Text of the determination
Case No: 245150 Determination Page 1 of 9
Case number: 245150
General Insurance - Domestic Insurance - Home Building – FSP Decision –
Denial of claim (Flood)
9 March 2012
Background
1. The Applicants hold a home building insurance policy with the Financial
Services Provider (FSP) that was incepted on 14 May 2010 for a twelve
month period. The building was insured up to a sum of $180,000 and claims
were subject to a $400 excess.
2. The Applicants lodged a claim on 15 January 2011 for damage due to water
inundation following severe weather events in Queensland.
3. Following investigations into the loss, the FSP denied the claim on the basis
the damage was caused by “flood”. The Applicants‟ solicitors have disputed
this.
4. For the sake of simplicity, reference to the Applicants will inc lude their legal
representatives.
5. Both the Applicants and the FSP have provided detailed submissions on the
relevant issues. For the sake of brevity, the Panel will only briefly summarise
these submissions given all of the material made available has been
exchanged with the other party.
Summary of Applicants’ position
6. The Applicants submit the following as alternative arguments in response to
the FSP‟s decision:
The FSP‟s policy failed to clearly inform them that flood was excluded
as required under section 35 of the Insurance Contracts Act 1984 (the
Act), and
The FSP has not provided sufficient information to establish that the
water which inundated their property was “flood”.
7. The Applicants maintain contrary to the FSP‟s submission that they do not
have a daughter and they were not at the property at the time of inundation
as they were in Perth.
Determination
Case No: 245150 Determination Page 2 of 9
8. The Applicants maintain that the general hydrology report referred to in the
FSP‟s response is unreliable and as for the site specific hydrology report,
given it was conducted 6 months after the event, it is also unreliable.
9. The Applicants therefore submit the FSP is required to indemnify them for
this claim.
Summary of FSP’s position
10. In relation to the Applicants‟ contention that it cannot rely on the flood
exclusion pursuant to section 35 of the Act, the FSP has responded in the
following:
It has provided sufficient evidence to establish that the policy document
was sent to the Applicants shortly after inception and well before the
claim;
The “flood” definit ion is clear and unambiguous; and
The exclusion for “flood” can be found by a person of average
intelligence and education.
11. The FSP relies on its assessor‟s report and both a site specific hydrology
report and the report obtained by the Insurance Council of Australia (ICA) to
support its contention that the waters which inundated the Applicants‟
property were “flood”. As such, it is entitled to rely on the following policy
provisions to deny the Applicants‟ claim:
“ Words with special meanings …
„ flood ‟ mean s the inundation of normally dry land by water that has escaped
or has been released from the normal confines of any natural watercourse,
lake or lagoon whether or not altered or modified or of any reservoir, canal or
dam.
…
Insured events we will pay …
9. Storm, rainwater or run- off …
We will not pay for loss or damage:
a. caused by:
flood, or
flood water combined with run-off and/or rainwater;
„ flood ‟ means the inundation of normally dry land by water that has
escaped or has been released from the normal confines of any natural
watercourse, lake or lagoon whether or not altered or modified, or of
any reservoir, canal or dam.
…
When we will not pay a claim under your policy …
2. Unless we state differently in your policy, we will not pay for:
Case No: 245150 Determination Page 3 of 9
a. flood as defined on page 11.”
Issues
12. Whether the FSP clearly informed the Applicants that they were not covered
for flood; and
13. If it did, whether the FSP has established the Applicants‟ loss was caused by
“flood” as defined by the policy.
Reasons for decision
14. Due to the nature of the dispute, the matter has been referred to the Panel
for Determination in line with the Operational Guidelines to the Service‟s
Terms of Reference.
15. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
16. In view of the issues involved in this dispute, a site inspection was arranged
for 2 March 2012. The Panel Chair Ombudsman attended the site, b ut the
Applicants were unable to attend. The Panel Chair Ombudsman was able to
observe that the property was located on a “no through road”. The area is
relatively flat with the property built on stumps with the front of the property
approximately 400mm above ground level. There were no obvious large
storm water drains in the area.
17. It is appropriate to consider the issues under various headings in this
dispute.
Has the FSP clearly informed the Applicants that they were not covered for
flood?
18. Section 35(2) of the Act states that when a claim is made under a
“prescribed contract” for a “prescribed event”, an insurer cannot refuse to
pay the claim unless it can establish that it clearly informed its insured in
writing that it would not cover this event. Sectio n 34 of the Act has defined
the terms “prescribed contract” and “prescribed event” by referring to the
Insurance Contracts Regulations 1985.
19. There is no dispute that contracts of insurance covering a person‟s home is
a “prescribed contract” and damage due to flood is a “prescribed event”. This
is set out under Regulation 10(a)(xi) of the Insurance Contracts Regulations
1985.
20. The onus is therefore on the FSP to establish that it has clearly informed the
Applicants prior to the claim that it would not cover damage caused by
Case No: 245150 Determination Page 4 of 9
“flood”. The FSP, in its submissions, has relied on two leading cases that
considered section 35(2) of the Act, namely Hams and Anor v CGU
Insurance Limited (2002) 12 ANZ Ins Cas 61-525 and Marsh v CGU
Insurance Limited (2004) 13 ANZ Ins Cases 61-594, to substantiate its
position.
21. The FSP provided submissions and documentation to substantiate its
position that the policy and policy schedule were sent to the Applicants‟
address well before the claim arose. The Applicants have never stated the y
did not receive the policy. Instead, their submissions have been based on
other considerations as to why the FSP has not discharged its obligations
under section 35(2) of the Act.
Verbal confirmation
22. The Applicants have relied on section 69 of the Act to argue that it was
reasonably practicable for the FSP to verbally inform them of the flood
exclusion given the following:
The policy was incepted over the phone;
The FSP took the opportunity to emphasise what is covered by the
policy to build trust;
The FSP failed to inform them of any of the exclusions despite having
the clear opportunity of doing so;
As flood is a significant risk in Southeast Queensland, it was
reasonably foreseeable for the FSP to bring this most important and
destructive risk to their attention; and
As the FSP failed to do so, it cannot rely on section 69 of the Act to
discharge its obligation under section 35 of the Act.
23. Providing that notice has been given in writing under section 69 of the Act,
the Panel accepts the FSP is able to rely upon the terms of the policies
subject to the policy itself clearly informing as to the nature of the exclusion.
In this case, the Panel is satisfied that the FSP has complied with its
obligations under section 69 of the Act and has established that it has most
likely provided the policy documentation to the Applicants within the relevant
14 day period.
Flood exclusion
24. The Applicants have then provided a number of arguments, in relation to the
PDS, to the effect , that the FSP‟s exclusion for flood does not satisfy section
35 of the Act, including but not limited to:
The definition of “flood” is too broad ; and
The layout of the policy is insufficient; particularly given the whole flood
exclusion is not available until page 28 of the policy even though “ flood”
is defined on page 11.
Case No: 245150 Determination Page 5 of 9
25. The Applicants have relied on two previous Determinations issued by the
Service (40607 and 41709). The FSP in contrast has relied on a recent
Determination issued by the Service (235302) involving this same policy and
a claim resulting from the same weather event.
26. Pursuant to clause 8.2 of the Terms of Reference, a Panel in determining a
dispute consider what is fair in all the circumstances having regard not only
to relevant legal principles, terms of the policy, good insurance practice, but
also prior determinations were applicable. In determining whether a policy
satisfies the requirements of section 35(2) of the Act, the Panel looks at the
whole inception process including the provision of the policy documentation.
Consistent with the reasoning of Mildren J in the case of Marsh, it is relevant
to consider whether a person of average intelligence and education having
reviewed the Applicants‟ policy would have been able to ascertain that flood
is not covered.
27. With this in mind, the Panel considers that a person of average intelligence
and education, having reviewed the Applicants‟ policy, would easily have
ascertained that flood is not covered given the following:
The policy contains an index on the front;
One of the bolded hea dings contained in this index is “When we will not
pay a claim under your policy”, in which most people would expect to
find any exclusions of cover;
Upon turning to the appropriate page, an insured would find on the
second section that flood is excluded. Further, this clause refers an
insured to page 11 where they can find the definition of “flood”;
The definition of “flood” contained in page 11 is commonly used by
insurers and expressed in relatively simple terms.
In addition to the above:
the FSP has also placed this exclusion with prominence
alongside the insured event of “Storm, rainwater or run - off”
given this is likely to be the most applicable under this insured
event, and
the policy schedule also states “Please Note: Flood is not
covered by this pol icy” on page 3, alongside information about
sums insured and excesses which most insureds will likely
carefully review.
28. In relation to the Applicants‟ submission that the flood definition only contains
half the exclusion, this is misconstrued. The definiti on of “flood” is consistent
throughout the policy and is excluded both under the general exclusions and
under the insured event of “Storm, rainwater or run - off”. The difference is
that under the insured event of “Storm, rainwater or run - off”, there is an
a dditional excluded event, namely “flood water combined with run -off and/or
rainwater”.
Case No: 245150 Determination Page 6 of 9
29. This additional exclusion operates independently of the preceding “flood”
exclusion which is made clear by the use of the conjunctive “or”. Further, the
FSP‟s attempt to include this additional exclusion is consistent with case law
whereby such an exclusion is essentially implied in a policy that excludes
“flood” only.
30. Accordingly, the Panel considers that pursuant to section 35(2) of the Act
and in line with the rationale set out by Mildren J in the case of Marsh, the
FSP has clearly informed the Applicants that flood is not covered.
Assessor’s Report
31. In the FSP‟s submission it relies on its assessor‟s report, specifically it
states: “ …the attending loss adjuster‟s first report dated 27 January 2011 …”
and then quotes:
“ Your insured occupies the premises with her daughter.
On Tuesday 11 January she [Applicant] noticed water entering her back yard
towards the middle of the day ”.
32. Review of the submission reveals that the assessor‟s report is actually dated
22 February 2011, and makes no reference to the Applicants‟ family, nor the
presence of the Applicants at the time of loss. In fact the Applicants ‟ further
submission notes that they have no children and were in fact in Perth at the
time of the loss. Clearly the FSP has relied on a report which is not relevant
to this matter.
33. Although the validity of this submission by the FSP was questioned in the
Applicants ‟ further submission, the FSP has omitted to make any comment
in this respect, or acknowledge its error.
34. The Panel has also reviewed what appears to be the relevant assessor‟s
report, but this is of little probative value. The assessor merely reports:
“…the flood water seems to have come from an over flow of nearby drains.”
And further “ Based on the evidence available at the time of our inspection
we consider that flood waters was (sic) the principle cause of damage.”
35. There is no evidence that the assessor is appropriately qualified to make
such a finding, or indeed on what basis he formed this view. Given there
were no witnesses to the events and no hydrological data was included in
his report, the Panel is inclined to disregard the report.
Water Inundation
36. The FSP has relied on a site specific hydrology report dated 20 July 2011.
This report contained the following observations:
The main floor level of the house is of timber construction and raised
approximately 0.7 metres above that of the surrounding ground levels.
The front room of the house is raised approximately 0.4 metres.
Case No: 245150 Determination Page 7 of 9
The peak depth of water inundation above the main floor level was
approximately 3.5 metres, while the peak depth above the front room
was approximately 3.8 metres.
At its closest, Stable Swamp Creek is located approximately 200
metres to the south of the subject property. This flows in a south
westerly direction, passing under the Ipswich Motorway approximately
750 metres to the south west of the property and joining with Oxley
Creek approximately 1.6 kilometres to the west of the property. Oxley
Creek then flows north to join with the Brisbane River approximately 3.2
kilometres north west of the property.
Based on the nearby Inala and Corinda High School alert gauges,
between 130mm and 150mm of rainfall fell in the vicinity of the property
between 0000 hours on 9 January 2011 and 1800 hours on 11 January
2011. No significant rainfall was recorded near the property after 1800
hours on 11 January 2011.
The maximum rainfall intensity recorded was about 15 mm/hr between
1000 and 1100 hours on 11 January 2011. This intensity was not
exceptional and actually less severe than the corresponding hourly 1 in
1 year ARI design rainfall intensity for Brisbane, which is 36 mm/hr.
No significant local catchment area drains towards the property as
Pegg Road will intercept overland flow from the catchment to the west
of the property and direct this to Stable Swamp Creek. Local run-off
from the subject property will drain to the west as overland flow heading
towards Corella Street and intercepted by that street‟s drainage
system.
The peak rate of stormwater run-off would occur within a short period of
time after peak rainfall intensity (30 minutes or less). This would have
been around 1200 hours on 11 January 2011.
The water level gauge at Stable Swamp Creek stopped recording at
1900 hours on 11 January 2011. Prior to this, the levels recorded were
virtually identical to the Corinda High School alert on Oxley Creek,
which is 2.5 km south west of the property.
Peak water levels in Oxley Creek at the Corinda High School alert and
Brisbane River Oxley Creek junction (3.2km northwest of the property)
occurred between 0100 and 0200 hours on 12 January 2011. The
estimated peak flood level at the house was RL 9.3mAHD, which is
estimated to have occurred at 0300 hours on 12 January 2011.
Based on the recorded water level information, initial inundation
occurred at approximately 2300 hours on 11 January 2011.
37. Based on the above, the hydrologist concluded as follows:
“The peak level of water inundation above the floor of the ho use on the
subject property was certainly caused by flood water overflowing from the
nearby Stable Swamp Creek watercourse … The estimated water levels in
Stable Swamp Creek and Oxley Creek were due to backwater flooding from
the Brisbane River …
Case No: 245150 Determination Page 8 of 9
Stormwater inundation could not have caused the peak levels of water
inundation observed above the floor level of the house …”
38. The FSP has also relied on the hydrology report obtained by the Insurance
Council of Australia (ICA) titled “Flooding in the Brisbane Rive r Catchment
January 2011, Volume 2 – Flooding in Brisbane City LGA”. The following
information is available within the sub- heading “9.3 Releases from Wivenhoe
Dam”:
Large releases were made from Wivenhoe Dam over the period from
0600 hours, possibly as early as 0300 hours on 11 January 2011, until
around 0300 hours on 12 January 2011.
Releases from Wivenhoe Dam caused a flood wave in the Brisbane
River. As the flood wave moved downstream, backwater flooding
occurred along the lower reaches of all tributaries through the Brisbane
City LGA.
Floodwaters moving down the Brisbane River were made up of dam
release floodwaters from Wivenhoe and floodwaters from Lockyer
Creek and the Bremer River.
It was concluded that the dam release flood from Wivenhoe Dam was
the immediate cause of flooding along the reach of the Brisbane River
downstream of the dam and along tributaries through the Brisbane City
LGA.
39. The Applicants have submitted that the FSP should not be able to rely on a
generic hydrology report or a site specific hydrology report commissioned six
months after the event. As such, given the FSP has the burden of proving
the damage was caused by “flood” and it has relied on insufficient evidence,
then the claim should be paid.
40. The Panel does not accept this. The site specific hydrology report does rely
on a set of facts which the Applicants have not disputed, namely the level of
inundation being 3.5 metres above the property‟s floor level and the level of
rainfall recorded in the vicinity of the Applicants‟ pro perty. This is significant
because given the level of rainfall recorded was a maximum of 150mm over
the period between 9 and 11 January 2011, the Panel finds it difficult to
accept this rainfall alone could have caused such a high level of inundation.
41. The Panel accepts it is more probable that given the severe weather events
in Queensland and the peak levels measured in the Oxley Creek and the
junction between Oxley Creek and Brisbane River, backwater flooding
resulted in the Stable Swamp Creek overflowing its banks and inundating the
Applicants‟ property to create the peak level inundation. This falls within the
definition of “flood”.
42. The next question for the Panel to consider is whether the property was
initially inundated by stormwater run-off prior to the waters overflowing from
Stamp Swamp Creek. In this regard, the Panel is not satisfied there is any
evidence to corroborate this possibility given the following:
Case No: 245150 Determination Page 9 of 9
The peak level of rainfall was recorded between 1000 and 1100 hours
on 11 January 2011 at a level of 15mm/hr. Given the property is raised
approximately 400mm above ground level, this rainfall alone would
have been insufficient to inundate the property.
The amount of rainfall that was recorded in the area on the day in
question was not significant, particularly given the highest intensity
recorded for a one hour period was less than a 1 in 1 year ARI design
rainfall intensity for Brisbane. It is reasonable to expect local drainage
characteristics would be able to cater for such rainfall.
There is no eyewitness evidence to suggest the property was
inundated shortly after the peak level of rainfall or even after the rainfall
had ceased in the area at 1800 hours on 11 January 2011.
The hydrologist‟s evidence regarding the ability of the lo cal catchment
and drainage catering for this rainfall is not refuted or unreasonable.
43. Accordingly, the Panel accepts that on the balance of probabilities, the
damage to the Applicants‟ property was caused by “flood”.
Determination
44. On the basis of the available information the Panel determines the FSP was
entitled to deny the Applicants‟ claim as it was caused by “flood” as defined
by the policy.