‟s representation of cover.
9. The Applicant relies on a copy of an internet page of the associated
company‟s insurance cover. The Panel notes that since 1 July 2008 the
associated company has covered flood.
10. The Applicant states that flood is a prescribed event for the purposes of
section 35 of the Insurance Contracts Act 1984, as defined by section 14 of
the Insurance Contracts Regulations 1985. The Corporations Act 2001
further requires clear, concise and effective disclosure.
11. The Applicant contends that he never received the PDS and as a result the
FSP has not met its obligation to inform of policy exclusions under section 35
of the Act. Accordingly, the policy should revert to standard cover which
includes flood.
12. The Applicant further contends that it was reasonable and practical for the
FSP to inform him that flood was not covered and to provide the PDS whilst
he was at the branch office. Accordingly, the FSP should not be entitled to
rely on section 69 of the Act.
13. The Applicant submits that the definitions of stormwater run-off and flood
water are likely to cause confusion for a reasonable consumer. This is
because a consumer cannot identify when stormwater run-off becomes
water that cannot enter a drain/watercourse because it is full or has
overflowed. There are similar issues in identifying the difference between
water that has overflowed from a stormwater drain from flood or from storm
water run-off. The Applicant further contends there is an issue with
identifying water escaping from flooded watercourses up storm water drains
into streets.
14. The Applicant contends the distinctions between the definitions that signify
cover or exclusion are artificial and it is unreasonable to expect a consumer
to understand them or to identify circumstances of cover. Accordingly, the
requirement to clearly inform under section 35 of the Act or to provide clear,
Case No: 245330 Determination Page 4 of 15
concise and effective disclosure under the Corporations Act has not been
met.
15. The Applicant notes that in certain circumstances, merely providing the
policy document may not be enough to clearly inform a consumer of the
relevant provisions, such as where there is inadequate attention drawn to
certain provisions. An insurer may be required to do more than merely
provide the policy document to discharge its obligations under section 35 of
the Act:
If the document provisions are complex and confusing; or
Where the language is unclear and ambiguous and the document is set
out in a manner which a person of average intelligence and educations
is likely to have difficulty finding and understanding.
16. The Applicant further relies on the Service‟s Determinations numbered
40607 and 41709 relating to the mixing, of rainwater with water coming from
a watercourse. In particular the Services criticisms of artificially defining flood
and the fact such policy construction may not be in compliance with section
35 of the Act. The Panel notes whilst it may take such Determinations into
account it is not bound by them. Further, the Panel notes the policy terms o f
both these determinations do not contain the same wording as the FSP‟s
policy which applies in the current dispute.
17. The Applicant contends that he was not adequately informed of the
exclusions in the contract under section 35 of the Act. Accordingly, the policy
should revert to standard cover which includes flood.
18. The Applicant further submits that the representations of flood cover by GR
led him to enter into the contract of insurance. Further, had he been aware
that flood was not covered he would have insured with the associated
company. The Applicant also notes that Determination numbered 233281
supports his position in this respect.
19. The Applicant has noted the material provided by the FSP responding to the
allegations of misrepresentation. The Applicant notes that GR does not recall
the actual conversation and cannot provide evidence of this particular
transaction. GR only provides a general outline of what information he would
ordinarily provide. The Applicant notes Determinations numbered 245666
and 239677 in which the Panel generally held that a Statutory Declaration
from an FSP employee who could not recall the conversation but provides
general information about what he would have said, does not satisfy the
burden of proof required.
20. The Applicant submits that he has provided direct evidence in a statutory
declaration format and he is the party most likely to recall the event as the
GR would complete many transactions each day. Further, the Applicant has
repeatedly stated to the FSP that this representation was made to him –
commencing at the time of claim lodgement.
Case No: 245330 Determination Page 5 of 15
21. In the alternative, the Applicant submits that the damage to the insured
property was caused as a result of run-off from a storm and/or rainwater.
22. The Applicant relies on Bureau of Meteorology (BoM) daily weather
observations over the period 10-11 January 2011 inclusive in the locale of
his property.
23. The local catchments and ground soils were saturated as a result of
prolonged rain over this period, exacerbated by heavy rains and
thunderstorms which affected parts of Brisbane and Ipswich on 10 January
2011 and 11 January 2011.
24. The Applicant lives in a little gully which does not have a natural run-off area
for storm water. This resulted in all the water from surrounding property
proceedin g through the Applicant‟s insured premise. Accordingly, an
increase in rain would have resulted in flash flood due to the sheer volume of
water running from the surrounding properties to get to the storm water
culvert. When the Applicant evacuated at 1.30pm on 11 January 2011 it was
raining heavily and water was in the property at that stage.
25. The Applicant submits this supports his position that heavy rain occurred on
Tuesday 11 January 2011 and it was only as a result of this storm that his
property was in undated, within the definition of the FSP‟s policy.
26. The Applicant notes the FSP‟s reliance on the mapping in the ICA hydrology
Reports and the warning in these reports that “The maps should not be used
to assess flooding at individual properties, which can be influenced by a
number of local factors that may not be properly reflected in the information
shown on the maps. This is especially true around the limits of inundation.”
The Applicant queries whether the FSP‟s reliance on this document which
does not take into account location specific issues is in compliance with the
Act or the General Insurance Code of Practice.
27. The Applicant further alleges the FSP failed to properly investigate the claim.
28. The Applicant has also raised an issue regarding a change in the monthly
policy premium which was reduced. There has been no explanation of the
reduction and the Applicant considers this a breach of clause 5.2(c) of the
Insurance Code of Practice. This is because the FSP has not provided key
factors that affect the premium
Summary of FSP’s position
29. The FSP relies on claim file records from which the Panel notes the
following:
On 14 January 2011, at the time of lodging the claim, the Applicant
stated the representative informed him flood was covered. Further this
was the reason for incepting the policy.
Case No: 245330 Determination Page 6 of 15
On 25 January 2011 during a telephone call with the Applicant the FSP
is again informed the Applicant was told flood was covered. The FSP
informed the Applicant that flood is not covered under a building policy
but is under “LTB” policy (possibly this refers to a landlord tenanted
building policy).
On 10 February 2011 the Applicant specifically informed the FSP that
GR had informed him he would be covered for flood.
On 7 March 2011 the Applicant again repeated the allegation he was
informed flood was covered.
30. The FSP relies on the assessor report from “CL” from which the Panel have
noted the following:
The insured residence is a double storey with stump foundations.
The habitable floor level above the ground level is one meter.
The ground level at the house is level with the street.
The heaviest rain fell on the morning of 11 January 2011.
The inundation of the property (yard) commenced 10.00am on 11
January 2011.
The water came into the house, garage and shed at 1.00pm on 11
January 2011.
The Applicant evacuated at 1.30pm on 11 January 2011.
The water level in the property peaked at 5m at approximately 10.00pm
on 11 January 2011.
31. The FSP relies on Queensland Reconstruction Authority‟s Flood Mapping.
This document indicates that the insured property was within the flood extent
of the River.
32. The FSP relies on an explanatory statement for dispatch of documents by an
employee “BV”. The Panel notes the following in relation to this information:
The policy document data for the Applicant and the co-insured was
received on 1 December 2009 and processed the same day.
The transaction was for the FSP‟s instalment notice for Home
Insurance.
There were no errors reported in the processing of this transaction and
the documents were lodged with Australia Post on 3 December 2009.
There were 14 returns within the postal batch but none of these were
for the policy number allocated to the Applicant.
The policy documentation appears to list the correct address for the
Applicant.
33. The FSP arranged for GR to be interviewed and provided the transcript of
the interview from which the Panel notes the following:
Case No: 245330 Determination Page 7 of 15
GR did not recall the Applicant or the specific conversation with the
Applicant which led to the inception of the policy.
GR did not have the current scripting for sales with him as the branch
office had also been inundated. GR could not satisfactorily recall the
information without prompting.
GR indicates that he is familiar with the PDS and would never have
stated the FSP provided flood cover.
GR also normally tries to avoid mentioning the fact that there is an
associated company as they are two separate business brands. In
particular, he feels referring to another brand is breaking the code of
practice and can also cause issues if the Applicant has had a negative
experience with the other brand.
The Panel notes that on occasion GR had informed potential insureds:
“We also highlighted to him that in the past [FPS name] covered most of their
claims in the Hunter Valley. I also referred him to the Courier-Mail where [FSP
name] was one of four companies that covered most of the claims out in the
west in the last 12 months for flood, or run- off water type claims.”
GR has also stated that:
“We highlight the fact that flood is not covered, and we hammer that home
you know....But we all then do use the fact that the Courier-Mail said that we
were one of the four that covered the issues out at Roma and Charleville,
because you know it is public knowledge that as being that we were you
know. So but that‟s only, it‟s after the event of, after this one anyway you
know but it was after.....”
The transcript appears to stop abruptly at page 15 without any further
discussion between the parties or a statement concluding the interview.
The Panel notes this is somewhat unusual but there is no indication
there are more pages transcribed. The Panel has further not been
provided with the recording from which the transcript has been
produced.
34. The FSP relies on the following from Volume 1 of the ICA Hydrology Report:
“The principal cause of flooding along the lower Brisbane River downstream
of Wivenhoe Dam was releases from the dam, especially over the period
0600 hours (and perhaps as early as 0300 hours) on Tuesday 11 January
until around 0300 hours on Wednesday 12 January, ie a “dam release flood”
according to the terminology of this Report. On the Tuesday, the peak outflow
from the dam was reportedly 7,450m3/s as dam operators “opened the gates”
to accommodate the second major incoming flood. Release from the dam
caused waterflow flooding along the Brisbane River and backwater flooding
long Lockyer Creek, the Bremer River and all other downstream tributaries
(see Section 8.6). Lockyer Creek and the Bremer River were still delivering (or
attempting to deliver) floodwaters to the Brisbane River when backwater
flooding occurred along these waterways. Thus, a “dam release flood” from
Wivenhoe Dam was the principal cause of flooding along the mainstream and
tributaries downstream of the dam over the period 11-12 January.
...
Case No: 245330 Determination Page 8 of 15
9.2 OVERLAND FLOW INUNDATION
Intense rainfall occurred across the Brisbane River catchment upstream of the
Wivenhoe Dam, over the upper and lower catchments of Lockyer Creek, and
the upper catchment of the Bremer River before and during the subsequent
waterway flooding. However, the severity of short duration rainfall (say 1 hour
or less) in these areas was generally inconsequential (with the exception of
the upper northwestern catchment areas of Lockyer Creek). Overland flow
inundation is generally associated with intense rainfalls of short duration. In
general such rainfalls did not occur across the Brisbane River catchment in
January 2011. Therefore, it is expected that at many locations in the Brisbane
River Catchment, overland flow inundation would not have occurred, either
before waterway flooding occurred or during waterway flooding (if rains were
still occurring.
...
The severities of short-term rainfall events over the Lower Brisbane River and
its tributaries were generally very low (less than 1-Year ARI), and it is
considered unlikely that overland flow inundation occurred in these
catchments.”
35. The FSP relies on the following from Volume 3 of the ICA Hydrology Report:
“Over the period Monday to Friday 9 to 14 January 2011, severe flooding
occurred in many areas of the Brisbane River catchment, including Ipswich
City Council (ICC) local government area (LGA).
...
After about 0900 hours on Tuesday 11 January, water levels at One Mile
Bridge are seen to rapidly increase to a peak of 21.3mGH around midnight on
Tuesday evening 11 January.”
36. The FSP relies on a desktop site specific hydrology report from which the
Panel notes the following:
The peak hourly rainfall intensity of 17.1mm/hr was recorded at the
One Mile Bridge Alert gauge in the hour to 2.00pm on 11 January 2011.
The peak stormwater run-off at the subject property would have
occurred within about 15 minutes of the peak rainfall intensity.
For durations up to 2 hours the recorded rainfalls had ARIs of less than
1 year. For durations from 3 hours up to 24 hours, the recorded rainfalls
had ARI‟s of between 1 -2 years. This means that higher rainfall
intensities are regularly experienced in the area of interest. The higher
rainfall intensities which caused major flooding in the Brisbane and
Bremer Rivers occurred further to the west of the subject property.
The Bremer River peaked at a level of about 21.35mGH at the One
Mile Bridge Alert gauge is set at 0mAHD. Hence the peak water level at
the gauge was 21.35mAHD.
The ground levels at the property range from 18.5m to 20.8mAHD. This
indicates that the entire property would have been inundated by the
peak water level of 21.35mAHD and initial inundation of the subject
property by floodwater from the river would have occurred at about
Case No: 245330 Determination Page 9 of 15
5.30pm on 11 January 2011 about 3-4 hours after the peak rainfall in
the area had occurred.
37. The FSP submits its policy provides cover for defined events but it does not
include cover for all risks. In particular the FSP does not cover flood
damage.
38. The FSP contends that the policy wording defines what flood means and
conversely what flood does not mean. The definition of flood is necessarily
broad to ensure it covers phenomena consistent with overland floodwater
flow.
39. The FSP does not accept the proposition that the policy wording in relation
to flood and the separate type of inundation known as storm and rainwater,
is unclear, nor that the reader of its policy wording would be confused by the
cover available under the policy. Accordingly, the FSP rejects the proposition
that its wording contravenes section 35 of the Act or that this fails to meet
the requirements espoused under the Corporations Act 2001 and the
relevant ASIC guidelines.
40. The policy is written and presented in a clear plain English format. The policy
also draws the reader‟s attention to the general exclusions applying to the
policy.
41. The FSP further relies on previous Service Determination numbered 233366
in which the Service previously considered the FSP‟s PDS wordings. The
FSP notes this Determination is useful as a guide to view the ease by which
the terms of the PDS in the current dispute are interpreted. The FSP notes
that 40607 has little relevance to the present dispute.
42. The FSP disputes the Applicant‟s submission that the definition of flooding is
artificial. The FSP confirms that in instances of water inundating the insured
property by water solely from a drain and/or run-off that the policy will
respond. This includes pipe backflow caused by water unable to escape.
43. The FSP rejects the proposition that its wording contravenes section 35 of
the Act or that this fails to meet the requirements espoused under the
Corporations Act 2001 and the relevant ASIC guidelines.
44. The FSP‟s data demonstrates that the policy documents (including the PDS)
were in fact sent to the Applicant‟s home within 14 days of the policy
inception. This is in accordance with section 69 of the Act. Due to the elapse
of time the FSP cannot determine the availability of the PDS at the branch.
45. The FSP disputes that GR informed the Applicant he was covered for flood.
The FSP considers GR has been honest regarding his recollection and was
clear he would never have advised flood was covered. This is consistent with
GR‟s level of experience with the policy and insurance matters. The
Applicant has the responsibility to read the PDS document and ensure it
meets his insurance requirements.
Case No: 245330 Determination Page 10 of 15
46. The FSP only determines its liability for a water damage claim once it has
adequately assessed the full circumstances of the claim, such that it
understands the nature of the water inundation which took place.
47. The FSP notes the Applicant has relied on severe weather warnings issued
by the Bureau of Meteorology regarding storms on the morning of 11
January 2011. The FSP does not dispute that there were storms
accompanied by heavy rain on this day, however, heavy rainfall is not
evidence of whether the home was inundated by stormwater run-off.
48. The evidence demonstrates that at the time the Applicant left the insured
property the Bremer River was measured at the One Mile Bridge Alert as
15mGH. The hydrology reports indicate the cause of flooding from the
Bremer River was the cause of damage to the insured property.
49. Whilst there was stormwater run-off flowing across the property there was no
evidence to support the Applicant‟s suggestion that it entered the house or
caused any damage which is the subject of the claim.
50. The FSP submits that the desktop hydrology can be relied upon given that a
vast quantity of data on the rainfall, topography and water levels collected
during the event retained its integrity during the delay. Accordingly, it is
entitled to rely on the report.
51. The hydrology evidence and depth of inundation mean the only reasonable
conclusion is that the property was inundated by floodwater which travelled
over normally dry land from the Bremer River.
Issues
52. Whether the FSP was entitled to rely on the policy terms and conditions.
53. Whether a misrepresentation occurred that negated the flood exclusion
contained within the policy.
54. Whether the FSP was entitled to decline the Applicant‟s claim for water
inundation.
Reasons for decision
55. There has been an exchange of material between each party, and the Panel
is satisfied each party has had an opportunity to reply to the issues raised.
56. The Panel has read each party‟s submissions and materials and will only
refer to the relevant submissions and materials raised.
57. Due to the nature and urgency of the dispute, it has been directly referred to
the Panel for Determination in accordance with the Operational Guidelines to
the Financial Ombudsman Service‟s (FOS) Terms of Reference.
Case No: 245330 Determination Page 11 of 15
58. The Panel consists of an Ombudsman, a representative with extensive
experience in the insurance industry and a representative with extensive
experience in consumer claims.
59. The Panel considers there are three discrete issues (as stated above) and it
will address each issue separately.
Whether the FSP was entitled to rely on the policy terms and conditions
60. The Panel notes the Applicant‟s statement that he did not receive the PDS.
However, the Panel accepts there is sufficient documentary evidence to
demonstrate the posting of the document to the Applicant in accordance with
the requirements of section 69 of the Act. That is, the PDS and other policy
documents were posted within 14 days of policy inception to the appropriate
address for the Applicant. This posting of the documents to the last known
address is capable of satisfying section 69 and the Act‟s requirements
regarding the provision of notices.
61. There is no evidence regarding whether or not the local branch had copies of
the PDS available and the FSP makes no submission as to why it may not
have been reasonably practicable to provide the policy terms and conditions
prior to policy inception. However, given that the FSP has evidenced the
issue of the PDS within 14 days and also a further renewal period has
elapsed since inception and prior to the loss occurring, the Panel is satisfied
that any initial omission has been subsequently corrected.
62. The Applicant disputes that the policy wording satisfies the requirements of
section 35 of the Act or the Corporations Act 2011.
63. The Applicant and FSP have both relied on several common law cases
regarding this particular issue including Suncorp General Insurance Australia
v Cheihk [1999] NSWCA 238, Max Hams and 1 Ors v CGU Insurance [2002]
NSWSC 273 and Marsh v CGU Insurance Ltd [2004] NTCA1 in support of its
contention.
64. The Panel has reviewed the PDS. Whilst the wording of the PDS is quite
broad, it is apparent from a reading of the documentation that it is indexed,
has appropriate references to the various definitions relied upon with respect
to storm and flood and that it clearly identifies that it is not intended to cover
flood.
65. Although the Applicant has suggested the wording was unclear and
ambiguous, the Panel is satisfied that the policy wording is sufficiently clear
to establish that the Applicant or a reasonable person in the circumstances
would have been clearly informed of the extent of the policy cover in
accordance with section 35 of the Insurance Contracts Act 1984 .
66. Accordingly, in the Panel‟s view, the PDS clearly informs that damage
caused by flood is excluded from cover under the policy.
Case No: 245330 Determination Page 12 of 15
Whether a misrepresentation occurred that negated the flood exclusion
contained within the policy
67. The Panel notes the Applicant has essentially raised an estoppel argument.
The doctrine of estoppel, broadly put, is concerned to ensure that a person
who leads another to act to his or her detriment in reliance on a statement
made by that person should be held responsible to the actor. The statement
may take the form of an express promise or representation or may be
inferred from the conduct of a person. (See page 159 of Business Law of
Australia [7 th Edition])
68. The Panel must consider whether a misrepresentation was made to the
Applicant by GR that flood was covered and if so, whether the Applicant
acted upon this misrepresentation to his detriment.
69. The Applicant submits that he was operating under the belief that he was in
fact covered for flood under this policy. Further, had the Applicant been
aware of the policy exclusion for flood he would have taken out insurance
with another FSP.
70. In support of his position the Applicant has provided a statutory declaration
regarding his specific recall of the conversation with GR that led to policy
inception. The Applicant has declared the reason that he had specific
concerns regarding flood and asked questions regarding flood cover
accordingly. The Applicant notes he would have insured with the associated
company that covers flood had he been aware the FSP did not cover flood.
71. There is evidence in the claim file notes that the Applicant has consistently
stated his belief that he was covered for flood.
72. The evidence from GR is more general as GR had difficulty recalling the
Applicant and/or the specific conversation which led to the policy inception.
GR was interviewed and quite adamant that he would have explained that
flood was not covered and that he would normally try to avoid noting that the
FSP was a subsidiary of another FSP.
73. However, the Panel holds concerns over the information contained in the
transcript. GR makes several references to highlighting the fact that the FSP
was one of only four insurers that had agreed to pay a number of flood
claims in the Hunter Valley, Roma and Charleville. GR makes further
comment that it is public knowledge that the FSP” covered the issues out of
Roma and Charleville”, however, the rest of GR‟s evidence appears abruptly
cut off and it is unclear what the rest of the explanation was or whether GR
utilised other statements to sell the positives of the FSP‟s policy.
74. This is problematic for the FSP as it introduces the possibility that GR
highlighted the FSP‟s recent history of paying claims fo r flood or water run-
off claims in the Hunter Valley and in Queensland.
75. The Panel considers that had such assurances been given to the Applicant it
was capable of creating a belief that the FSP would in fact cover flood
claims.
Case No: 245330 Determination Page 13 of 15
76. Of particular concern is the statement “But we all then do use the fact that
the Courier-Mail said that we were one of the four that covered the issues
out at Roma and Charleville…”
77. This appears to indicate that the FSP‟s representatives were using such
statements about the FSP having paid previous flood claims to reassure
potential insureds. Such statements could well be capable of influencing
potential insureds to believe that payment of flood claims in these
circumstances was the FSP‟s practice.
78. The Panel is aware that this particular FSP did actually pay a number of
claims in Roma and Charleville despite its current PDS document wording
which would have been utilised in 2009. The actions of the FSP were
publicised in newspapers such as the Courier Mail referred to by GR. The
FSP‟s generous treatment of the flood victims in these areas when
highlighted in these circumstances would have been capable of cementing
the Applicant‟s belief that the FSP covered flood.
79. The Panel considers that there is evidence to suggest multiple
representa tions had been made to the Applicant regarding the FSP‟s past
cover of flood claims. Whilst the Applicant had a duty to read the PDS the
Panel considers that the well publicised conduct of the FSP in covering other
flood claims when coupled with the representation by GR would be capable
of overriding the Applicant‟s understanding of the flood exclusion.
80. The Applicant has provided evidence that he would have sought insurance
from another FSP had he been aware the FSP did not cover flood.
81. Given this the Panel is of the view that the representative‟s statements
constituted a misrepresentation to the Applicant. The Panel accepts that the
representative did not intend to deceive or mislead the Applicant and
perhaps it was GR‟s enthusiasm in promoting the FSP‟s ge nerous record
that led him to make such statements.
82. Despite the FSP‟s issue of its PDS, the misrepresentation was, in the
Panel‟s view, sufficient to confuse the Applicant, or to reassure him that
despite the contents of the PDS, the FSP could be relied upon to pay flood
claims, given its past record.
83. In any event, following GR‟s discussion with the Applicant, the
misrepresentation was relied upon to the Applicant‟s detriment as he missed
the opportunity to be insured by an FSP that did actually cover flood.
84. Accordingly, the Panel considers that estoppel has been established in this
matter.
Whether the FSP was entitled to decline the Applicant’s claim for water
inundation
85. The Panel confirms that as estoppel has been made out in relation to the
flood cover that the FSP is estopped from relying on the policy exclusion.
Case No: 245330 Determination Page 14 of 15
86. The Panel notes that in any event there is some question regarding whether
stormwater run-off occurred prior to flood based on the observations of the
Applicant as reported by CL and the site specific hydrology report.
87. The water commenced entering the house, garage and shed at 1.00pm on
11 January 2011. The Applicant evacuated after this at 1.30pm.
88. The site specific hydrology report states the heaviest rainfall was in the hour
to 2.00pm on 11 January 2011 and that stormwater run-off at the property
would have occurred within 15 minutes of the peak rainfall intensity. This
statement by the hydrologist would be consistent with the observations of the
Applicant who stated water entered the residence at 1.00pm.
89. The hydrologist, however, then states that the floodwater would have initially
inundated the subject property at about 5.30pm on 11 January 2011. This
being 4.5 hours after the first inundation of the property was witnessed and
which the hydrologist has indicated would be possible.
90. Whilst the Panel accepts it is highly unlikely that the stormwater run-off has
inundated the property up to 5 meters the evidence of the hydrologist does
not unequivocally rule out the potential for some earlier inundation by
stormwater run-off.
91. Conversely, it is possible that an on-site inspection by the hydrologist may
have ruled out such an occurrence, however, the desktop assessment has
not done so.
92. In any event, given the Panel‟s finding above, this aspect is not critical to the
outcome of this dispute.
Determination
93. On the basis of the available information the Panel determines the FSP
provided the Applicant with a copy of its PDS and therefore was not in
breach of its obligations under sections 35 and 69 of the Act.
94. The Panel determines that a misrepresentation occurred that negated the
flood exclusion contained within the policy.
95. The Panel accordingly determines the FSP was not entitled to decline the
Applicant‟s claim.
96. Once the Applicant has indicated his acceptance of this Determination, the
FSP is directed to urgently enter into discussions/assessment as to the final
quantum. Pursuant to its fair and reasonable mandate, recognising the
elapse of time since the flood, the Panel further determines the Applicant is
to be cash settled, as soon as a final figure has been mutually agreed.
Case No: 245330 Determination Page 15 of 15
97. The FSP is to pay interest on the settlement amount from the date of denial
to the date of settlement at the rate specified by the Insurance Contracts Act.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.