Home / Financial Firm (Unknown - Insurer) / Determination 245118

Determination 245118

Denial of water inundation claim (river flood exclusion)

FirmFinancial Firm (Unknown - Insurer)
Decided2012-04-30
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicants' home was inundated on 11 January 2011 and the FSP declined the claim as river flood. AFCA found the wetlands were not a watercourse and the FSP did not prove the loss was flood, so the claim is payable as storm water or flash flood, with the amount to be settled.

The FSP did not discharge its onus to show the initial inundation came from a water catchment system, as the wetlands were not a watercourse and the evidence showed inundation before the river flood peak.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 245118 Determination Page 1 of 14 Case number: 245118 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim 24 April 2012 Background 1. The Applicants hold a Home Building and Contents policy with the Financial Services Provider (FSP) covering a residential home. 2. On or about 11 January 2011 the insured premise was inundated by water. The Applicants subsequently made a claim on their policy. 3. The FSP declined the claim on the basis that the inundation was caused by flood which is an excluded event under the policy. 4. The Applicants dispute the declinature on the basis that the inundation arose from stormwater run-off and/or flash flood. Further, the FSP failed to inform them of the flood exclusion. Summary of Applicants ’ position 5. The Applicants rely on the following policy terms and conditions: “What you are not covered for .... Damage caused by the seas or river flood (see Section 1.12) ... Definitions (The Meaning of Some Words) ... Flash Flood means what occurs when there are heavy, intense bursts of rainfall usually during thunderstorms where so much water falls in a very short time that it cannot get away quickly enough and collects and flows into your home. But does not include when rainwater on the site; - Cannot run off into a water catchment system, because it is overflowing in flood; and - Mixes with the flood water coming from the water catchment system and then flows into your home. Determination Case No: 245118 Determination Page 2 of 14 ... Rain means water that has fallen from the sky on to your building and the site but not water from flash flood. ... River Flood means when water that is normally contained in a water catchment system increases because of rainfall or snowmelt (whether in the immediate region or elsewhere) or is deliberately released by an authority and the water overflows onto land that is not normally covered by water into your home. ... Storm means violent weather and high winds, sometimes accompanied by rain, hail or snow including a cyclone, tornado or willy willy. ... “wate r catchment system" means; - A river, creek, other natural watercourse or lake, whether they are in their original state or have been modified, are named or unnamed, or normally dry that only run during periods of rain; - A dam, reservoir, storm water channel or canal. ... 1.12 Storm, Rain or Flash Flood You are insured for damage to your building and/or your contents caused by storm, rain or flash flood. We will not pay for water damage to your building caused by storm or rain seeping or otherwise entering your building unless the water entered through an opening in the wall or roof that had been made directly by the storm or rain or as a direct result of it.” 6. The Applicants rely on section 35 of the Insurance Contracts Act 1984 (“the Act”). Section 35 of the Act provides that, where a claim is made under a prescribed contract and the event giving rise to the claim is a prescribed event in relation to the contract, an insurer may not refuse to pay an amount equal to the minimum amount of cover set out in the regulations made pursuant to the Act unless it can prove that before the contract was entered into, the insurer clearly informed the insured in writing of the relevant provisions of the contract, or that the insured knew or a reasonable person in the circumstances could be expected to have known of such provision. 7. The Applicants rely on a flood peak diagram demonstrating the relevant flood peak travel times. They state that from the Wivenhoe Dam it would have taken approximately 18.5 hours for the flood peak to travel to the locale of the Applicants‟ property. 8. The Applicants rely on photographs of the wetlands showing that it was a park type area and that there was some water in it but small ponded areas. The wetlands are then depicted as substantially under water. The photographs of the roadway adjacent to the wetlands depict significant amounts of water traversing during daylight hours on 11 January 2011. Case No: 245118 Determination Page 3 of 14 9. The Applicants have provided Council mapping which depicts the topography and urban stormwater (which is defined as run-off from urban areas). The mapping does suggest that the Applicants‟ home may be subject to substantive stormwater run-off. 10. The Applicants rely on a Statutory Declaration from witness “MJ”. The Panel notes the following from the Statutory Declaration:  MJ returned home from a night shift at 10.30am on 11 January 2011. MJ notes the Applicants‟ home “being hit with running storm water”.  The water was flowing torrentially down from neighbouring Streets to the “T Road” where the Applicants‟ residence is located. These streets are on an incline above T Road.  Water was rising from the wetlands behind the insured premise.  The storm water run-off had a strong current up to 3 metres in the wetlands behind the insured premise around 11.00am.  MJ notes that at this time, the river had not risen.  The rain continued to fall heavily until 5.00pm. 11. The Applicants rely on a Statutory Declaration from witness “SB”, from which the Panel notes the following:  SB returned home from work at 9.00am on 11 January 2011 as the weather was really bad. SB states it was “bucketing down with rain all day” until it eased in the evening.  The water in the wetlands was quite high and was gushing heavily. The water had nowhere to go so it was coming into the backyards of the houses that back onto the wetlands. The water was flowing towards the Bremer River which is 1km away.  At 10.00am SB went to his neighbour‟s house to warn them of flooding as the water in the wetlands behind their house was rising quickly.  SB went to the insured premise at 10.30am and he notes the insured premise is the closest to the Wetlands.  During heavy rain, water in the Wetlands drains away slowly.  Tuesday night (11 January 2011) the water had backed up so much in the wetlands it was starting to inunda te the Applicants‟ home between 6.00pm-7.00pm. 12. The Applicants state that flood is a prescribed event for the purposes of section 35 of the Insurance Contracts Act 1984, as defined by section 14 of the Insurance Contracts Regulations 1985. The Corporations Act 2001 further requires clear, concise and effective disclosure. The Panel notes that section 37 of the Act has been referred to, however, this does not apply as the policy is deemed a prescribed contract to which section 37 does not apply. Case No: 245118 Determination Page 4 of 14 13. The Applicants submit that the flood exclusion was not immediately apparent in the Product Disclosure Statement (PDS) and was not flagged in the Certificate of Insurance. The Applicants were ignorant of the flood exclusion as a consequence of the PDS construction. 14. The various definitions used in the policy for storm, rain or flash flood make it difficult for a consumer to determine what kind of rain is covered under the policy. This is particularly so given the definitions are vague, for example, storm requires „violent weather‟ but it is unclear whether severe rain falling on its own may be considered violent weather. 15. The Applicants submit that the techniques used in the PDS prevent a consumer of average intelligence and education from fully understanding all of the information contained in the PDS and comprehending the exclusions. The exclusions in the PDS have not been clearly communicated to them. 16. The Applicants note that in certain circumstances, merely providing the policy document may not be enough to clearly inform a consumer of the relevant provisions, such as where there is inadequate attention drawn to certain provisions. An insurer may be required to do more than merely provide the policy document to discharge its obligations under section 35 of the Act:  If the document provisions are complex and confusing; or  Where the language is unclear and ambiguous and the document is set out in a manner which a person of average intelligence and education is likely to have difficulty finding and understanding. 17. The Applicants contend the requirement to clearly inform under section 35 of the Act or to provide clear, concise and effective disclosure under the Corporations Act has not been met. 18. The Applicants rely on Suncorp General Insurance Australia v Cheihk [1999] NSWCA 238, Max Hams and 1 Ors v CGU Insurance [2002] NSWSC 273 and Marsh v CGU Insurance Ltd [2004] NTCA1 in support of their contentions. 19. The Applicants further rely on the Service‟s Determinations numbered 40607 and 41709 relating to the mixing of rainwater with water coming from a watercourse. In particular the Service‟s criticisms of artificially defining flood and the fact such policy construction may not be in compliance with section 35 of the Act 20. The Applicants contend that the FSP‟s staff failed in their dut y of utmost good faith to inform them of the unsuitability of the insurance cover selected. The Applicants were not informed of the shortcoming of the policy given their proximity to wetlands and the Bremer River. It was foreseeable by the Applicants and the FSP that the Bremer River could flood. Case No: 245118 Determination Page 5 of 14 21. The Applicants contend that they were not adequately informed of the exclusions in the contract contrary to section 35 of the Act. Accordingly, the policy should revert to standard cover which includes flood. 22. In the alternative, the Applicants submit that the damage to the insured property was caused as a result of run-off from a storm and/or flash flood. 23. The rainfall data indicates that heavy rain fell on Tuesday 11 January 2011 and the Applicants contend this caused flash flooding and damage to the property the same day. 24. The Applicants‟ property is situated at the bottom of a number of hills and water ran from adjoining higher streets towards their property during the unusual events of the week commencing Monday 10 January 2011. The Applicants have identified 12 different stormwater paths flowing that week which „barrelled down‟ on 11 January 2011 and 12 January 2011 as a result of a series of heavy storms commencing from 10 January 2011. 25. On 11 January 2011 the Applicants awoke to heavy rain. Rain was flowing beyond their back fence in the direction of the lower swampier ground, in the direction of the river. By 3.00pm that day the water flowing down the hill had widened to flow through the shed but not the home, situated on the highest part of the block. By 12 January 2011 the water was halfway up the house and peaked later that day, 300mm below the gutters. 26. Without specific hydrology reports it is impossible to determine whether and at what point water avalanching down the hill and impacting on the Applicants‟ house met wa ter which was trapped in the stormwater reserves which may or may not have backed up. Clearly there was the possibility of damage caused by stormwater flow occurring prior to any flood. 27. The Applicants object to the FSP‟s reliance on the ICA hydrology repo rt given the report warns that it is an overview of flooding and should not be used to ascertain flooding behaviour at the individual property level. Further, the assessment report is insufficient to be categorised as a site specific hydrology report. Further, the Applicants refer to FOS Determination numbered 94-997 in which the Panel determined that where it was not known which damage was caused by floodwater or rainwater then the insurer should pay for the whole of the loss. 28. The ICA hydrology report was also written prior to the receipt of information from the Flood Commission Inquiry or the peak flow time guide. The Applicants estimate that backwater flooding up the Bremer River would have hit their suburb at approximately 3.30am on Wednesday 12 January 2011. The home, however, had been inundated 7 hours prior to this time and the sheds on the lower part of the property approximately 11.5 hours before this time. The water affecting the property could not have been the result of the flood wave from dam releases. 29. The mapping from the Queensland Reconstruction Authority Peak Inundation Maps show the peak flooding extent in the Ipswich location. Case No: 245118 Determination Page 6 of 14 However, as the peak flood occurred on 12 January 2011 it does not depict how the water entered the Applicants‟ prop erty on 11 January 2011. 30. The Applicants contend that if water inundation was not caused by flash flood then it came from the rising water in the wetlands behind the insured premise. 31. The Applicants further argue that water coming from the wetlands is not caught by the flood exclusion. The Applicants have enclosed multiple Macquarie Dictionary definitions as follows: “Wetland noun 1. an area in which the soil is frequently or permanently saturated with or under water, as a swamp, marsh, etc. ... Swamp noun 1. a piece or tract of wet, spongy land; marshy ground; an area of still, often stagnant water. 2. a tract of soft, wet ground having a growth of certain kinds of trees, but unfit for cultivation. ... Marsh noun a tract of low, wet land; a swamp. ... Watercourse noun 1. a stream of water, as a river or brook. 2. the bed of such a stream: 3. a natural channel conveying water. 4. a channel or canal made for the conveyance of water.” 32. The Applicants also submit that the High Court defined a water course as having defined banks, beds and that it regularly conveys water from one place to another (Gartner v Kidman (1962) 108 CLR 12). 33. The Applicants contend that any attempt to include a wetland within the definition of the flood exclusion would fall within the contra proferentum rule. 34. The FSP has provided no evidence on which to base its assertion that the wetlands are an extension of the Bremer River and therefore a natural watercourse. 35. The Applicants seek payment under Regulation 14 of the Insurance Contracts Regulations 1985. Alternatively, the Applicants seek payment for storm or flash flood under the policy terms and conditions. Case No: 245118 Determination Page 7 of 14 Summary of FSP’s position 36. The FSP relies on the following additional policy terms and conditions: “This document contains important information to help you understand this insurance. It is up to you to choose the cover you need. This document contains information which can help you decide. Any advice in this document is of a general nature only and has not considered your objectives, financial situation or needs. You should carefully consider the information provided having regard to your personal circumstances to decide if this insurance is right for you.” 37. The FSP has noted Section 13 of the Act. The Panel notes Section 13 of the Insurance Contracts Act 1984 provides that a contract of insurance is a contract based on the utmost good faith, and there is implied in each contract, a provision requiring each party to act towards the other party, in respect of any matter arising under or in relation to it, with the utmost good faith. 38. The FSP relies on an assessor report from which the Panel notes the following:  The date of loss is listed as 11 January 2011 and the time of discovery as 13 January 2011.  The insured is listed as being present at the time of the loss and that the water first entered the property at 1.00pm on 11 January 2011. The water is described as coming in fast.  The water is described as coming from Ipswich wetlands, Council drainage area. Water came from all directions.  The insured premise is noted as being 1km from the Bremer River.  The Applicants were required to evacuate the property at 2.00pm.  The property has stump foundations and there is a 1.5m distance between floor and ground level.  The water peaked at 19.5m and the home remained inundated by water for 48 hours. 39. The FSP relies on a map from the Queensland Reconstruction Authority which depicts the insured premise as being within the flood extent of the Bremer River. 40. The FSP has enclosed the ICA Hydrology Report Volume 3 for flooding in the local government area of Ipswich. 41. The FSP contends that the sources of water which inundated the Applicants‟ home were the Bremer River and the wetlands to the rear of their home. Both these sources of inundation fall under the exc lusion of „river flood‟. The Bremer River is clearly a natural watercourse and overflow from it would be deemed water that is normally contained in a water catchment system that increases because of rainfall and overflows onto land that is not normally Case No: 245118 Determination Page 8 of 14 covered by water. Similarly, the wetlands falls under the definition of water catchment system as a natural watercourse which is normally dry and only runs during periods of rain. Consequently, any water overflowing from the wetlands comes within the policy definition of river flood. 42. The FSP dispute that water „avalanching down the hill‟ can be categorised as flash flood under the policy. The inundation map from the reconstruction authority clearly demonstrates the insured premise was inundated by flood water from the Bremer River. Further, the insured property backs on to wetlands and is in close proximity to the Bremer River. 43. The water level was 3.4 metres (with a floor level from the ground of 1.5 metres and an inundation level to the home of 1.9 metres). The extreme height of the inundation would be considered grossly excessive for inundation by stormwater, although it is consistent with water which has overflowed the Bremer River and the wetlands. 44. The FSP notes the evidence in respect of the water levels by itself does not rule out the possibility that the premise was first inundated by flash flood. However the ICA report confirms that the: “Intense rainfall occurred over the south -western and western of the Bremer River catchment before and after subsequent waterway flooding...the severity of short duration rainfall across other areas of Ipswich City LGA was generally inconsequential (less than 1 year ARI)” 45. The rainfall gauges nearest to the insured premises are recorded on page 38 of the ICA report and record the rainfall intensities at both weather stations, for all periods up to two hours, were less than one year ARI. The rainfall of such intensity is generally considered incapable of overwhelming the local drainage infrastructure and thereby causing sufficient overland flow to result in „flash flooding‟. 46. The version of events provided by the Applicants and the witnesses make it clear that the home was inundated by water which rose up from the wetlands and then into the Applicants‟ home building sometime after 3.00pm on 11 January 2011. It is irrelevant to determine whether the Bremer River overflowed into the wetlands or the wetlands were waterlogged due to heavy rainfall over the weeks as both of these circumstances are covered by the flood exclusion as they are both overflowing watercourses. Obtaining a hydrology report is therefore unnecessary as the source of water is excluded on either factual circumstance. 47. The FSP notes the Applicants‟ map but considers the map demonstrates that a stormwater flow run s to the west of the Applicants‟ home prior to diverting into the wetlands located at the rear of the property. However, the water escaping back out of the wetlands would still be considered flood. 48. The FSP believes that the witness, MJ, meant that stormwater from the nearby hills had simply entered the property – which is not the same as the dwelling being inundated by stormwater. Case No: 245118 Determination Page 9 of 14 49. The FSP contends the Applicants attempt to apply the contra proferentum rule creates the ambiguity it was designed to resolve. 50. The FSP has not breached its duty to act with the utmost good faith towards the Applicants by not advising them to purchase insurance that covers flood. The PDS clearly confirms that it is the Applicants‟ responsibility to determine whether the cover is appropriate for their personal circumstances. There is no obligation on the FSP to provide personal advice to the Applicants. 51. The FSP has not breached its obligation under section 35 of the Act as alleged by the Applicants. 52. The FSP contends that the case law by and large holds that the obligation to clearly inform is met by providing the PDS. The FSP‟s PDS provides an orderly plain English account of the cover and exclusions and does not employ technical jargon. The flood exclusion provides multiple references to the flood exclusions. 53. The distinction between river flood and flash flood may be factually complex but the policy draws a clear line between the two events. Further, an individual of average intelligence and education who read all the different definitions would be able to understand same. Issues 54. Whether the FSP is entitled to rely on the policy terms and conditions. 55. Whether the FSP has appropriately declined the Applicants‟ claim for damage arising from water inundation. Reasons for decision 56. There has been an exchange of material between each party, and the Panel is satisfied each party has had an opportunity to reply to the issues raised. 57. The Panel has read each party‟s submissions and materials and will only refer to the relevant submissions and materials raised. 58. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in insurance industry matters and a representative with extensive experience in consumer claims. 59. The Panel Chair Ombudsman attended on site and met with the Applicants and representatives of the FSP. 60. The Panel considers there are two discrete issues raised by this dispute and it will deal with each separately below. Case No: 245118 Determination Page 10 of 14 Whether the FSP is entitled to rely on the policy terms and condit ions 61. The Panel notes that the Applicants do not dispute receiving the policy documents – including the Product Disclosure Statement (PDS). The Applicants and FSP dispute that the policy wording satisfies the requirements of section 35 of the Act or the Corporations Act 2011. 62. The Applicants and FSP have both relied on several common law cases regarding this particular issue including Suncorp General Insurance Australia v Cheihk [1999] NSWCA 238, Max Hams and 1 Ors v CGU Insurance [2002] NSWSC 273 and Marsh v CGU Insurance Ltd [2004] NTCA1 in support of their respective contentions. 63. It is the Applicants‟ responsibility to read the policy and relevant material to ensure they had obtained the appropriate cover for their needs. In fact, the FSP must be appropriately licensed to provide personalised insurance advice of the type suggested by the Applicants. As the FSP is not so licensed the provision of same would be improper. 64. In the Panel‟s view, when looking at whether an Applicant has been clearly informed for the purposes of section 35 of the ICA, it is appropriate to look at the whole inception process. There is nothing in this case to disprove the fact that the Applicants had received the PDS documentation. Section 35 in most circumstances will be satisfied where the appropriate PDS has been supplied. This has been well recognised by the courts. In certain circumstances where there is ambiguity or confusion, the provision of the PDS itself will not be sufficient. In these circumstances it is necessary to look at the whole process to determine whether the Applicants or a reasonable person in the circumstances would have been clearly informed. 65. The Panel has reviewed the PDS. Whilst the wording of the PDS is quite broad, it is apparent from a reading of the documentation that it is indexed, has appropriate references to the various definitions relied upon with respect to storm, flash flooding and flood and that it clearly identifies that it is not intended to cover flood. 66. Although the Applicants have suggested they misunderstood the extent of cover, the Panel is satisfied that the policy wording is sufficiently clear to establish that the Applicants or a reasonable person in the circumstances would have been clearly informed of the extent of the policy cover in accordance with section 35 of the Insurance Contracts Act 1984 . 67. Accordingly, the FSP is entitled to rely on the terms and conditions set out in the policy. Whether the FSP has appropriately declined the Applicants ’ claim for damage arising from water inundation. 68. The Panel notes the following information does not appear to be disputed:  The Applicants had a valid policy covering the residence with the FSP. Case No: 245118 Determination Page 11 of 14  There was an extreme storm event over the locale of the insured premise between 9 - 11 January 2011.  The insured premise is adjacent to a wetlands area.  The insured premise is approximately 1km from the Bremer River.  The insured premise is subject to stormwater run-off due to its particular locale at the bottom of an incline and proximity to stormwater paths.  The flood peak travel time from the Wivenhoe Dam to the Bremer River in the Applicants‟ locale was approximately 18.5 hours. The Applicants‟ estimate of the flood peak in their locale of 3.30am on 12 January 2011 has not been challenged by the FSP.  The two hour rainfall data suggests only a 1-ARI.  There is no site specific hydrology report for the inundation of the Applicants‟ property. 69. The Panel notes the witness evidence suggests the rainfall was substantial on 11 January 2011. Further, the stormwater run-off was running down several streets in the vicinity of the Applicants‟ premise and also coming from the wetlands area behind their home. 70. The witness evidence in this regard from MJ indicates that the wetlands had 3 metres of water at 11.00am at a time when the river had not yet risen. Further, that rain continued to fall until 5.00pm. 71. In respect to the question of rainfall, the FSP relies upon the ICA reports and the relevant Bureau of Meteorology data contained in those reports. The FSP simply refers the reader to the ICA reports, rather than extracting and presenting the relevant data from those reports. Having carefully examined the reports, the Panel is satisfied that there is great variance across various recording stations and in those circumstances; the Panel accepts the evidence of MJ that the rain continued to fall heavily until 5.00pm. The evidence is that by 3.00pm on 11 January 2011 the water flowing down the hill had widened to flow through the shed but not the home. 72. The Panel notes, therefore, that the shed was inundated some 11½ hours prior to the peak flow estimation of the Bremer River. 73. The witness evidence from SB is that it was raining heavily all day. He then saw water in the wetlands was high and gushing heavily. The water commenced inundating the backyards of houses that back onto the neighbours and he noted the insured premise was inundated between 6.00pm-7.00pm. 74. The witness evidence appears consistent with the Applicants‟ evidence that the water first entered the rear of the property at 1.00pm on 11 January 2011 and came from the wetlands. The water rose quickly and subsequently inundated the Applicants‟ premises between 6.00pm and 7.00pm. The assessor report also notes water came from Council drainage areas and Case No: 245118 Determination Page 12 of 14 from all directions. This would corroborate the information the Applicants provided of being in the pathway of urban run-off areas. 75. The Panel notes, therefore, that the Applicants‟ premises were inundated some 8½ hours prior to the peak flow estimation of the Bremer River. 76. The Panel also notes there is no site specific hydrology report and the ICA Hydrology Reports cannot necessarily be relied upon as an appropriate basis to determine the source of inundation in circumstances of potential multiple inundation sources. 77. Based on the specific witness evidence, the Panel accepts that the water which inundated the insured premise was a combination of stormwater run- off and water from the wetlands. It appears the water commenced inundating the property and then the residence, prior to the river breaking its banks and well before the flood peak from the Wivenhoe Dam Release. 78. The question before the Panel is whether the water which came from the wetlands should be considered water from a water catchment system under the policy terms and conditions. 79. The Panel does not consider the wetlands could be described as a dam, reservoir, stormwater channel or canal as it is not built for the purpose of storing or conveying water. It is further not a river, creek or lake (whether normally dry until it runs during a period of rain) as the wetlands are not a defined channel for water which has tributaries and has no defined banks which would be indicative of a lake. 80. The Panel must now consider whether a wetlands should be considered as “other natural watercourse”. 81. First, the Panel accepts the plain English meaning of a „wetland' as provided by the Applicants as to what a wetland is. A wetland is a frequently or permanently saturated tract of land such as a swamp or marsh. 82. Second, the Panel has also considered the plain English meaning of watercourse which suggests that it is a natural channel conveying water or made for the conveyance of water. 83. The Panel has also reviewed the case of Gartner v Kidman [1962] HCA 27 and notes the following:  The case held there was a difference between natural and artificial watercourses as well as the natural flow of surface water.  The Court relied on the case of Lyons v Winter (1899) 25 VLR which held that to constitute a watercourse, there must be a stream of water flowing in a defined channel or between something in the nature of banks.  The Court further noted the case of Cooper v The Corporation of Sydeney (1853) 1 Legge 756 which distinguished between a regular stream between banks and the occasional overflow of a swamp. Case No: 245118 Determination Page 13 of 14  The Court further considered with some approval the American case of Barkley v Wilcox (1881) 86 NY 140 which stated “Depressions in the soil to which the surface water from adjacent lands naturally finds it way and is discharged into some natural outlet are not thereby made watercourses” . 84. Based on both common law and the plain English meaning of watercourse as opposed to wetlands, the Panel accepts that a wetlands is not necessarily a watercourse. There is no evidence that the wetlands has a stream of wa ter flowing in a defined channel or between something in the nature of banks. Further, the photographs of the wetlands, as confirmed by the Panel Chair Ombudsman‟s site visit, depict it as more like parkland with a depression which is again different from a watercourse. A depression in the ground which receives stormwater run-off is not a watercourse. 85. The Panel therefore accepts that the wetlands in this case is not a watercourse and accordingly overflow from same is not automatically excluded under the flood and water catchment system definition in the policy. The Panel is unable to determine the actual basis the FSP determined that the wetlands should be defined a watercourse under its policy terms and conditions. 86. The Panel notes that there was a „storm event‟ which is capable of falling within the policy definition and cover. Further, that water has collected in the wetlands and generally around the property and flowed into the insured premise resulting in substantive inundation. The overflow of the wetlands could well be deemed stormwater run-off or flash flood. 87. The Panel has no evidence indicating that the stormwater run-off and/or flash flood would actually have mixed with riverine flood water prior to inundating the property. The evidence suggests the i nitial inundation occurred at a time when the Bremer River had not broken its banks and well prior to the flood peak travel time from the Wivenhoe Dam release. Further, as there is no evidence of surcharging storm water drains there is no evidence that riverine flood mingled with the stormwater run-off. In addition to this, there is no information suggesting a link between the wetlands and the Bremer River despite the assertion by the FSP. Accordingly, the Panel cannot find on the evidence that the initial inundation is excluded under the policy. 88. The Panel has no evidence as to how deep the stormwater inundation was prior to potential overflow from the Bremer River. There is no evidence demonstrating the exclusion or what portion of the damage was caused by the exclusion. There is, accordingly, no basis on which the Panel should restrict the loss to a certain depth or percentage of loss. 89. Accordingly, the Panel is of the opinion that the FSP has not discharged its onus to establish that the loss was attributab le to flooding of the Bremer River. Whilst it is entirely possible that this was the case, the FSP carries the burden of establishing this. As it has not, the policy must respond to the Applicants‟ loss. Case No: 245118 Determination Page 14 of 14 Determination 90. On the basis of the available information the Panel determines that the FSP was entitled to rely on the policy terms and conditions. 91. The Panel further determines that the FSP was not entitled to decline the Applicants‟ claim for damage arising from water inundation. 92. On the basis of the available information the Panel determines that the FSP is liable to pay the Applicants‟ claim as damage which arose from storm water and/or flash flood. The Panel has insufficient information regarding the loss incurred by the Applicants. Once the Applicants have indicated their acceptance of this Determination, the FSP is directed to urgently enter into discussions as to final quantum. Pursuant to its fair and reasonable mandate, recognising the elapse of time since the storm and/or flash flood, the Panel further determines the Applicants are to be cash settled, as soon as a final figure has been mutually agreed. 93. The FSP is to pay interest on the final settlement amount at the rate specified by the Insurance Contracts Act from the date of denial of the claim to the date of settlement.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.