Text of the determination
Case No: 245118 Determination Page 1 of 14
Case number: 245118
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
24 April 2012
Background
1. The Applicants hold a Home Building and Contents policy with the Financial
Services Provider (FSP) covering a residential home.
2. On or about 11 January 2011 the insured premise was inundated by water.
The Applicants subsequently made a claim on their policy.
3. The FSP declined the claim on the basis that the inundation was caused by
flood which is an excluded event under the policy.
4. The Applicants dispute the declinature on the basis that the inundation arose
from stormwater run-off and/or flash flood. Further, the FSP failed to inform
them of the flood exclusion.
Summary of Applicants ’ position
5. The Applicants rely on the following policy terms and conditions:
“What you are not covered for
....
Damage caused by the seas or river flood (see Section 1.12)
...
Definitions (The Meaning of Some Words)
...
Flash Flood means what occurs when there are heavy, intense bursts of
rainfall usually during thunderstorms where so much water falls in a very short
time that it cannot get away quickly enough and collects and flows into your
home.
But does not include when rainwater on the site;
- Cannot run off into a water catchment system, because it is overflowing in
flood; and
- Mixes with the flood water coming from the water catchment system and
then flows into your home.
Determination
Case No: 245118 Determination Page 2 of 14
...
Rain means water that has fallen from the sky on to your building and the site
but not water from flash flood.
...
River Flood means when water that is normally contained in a water
catchment system increases because of rainfall or snowmelt (whether in the
immediate region or elsewhere) or is deliberately released by an authority and
the water overflows onto land that is not normally covered by water into your
home.
...
Storm means violent weather and high winds, sometimes accompanied by
rain, hail or snow including a cyclone, tornado or willy willy.
...
“wate r catchment system" means;
- A river, creek, other natural watercourse or lake, whether they are in their
original state or have been modified, are named or unnamed, or normally
dry that only run during periods of rain;
- A dam, reservoir, storm water channel or canal.
...
1.12 Storm, Rain or Flash Flood
You are insured for damage to your building and/or your contents caused by
storm, rain or flash flood.
We will not pay for water damage to your building caused by storm or rain
seeping or otherwise entering your building unless the water entered through
an opening in the wall or roof that had been made directly by the storm or rain
or as a direct result of it.”
6. The Applicants rely on section 35 of the Insurance Contracts Act 1984 (“the
Act”). Section 35 of the Act provides that, where a claim is made under a
prescribed contract and the event giving rise to the claim is a prescribed
event in relation to the contract, an insurer may not refuse to pay an amount
equal to the minimum amount of cover set out in the regulations made
pursuant to the Act unless it can prove that before the contract was entered
into, the insurer clearly informed the insured in writing of the relevant
provisions of the contract, or that the insured knew or a reasonable person in
the circumstances could be expected to have known of such provision.
7. The Applicants rely on a flood peak diagram demonstrating the relevant
flood peak travel times. They state that from the Wivenhoe Dam it would
have taken approximately 18.5 hours for the flood peak to travel to the locale
of the Applicants‟ property.
8. The Applicants rely on photographs of the wetlands showing that it was a
park type area and that there was some water in it but small ponded areas.
The wetlands are then depicted as substantially under water. The
photographs of the roadway adjacent to the wetlands depict significant
amounts of water traversing during daylight hours on 11 January 2011.
Case No: 245118 Determination Page 3 of 14
9. The Applicants have provided Council mapping which depicts the
topography and urban stormwater (which is defined as run-off from urban
areas). The mapping does suggest that the Applicants‟ home may be subject
to substantive stormwater run-off.
10. The Applicants rely on a Statutory Declaration from witness “MJ”. The Panel
notes the following from the Statutory Declaration:
MJ returned home from a night shift at 10.30am on 11 January 2011.
MJ notes the Applicants‟ home “being hit with running storm water”.
The water was flowing torrentially down from neighbouring Streets to
the “T Road” where the Applicants‟ residence is located. These streets
are on an incline above T Road.
Water was rising from the wetlands behind the insured premise.
The storm water run-off had a strong current up to 3 metres in the
wetlands behind the insured premise around 11.00am.
MJ notes that at this time, the river had not risen.
The rain continued to fall heavily until 5.00pm.
11. The Applicants rely on a Statutory Declaration from witness “SB”, from which
the Panel notes the following:
SB returned home from work at 9.00am on 11 January 2011 as the
weather was really bad. SB states it was “bucketing down with rain all
day” until it eased in the evening.
The water in the wetlands was quite high and was gushing heavily. The
water had nowhere to go so it was coming into the backyards of the
houses that back onto the wetlands. The water was flowing towards the
Bremer River which is 1km away.
At 10.00am SB went to his neighbour‟s house to warn them of flooding
as the water in the wetlands behind their house was rising quickly.
SB went to the insured premise at 10.30am and he notes the insured
premise is the closest to the Wetlands.
During heavy rain, water in the Wetlands drains away slowly.
Tuesday night (11 January 2011) the water had backed up so much in
the wetlands it was starting to inunda te the Applicants‟ home between
6.00pm-7.00pm.
12. The Applicants state that flood is a prescribed event for the purposes of
section 35 of the Insurance Contracts Act 1984, as defined by section 14 of
the Insurance Contracts Regulations 1985. The Corporations Act 2001
further requires clear, concise and effective disclosure. The Panel notes that
section 37 of the Act has been referred to, however, this does not apply as
the policy is deemed a prescribed contract to which section 37 does not
apply.
Case No: 245118 Determination Page 4 of 14
13. The Applicants submit that the flood exclusion was not immediately apparent
in the Product Disclosure Statement (PDS) and was not flagged in the
Certificate of Insurance. The Applicants were ignorant of the flood exclusion
as a consequence of the PDS construction.
14. The various definitions used in the policy for storm, rain or flash flood make it
difficult for a consumer to determine what kind of rain is covered under the
policy. This is particularly so given the definitions are vague, for example,
storm requires „violent weather‟ but it is unclear whether severe rain falling
on its own may be considered violent weather.
15. The Applicants submit that the techniques used in the PDS prevent a
consumer of average intelligence and education from fully understanding all
of the information contained in the PDS and comprehending the exclusions.
The exclusions in the PDS have not been clearly communicated to them.
16. The Applicants note that in certain circumstances, merely providing the
policy document may not be enough to clearly inform a consumer of the
relevant provisions, such as where there is inadequate attention drawn to
certain provisions. An insurer may be required to do more than merely
provide the policy document to discharge its obligations under section 35 of
the Act:
If the document provisions are complex and confusing; or
Where the language is unclear and ambiguous and the document is set
out in a manner which a person of average intelligence and education
is likely to have difficulty finding and understanding.
17. The Applicants contend the requirement to clearly inform under section 35 of
the Act or to provide clear, concise and effective disclosure under the
Corporations Act has not been met.
18. The Applicants rely on Suncorp General Insurance Australia v Cheihk [1999]
NSWCA 238, Max Hams and 1 Ors v CGU Insurance [2002] NSWSC 273
and Marsh v CGU Insurance Ltd [2004] NTCA1 in support of their
contentions.
19. The Applicants further rely on the Service‟s Determinations numbered 40607
and 41709 relating to the mixing of rainwater with water coming from a
watercourse. In particular the Service‟s criticisms of artificially defining flood
and the fact such policy construction may not be in compliance with section
35 of the Act
20. The Applicants contend that the FSP‟s staff failed in their dut y of utmost
good faith to inform them of the unsuitability of the insurance cover selected.
The Applicants were not informed of the shortcoming of the policy given their
proximity to wetlands and the Bremer River. It was foreseeable by the
Applicants and the FSP that the Bremer River could flood.
Case No: 245118 Determination Page 5 of 14
21. The Applicants contend that they were not adequately informed of the
exclusions in the contract contrary to section 35 of the Act. Accordingly, the
policy should revert to standard cover which includes flood.
22. In the alternative, the Applicants submit that the damage to the insured
property was caused as a result of run-off from a storm and/or flash flood.
23. The rainfall data indicates that heavy rain fell on Tuesday 11 January 2011
and the Applicants contend this caused flash flooding and damage to the
property the same day.
24. The Applicants‟ property is situated at the bottom of a number of hills and
water ran from adjoining higher streets towards their property during the
unusual events of the week commencing Monday 10 January 2011. The
Applicants have identified 12 different stormwater paths flowing that week
which „barrelled down‟ on 11 January 2011 and 12 January 2011 as a result
of a series of heavy storms commencing from 10 January 2011.
25. On 11 January 2011 the Applicants awoke to heavy rain. Rain was flowing
beyond their back fence in the direction of the lower swampier ground, in the
direction of the river. By 3.00pm that day the water flowing down the hill had
widened to flow through the shed but not the home, situated on the highest
part of the block. By 12 January 2011 the water was halfway up the house
and peaked later that day, 300mm below the gutters.
26. Without specific hydrology reports it is impossible to determine whether and
at what point water avalanching down the hill and impacting on the
Applicants‟ house met wa ter which was trapped in the stormwater reserves
which may or may not have backed up. Clearly there was the possibility of
damage caused by stormwater flow occurring prior to any flood.
27. The Applicants object to the FSP‟s reliance on the ICA hydrology repo rt
given the report warns that it is an overview of flooding and should not be
used to ascertain flooding behaviour at the individual property level. Further,
the assessment report is insufficient to be categorised as a site specific
hydrology report. Further, the Applicants refer to FOS Determination
numbered 94-997 in which the Panel determined that where it was not
known which damage was caused by floodwater or rainwater then the
insurer should pay for the whole of the loss.
28. The ICA hydrology report was also written prior to the receipt of information
from the Flood Commission Inquiry or the peak flow time guide. The
Applicants estimate that backwater flooding up the Bremer River would have
hit their suburb at approximately 3.30am on Wednesday 12 January 2011.
The home, however, had been inundated 7 hours prior to this time and the
sheds on the lower part of the property approximately 11.5 hours before this
time. The water affecting the property could not have been the result of the
flood wave from dam releases.
29. The mapping from the Queensland Reconstruction Authority Peak
Inundation Maps show the peak flooding extent in the Ipswich location.
Case No: 245118 Determination Page 6 of 14
However, as the peak flood occurred on 12 January 2011 it does not depict
how the water entered the Applicants‟ prop erty on 11 January 2011.
30. The Applicants contend that if water inundation was not caused by flash
flood then it came from the rising water in the wetlands behind the insured
premise.
31. The Applicants further argue that water coming from the wetlands is not
caught by the flood exclusion. The Applicants have enclosed multiple
Macquarie Dictionary definitions as follows:
“Wetland
noun 1. an area in which the soil is frequently or permanently saturated with
or under water, as a swamp, marsh, etc.
...
Swamp
noun 1. a piece or tract of wet, spongy land; marshy ground; an area of still,
often stagnant water.
2. a tract of soft, wet ground having a growth of certain kinds of trees, but unfit
for cultivation.
...
Marsh
noun a tract of low, wet land; a swamp.
...
Watercourse
noun 1. a stream of water, as a river or brook.
2. the bed of such a stream:
3. a natural channel conveying water.
4. a channel or canal made for the conveyance of water.”
32. The Applicants also submit that the High Court defined a water course as
having defined banks, beds and that it regularly conveys water from one
place to another (Gartner v Kidman (1962) 108 CLR 12).
33. The Applicants contend that any attempt to include a wetland within the
definition of the flood exclusion would fall within the contra proferentum rule.
34. The FSP has provided no evidence on which to base its assertion that the
wetlands are an extension of the Bremer River and therefore a natural
watercourse.
35. The Applicants seek payment under Regulation 14 of the Insurance
Contracts Regulations 1985. Alternatively, the Applicants seek payment for
storm or flash flood under the policy terms and conditions.
Case No: 245118 Determination Page 7 of 14
Summary of FSP’s position
36. The FSP relies on the following additional policy terms and conditions:
“This document contains important information to help you understand this
insurance. It is up to you to choose the cover you need. This document
contains information which can help you decide. Any advice in this document
is of a general nature only and has not considered your objectives, financial
situation or needs. You should carefully consider the information provided
having regard to your personal circumstances to decide if this insurance is
right for you.”
37. The FSP has noted Section 13 of the Act. The Panel notes Section 13 of the
Insurance Contracts Act 1984 provides that a contract of insurance is a
contract based on the utmost good faith, and there is implied in each
contract, a provision requiring each party to act towards the other party, in
respect of any matter arising under or in relation to it, with the utmost good
faith.
38. The FSP relies on an assessor report from which the Panel notes the
following:
The date of loss is listed as 11 January 2011 and the time of discovery
as 13 January 2011.
The insured is listed as being present at the time of the loss and that
the water first entered the property at 1.00pm on 11 January 2011. The
water is described as coming in fast.
The water is described as coming from Ipswich wetlands, Council
drainage area. Water came from all directions.
The insured premise is noted as being 1km from the Bremer River.
The Applicants were required to evacuate the property at 2.00pm.
The property has stump foundations and there is a 1.5m distance
between floor and ground level.
The water peaked at 19.5m and the home remained inundated by
water for 48 hours.
39. The FSP relies on a map from the Queensland Reconstruction Authority
which depicts the insured premise as being within the flood extent of the
Bremer River.
40. The FSP has enclosed the ICA Hydrology Report Volume 3 for flooding in
the local government area of Ipswich.
41. The FSP contends that the sources of water which inundated the Applicants‟
home were the Bremer River and the wetlands to the rear of their home.
Both these sources of inundation fall under the exc lusion of „river flood‟. The
Bremer River is clearly a natural watercourse and overflow from it would be
deemed water that is normally contained in a water catchment system that
increases because of rainfall and overflows onto land that is not normally
Case No: 245118 Determination Page 8 of 14
covered by water. Similarly, the wetlands falls under the definition of water
catchment system as a natural watercourse which is normally dry and only
runs during periods of rain. Consequently, any water overflowing from the
wetlands comes within the policy definition of river flood.
42. The FSP dispute that water „avalanching down the hill‟ can be categorised
as flash flood under the policy. The inundation map from the reconstruction
authority clearly demonstrates the insured premise was inundated by flood
water from the Bremer River. Further, the insured property backs on to
wetlands and is in close proximity to the Bremer River.
43. The water level was 3.4 metres (with a floor level from the ground of 1.5
metres and an inundation level to the home of 1.9 metres). The extreme
height of the inundation would be considered grossly excessive for
inundation by stormwater, although it is consistent with water which has
overflowed the Bremer River and the wetlands.
44. The FSP notes the evidence in respect of the water levels by itself does not
rule out the possibility that the premise was first inundated by flash flood.
However the ICA report confirms that the:
“Intense rainfall occurred over the south -western and western of the Bremer
River catchment before and after subsequent waterway flooding...the severity
of short duration rainfall across other areas of Ipswich City LGA was generally
inconsequential (less than 1 year ARI)”
45. The rainfall gauges nearest to the insured premises are recorded on page 38
of the ICA report and record the rainfall intensities at both weather stations,
for all periods up to two hours, were less than one year ARI. The rainfall of
such intensity is generally considered incapable of overwhelming the local
drainage infrastructure and thereby causing sufficient overland flow to result
in „flash flooding‟.
46. The version of events provided by the Applicants and the witnesses make it
clear that the home was inundated by water which rose up from the wetlands
and then into the Applicants‟ home building sometime after 3.00pm on 11
January 2011. It is irrelevant to determine whether the Bremer River
overflowed into the wetlands or the wetlands were waterlogged due to heavy
rainfall over the weeks as both of these circumstances are covered by the
flood exclusion as they are both overflowing watercourses. Obtaining a
hydrology report is therefore unnecessary as the source of water is excluded
on either factual circumstance.
47. The FSP notes the Applicants‟ map but considers the map demonstrates
that a stormwater flow run s to the west of the Applicants‟ home prior to
diverting into the wetlands located at the rear of the property. However, the
water escaping back out of the wetlands would still be considered flood.
48. The FSP believes that the witness, MJ, meant that stormwater from the
nearby hills had simply entered the property – which is not the same as the
dwelling being inundated by stormwater.
Case No: 245118 Determination Page 9 of 14
49. The FSP contends the Applicants attempt to apply the contra proferentum
rule creates the ambiguity it was designed to resolve.
50. The FSP has not breached its duty to act with the utmost good faith towards
the Applicants by not advising them to purchase insurance that covers flood.
The PDS clearly confirms that it is the Applicants‟ responsibility to determine
whether the cover is appropriate for their personal circumstances. There is
no obligation on the FSP to provide personal advice to the Applicants.
51. The FSP has not breached its obligation under section 35 of the Act as
alleged by the Applicants.
52. The FSP contends that the case law by and large holds that the obligation to
clearly inform is met by providing the PDS. The FSP‟s PDS provides an
orderly plain English account of the cover and exclusions and does not
employ technical jargon. The flood exclusion provides multiple references to
the flood exclusions.
53. The distinction between river flood and flash flood may be factually complex
but the policy draws a clear line between the two events. Further, an
individual of average intelligence and education who read all the different
definitions would be able to understand same.
Issues
54. Whether the FSP is entitled to rely on the policy terms and conditions.
55. Whether the FSP has appropriately declined the Applicants‟ claim for
damage arising from water inundation.
Reasons for decision
56. There has been an exchange of material between each party, and the Panel
is satisfied each party has had an opportunity to reply to the issues raised.
57. The Panel has read each party‟s submissions and materials and will only
refer to the relevant submissions and materials raised.
58. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in insurance industry matters and a
representative with extensive experience in consumer claims.
59. The Panel Chair Ombudsman attended on site and met with the Applicants
and representatives of the FSP.
60. The Panel considers there are two discrete issues raised by this dispute and
it will deal with each separately below.
Case No: 245118 Determination Page 10 of 14
Whether the FSP is entitled to rely on the policy terms and condit ions
61. The Panel notes that the Applicants do not dispute receiving the policy
documents – including the Product Disclosure Statement (PDS). The
Applicants and FSP dispute that the policy wording satisfies the
requirements of section 35 of the Act or the Corporations Act 2011.
62. The Applicants and FSP have both relied on several common law cases
regarding this particular issue including Suncorp General Insurance Australia
v Cheihk [1999] NSWCA 238, Max Hams and 1 Ors v CGU Insurance [2002]
NSWSC 273 and Marsh v CGU Insurance Ltd [2004] NTCA1 in support of
their respective contentions.
63. It is the Applicants‟ responsibility to read the policy and relevant material to
ensure they had obtained the appropriate cover for their needs. In fact, the
FSP must be appropriately licensed to provide personalised insurance
advice of the type suggested by the Applicants. As the FSP is not so
licensed the provision of same would be improper.
64. In the Panel‟s view, when looking at whether an Applicant has been clearly
informed for the purposes of section 35 of the ICA, it is appropriate to look at
the whole inception process. There is nothing in this case to disprove the
fact that the Applicants had received the PDS documentation. Section 35 in
most circumstances will be satisfied where the appropriate PDS has been
supplied. This has been well recognised by the courts. In certain
circumstances where there is ambiguity or confusion, the provision of the
PDS itself will not be sufficient. In these circumstances it is necessary to look
at the whole process to determine whether the Applicants or a reasonable
person in the circumstances would have been clearly informed.
65. The Panel has reviewed the PDS. Whilst the wording of the PDS is quite
broad, it is apparent from a reading of the documentation that it is indexed,
has appropriate references to the various definitions relied upon with respect
to storm, flash flooding and flood and that it clearly identifies that it is not
intended to cover flood.
66. Although the Applicants have suggested they misunderstood the extent of
cover, the Panel is satisfied that the policy wording is sufficiently clear to
establish that the Applicants or a reasonable person in the circumstances
would have been clearly informed of the extent of the policy cover in
accordance with section 35 of the Insurance Contracts Act 1984 .
67. Accordingly, the FSP is entitled to rely on the terms and conditions set out in
the policy.
Whether the FSP has appropriately declined the Applicants ’ claim for damage
arising from water inundation.
68. The Panel notes the following information does not appear to be disputed:
The Applicants had a valid policy covering the residence with the FSP.
Case No: 245118 Determination Page 11 of 14
There was an extreme storm event over the locale of the insured
premise between 9 - 11 January 2011.
The insured premise is adjacent to a wetlands area.
The insured premise is approximately 1km from the Bremer River.
The insured premise is subject to stormwater run-off due to its
particular locale at the bottom of an incline and proximity to stormwater
paths.
The flood peak travel time from the Wivenhoe Dam to the Bremer River
in the Applicants‟ locale was approximately 18.5 hours. The Applicants‟
estimate of the flood peak in their locale of 3.30am on 12 January 2011
has not been challenged by the FSP.
The two hour rainfall data suggests only a 1-ARI.
There is no site specific hydrology report for the inundation of the
Applicants‟ property.
69. The Panel notes the witness evidence suggests the rainfall was substantial
on 11 January 2011. Further, the stormwater run-off was running down
several streets in the vicinity of the Applicants‟ premise and also coming
from the wetlands area behind their home.
70. The witness evidence in this regard from MJ indicates that the wetlands had
3 metres of water at 11.00am at a time when the river had not yet risen.
Further, that rain continued to fall until 5.00pm.
71. In respect to the question of rainfall, the FSP relies upon the ICA reports and
the relevant Bureau of Meteorology data contained in those reports. The
FSP simply refers the reader to the ICA reports, rather than extracting and
presenting the relevant data from those reports. Having carefully examined
the reports, the Panel is satisfied that there is great variance across various
recording stations and in those circumstances; the Panel accepts the
evidence of MJ that the rain continued to fall heavily until 5.00pm. The
evidence is that by 3.00pm on 11 January 2011 the water flowing down the
hill had widened to flow through the shed but not the home.
72. The Panel notes, therefore, that the shed was inundated some 11½ hours
prior to the peak flow estimation of the Bremer River.
73. The witness evidence from SB is that it was raining heavily all day. He then
saw water in the wetlands was high and gushing heavily. The water
commenced inundating the backyards of houses that back onto the
neighbours and he noted the insured premise was inundated between
6.00pm-7.00pm.
74. The witness evidence appears consistent with the Applicants‟ evidence that
the water first entered the rear of the property at 1.00pm on 11 January 2011
and came from the wetlands. The water rose quickly and subsequently
inundated the Applicants‟ premises between 6.00pm and 7.00pm. The
assessor report also notes water came from Council drainage areas and
Case No: 245118 Determination Page 12 of 14
from all directions. This would corroborate the information the Applicants
provided of being in the pathway of urban run-off areas.
75. The Panel notes, therefore, that the Applicants‟ premises were inundated
some 8½ hours prior to the peak flow estimation of the Bremer River.
76. The Panel also notes there is no site specific hydrology report and the ICA
Hydrology Reports cannot necessarily be relied upon as an appropriate
basis to determine the source of inundation in circumstances of potential
multiple inundation sources.
77. Based on the specific witness evidence, the Panel accepts that the water
which inundated the insured premise was a combination of stormwater run-
off and water from the wetlands. It appears the water commenced inundating
the property and then the residence, prior to the river breaking its banks and
well before the flood peak from the Wivenhoe Dam Release.
78. The question before the Panel is whether the water which came from the
wetlands should be considered water from a water catchment system under
the policy terms and conditions.
79. The Panel does not consider the wetlands could be described as a dam,
reservoir, stormwater channel or canal as it is not built for the purpose of
storing or conveying water. It is further not a river, creek or lake (whether
normally dry until it runs during a period of rain) as the wetlands are not a
defined channel for water which has tributaries and has no defined banks
which would be indicative of a lake.
80. The Panel must now consider whether a wetlands should be considered as
“other natural watercourse”.
81. First, the Panel accepts the plain English meaning of a „wetland' as provided
by the Applicants as to what a wetland is. A wetland is a frequently or
permanently saturated tract of land such as a swamp or marsh.
82. Second, the Panel has also considered the plain English meaning of
watercourse which suggests that it is a natural channel conveying water or
made for the conveyance of water.
83. The Panel has also reviewed the case of Gartner v Kidman [1962] HCA 27
and notes the following:
The case held there was a difference between natural and artificial
watercourses as well as the natural flow of surface water.
The Court relied on the case of Lyons v Winter (1899) 25 VLR which
held that to constitute a watercourse, there must be a stream of water
flowing in a defined channel or between something in the nature of
banks.
The Court further noted the case of Cooper v The Corporation of
Sydeney (1853) 1 Legge 756 which distinguished between a regular
stream between banks and the occasional overflow of a swamp.
Case No: 245118 Determination Page 13 of 14
The Court further considered with some approval the American case of
Barkley v Wilcox (1881) 86 NY 140 which stated “Depressions in the
soil to which the surface water from adjacent lands naturally finds it way
and is discharged into some natural outlet are not thereby made
watercourses” .
84. Based on both common law and the plain English meaning of watercourse
as opposed to wetlands, the Panel accepts that a wetlands is not necessarily
a watercourse. There is no evidence that the wetlands has a stream of wa ter
flowing in a defined channel or between something in the nature of banks.
Further, the photographs of the wetlands, as confirmed by the Panel Chair
Ombudsman‟s site visit, depict it as more like parkland with a depression
which is again different from a watercourse. A depression in the ground
which receives stormwater run-off is not a watercourse.
85. The Panel therefore accepts that the wetlands in this case is not a
watercourse and accordingly overflow from same is not automatically
excluded under the flood and water catchment system definition in the
policy. The Panel is unable to determine the actual basis the FSP
determined that the wetlands should be defined a watercourse under its
policy terms and conditions.
86. The Panel notes that there was a „storm event‟ which is capable of falling
within the policy definition and cover. Further, that water has collected in the
wetlands and generally around the property and flowed into the insured
premise resulting in substantive inundation. The overflow of the wetlands
could well be deemed stormwater run-off or flash flood.
87. The Panel has no evidence indicating that the stormwater run-off and/or
flash flood would actually have mixed with riverine flood water prior to
inundating the property. The evidence suggests the i nitial inundation
occurred at a time when the Bremer River had not broken its banks and well
prior to the flood peak travel time from the Wivenhoe Dam release. Further,
as there is no evidence of surcharging storm water drains there is no
evidence that riverine flood mingled with the stormwater run-off. In addition
to this, there is no information suggesting a link between the wetlands and
the Bremer River despite the assertion by the FSP. Accordingly, the Panel
cannot find on the evidence that the initial inundation is excluded under the
policy.
88. The Panel has no evidence as to how deep the stormwater inundation was
prior to potential overflow from the Bremer River. There is no evidence
demonstrating the exclusion or what portion of the damage was caused by
the exclusion. There is, accordingly, no basis on which the Panel should
restrict the loss to a certain depth or percentage of loss.
89. Accordingly, the Panel is of the opinion that the FSP has not discharged its
onus to establish that the loss was attributab le to flooding of the Bremer
River. Whilst it is entirely possible that this was the case, the FSP carries the
burden of establishing this. As it has not, the policy must respond to the
Applicants‟ loss.
Case No: 245118 Determination Page 14 of 14
Determination
90. On the basis of the available information the Panel determines that the FSP
was entitled to rely on the policy terms and conditions.
91. The Panel further determines that the FSP was not entitled to decline the
Applicants‟ claim for damage arising from water inundation.
92. On the basis of the available information the Panel determines that the FSP
is liable to pay the Applicants‟ claim as damage which arose from storm
water and/or flash flood. The Panel has insufficient information regarding the
loss incurred by the Applicants. Once the Applicants have indicated their
acceptance of this Determination, the FSP is directed to urgently enter into
discussions as to final quantum. Pursuant to its fair and reasonable
mandate, recognising the elapse of time since the storm and/or flash flood,
the Panel further determines the Applicants are to be cash settled, as soon
as a final figure has been mutually agreed.
93. The FSP is to pay interest on the final settlement amount at the rate
specified by the Insurance Contracts Act from the date of denial of the claim
to the date of settlement.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.