Background
1. The Applicant and his wife hold a home insurance policy with the Financial
Services Provider (FSP). The relevant period of insurance operated for 12
months from 15 September 2010. During this period, the building was
insured up to a sum of $343,470 and contents for $10,500. Claims were
subject to a $300 basic excess.
2. On 12 January 2011, the Applicant advised the FSP of damage due to water
inundation as a result of the severe weather events in Queensland.
3. Following consideration of the claim, the FSP denied liability on the basis the
damage was caused by “flood”. The Applicant‟s solicitors disputed this and
referred the matter to the Service.
4. For the sake of simplicity, reference to the Applicant will include his legal
representatives.
5. The FSP subsequently obtained a site specific hydrology report. Following
receipt of the hydrologist‟s findings, t he FSP accepted liability for damage up
to 100mm of water inundation to the lower level of the property. The
Applicant has disputed this.
6. Both the Applicant and the FSP have provided detailed submissions on the
relevant issues. For the sake of brevity, the Panel will only briefly summarise
these submissions given all of the material made available has been
exchanged with the other party.
Summary of Applicant’s position
7. The Applicant submits the following as alternative arguments in response to
the FSP‟s de cision:
The FSP‟s policy failed to clearly inform him that flood was excluded
pursuant to its obligation under section 35 of the Insurance Contracts
Act 1984 (the Act),
Determination
Case No: 244814 Determination Page 2 of 11
The FSP represented prior to the claim that he would be covered for
any water inundation under the insured event of “Storm, rainwater or
run-off ”, and
The FSP has not provided sufficient information to establish that the
water which inundated his property was “flood”. In this regard, the
Applicant has provided corroborating evidence from his father-in-law, a
qualified hydrographer.
8. The Applicant therefore submits the FSP is required to indemnify him for this
claim.
Summary of FSP’s position
9. In relation to t he Applicant‟s contention that it cannot rely on the flood
exclusion pursuant to section 35 of the Act, the FSP has responded in the
following:
It has provided sufficient evidence to establish that the policy document
was sent to the Applicant before the claim,
The “flood” definition is clear and unambiguous , and
The exclusion for “flood” can be found by a person of average
intelligence and education.
10. The FSP is unable to obtain a recording of the conversation referred to by
the Applicant regarding an alleged representation that any water inundation
would be covered under the insured event of “storm, rainwater or run - off”.
However, it relies on the policy which clearly informs the Applicant that
“flood” is not covered.
11. The FSP relies on both a site specific hydrology report and the report
obtained by the Insurance Council of Australia (ICA) to support its contention
that water which inundated the Applicant‟s property beyond the 100mm
lower level depth were “flood”. As such, it is entitled to rely on the follo wing
policy provisions to deny the balance of the Applicant‟s claim:
“ Words with special meanings …
„ flood ‟ means the inundation of normally dry land by water that has escaped
or has been released from the normal confines of any natural watercourse,
lake or lagoon whether or not altered or modified from any reservoir, canal or
dam.
…
Insured events we will pay …
9. Storm, rainwater or run- off …
We will not pay for loss or damage:
a. caused by:
flood, or
Case No: 244814 Determination Page 3 of 11
flood water combined with run-off and/or rainwater;
…
When we will not pay a claim under your policy …
2. Unless we state differently in your policy, we will not pay for:
a. flood as defined on page 5.”
Issues
12. Whether the FSP clearly informed the Applicant that he was not covered for
flood,
13. Whether the FSP represented to the Applicant that any water inundation
would be covered under the insured event of “storm, rainwater or run - off”,
and
14. Whether the FSP has established the Applicant‟s loss beyond the inundation
depth of 100mm was caused by “flood” as defined by the policy.
Reasons for decision
15. Due to the nature of the dispute, the matter has been referred to the Panel
for Determination in line with the Operational Guidelines to the Service‟s
Terms of Reference. This dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
16. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
17. The Panel Chair Ombudsman attended on site where he met with the
Applicant and a representative of the FSP.
18. It is appropriate to consider the issues under the various headings.
Has the FSP clearly informed the Applicant that he was not covered for flood?
19. Section 35(2) of the Act states that when a claim is made under a
“prescribed contract” for a “prescribed event”, an insurer cannot refuse to
pay the claim unless it can establish that it clearly informed its insured in
writing that it would not cover this event. Section 34 of the Act has defined
the terms “prescribed contract” and “prescribed event” by referring to the
Insurance Contracts Regulations 1985.
20. There is no dispute that contracts of insurance covering a person‟s home
and contents is a “prescribed contract” and damage due to flood is a
“prescribed event”. The onus is therefore on the FSP to establish that it has
clearly informed the Applicant prior to the claim that it would not cover
Case No: 244814 Determination Page 4 of 11
damage caused by “flood”. The FSP, in its submissions, has relied on two
leading cases that considered section 35(2) of the Act, namely Hams and
Anor v CGU Insurance Limited (2002) 12 ANZ Ins Cas 61-525 and Marsh v
CGU Insurance Limited (2004) 13 ANZ Ins Cases 61-594 , to substantiate its
position.
21. The Panel notes that in order for the FSP to rely on section 35(2) of the Act,
it must first establish that the Applicant was sent a copy of the policy that
contains the relevant terms prior to the claim.
22. The FSP provided submissions and documentation to substantiate its
position that the policy and policy schedule were sent to the Applicant‟s
address well before the claim arose. The Applicant has never stated he did
not receive the policy. Instead, his submissions have been based on other
considerations as to why the FSP has not discharged its obligations under
section 35(2) of the Act.
23. Given the above, the Panel therefore accepts that, on balance, the Applicant
received the policy prior to the claim occurring.
Flood exclusion
24. The Applicant has provided a number of arguments to substantiate that the
FSP‟s exclusion for flood does not satisfy section 35 of the Act, including but
not limited to:
The definition of “flood” is too broad, and
The layout of the policy is insufficient; particularly given the whole flood
exclusi on is not available until page 19 of the policy even though “flood”
is defined on page 5.
25. In this regard, the Applicant has relied on two previous Determinations
issued by the Service (40607 and 41709). The FSP in contrast has relied on
a recent Determination issued by the Service (235302) involving this same
policy and a claim resulting from the same weather event.
26. The Panel considers that in line with clause 8.2 of the Terms of Reference,
although it may have regard to previous decisions, it will do what is fair in all
the circumstances. Given this, the Panel considers it is fair in all the
circumstances that it reviews the policy along with the facts and
circumstances present in this issue and make its own decision on this salient
point.
27. In this regard, the Panel considers that the reasoning contained by Mildren J
in the seminal case of Marsh to be significant, particularly his comments as
follows:
“I reject the submission of the appellant's counsel that the policy is a lengthy
document, did not readily disclose that flood was exempted, and required a
careful reading of the policy. The answer to the question „is flood covered‟ is
easily ascertainable by any person of average intelligence and education.
Case No: 244814 Determination Page 5 of 11
Similarly, the answer to the question, „what risks are excluded‟ would easily
have revealed that flood is not covered”
28. With this in mind, the Panel considers that a person of average intelligence
and education, having reviewed the Applicant‟s policy, would easily have
ascertained that flood is not covered given the following:
The policy contains an index on the front,
One of the bolded headings contained in this index is “When we will not
pay a claim under your policy”, which is where most people would
expect to find any exclusions of cover,
Upon turning to the appropriate page, an insured would find on the
second section that flood is excluded. Further, this clause refers an
insured to page 5 where they can find the definition of “flood”,
The definition of “flood” contained in page 5 is commonly used by mo st
insurers and is consistent with the current definition being considered
by Parliament in the amendments to the Act, and
In addition to the above:
- the FSP has also placed this exclusion with prominence
alongside the insured event of “Storm, rainwater o r run- off” given
this is likely to be the most applicable exclusion under this
insured event, and
- the policy schedule also states “Please Note: Flood is not
covered by this policy” on page 3, alongside information about
sums insured and excesses which most insureds will likely
carefully review.
29. In relation to the Applicant‟s submission that the flood definition only contains
half the exclusion, this is misconstrued. The definition of “flood” is consistent
throughout the policy and is excluded both under the general exclusions and
under the insured event of “Storm, rainwater or run - off”. The difference is
that under the insured event of “Storm, rainwater or run - off”, there is an
additional excluded event, namely “flood water combined with run -off and/or
rai nwater”.
30. This additional exclusion operates independently of the preceding “flood”
exclusion which is made clear by the use of the conjunctive “or”. Further, the
FSP‟s attempt to include this additional exclusion is consistent with case law
whereby such an exclusion is essentially implied in a policy that excludes
“flood” only ( Petersen v Union des Assurances de Paris IARD (1995) 8 ANZ
Ins Cases 61-244).
31. Accordingly, the Panel considers that pursuant to section 35(2) of the Act
and in line with the rationale set out by Mildren J in the case of Marsh, the
FSP has clearly informed the Applicant that flood is not covered.
Case No: 244814 Determination Page 6 of 11
Representation
32. The Applicant has not provided a statement regarding this. Instead, his
evidence has been set out in his solicitor‟s submissio n dated 11 January
2012. In this, the solicitor described the representation as follows:
“Our client spoke to a female employee at [FSP] and explained the
circumstances. He stated the property in question was near stormwater drains
and often affected by stormwater. He explained how commonly, any rain and
stormwater would flow from an area north of their property into the stormwater
drain at the bottom of the affected property.
After providing this information, our client maintains he was of the
understanding that the [FSP] employee was assuring him they would be
covered under storm water under the policy.”
33. The Panel cannot accept this representation states the FSP would consider
any water inundation to be covered. The situation described by the Applicant
discusses rain and stormwater flowing into the home. This clearly is covered
under the insured event of “storm, rainwater or run-off ” so any assurance in
this regard is consistent with the coverage provided.
34. Further, there is no indication that the Applicant‟ s enquiry extended beyond
this, for instance by seeking clarification regarding water that overflowed or
escaped from a watercourse that inundated the home.
35. As such, the Panel does not consider the Applicant has established that the
FSP represented to him that any water inundation would be covered under
the insured event of “storm, rainwater or run-off ”.
Water Inundation
Expert Evidence
36. The FSP has relied on two site specific reports provided by a hydrologist
dated 1 June 2011 and 25 January 2012. These contained the following
observations:
The property is located on the northern side of M Street and about
650m north-west of the Bremer River.
Mihi Creek flows in a south-easterly direction along the northern
boundary of the property. This creek discharges into the Bremer River
approximately 1.3km downstream of the property.
There is a local catchment of up to 0.8ha which drains to the property
off M Street and neighbouring properties.
Rainfall data from Brassall (Hancocks Bridge) Alert, located
approximately 1.5km south of the property, showed:
- A total of 188mm fell between 9 and 11 January 2011.
- The peak rainfall intensity of 21.2mm/hr occurred at 1400 hours
on 11 January 2011.
Case No: 244814 Determination Page 7 of 11
- The recorded rainfall for storm durations up to 2 hours was less
than 1 year average recurrence interval (ARI).
- For storm durations of 3 to 72 hours, the ARI was between 1 to
5 years.
- No rainfall recorded after 1800 hours on 11 January 2011.
The peak level of inundation was measured by the Applicant to be 1.5m
above the upper floor level. This calculates to be 20.5m AHD. However,
according to the records provided by the Ipswich City Council, the peak
level of inundation was measured at 19.6m AHD, which is corroborated
by aerial photographs and available topographical data.
Recorded water levels of the Bremer River at Ipswich Alert, located
approximately 3.5km downstream of the property, peaked at a level of
19.4m AHD at about 1400 hours on 12 January 2011.
Recorded water levels of the Bremer River at Brassall (Ha ncocks
Bridge) Alert, located approximately 1.5km upstream of the confluence
of Mihi Creek and Bremer River, peaked at a level of approximately
21.58m AHD.
Based on the recorded water levels at these two stations, there was a
drop in water level of 2.18m over the 3.7km between Brassall and
Ipswich alerts during the peak levels. Therefore, the peak water level at
the confluence of Bremer River and Mihi Creek would have been higher
than the peak level of 19.4m AHD measured at Ipswich Alert.
The difference in water levels between the property and the Ipswich
alert was only 0.2m at the peak of the flood event. As the peak level at
the confluence of the Bremer River and Mihi Creek was higher than the
19.4m AHD peak recorded at Ipswich Alert, the hydraulic gradient
between the property and the Bremer River would have been less than
0.2m over a distance of 1.1km. This flat gradient (less than 0.02%) is
consistent with the dominant influence of Bremer River backwater at
the property.
37. Based on the above, the hydrologist concluded in his report dated 25
January 2012 as follows:
“Based on the available information we remain of the opinion that the subject
property was inundated to the peak depth above floor level by floodwater from
the Bremer River flowing back up Mihi Creek. As indicated in our original
report, it is possible that the lower level of the house was inundated above
floor level by stormwater run-off from the local catchment prior to the arrival of
floodwater from the Bremer River.”
38. The Applicant‟s father -in-law provided a report based on his qualification as
a hydrographer for over 35 years. Portions of this report set out his personal
opinion regarding the FSP‟s claims handling. In regards to the hydrological
aspects, his report set out the following:
He was critical of the initial report as it did not contain surveyed floor
level information of the property level and the peak flood level.
Case No: 244814 Determination Page 8 of 11
A qualified engineer inspected the property for structural damage and
also measured the floor levels. From this survey, the upper floor level
was measured at 18.95m AHD.
Based on the FSP‟s initial hydrology report, the peak level measured at
the property was 1.5m above the upper floor, being 20.5m AHD. The
flood peak level measured at Ipswich alert was 19.4m AHD, meaning a
1.1m hydraulic gradient from the property to this river gauge.
This is not possible in a backwater situation as there is minimal water
surface slope. This gradient would therefore imply other factors came
into play, such as blockage of the Mihi Creek behind the property being
washed into the drain and not allowing urban stormwater to escape.
This could cause stormwater inundation prior to the peak on the
Bremer River.
39. When the Panel Chair Ombudsman attended on site, the Applicant
confirmed the level of inundation as 0.604m above the upper floor level. The
FSP‟s hydrologist who also attended on site agreed that the previously
referred to level of 1.5m was not accurate and had been clarified after
speaking further with the Applicant. The hydrologist agreed that the level of
inundation above the upper floor level was approximately 0.604m.
Analysis
40. The parties do not dispute that some initial stormwater inundation occurred
to the property. However, the Applicant maintains the level provided by the
FSP‟s hydrolog ist, being 100mm, is insufficient. In an email he sent to the
FSP dated 27 January 2011, he provided evidence noting the property was
inundated from the northern side where storm and rainwater run-off usually
flows. He also mentioned the possibility of there being blocked debris
contributing to the stormwater run-off and a previous history of this.
41. However, according to the available floor levels of the property provided by
the Ipswich City Council, the minimum ground level at the rear of the
property‟s boundary is 10.8m AHD. The rear of the Applicant‟s property
faces north, which is where the Applicant has stated the water came from.
The upper floor level, according to the engineer engaged by the Applicant, is
18.95m AHD. This would therefore imply that water would need to pool by
over 8 metres in order to inundate the Applicant‟s property from the rear
given it would need to travel uphill.
42. There is no evidence regarding the timing of inundation. According to the
rainfall data available for the period between 9 and 11 January 2011, a total
of 188mm rainfall fell. It seems unlikely therefore that this rainfall alone could
have resulted in an inundation to the depth sustained to the Applicant‟s
property.
43. According to the hydrological evidence, a number of factors contributed to
the Brisbane River and Bremer River overflows. These included intense
rainfall in the catchment areas and large releases from Wivenhoe Dam.
Case No: 244814 Determination Page 9 of 11
These large releases from the Dam began from approximately 0800 hours
on 11 January 2011.
44. Additionally the evidence is that the Bremer River levels were substantially
influenced by and similar to the Brisbane River levels along its lower
catchment due to these large releases and resultant backwater flooding.
Further, due to the heavy and intense rainfall over the north-western parts of
the Bremer River catchment, a significant flooding event was also trying to
exit into the Brisbane River whilst this backwater flooding was occurring. A
combination of these two resulted in the high levels in the Bremer River,
which resulted in backwater flooding in the Bremer River‟s various tributaries
in its lower catchment.
45. The Applicant‟s property is located along the lower catchment of the Bremer
River. In light of this, the Panel is satisfied that the high levels of the Bremer
River caused backwater flooding to the Mihi Creek tributary. This resulted in
the Mihi Creek breaking its banks and inundating the Applicant‟s property
from its northern boundary. This inundation would fall within the policy
definition of “flood”.
46. As a result, the Panel is not satisfied that all of the inundation to the
Applicant‟s property was solely due to stormwater run-off.
Contribution
47. The FSP‟s hydrologist has estimated that the Applicant‟s property may have
been inundated up to 100mm on the lower level of the property due to
stormwater run-off.
48. The Applicant has disputed this and highlighted some apparent deficiencies
in the hydrologist‟s initial report, namely that there was a substantive
difference between the peak level of inundation and the Bremer River levels
measured at the Ipswich Alert.
49. The FSP‟s hydrologist has responded to this noting the peak level of
inundation referred to in his report was based on the Applicant‟s evidence.
The hydrologist was unable to measure this himself during the site
inspection as the property was being cleaned and repairs had begun.
However, in his second report, he utilised a document from the Ipswich City
Council Property Specific Flood Report to state the estimated flood level was
19.6m AHD.
50. The Panel notes that the Applicant provided evidence from an engineer who
surveyed the upper floor level at 18.95m AHD. This is consistent with the
City Council Property Specific Flood Report of an estimated flood level of
19.6m AHD and the inundation of 0.604m above floor level.
51. The Panel finds it is difficult to accept that stormwater run-off would have
substantively inundated the Applicant‟s property (that is above the agreed
level of 100mm), especially given that the maximum amount of rainfall that
was recorded within 1.5km from his property measured a total amount over a
Case No: 244814 Determination Page 10 of 11
three day period of 188mm. The FSP‟s hydrologist has measured that the
likely inundation that could have occurred from stormwater run-off alone,
having considered the rainfall data, would be 100mm above the lower floor
level. Given the available hydrology evidence, the Panel accepts this is the
likely level of inundation caused by stormwater run-off alone before
floodwater inundated the property, especially given the rear of the property
slopes uphill towards the house and is where the water came from according
to the Applicant.
53. Whilst the Applicant maintains that 100mm is simply a best guess estimate
on the part of the FSP, this is a defined events policy and it is accepted
insured law that the onus is on the Applicant to prove the extent of their loss
as a result of the defined event of storm, rainwater or run-off.
54. The Applicant has not presented any evidence to confirm that the run-off
exceeded 100mm. Given the Panel‟s experience in simila r matters and
noting the rainfall data and the fact the bulk of inundation was caused by
flooding as defined, the Panel is satisfied that 100mm is a reasonable
estimate for run-off inundation.
55. Pursuant to well established case law, once floodwater entered the property,
any damage caused by that in combination with the stormwater would still be
excluded. As such, even if the Panel was to accept stormwater contributed
to the peak level of inundation due to the blockages, the evidence supports
the fact this worked in combination with water escaping from the confines of
Mihi Creek to cause the damage.
56. The site inspection by the Panel Chair Ombudsman revealed that there are
two separate lower level areas, one higher than the other. The lower of the
two areas consisted of a family/rumpus room and a laundry. The higher of
the two areas contained the hot water service and items, including a fridge,
barbeque and gym equipment, were also stored there.
57. As in the case of the lower of the two areas, the higher of the two areas was
south facing (towards the front of the home) and would have been subject to
the same run-off as the lower of the two areas.
58. Accordingly, the FSP‟s liability to the Applicant relates to 100mm inundation
of both lower areas.
Quantum
59. There is minimal evidence regarding the level of damage that would have
been sustained as a result of 100mm inundation. According to the
Applicant‟s father -in-law, the FSP offered $4,000 in settlement, which was
rejected by the Applicant. The Applicant has not provided any evidence
regarding the extent of damage this level of inundation would have caused.
60. Accordingly, in light of the minimal evidence available regarding quantum,
the Panel is unable to provide any comment regarding a reasonable basis of
settlement. In this regard, the parties are enjoined to work co-operatively and
Case No: 244814 Determination Page 11 of 11
speedily to establish the quantum of loss in this regard in the event this
Determination is accepted.
61. In this regard, it is also to be noted that the site inspection revealed a further
area of loss, being the higher of the two lower areas. The Applicant will need
to provide details to the FSP of the damage in this area.
Determination
62. On the basis of the available information the Panel determines:
The FSP is required to indemnify the Applicant for up to 100mm
inundation to both lower levels of the property, and
The FSP is entitled to deny liability for the rest of the damage.
63. In the event any aspect of the claim is resolved by way of cash settlement,
the FSP is required to pay interest on any sum paid in accordance with this
determination from 11 March 2011 (being the date it first informed the
Applicant it would deny the claim) to the date when payment is affected.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.