Denial of claim for replacement of tiled roof said to be hail damage

FirmFinancial Firm (Unknown - Insurer)
Decided2012-01-30
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$18,000
SourceAFCA PDF

Summary

The homeowners sought $18,000 for a roof replacement, saying a 1992 hailstorm caused leaks. The FSP had offered $1,000 as a goodwill gesture and refused the claim, and AFCA found no insured event was established and ordered no payment.

The applicants bear the onus of proving a covered loss, and the evidence showed long-term wear, maintenance issues and no proven link to a 1992 insured event.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 245239 Determination Page 1 of 4 Case number: 245239 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim 30 January 2012 Background 1. This is a review of a Recommendation by the Services‟ Case Manager dated 8 December 2011. The Recommendation has been rejected by the Applicants and in accordance with the Terms of Reference; the matter has been referred to me for Determination. 2. The relevant background, summaries of the parties‟ position and issue in dispute have been set out in paragraphs 1 to 8 of the Recommendation and in the interest of clarity and completeness, I will restate same. 3. The Applicants have held a home insurance policy with the Financial Services Provider (FSP) for over 25 years. 4. The Applicants state their tiled roof was damaged by a hail storm in 1992. They have lodged several claims for water inundation through the roof since 1992. In March 2011 they had the roof replaced and seek to be reimbursed the $18,000 cost on the basis the damage was caused by a hail storm in 1992 and the FSP is liable. 5. The FSP has refused liability on the basis the Applicants have not established a prima facie claim under the policy and there is evidence that a contractor engaged by the Applicants to repair the roof in the past undertook poor repairs and there is evidence of general wear and tear. Summary of Applicant s’ Position 6. Prior to 1992 there had been no issues with the roof. Around 1992 there was a leak affecting the kitchen and living room. They had the lights checked and the ceilings repaired at their own cost. 7. Between 1996 and 1999 they told the FSP there were problems with the roof leaking. The FSP sent an assessor who advised the whole roof needed to be replaced. The FSP sent a second assessor who advised no repairs were required. Since then, leaking issues have been occurring. Determination Case No: 245239 Determination Page 2 of 4 8. The FSP arranged for a building company „SHBR‟ to inspect the roof in 2010. It reported there had been faulty works undertaken by a contractor engaged by the Applicants at sometime in the past. This is incorrect and the cracked tiles SHBR found were the originals and there has only ever been one company who has done repairs „MR‟. SHBR also inspected the wrong area of the roof. 9. The Bureau of Meteorology confirms there was a hail storm in 1992. There was a note put on their loan account with the FSP‟s finance arm in 1992; however, the FSP now states this cannot be found. 10. They have always maintained their home. In March 2011 they decided to replace the roof to prevent further issues. A terracotta roof can last 70 to 90 years, not 30 to 40 years as it did due to the hail damage. Summary of FSP’s Position 11. The Applicants have not provided evidence to support their case that the roof was damaged by an insured event in 1992 or since. 12. From what records it has, the FSP states it appears the Applicants have held a policy since 1984. Records prior to 1994 cannot be obtained and accordingly, it cannot confirm if a claim was lodged in 1992. 13. Its records indicate the Applicants have lodged four claims since 2000. In each case it either repaired the internal damage or paid to have internal repairs completed. The FSP provides a brief summary of each claim. 14. As part of the claim lodged in March 2010, the FSP appointed SHRB to report on the loss. The report indicated there were faulty repairs on the roof and the sarking was showing signs of wear and tear. It appears as though the five broken tiles were the same as from the 2006 claim. 15. The Applicant s‟ repairer, MR provided a report stating nine broken tiles were found. The report does not state the cause of the damage or that the entire roof required replacement. 16. It contacted MR and asked for a condition report and details of the roof prior to the replacement; however, there has been no response. 17. The FSP relies on the following policy provisions: “ The policy doesn’t cover everything General exclusions – apply to the overall policy Unless included in additional cover, we will not cover loss, damage or legal liability caused by: …  wear and tear and lack of maintenance, including rust, corrosion, deterioration, except in the case of escape of liquid (refer page 21), or legal liability claims;  gradual loss or damage of any kind; Case No: 245239 Determination Page 3 of 4  structural defects and faulty workmanship in the construction of the building and/or lack of maintenance to the building and/or contents;” Issue 18. Whether the FSP has an obligation to cover the cost of replacing of the roof. Reasons for Decision 19. The parties have exchanged material and each has had the opportunity to address the issues raised. 20. I have read all of the exchanged material and I have carefully considered the parties‟ submissions, including the Applicants‟ further submission dated 4 January 2012. 21. As noted by the Case Manager, the alleged events causing damage to the roof of the Applicants‟ house occurred almost 20 years ago. I note, there is contained in the materials exchanged a report from the Bureau of Meteorology confirming that a thunderstorm with lightning and hail was reported at the locality of the Applicants‟ home on 12 February 1992. The FSP says these records do not go back past 1994 and it cannot confirm whether or not a claim was lodged in 1992. 22. According to the FSP‟s records, the Applicants‟ have lodged four claims since 2000. In March 2010, the FSP appointed its contractor “SHRB” to report on the loss. Following receipt of that report, the FSP declined the claim as there was no claimed event and offered the sum of $1,000 as a goodwill gesture. This matter was the subject of a decision by a tribunal that upheld the FSP‟s offer of the gratis payment of $1,000. The Applicants rejected that offer. 23. Further claims were lodged in February 2006 and 13 February 2010 and each of these claims appear to have been settled for amounts of $690 less $100 excess and $445.50 less $100 excess a cash settlement basis. A further claim was lodged following an event on 9 December 2007 but this was declined by the FSP as not related to an insured event under the policy. 24. It appears that as a result of the continuing problems with roof repair, the Applicants decided of their own volition to replace the roof and avoid further internal damage as a result of water entry. To u se the Applicants‟ words in their letter to the FSP dated April 2011: “We decided to bite the bullet and get a new roof for our “peace of mind”. 25. At that time, the Applicants submitted a quotation from its repairer in the sum of $18,000 for the cost of replacing the roof. The claim was denied by the FSP because there was no proof that the alleged damage was related to an insured event. Further, the information in the possession of the FSP indicated that the roof had suffered from gradual wear and tear and lack of maintenance and Case No: 245239 Determination Page 4 of 4 alleged faulty work carried out by independent contractors over a period of some 20 years. 26. In their most recent submission dated 4 January 2012, the Applicants deny that the repairs carried out by contractors over a period of years were faulty as alleged by the FSP‟s builder. 27. In making his Recommendation, the Services‟ Case Manager has made a number of comments and factual observations in paragraphs 20 to 34 inclusive. I agree with those comments and reasons and add the following. 28. The Applicants have the obligation of establishing that a loss has occurred that is covered by the policy. In reviewing all of the material, I am not satisfied that any evidence has been presented to establish that the replacement of the roof was due to a particular insured event. It is clear that there were maintenance issues over a long period that required attention and repair and the FSP has dealt with each of those matters as stated above. 29. Whilst no one doubts the bonafides of the Applicants and putting to one side the question of whether any claim would be statute barred, I believe it is somewhat fanciful to suggest that a claim can be laid at the doorstep of the FSP almost 20 years after the alleged insured event. In any event, as stated above, there is no satisfactory supportive material to prove that the original alleged damage was caused by the 1992 hailstorm event nor is there any satisfactory material to prove that subsequent repairs were related to that initial insured event. Determination 30. The FSP is not required to reimburse the Applicants for the cost of replacing the roof.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.