Home / Financial Firm (Unknown - Insurer) / Determination 244814

Determination 244814

Partial denial of flood damage claim above 100mm stormwater inundation

FirmFinancial Firm (Unknown - Insurer)
Decided2012-05-18
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Represented homeowners claimed for flood damage from the January 2011 Queensland storms, which the FSP partly declined as flood. AFCA found the flood exclusion was clear, accepted about 100mm of stormwater run-off was covered, and ordered indemnity to that level with interest, with quantum left to the parties.

The flood exclusion was clearly disclosed under section 35, and on the hydrology evidence only about 100mm of inundation was caused by stormwater run-off rather than excluded flood.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 244814 Determination Page 1 of 11 Case number: 244814 General Insurance - Domestic Insurance - Home Building – FSP Decision - Claim amount (Flood) 12 April 2012 Background 1. The Applicant and his wife hold a home insurance policy with the Financial Services Provider (FSP). The relevant period of insurance operated for 12 months from 15 September 2010. During this period, the building was insured up to a sum of $343,470 and contents for $10,500. Claims were subject to a $300 basic excess. 2. On 12 January 2011, the Applicant advised the FSP of damage due to water inundation as a result of the severe weather events in Queensland. 3. Following consideration of the claim, the FSP denied liability on the basis the damage was caused by “flood”. The Applicant‟s solicitors disputed this and referred the matter to the Service. 4. For the sake of simplicity, reference to the Applicant will include his legal representatives. 5. The FSP subsequently obtained a site specific hydrology report. Following receipt of the hydrologist‟s findings, t he FSP accepted liability for damage up to 100mm of water inundation to the lower level of the property. The Applicant has disputed this. 6. Both the Applicant and the FSP have provided detailed submissions on the relevant issues. For the sake of brevity, the Panel will only briefly summarise these submissions given all of the material made available has been exchanged with the other party. Summary of Applicant’s position 7. The Applicant submits the following as alternative arguments in response to the FSP‟s de cision:  The FSP‟s policy failed to clearly inform him that flood was excluded pursuant to its obligation under section 35 of the Insurance Contracts Act 1984 (the Act), Determination Case No: 244814 Determination Page 2 of 11  The FSP represented prior to the claim that he would be covered for any water inundation under the insured event of “Storm, rainwater or run-off ”, and  The FSP has not provided sufficient information to establish that the water which inundated his property was “flood”. In this regard, the Applicant has provided corroborating evidence from his father-in-law, a qualified hydrographer. 8. The Applicant therefore submits the FSP is required to indemnify him for this claim. Summary of FSP’s position 9. In relation to t he Applicant‟s contention that it cannot rely on the flood exclusion pursuant to section 35 of the Act, the FSP has responded in the following:  It has provided sufficient evidence to establish that the policy document was sent to the Applicant before the claim,  The “flood” definition is clear and unambiguous , and  The exclusion for “flood” can be found by a person of average intelligence and education. 10. The FSP is unable to obtain a recording of the conversation referred to by the Applicant regarding an alleged representation that any water inundation would be covered under the insured event of “storm, rainwater or run - off”. However, it relies on the policy which clearly informs the Applicant that “flood” is not covered. 11. The FSP relies on both a site specific hydrology report and the report obtained by the Insurance Council of Australia (ICA) to support its contention that water which inundated the Applicant‟s property beyond the 100mm lower level depth were “flood”. As such, it is entitled to rely on the follo wing policy provisions to deny the balance of the Applicant‟s claim: “ Words with special meanings … „ flood ‟ means the inundation of normally dry land by water that has escaped or has been released from the normal confines of any natural watercourse, lake or lagoon whether or not altered or modified from any reservoir, canal or dam. … Insured events we will pay … 9. Storm, rainwater or run- off … We will not pay for loss or damage: a. caused by:  flood, or Case No: 244814 Determination Page 3 of 11  flood water combined with run-off and/or rainwater; … When we will not pay a claim under your policy … 2. Unless we state differently in your policy, we will not pay for: a. flood as defined on page 5.” Issues 12. Whether the FSP clearly informed the Applicant that he was not covered for flood, 13. Whether the FSP represented to the Applicant that any water inundation would be covered under the insured event of “storm, rainwater or run - off”, and 14. Whether the FSP has established the Applicant‟s loss beyond the inundation depth of 100mm was caused by “flood” as defined by the policy. Reasons for decision 15. Due to the nature of the dispute, the matter has been referred to the Panel for Determination in line with the Operational Guidelines to the Service‟s Terms of Reference. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 16. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 17. The Panel Chair Ombudsman attended on site where he met with the Applicant and a representative of the FSP. 18. It is appropriate to consider the issues under the various headings. Has the FSP clearly informed the Applicant that he was not covered for flood? 19. Section 35(2) of the Act states that when a claim is made under a “prescribed contract” for a “prescribed event”, an insurer cannot refuse to pay the claim unless it can establish that it clearly informed its insured in writing that it would not cover this event. Section 34 of the Act has defined the terms “prescribed contract” and “prescribed event” by referring to the Insurance Contracts Regulations 1985. 20. There is no dispute that contracts of insurance covering a person‟s home and contents is a “prescribed contract” and damage due to flood is a “prescribed event”. The onus is therefore on the FSP to establish that it has clearly informed the Applicant prior to the claim that it would not cover Case No: 244814 Determination Page 4 of 11 damage caused by “flood”. The FSP, in its submissions, has relied on two leading cases that considered section 35(2) of the Act, namely Hams and Anor v CGU Insurance Limited (2002) 12 ANZ Ins Cas 61-525 and Marsh v CGU Insurance Limited (2004) 13 ANZ Ins Cases 61-594 , to substantiate its position. 21. The Panel notes that in order for the FSP to rely on section 35(2) of the Act, it must first establish that the Applicant was sent a copy of the policy that contains the relevant terms prior to the claim. 22. The FSP provided submissions and documentation to substantiate its position that the policy and policy schedule were sent to the Applicant‟s address well before the claim arose. The Applicant has never stated he did not receive the policy. Instead, his submissions have been based on other considerations as to why the FSP has not discharged its obligations under section 35(2) of the Act. 23. Given the above, the Panel therefore accepts that, on balance, the Applicant received the policy prior to the claim occurring. Flood exclusion 24. The Applicant has provided a number of arguments to substantiate that the FSP‟s exclusion for flood does not satisfy section 35 of the Act, including but not limited to:  The definition of “flood” is too broad, and  The layout of the policy is insufficient; particularly given the whole flood exclusi on is not available until page 19 of the policy even though “flood” is defined on page 5. 25. In this regard, the Applicant has relied on two previous Determinations issued by the Service (40607 and 41709). The FSP in contrast has relied on a recent Determination issued by the Service (235302) involving this same policy and a claim resulting from the same weather event. 26. The Panel considers that in line with clause 8.2 of the Terms of Reference, although it may have regard to previous decisions, it will do what is fair in all the circumstances. Given this, the Panel considers it is fair in all the circumstances that it reviews the policy along with the facts and circumstances present in this issue and make its own decision on this salient point. 27. In this regard, the Panel considers that the reasoning contained by Mildren J in the seminal case of Marsh to be significant, particularly his comments as follows: “I reject the submission of the appellant's counsel that the policy is a lengthy document, did not readily disclose that flood was exempted, and required a careful reading of the policy. The answer to the question „is flood covered‟ is easily ascertainable by any person of average intelligence and education. Case No: 244814 Determination Page 5 of 11 Similarly, the answer to the question, „what risks are excluded‟ would easily have revealed that flood is not covered” 28. With this in mind, the Panel considers that a person of average intelligence and education, having reviewed the Applicant‟s policy, would easily have ascertained that flood is not covered given the following:  The policy contains an index on the front,  One of the bolded headings contained in this index is “When we will not pay a claim under your policy”, which is where most people would expect to find any exclusions of cover,  Upon turning to the appropriate page, an insured would find on the second section that flood is excluded. Further, this clause refers an insured to page 5 where they can find the definition of “flood”,  The definition of “flood” contained in page 5 is commonly used by mo st insurers and is consistent with the current definition being considered by Parliament in the amendments to the Act, and  In addition to the above: - the FSP has also placed this exclusion with prominence alongside the insured event of “Storm, rainwater o r run- off” given this is likely to be the most applicable exclusion under this insured event, and - the policy schedule also states “Please Note: Flood is not covered by this policy” on page 3, alongside information about sums insured and excesses which most insureds will likely carefully review. 29. In relation to the Applicant‟s submission that the flood definition only contains half the exclusion, this is misconstrued. The definition of “flood” is consistent throughout the policy and is excluded both under the general exclusions and under the insured event of “Storm, rainwater or run - off”. The difference is that under the insured event of “Storm, rainwater or run - off”, there is an additional excluded event, namely “flood water combined with run -off and/or rai nwater”. 30. This additional exclusion operates independently of the preceding “flood” exclusion which is made clear by the use of the conjunctive “or”. Further, the FSP‟s attempt to include this additional exclusion is consistent with case law whereby such an exclusion is essentially implied in a policy that excludes “flood” only ( Petersen v Union des Assurances de Paris IARD (1995) 8 ANZ Ins Cases 61-244). 31. Accordingly, the Panel considers that pursuant to section 35(2) of the Act and in line with the rationale set out by Mildren J in the case of Marsh, the FSP has clearly informed the Applicant that flood is not covered. Case No: 244814 Determination Page 6 of 11 Representation 32. The Applicant has not provided a statement regarding this. Instead, his evidence has been set out in his solicitor‟s submissio n dated 11 January 2012. In this, the solicitor described the representation as follows: “Our client spoke to a female employee at [FSP] and explained the circumstances. He stated the property in question was near stormwater drains and often affected by stormwater. He explained how commonly, any rain and stormwater would flow from an area north of their property into the stormwater drain at the bottom of the affected property. After providing this information, our client maintains he was of the understanding that the [FSP] employee was assuring him they would be covered under storm water under the policy.” 33. The Panel cannot accept this representation states the FSP would consider any water inundation to be covered. The situation described by the Applicant discusses rain and stormwater flowing into the home. This clearly is covered under the insured event of “storm, rainwater or run-off ” so any assurance in this regard is consistent with the coverage provided. 34. Further, there is no indication that the Applicant‟ s enquiry extended beyond this, for instance by seeking clarification regarding water that overflowed or escaped from a watercourse that inundated the home. 35. As such, the Panel does not consider the Applicant has established that the FSP represented to him that any water inundation would be covered under the insured event of “storm, rainwater or run-off ”. Water Inundation Expert Evidence 36. The FSP has relied on two site specific reports provided by a hydrologist dated 1 June 2011 and 25 January 2012. These contained the following observations:  The property is located on the northern side of M Street and about 650m north-west of the Bremer River.  Mihi Creek flows in a south-easterly direction along the northern boundary of the property. This creek discharges into the Bremer River approximately 1.3km downstream of the property.  There is a local catchment of up to 0.8ha which drains to the property off M Street and neighbouring properties.  Rainfall data from Brassall (Hancocks Bridge) Alert, located approximately 1.5km south of the property, showed: - A total of 188mm fell between 9 and 11 January 2011. - The peak rainfall intensity of 21.2mm/hr occurred at 1400 hours on 11 January 2011. Case No: 244814 Determination Page 7 of 11 - The recorded rainfall for storm durations up to 2 hours was less than 1 year average recurrence interval (ARI). - For storm durations of 3 to 72 hours, the ARI was between 1 to 5 years. - No rainfall recorded after 1800 hours on 11 January 2011.  The peak level of inundation was measured by the Applicant to be 1.5m above the upper floor level. This calculates to be 20.5m AHD. However, according to the records provided by the Ipswich City Council, the peak level of inundation was measured at 19.6m AHD, which is corroborated by aerial photographs and available topographical data.  Recorded water levels of the Bremer River at Ipswich Alert, located approximately 3.5km downstream of the property, peaked at a level of 19.4m AHD at about 1400 hours on 12 January 2011.  Recorded water levels of the Bremer River at Brassall (Ha ncocks Bridge) Alert, located approximately 1.5km upstream of the confluence of Mihi Creek and Bremer River, peaked at a level of approximately 21.58m AHD.  Based on the recorded water levels at these two stations, there was a drop in water level of 2.18m over the 3.7km between Brassall and Ipswich alerts during the peak levels. Therefore, the peak water level at the confluence of Bremer River and Mihi Creek would have been higher than the peak level of 19.4m AHD measured at Ipswich Alert.  The difference in water levels between the property and the Ipswich alert was only 0.2m at the peak of the flood event. As the peak level at the confluence of the Bremer River and Mihi Creek was higher than the 19.4m AHD peak recorded at Ipswich Alert, the hydraulic gradient between the property and the Bremer River would have been less than 0.2m over a distance of 1.1km. This flat gradient (less than 0.02%) is consistent with the dominant influence of Bremer River backwater at the property. 37. Based on the above, the hydrologist concluded in his report dated 25 January 2012 as follows: “Based on the available information we remain of the opinion that the subject property was inundated to the peak depth above floor level by floodwater from the Bremer River flowing back up Mihi Creek. As indicated in our original report, it is possible that the lower level of the house was inundated above floor level by stormwater run-off from the local catchment prior to the arrival of floodwater from the Bremer River.” 38. The Applicant‟s father -in-law provided a report based on his qualification as a hydrographer for over 35 years. Portions of this report set out his personal opinion regarding the FSP‟s claims handling. In regards to the hydrological aspects, his report set out the following:  He was critical of the initial report as it did not contain surveyed floor level information of the property level and the peak flood level. Case No: 244814 Determination Page 8 of 11  A qualified engineer inspected the property for structural damage and also measured the floor levels. From this survey, the upper floor level was measured at 18.95m AHD.  Based on the FSP‟s initial hydrology report, the peak level measured at the property was 1.5m above the upper floor, being 20.5m AHD. The flood peak level measured at Ipswich alert was 19.4m AHD, meaning a 1.1m hydraulic gradient from the property to this river gauge.  This is not possible in a backwater situation as there is minimal water surface slope. This gradient would therefore imply other factors came into play, such as blockage of the Mihi Creek behind the property being washed into the drain and not allowing urban stormwater to escape. This could cause stormwater inundation prior to the peak on the Bremer River. 39. When the Panel Chair Ombudsman attended on site, the Applicant confirmed the level of inundation as 0.604m above the upper floor level. The FSP‟s hydrologist who also attended on site agreed that the previously referred to level of 1.5m was not accurate and had been clarified after speaking further with the Applicant. The hydrologist agreed that the level of inundation above the upper floor level was approximately 0.604m. Analysis 40. The parties do not dispute that some initial stormwater inundation occurred to the property. However, the Applicant maintains the level provided by the FSP‟s hydrolog ist, being 100mm, is insufficient. In an email he sent to the FSP dated 27 January 2011, he provided evidence noting the property was inundated from the northern side where storm and rainwater run-off usually flows. He also mentioned the possibility of there being blocked debris contributing to the stormwater run-off and a previous history of this. 41. However, according to the available floor levels of the property provided by the Ipswich City Council, the minimum ground level at the rear of the property‟s boundary is 10.8m AHD. The rear of the Applicant‟s property faces north, which is where the Applicant has stated the water came from. The upper floor level, according to the engineer engaged by the Applicant, is 18.95m AHD. This would therefore imply that water would need to pool by over 8 metres in order to inundate the Applicant‟s property from the rear given it would need to travel uphill. 42. There is no evidence regarding the timing of inundation. According to the rainfall data available for the period between 9 and 11 January 2011, a total of 188mm rainfall fell. It seems unlikely therefore that this rainfall alone could have resulted in an inundation to the depth sustained to the Applicant‟s property. 43. According to the hydrological evidence, a number of factors contributed to the Brisbane River and Bremer River overflows. These included intense rainfall in the catchment areas and large releases from Wivenhoe Dam. Case No: 244814 Determination Page 9 of 11 These large releases from the Dam began from approximately 0800 hours on 11 January 2011. 44. Additionally the evidence is that the Bremer River levels were substantially influenced by and similar to the Brisbane River levels along its lower catchment due to these large releases and resultant backwater flooding. Further, due to the heavy and intense rainfall over the north-western parts of the Bremer River catchment, a significant flooding event was also trying to exit into the Brisbane River whilst this backwater flooding was occurring. A combination of these two resulted in the high levels in the Bremer River, which resulted in backwater flooding in the Bremer River‟s various tributaries in its lower catchment. 45. The Applicant‟s property is located along the lower catchment of the Bremer River. In light of this, the Panel is satisfied that the high levels of the Bremer River caused backwater flooding to the Mihi Creek tributary. This resulted in the Mihi Creek breaking its banks and inundating the Applicant‟s property from its northern boundary. This inundation would fall within the policy definition of “flood”. 46. As a result, the Panel is not satisfied that all of the inundation to the Applicant‟s property was solely due to stormwater run-off. Contribution 47. The FSP‟s hydrologist has estimated that the Applicant‟s property may have been inundated up to 100mm on the lower level of the property due to stormwater run-off. 48. The Applicant has disputed this and highlighted some apparent deficiencies in the hydrologist‟s initial report, namely that there was a substantive difference between the peak level of inundation and the Bremer River levels measured at the Ipswich Alert. 49. The FSP‟s hydrologist has responded to this noting the peak level of inundation referred to in his report was based on the Applicant‟s evidence. The hydrologist was unable to measure this himself during the site inspection as the property was being cleaned and repairs had begun. However, in his second report, he utilised a document from the Ipswich City Council Property Specific Flood Report to state the estimated flood level was 19.6m AHD. 50. The Panel notes that the Applicant provided evidence from an engineer who surveyed the upper floor level at 18.95m AHD. This is consistent with the City Council Property Specific Flood Report of an estimated flood level of 19.6m AHD and the inundation of 0.604m above floor level. 51. The Panel finds it is difficult to accept that stormwater run-off would have substantively inundated the Applicant‟s property (that is above the agreed level of 100mm), especially given that the maximum amount of rainfall that was recorded within 1.5km from his property measured a total amount over a Case No: 244814 Determination Page 10 of 11 three day period of 188mm. The FSP‟s hydrologist has measured that the likely inundation that could have occurred from stormwater run-off alone, having considered the rainfall data, would be 100mm above the lower floor level. Given the available hydrology evidence, the Panel accepts this is the likely level of inundation caused by stormwater run-off alone before floodwater inundated the property, especially given the rear of the property slopes uphill towards the house and is where the water came from according to the Applicant. 53. Whilst the Applicant maintains that 100mm is simply a best guess estimate on the part of the FSP, this is a defined events policy and it is accepted insured law that the onus is on the Applicant to prove the extent of their loss as a result of the defined event of storm, rainwater or run-off. 54. The Applicant has not presented any evidence to confirm that the run-off exceeded 100mm. Given the Panel‟s experience in simila r matters and noting the rainfall data and the fact the bulk of inundation was caused by flooding as defined, the Panel is satisfied that 100mm is a reasonable estimate for run-off inundation. 55. Pursuant to well established case law, once floodwater entered the property, any damage caused by that in combination with the stormwater would still be excluded. As such, even if the Panel was to accept stormwater contributed to the peak level of inundation due to the blockages, the evidence supports the fact this worked in combination with water escaping from the confines of Mihi Creek to cause the damage. 56. The site inspection by the Panel Chair Ombudsman revealed that there are two separate lower level areas, one higher than the other. The lower of the two areas consisted of a family/rumpus room and a laundry. The higher of the two areas contained the hot water service and items, including a fridge, barbeque and gym equipment, were also stored there. 57. As in the case of the lower of the two areas, the higher of the two areas was south facing (towards the front of the home) and would have been subject to the same run-off as the lower of the two areas. 58. Accordingly, the FSP‟s liability to the Applicant relates to 100mm inundation of both lower areas. Quantum 59. There is minimal evidence regarding the level of damage that would have been sustained as a result of 100mm inundation. According to the Applicant‟s father -in-law, the FSP offered $4,000 in settlement, which was rejected by the Applicant. The Applicant has not provided any evidence regarding the extent of damage this level of inundation would have caused. 60. Accordingly, in light of the minimal evidence available regarding quantum, the Panel is unable to provide any comment regarding a reasonable basis of settlement. In this regard, the parties are enjoined to work co-operatively and Case No: 244814 Determination Page 11 of 11 speedily to establish the quantum of loss in this regard in the event this Determination is accepted. 61. In this regard, it is also to be noted that the site inspection revealed a further area of loss, being the higher of the two lower areas. The Applicant will need to provide details to the FSP of the damage in this area. Determination 62. On the basis of the available information the Panel determines:  The FSP is required to indemnify the Applicant for up to 100mm inundation to both lower levels of the property, and  The FSP is entitled to deny liability for the rest of the damage. 63. In the event any aspect of the claim is resolved by way of cash settlement, the FSP is required to pay interest on any sum paid in accordance with this determination from 11 March 2011 (being the date it first informed the Applicant it would deny the claim) to the date when payment is affected.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.