Home / Financial Firm (Unknown - Insurer) / Determination 245155

Determination 245155

Denial of water inundation claim under river flood exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2012-08-07
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A couple represented by solicitors claimed for flood damage to their Graceville home after the FSP denied under the river flood exclusion. AFCA found the policy was clearly worded and the damage was caused by river flood, although the FSP had misrepresented cover at lodgement, the misrepresentation caused no proven detriment, so no remedy was ordered.

The river flood exclusion was clearly informed under section 35(2) of the Insurance Contracts Act and the hydrology showed Brisbane River backflow caused the inundation.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 245155 Determination Page 1 of 20 Case number: 245155 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim (Flood) 6 August 2012 Background 1. The Applicants (CL and JL) arranged an insurance policy with the Financial Services Provider (FSP) to cover their home and contents. This policy operated for twelve months beginning from 16 February 2010. During this period, the building was insured up to a sum of $500,000 and contents up to $150,000. Claims were subject to a basic excess of $500. 2. The Applicants lodged a claim due to damage sustained to the property in Graceville as a result of water inundation, following severe weather events in Queensland in January 2011. 3. The FSP denied the claim on the basis the damage was due to “river flood”. The Applicants, through their solicitors have disputed this. 4. For the sake of simplicity, reference to the Applicants will include their legal representatives. 5. Both the Applicants and the FSP have provided detailed submissions on the relevant issues. For the sake of brevity, the Panel will only briefly summarise these submissions given all of the material made available has been exchanged with the other party. Summary of Applicants’ position 6. The Applicants submit the following as alternative arguments in response to the FSP‟s decision: a. The FSP‟s policy failed to clearly inform them that “river flood” was excluded as required under Sections 35 and 37 of the Insurance Contracts Act 1984 (the Act). b. The FSP misrepresented to them at claim lodgement that the claim would be paid. Accordingly, they sustained detriment as a result of this misrepresentation. c. The FSP breached its duty of utmost good faith by failing to ensure the policy the Applicants had taken out was suitable to their needs. Determination Case No: 245155 Determination Page 2 of 20 d. The damage was solely due to stormwater run-off or flash flood. e. The damage is covered under the insured event of “Water or Other Liquid”. f. The FSP is unable to discharge its onus in establishing the loss was caused by “river flood”. 7. The Applicants therefore seek to be indemnified for their losses. Summary of FSP’s position 8. In response to the Applicants‟ arguments, the FSP submits the following: a. It has provided evidence from an appropriately qualified individual to corroborate that a PDS was sent to the Applicants prior to the claim. Further, the policy structure and layout in conjunction with this evidence enables it to rely on the exclusion clause of “river flood” pursuant to Section 35(2) of the Act. b. It denies any of its telephone consultants misrepresented to the Applicants after the incident that the claim was covered. Alternatively, the Applicants are unable to establish any detriment suffered from the alleged misrepresentation. c. The duty of utmost good faith does not extend to an obligation to ensure a policy is suitable to the Applicants‟ needs. 9. The FSP therefore relies on the following policy provisions, a site specific hydrology report and the reports commissioned by the Insurance Council of Australia (ICA) to substantiate its position: “ What you are not covered for … Some events we may not cover include:  Damage caused by the seas or tidal wave or river flood (see Section 1.12) … Definitions (The Meaning Of Some Words) … “ flash flood ” means what occurs when there are heavy, intense bursts of rainfall, usually during thunderstorms where so much water falls in a very short time that it cannot get away quickly enough and collects and flows into your home . but does not include when rainwater on the site :  cannot run-off into a water catchment system , because it is overflowing in flood; and  mixes with the flood water coming from the water catchment system and then flows into your home . … Case No: 245155 Determination Page 3 of 20 “ rain ” means water that has fallen from the sky on to your home and the site but not water from flash flood . “ river flood ” means when water that is normally contained in a water catchment system increases because of rainfall or snow melt (whether in the immediate region or elsewhere) or is deliberately released by an authority, and the water overflows onto land that is not normally covered by water into your home For example water may be deliberately released by an authority from a dam or reservoir. … “ storm ” means violent weather and high winds, sometimes accompanied by rain, hail or snow including a cyclone, tornado or willy willy. … “ water catchment system ” means:  a river, creek, other natural watercourse or lake, whether they are in their original state or have been modified, are named or unnamed, or normally dry land that only run during periods of rain;  a dam, reservoir, storm water channel or canal. … 1.12 Storm, Rain or Flash Flood You are insured for damage to your home caused by storm , rain or flash flood . … We will not pay for damage caused by:  …  river flood ;” Issues 10. Whether the FSP breached its duty of utmost good faith in allowing the Applicants to incept this type of policy. 11. Whether the FSP has complied with the requirements under Section 35 of the Act to rely on the policy exclusion of “river flood”. 12. Whether the FSP misrepresented to the Applicants after the claim that they would be indemnified and if so, whether this entitles the Applicants to any compensation. 13. Whether the FSP is able to establish the Applicants‟ loss was caused by “river flood”. 14. Whether the FSP is able to rely on the “river flood” exclusion. Case No: 245155 Determination Page 4 of 20 Reasons for decision 15. Due to the nature of the dispute, the parties have been informed that the matter has been referred to the Panel for Determination in line with the Operational Guidelines to the Service‟s Terms of Reference. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 16. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 17. It is appropriate to consider the issues under the various headings. Clearly Inform 18. Section 35(2) of the Act states that when a claim is made under a “prescribed contract” for a “prescribed event”, an insurer cannot refuse to pay the claim unless it can establish that it clearly informed its insured in writing that it would not cover this event. Section 34 of the Act has defined the terms “prescribed contract” and “prescribed event” by referring to the Insurance Contracts Regulations 1985. 19. There is no dispute that contracts of insurance covering a person‟s home and contents are a “prescribed contract” and damage due to flood is a “prescribed event”. 20. The onus is therefore on the FSP to establish that it has clearly informed the Applic ants prior to the claim that it would not cover damage caused by “river flood”. This is generally done by an insurer providing a copy of its policy to its insured which is meant to set out completely the rights and obligations of both parties under the insurance contract. 21. Further, the Courts have supported this and particularly, in the case of Marsh v CGU Insurance Ltd [2004] NTCA 1 , Mildren J provided the following comments that is particularly relevant to the operation of Section 35(2) of the Act: “In Ha ms & Anor v CGU Insurance Ltd(2002) 12 ANZ Insurance Cases 61 - 525, Einstein J held that the provisions of s 35(2) of the Insurance Contracts Act 1984 (Cth) could be met if the insurer provided to the proposed insured a document such as the proposed policy, which contained the relevant wording. I agree. … Whether the policy wording in fact "clearly informed" the insured that there was no cover for flood is a question of fact to be determined by an examination of the document in question. … Furthermore, the language of s 35(2) suggests that the proposed insured can be clearly informed merely by providing the insured with a copy of the policy which shows the exclusion in clear and unambiguous terms. … The answer to the question "is flood covered" is easily ascertainable by any person of average intelligence and education. ” (Panel emphasis) Case No: 245155 Determination Page 5 of 20 Receiving the policy 22. The Applicants, in a letter dated 19 April 2011, made a number of references about not receiving the policy prior to the claim. The FSP, in response to this, provided a statutory declaration from HW, a Business Systems Manager, to confirm that the policy was sent out to the Applicants shortly after the policy was initially incepted on 22 January 2010. This declaration contained the following information:  The Applicants‟ policy documents were contained in a batch that required various inserts depending on their type. In the Applicants‟ case, the inserts required were described as “Home Cover PDS & Policy Wording (insert 2)”.  Each stage of the process, between the information being sent by the FSP to the mail house and the mail house to Australia Post, is reconciled to ensure all the jobs have been printed and sent. With respect to the batch that the Applicants‟ documentation was contained within, all of the various numbers reconciled.  In the Applicants‟ case, these documents were processed on 25 January 2010 and sent on 27 January 2010.  The documents issued to the Applicants included a covering letter that advised a Product Disclosure Statement (PDS) and Policy Wording were enclosed and that if any enclosures were missing, the Applicants were to contact the FSP. No such contact was made. 23. To clarify, the Panel notes the policy was originally meant to commence on 22 January 2010 but this was deferred until 16 February 2010 pursuant to the Applicants‟ request in a telephone conversation with the FSP on 29 January 2010. 24. The Applicants, in their later submissions, did not respond to the information contained in HW‟s statutory declaration. In particular, although J L provided a statutory declaration to address the issue of misrepresentation, she provided no evidence regarding whether a policy was sent to them prior to the claim. 25. In addition to this, the FSP provided a transcript of the telephone conversation on 29 January 2010. The Panel finds the following comment of particular significance, which was attributable to the Applicant who called: “Will a new PDS come out to me or? Not PDS - a new letter come out to me?” 26. This comment could be construed as indicating that a PDS had been received by the Applicants as part of the original batch of documents sent to them when originally incepting the policy on 22 January 2010. 27. At the very least, this comment is a clear acknowledgement that the Applicants received the coverin g letter. The FSP‟s evidence indicates that this covering letter (as set out in HW‟s declaration) contained the following information: “ What is enclosed? Case No: 245155 Determination Page 6 of 20 Enclosed, you‟ll find information you need to know about your insurance cover:  Your Product Disclosure Statement and Policy Wording booklet  Conversation Record  Policy Schedule” 28. In their submissions, the Applicants are described as being careful and meticulous in record keeping. However, despite receiving the above letter, it appeared no effort was made by the Applicants to follow up the missing policy, had a PDS not been attached as articulated in the letter. 29. In the Panel‟s opinion, taking into consideration all of the above, it is more likely than not that a copy of the PDS and policy were sent and received by the Applicants before the claim occurred. 30. The Applicants have made reference that there may be three different versions of the policy that are effective, the one available when the policy was taken out, a revised policy issued by the FSP on 27 November 2010 and the new policy sent at renewal. 31. The Panel does not accept this submission assists the Applicants for the following reasons: 32. There is no indication that the revised policy issued on 27 November 2010 had any applicability to the Applicants. As stated by the FSP, the fact that it revised its policy does not automatically mean that this constitutes a variation of every existing insurance contract in place. Indeed, an insurer‟s ability to unilaterally vary a policy mid-term is extremely limited by the Act (Section 52) and further, there is no indication that the FSP ever attempted to do so in the Applicants‟ circumstances. 33. In regards to any policy sent at renewal, this would have no effect. Renewals constitute a new contract and any renewal of the 2010 policy would only have been operable after the claim given it would not have been in effect until 16 February 2011. 34. Accordingly, the Panel accepts that the only policy which can and is being relied upon is the one the FSP submits was sent to the Applicants on 25 January 2010. It is this policy therefore that the Panel will consider in the context of Section 35 of the Act. The terms and conditions of the PDS are confusing, complex and unclear 35. The Applicants have also provided numerous submissions arguing that the terms and conditions in the policy are confusing, complex and unclear. In particular, the Applicants have referred to the defined terms of “storm”, “flash flood”, “rain” and “river flood” to argue that the distinctions are ambiguous, unclear and confusing and therefore should not be relied upon. Case No: 245155 Determination Page 7 of 20 36. These specific issues and arguments have been raised by the Applicants‟ solicitors in another dispute, case number 254731, involving a very similar policy. These arguments were reviewed at length by the Pa nel in that case. In particular, paragraphs 28 to 38 sets out that Panel‟s rationale in finding that the definitions of “rain”, “storm”, “flash flood” and “river flood” being used in both policies are clear and unambiguous. 37. As the Applicants have not been privy to this reasoning, the Panel will set this out for their benefit: “28. As an alternative, the Applicants have provided numerous submissions regarding the terms and conditions in the PDS being confusing, complex and unclear. In particular, the Applicants have referred to the defined terms of “storm”, “flash flood”, “rain” and “river flood” to argue that the distinctions are ambiguous, unclear and confusing and therefore should not be relied upon. 29. The Panel does not accept the Applicants‟ submission s in this regard. For instance, the Applicants have stated the definition of “rain” is restrictive as it only includes rain which falls directly on the property. The Panel considers this explanation is clear and unambiguous. 30. Further, the Panel does not accept such a definition can be considered oppressive. It is difficult to conceive that rain which falls outside the property would cause damage to it unless it does so by rainwater run- off. In this regard, the definition of “flash flood” would appear to be applicable in those circumstances and covered by the policy, thereby overcoming the Applicants‟ argument that the policy definition of “rain” is oppressive. 31. In relation to the definitions of “storm” and “flash flood”, the Applicants have argued tha t the use of the terms “usually”, “short time” and “violent weather” in them are unclear and ambiguous. The Panel disagrees for the following reasons:  The term “violent weather” is clear. “Weather” is a common and well understood term as is “violent”. The use of them together requires the “weather” to be of sufficient degree to satisfy the term “violent”. The Panel considers this is clear and unambiguous.  “Short time”, although imprecise, is not to the extent that it cannot have any applicability. In essenc e, the use of the phrase “short time” requires some contemporaneous connection between the rainfall and inundation. What exactly constitutes “short time” will normally be resolved by analysis of the particular circumstances of an event.  “Usually” is a co mmon and well understood term. Its use within the “flash flood” definition actually assists an insured as it does not limit this insured event to thunderstorms alone. Instead, the use of the phrase provides a guide to insureds as to when the event is likely to occur. Accordingly, the Panel considers its use to be appropriate. 32. The Applicants have also argued that the “flash flood” definition is ambiguous because it contains two limitations. The Panel does not accept this. The limitations in the insured event are relatively clear and further, the use of limitations in an insured event is arguably more Case No: 245155 Determination Page 8 of 20 appropriate as opposed to having them contained in a separate exclusion clause. 33. The Applicants have also argued that “flash flood” is illusory as it is s o restrictive. The Panel disagrees. “Flash flood” occurs when rainwater inundates the Applicants‟ property and causes damage in circumstances when this water has not mixed with flood water or inundated the property because it could not drain into a full water catchment system. 34. In essence, inundation due to rainwater alone following a heavy and intense period of rain would be covered under “flash flood”. The Panel considers this is clear and has a foreseeable application. 35. The Applicants have also referred to two previous Determinations issued by a Predecessor Scheme, namely case numbers 41709 and 40607, to argue that the “flash flood” definition is unclear. However, due to a number of distinguishing features between those cases and the current one, they provide minimal probative value. These features are:  The Determinations referred to the definition of “flood”, which operated as an exclusion in those policies. The FSP‟s definition of “flash flood” operates as an insured event.  The Applicants‟ quote from the Determination in case number 40607 was taken in isolation. Upon considering the whole reasoning in the Determination, it is clear the previous Panel ultimately found against the insurer due to a number of other factors, such as: - The manner in which the policy was incepted, and - The fact the FSP in that case could not establish the Applicants received the policy.  In relation to case number 41709, the substance of the Panel‟s finding was the lack of appropriate cross referencing in addition to the “flood” definition. For reasons that will become apparent, the Panel does not consider such an issue is evident in the FSP‟s policy. 36. The Applicants have argued “river flood” is ambiguous because it discusses what is “normally contained” in a waterc ourse that is “normally dry”. The Panel considers the Applicants‟ submission in this regard is taken out of context. 37. The definition of “river flood” refers to water that is “normally contained in a water catchment system”. The phrase “water catchment system” includes watercourses that are “normally dry that only run during periods of rain”. In the Panel‟s opinion, this refers to watercourses such as dry river or creek beds that can have water in them during wet seasons. Accordingly, the Panel does not accept this renders the definition confusing or ambiguous. 38. The Applicants have also attempted to argue that the definition cannot include water that escapes a creek because of the use of the term “river flood”. The Panel does not agree. “River flood” sp ecifically refers to water from a “water catchment system” overflowing. The policy then defines “water catchment system” to include a creek. Case No: 245155 Determination Page 9 of 20 38. Although each dispute before the Service is considered on its individual merits, the Panel determines it is entitled to adopt the above reasoning and apply it to the Applicants‟ case given the following:  As evident from above, the arguments and issues dealt with by the previous Panel are essentially identical to the ones currently before this Panel.  The Panel can have regard to previous decisions under clause 8.2 of the Terms of Reference when reviewing a dispute.  The previous Determination dealt with issues and policy wording that is significantly similar and contemporaneous to this dispute. 39. Accordingly, the Panel considers it is appropriate to have regard to and apply the reasoning of this Determination rather than the ones relied upon by the parties. 40. The Panel therefore accepts the relevant policy terms of “storm”, “flash flood”, “rain”, “river flood” and “water catchment system” are clear and unambiguous. Is the FSP entitled to rely on the “river flood” exclusion? 41. Applying the principles of Mildren J in the case of Marsh, the Panel accepts a person of average intelligence and education would easily ascertain “river flood” was not covered pursuant to the following:  The policy has an index which contains a reference to Section 1 which is headed “Insured Events Causing Loss or Damage Your Building and/or Your Contents”.  Upon turning to the relevant page, this Section informs an insured that the FSP‟s policy only responds to a number of listed insured events. Upon consulting the various insured events, the most applicable to damage by water inundation is “1.12 Storm, Rain or Flash Flood”.  Within this insured event is reference to the fact the FSP will not pay damage caused by “river flood”.  The term “river flood” is highlighted in bold, indicating that the term contains some significance. An insured, upon determining whether the term has a specific meaning, can consult t he policy‟s index again and this contains reference to “Definitions ( The Meaning Of Some Words )”.  Upon turning to the appropriate page, the insured can easily find the definitions for the terms “river flood” and “water catchment system”, which the Panel has accepted are clear and unambiguous. 42. The Panel therefore accepts that pursuant to Section 35(2) of the Act, the FSP is entitled to rely on the “river flood” exclusion provided it can establish it is applicable to the Applicants‟ circumstances. Case No: 245155 Determination Page 10 of 20 43. The Applicants have also referred to Section 37 of the Act. However, the Panel agrees with the FSP‟s position that this does not apply to “prescribed contracts” as evident by the following wording contained in that provision: “An insurer may not rely on a provision included in a contract of insurance (not being a prescribed contract) …” Utmost Good Faith 44. The Applicants have alleged the FSP breached its duty of utmost good faith by failing to ensure the policy provided adequate coverage or was suitable to their needs. 45. The Panel considers the Applicants‟ arguments regarding the duty of utmost good faith are misconceived. There is no legal principle that supports the Applicants‟ argument that an insurer‟s duty of utmost good faith extends to enquiring and ensuring its po licy is appropriate to the insured‟s needs. Such a duty is generally associated with insurance brokers or other authorised parties where case law makes it clear these professionals have a duty to ensure the policy they procure is suitable to their client‟s needs. 46. Further the FSP‟s policy, which the Panel has found the Applicants received before the policy commenced:  Is a standard home insurance policy that appears to be available to the general public as opposed to being tailored to the Applicants‟ needs, and  Had a 21 day cooling off period which provided the Applicants ample opportunity to review the contract and obtain advice on it to ensure it was suitable to their needs. 47. Given this, the Panel does not accept the FSP breached its duty of utmost good faith with respect to offering its standard home insurance policy to the Applicants. Misrepresentation at claim lodgement 48. The Panel notes that in the Applicants‟ submissions regarding this issue, they have referred to legal concepts such as “misrepresentation” and “detriment”. These concepts are generally associated with the equitable principle of estoppel which, broadly speaking, requires three elements to be satisfied: a. A clear misrepresentation was made to the Applicants; b. The Applicants relied on that misrepresentation to their detriment; and c. The extent of the detriment suffered. 49. The two leading cases that sets out this equitable principle are Walton Stores (interstate) Ltd v Maher (1988) 164 CLR 387 and Commonwealth v Verwayan (1990) 170 CLR 394. Case No: 245155 Determination Page 11 of 20 Did a misrepresentation occur? 50. The Applicants claim these misrepresentations occurred in two telephone conversations shortly after the claim, namely on 12 January 2011 and 13 January 2011. Further, the Applicants state that they recorded contemporaneous handwritten notes and typed same afterwards with JL providing a statutory declaration attesting that the typed versions of the notes are true and correct. 51. The conversation on 12 January 2011 was between CL and the FSP. The typed notes provided by the Applicants for this conversation contained the following relevant information: “Advised re flooding … Informed neighbour who was drug squad detective QLD police said drains gurgling then water came up Discussed coverage. [CB] “Don‟t worry. Everything will be OK. You are covered as this is 1:100 year event and [FSP] has a moral and ethical obligation to cover you” [CB] further advised “inundation rivers was a freakish event” Asked if being covered was from her being a nice person or from managers? [CB] responded “NO, direction from management.” … [CB] “Don‟t worry you are covered. Will send out PDF in email”.(sic) 52. The conversation on 13 January 2011 was between JL and [S] from the FSP. The typed version of the contemporaneous notes stated the following: “Asked [S] to confirm that our claim had been accepted? She advised that yes it had been accepted and our policy covered flooding that had happened to place in Brisbane. … Again asked [S] that as our claim had been accepted, that [FSP] wouldn‟t change their mind and decide to refuse claim? [S] confirmed that claim has been accepted and that there would be no change to this decision. She was able to confirm again, on my asking, that we were covered and we just needed to wait to hear from [loss adjuster] to make a time to come out t the assessment.” 53. CL has provided no statutory declaration to corroborate that the typed version of his notes for the conversation on 12 January 2011 is a true and accurate reflection. JL states she was present during this conversation; in the Applicants ‟ submission of 19 April 2011 it is stated “[CL] made the call but his wife listened from his end” . It is unlikely she was in a position to hear the FSP‟s responses unless the co nversation was on speaker or connected phones. There is nothing in any of the evidence to indicate that this is the case or that she could hear the FSP‟s responses. Case No: 245155 Determination Page 12 of 20 54. Furthermore, the Applicants did not produce a copy of the original handwritten notes taken. Although JL has provided a statutory declaration attesting that the typed version is an accurate copy, no explanation has been provided as to why the original notes were not made available. Accordingly, the Panel is not in a position to corroborate that the original notes were clear or decipherable enough to enable an accurate reconstruction. 55. However, given JL has authenticated both notes, particularly those of her conversation on 13 January 2011, the Panel accepts that this is a true representation of her understanding of the advice received. 56. In rebuttal to the Applicants‟ evidence, the FSP obtained a statutory declaration from ER, claims department manager, whom CB reported to at the time of the claim. The FSP was unable to obtain a statutory declaration from CB as she had resigned from her position since October 2011. 57. ER‟s declaration stated the following:  Based on her position, she is able to report that CB was employed as a claims handler from early 2008 until July 2011. She considered CB to be very competent and one of the more experienced members of her team.  Upon joining in 2008, CB underwent an intensive training course, which involved emphasising that CB would never advise whether a claim is covered before it has been investigated.  CB had extensive and recent experience in managing floods, which included the Roma floods of December 2010. Accordingly, she did not have a propensity to provide information customers wished to hear.  In her opinion, the statements the Applicants are attributing to CB, na mely that she stated the FSP had “a moral and ethical duty to cover you” is inconsistent with her experience and product knowledge. 58. The declaration also attached a memo that was issued to staff on the morning of 13 January 2011 regarding the advice to be p rovided to customers affected by the severe weather events. However, as identified by the Applicants, this provides no probative value given it was sent after the conversation between CB and CL occurred. 59. Although the FSP does appear to record some telephone conversations given it was able to produce transcripts for the telephone conversations on 23 and 29 January 2010, it has stated no such recordings were available for these two conversations. It is unclear why this was the case given the transcripts it has provided related to conversations that occurred approximately one year prior to these calls in January 2011. 60. In addition, the FSP has not provided any of its claim notes or explained their absence. Given part of the purpose of the 12 January 2011 telephone call was CL notifying the FSP of a claim, it is reasonable to expect that information would have been recorded by CB in some manner. Case No: 245155 Determination Page 13 of 20 61. The Panel also notes that the FSP provided no evidence to rebut the conversation that occurred between S and JL, such as:  A statutory declaration from either S or her supervisor regarding this conversation, and/or  A copy of any contemporaneous notes taken. 62. Based on this, the Panel is therefore persuaded, on the balance of the evidence presented, that the FSP did misrepresent to the Applicants on 13 January 2011 that the claim would be covered. The Panel has reservations about whether this occurred in the conversation on 12 January 2011 given:  The notes regarding his conversation were not corroborated by CL,  CL‟s original notes was not produced, and  It seems improbable that someone of CB‟s experience would unilaterally state a claim was covered on the basis the FSP had “a moral and ethical obligation” and that this was the direction from management. 63. However the Panel is satisfied that, at the least, the evidence provided by JL corroborates this misrepresentation occurred in the conve rsation on 13 January 2011. 64. The Panel acknowledges the FSP provided a copy of an email dated 13 January 2011 sent out by management to its staff directing them not to provide any comment about claim decisions. However, it is unclear if this email made its way to S at all and if it did, whether it reached her before the conversation with JL occurred. Have the Applicants suffered detriment? 65. The Panel has considered the judgment of Brennan J in the case of Walton Stores (interstate) Ltd v Maher (1988) 164 CLR 387 regarding the issue of detriment. In particular, the Panel considers the following comments to contain his substantive analysis of the issue of the unconscionability for a party to resile from a misrepresentation and this states: “The unconscionable conduct which it is the object of equity to prevent is the failure of a party, who has induced the adoption of the assumption or expectation and who knew or intended that it would be relied on, to fulfil the assumption or expectation or otherwise to avoid the detriment which that failure would occasion. The object of the equity is not to compel the party bound to fulfil the assumption or expectation; it is to avoid the detriment which, if the assumption or expectation goes unfulfilled, will be suffered by the party who has been induced to act or to abstain from acting thereon.” 66. Based on this, the Panel accepts that the appropriate remedy for equitable estoppel is to rectify or reimburse the actual detriment sustained by the Applicants in relying on the misrepresentation. It is not to compel the FSP to pay the claim, particularly if the Applicants sustained no material prejudice by it. Case No: 245155 Determination Page 14 of 20 67. The detriment being claimed by the Applicants is set out in JL‟s statutory declaration and this states: “Had we been told tha t we were not insured we would have flown immediately to take charge and direct the removal of items from within our house. We would have been on site, making real time decisions regarding what items could be saved intact and what could be salvaged. We would have been on site and would have directed volunteers. As a result, volunteers would not have been left to their own devices to carry out contents removal from the house.” 68. However, the Applicants have provided no explanation about what items the volunteers made decisions on that would have been different to their own. 69. In subsequent submissions, the Applicants state either they, or friends nearby, would have been in a position to salvage goods, such as the lawn mower, air conditioning unit and rugs. Again, the Applicants have provided no detail as to how this could have been achieved or whether it was actually possible. 70. As a result, the Panel is not satisfied the Applicants are able to establish, on the balance of probabilities, that they sustained any actual detriment by the FSP‟s misrepresentation. That is, the Panel cannot be satisfied that the Applicants‟ loss increased as a result of this misrepresentation. 71. In addition, the Panel also notes that the policy imposes the following obligations upon the Appl icants under “Section 9 Claim Information”, particularly section 9.1 “Straight After An Incident Occurs”, in the event a claim is accepted: “As soon as you discover that an incident likely to result in a claim has occurred, you must:  take all reasonable steps to reduce the loss or damage and to prevent any further loss or damage ;  inform the policy immediately following theft or vandalism.” 72. Accordingly, if the Applicants directed or allowed volunteers to dispose of items without any reasonable attempt to determine their potential salvage on a presumption that the claim would be paid, then this would be in breach of this condition. Consequently, the FSP would be entitled to reduce any payment by the extent of the prejudice suffered. 73. Although the Panel accepts there is no evidence to establish this was the case in the circumstances, the point was to illustrate that even if the claim was paid, the Applicants still had an obligation to undertake reasonable steps to prevent additional loss or damage. 74. Further and in the alternative, the Applicants have attempted to demonstrate their detriment by describing what actions they would have undertaken if they were told the claim was not covered. However, the assessment of their detriment based on this outcome is not necessarily correct. Case No: 245155 Determination Page 15 of 20 75. As stated by the FSP, its claims consultants were not trained to provide any claim decisions. Instead, their authorisation was limited to providing information, such as the fact claims would be assessed and determined on their merits and that policyholders should check their policy wording and schedule. 76. Accordingly, the extent of the FSP‟s misrepresentation is that it shoul d have originally informed the Applicants that the claim would still need to be assessed and for the Applicants to consult their policy with respect to whether they are covered. It is therefore based on what the Applicants would have done in this context that detriment is determined. 77. It is unclear whether the Applicants would have undertaken any action in the situation when they were unclear what the claim outcome would be. Although the Applicants may argue that they would have undertaken the same actions because they would have ascertained they were not covered for “river flood”, this is not necessarily corroborated by their conduct. 78. The reason being is that the Applicants have provided numerous arguments about why they consider the policy confusing and the fact the claim is payable. It therefore follows that it is possible the Applicants may not have taken any further action given their expectation that the FSP was liable for the claim. Conclusion 79. In relation to the argument regarding estoppel, the Panel is satisfied, on the balance of probabilities, that the Applicants have established the FSP misrepresented to them that their claim would be accepted after lodgement of the claim. 80. However, the Panel is not satisfied, on the balance of probabilities that the Applicants have been able to establish any actual detriment suffered as a result of the representation. 81. As a result, the Panel does not accept the Applicants are able to discharge their onus in establishing the grounds of equitable estoppel. Can the Applicants establish an insured event? 82. As the Panel is satisfied that the FSP can rely upon the policy, the onus is therefore on the Applicants to establish that the damage sustained was due to a cause covered by the policy. 83. There are three possible insured events that the Applicants‟ claim can fall under, namely:  Water or Other Liquid,  Storm, Rain or Flash Flood, or  Accidental Loss or Damage. Case No: 245155 Determination Page 16 of 20 84. In relation to the latter, the Panel notes this insured event is restricted in the following manner: “By accidental l oss or damage, we mean loss or damage that is caused by an unintended and unexpected event that is not excluded under sections 1, 2 …” 85. Section 1 of the policy contains all of the insured events and within each insured event are a number of exclusions, incl uding “river flood”. As such, even though the Panel accepts the loss would fall within the policy description of accidental loss or damage, the Panel also accepts the FSP is entitled to rely on the exclusion of “river flood” if it is applicable. 86. Accordingly, a substantive issue for the Panel to determine is the source of the water inundation. Water Inundation 87. The FSP is relying on a site specific hydrology report and the reports commissioned by the ICA to establish that the cause of the damage was “river flood”. 88. The site specific report is dated 27 April 2012 and contains the following relevant information:  The property is located about 300m south-west of the Brisbane River. Oxley Creek discharges into the Brisbane River about 500m to the east. There is a small catchment that could drain towards the property, consisting of several adjoining allotments to the west. Ground levels of the property range between 5.2 and 6.7mAHD.  Hourly rainfall depths recorded from Corinda High Alert, located 2.8km south of the property, state 42mm of rainfall was recorded in the 12 hours to 1700 hours on 11 January 2011. The maximum 1 hour rainfall intensity (15mm/hr) occurred in the hour to 1100 hours. Very little rainfall was recorded after 1700 hours on 11 January 2011.  Recorded rainfall intensities were not severe with an Average Recurrence Interval (ARI) of less than 1 year for all durations. Higher rainfall intensities are regularly experienced in Brisbane.  Maximum stormwater runoff at the property would have occurred within 15 minutes of the maximum rainfall intensity. Stormwater runoff would have ceased within 1 hour of the rainfall stopping.  Recorded levels of the Brisbane River were obtained from the Oxley Creek Mouth station, located approximately 500m southeast of the property. The Brisbane River peaked at a level of 9.2mAHD, which would have been sufficient to completely inundate the property. The Brisbane River likely first inundated the lower floor of the propert y at about 2200 hours on 11 January and the upper floor level at about 1100 hours on 12 January. 89. Based on the above, the hydrologist concluded as follows: Case No: 245155 Determination Page 17 of 20 “The initial inundation and the peak inundation of the subject property above floor level were caused by floodwaters from the Brisbane River which initially back flowed up Oxley Creek and the open channels draining the eastern portion of [S] Avenue. Floodwater later also overtopped the Brisbane River bank to the north of the subject property. The property was inundated by „river flood‟ as defined by the policy.” 90. The ICA hydrology report relied upon by the FSP is titled “Flooding in the Brisbane River Catchment January 2011, Volume 2 – Flooding in Brisbane City LGA”. The following information is available within the sub- heading “9.3 Releases from Wivenhoe Dam”:  Large releases were made from Wivenhoe Dam over the period from 0600 hours, possibly as early as 0300 hours on 11 January 2011, until around 0300 hours on 12 January 2011.  Releases from Wivenhoe Dam caused a flood wave in the Brisbane River. As the flood wave moved downstream, backwater flooding occurred along the lower reaches of all tributaries through the Brisbane City LGA.  Floodwaters moving down the Brisbane River were made up of dam release floodwaters from Wivenhoe and floodwaters from Lockyer Creek and the Bremer River.  It was concluded that the dam release flood from Wivenhoe Dam was the immediate cause of flooding along the reach of the Brisbane River downstream of the dam and along tributaries through the Brisbane City LGA. 91. Although the FSP is also relying upon Volume 1 of the ICA report, this is more of a general overview. Volume 2 provides more specific information with respect to suburbs in the Brisbane LGA. 92. The Applicants have not provided any hydrological evidence. However, they consider the FSP cannot rely on the ICA report because it is in general in nature. With respect to the site specific report, they have provided photographs of the property taken on 13 January 2011 that show the second level had not been inundated by that time. Accordingly, they submit the hydrologist‟s prediction about when the second level was inundated is substantively inaccurate and it therefore follows his evidence about the inundation as a whole is unreliable. 93. Although the Panel agrees that this photograph appears to contradict the hydrologist‟s conclusion with respect to the inundation of the second level, this does not infer that the rest of his conclusions or evidence should be dismissed as unreliable. Instead, his opinion should be considered in context of the available evidence. This also applies with the ICA report although the Panel acknowledges this report will contain less probative value due to its general nature. 94. The Applicants have provided information that according to their neighbours, water was lapping at the back door downstairs at 11.30pm on 11 January Case No: 245155 Determination Page 18 of 20 2011. This is relatively consistent with the hydrologist‟s estimation that the property would have been initially inundated at the lower floor level at about 10.00pm that night. 95. The Panel also accepts that the rainfall data relied upon by the hydrologist is appropriate given its proximity to the Applicants‟ property. Based on this data, there was no rainfall for at least five hours preceding the h ydrologist‟s estimate of the property‟s initial inundation. If the Panel were to accept the Applicants‟ evidence regarding the initial inundation, which indicates this occurred at 11.00pm, the time period would increase to six hours. 96. The hydrologist has stated it is highly unlikely stormwater runoff inundation would have occurred at this time due to the lack of rainfall and the fact such inundation is normally contemporaneous to intense bursts of rainfall. The Panel accepts this conclusion as it is both logical and reasonable. 97. The Applicants have also referred to the fact their neighbours believe the water came up through the stormwater drains. This is relatively consistent with the hydrologist‟s conclusion that water backed up from the Brisbane River to the Oxley Creek and then through the open stormwater channels draining east from S Avenue. It is reasonable to accept this water may have also backed up through the stormwater drains along this street and then surcharged out as the levels in the Brisbane River continued to rise. 98. This water cannot be characterised as stormwater runoff given it came from the Brisbane River, particularly given:  It is unlikely that stormwater runoff would be surcharging from stormwater drains five to six hours after the last rainfall and almost 12 hours after the most intense hourly rainfall, and  The levels of the Brisbane River, as measured from the Oxley Creek Mouth station located approximately 500m from the Applicants‟ property, were increasing significantly from 6pm. 99. Given this, the Panel therefore accepts that even if the initial inundation was due to water coming from the stormwater drain or through the open stormwater channel on the east of S Avenue, this water came from the confines of a “water catchment system”, namely the Brisbane River and the Oxley Creek. 100. It therefore follows that as this water eventually overflowed onto normally dry land to inundate the Applicants‟ property, it falls within the policy definition of “river flood”. As a result, the Applicants‟ claim ca nnot be covered under the insured events of either “Accidental Loss or Damage” or “Storm, Rain or Flash Flood.” Water or Other Liquid 101. A peculiarity of the FSP‟s policy is that “river flood” is an exclusion that only operates to the insured event of “Storm, Rain or Flash Flood”. It does not apply as a general exclusion and only extends to the insured event of Case No: 245155 Determination Page 19 of 20 “Accidental Loss or Damage” due to the restriction clause highlighted previously. 102. This interpretation is also consistent with the summary of the cover contained in the PDS section of the policy. The PDS section of the policy summarises many of the benefits and restrictions contained in the policy wording and with respect to the exclusion for “river flood”, it states the following on page 5: “Damage caused by the seas or river flood (see Section 1.12).” 103. Section 1.12 contains the insured event of “Storm, Rain or Flash Flood”. 104. Accordingly, the Panel accepts that the construction of the policy is such that it leaves open the argument that the “river flood” e xclusion does not apply to loss or damage that can be attributable to the insured event of “Water Or Other Liquid”. 105. This insured event is described as follows: “You are insured for damage to your building and/or your contents caused when water or other liquid suddenly escapes from:  …  the - road gutter or curbing - water main or pipe.” 106. The Applicants have attempted to argue that a stormwater drain is a pipe, water main or part of the road gutter and curbing. Accordingly, any water that escaped from the stormwater drain, regardless of the fact that it may have originated from a “water catchment system” is covered by this insured event. 107. In this regard, the Applicants have relied upon information from a neighbour who stated that the water came up from the stormwater drains at the time of the inundation. 108. Neither the FSP nor the hydrologist specifically addressed this point. However, the Panel notes that the hydrologist did conclude that the initial inundation was caused by the Brisbane River backing up into the Oxley Creek and the open stormwater channels on the eastern side of S Avenue. He made no comment that the water then backed up into the stormwater drains along S Avenue before surcharging through them to inundate the Applicants‟ property. 109. The Panel, upon reviewing the available evidence, considers this omission was likely deliberate as it is not probable the Applicants‟ property was initially inundated by water surcharging from a stormwater drain along S Avenue for the following reasons:  According to the top ography map enclosed within the hydrologist‟s report, the rear of the property is lower than the front. This is consistent Case No: 245155 Determination Page 20 of 20 with the photograph taken of the property along the front which shows it to be sloping downwards from the front.  Any runoff from the rear of the property appears to flow towards the open stormwater channels east of S Avenue. The converse would therefore appear to be true.  In the Applicants‟ letter to the FSP dated 19 April 2011, they made reference to water lapping downstairs at 11.30pm from the rear of the property. It is unlikely this water originated from the stormwater drains along S Avenue given the property would have been inundated from the front before reaching the rear.  Water backing up from the open stormwater channels east of S Avenue would likely flow to the rear first given it is lower lying than the stormwater drains along the front. 110. Instead, the Panel accepts that the evidence corroborates the hydrologist‟s conclusion, namely water backed up from the Brisbane River into Oxley Creek and then the stormwater channel east on S Avenue. This water then travelled overland to inundate the rear of the Applicants‟ property given it is lower lying than the front. 111. This is consistent with the evidence of water lapping at the rear of the property and this inundation would have preceded any inundation from the stormwater drains along the front of the property. 112. The Panel does not accept an open stormwater channel could be considered either as a water main or pipe within the natural or ordinary meaning of the term. It therefore follows that any water that escaped from this open stormwater channel would not fall within the insured event of “Water or Other Liquid”. 113. Accordingly, the Applicants are unable to establish their loss falls within this insured event. Determination 114. On the basis of the above analysis, the Panel determines the FSP is entitled to deny the claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.