Home / Financial Firm (Unknown - Insurer) / Determination 244684

Determination 244684

Flood damage denied under flood exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2012-02-24
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$6,000
SourceAFCA PDF

Summary

The Applicants' home was inundated in the January 2011 Queensland floods and the FSP declined the claim under the flood exclusion. AFCA found the damage above floor level came from floodwater, so the exclusion applies and no compensation was awarded.

Water overflowing from a watercourse, including a modified open drainage channel, is flood under the policy definition, and the policy was clearly informed under s35 of the Insurance Contracts Act.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 244684 Determination Page 1 of 14 Case number: 244684 General Insurance - Domestic Insurance - Home Building & Contents - FSP Decision – Flood – Clearly Inform - Denial of claim – Section 35 Insurance Contracts Act 1984 23 February 2012 Background 1. The Applicants held Home Building and Contents insurance (the policy) with the Financial Services Provider (FSP). 2. The insured property sustained substantial damage arising from the significant weather events experienced in Queensland during January 2011. 3. The FSP declined the Applicants‟ claim on the basis that loss or damage arising from the event “Flood”, is not covered under the policy. 4. The Applicants dispute the FSP‟s decision and maintain that the damage to their property was caused by stormwater prior to the arrival of the floodwaters. Summary of Applicants’ Position 5. The Applicants maintain the terms of the policy in respect to „Flood‟, „Stormwater run - off‟ and „Water escaping from a drain‟ etc are all terms a reasonable person would not be able to understand. Such contradictory definitions do not meet the requirement to “clearly inform” under the Insurance Contracts Act 1984 (the Act) or the requirement for “clear, concise and effective”, disclosure under the Corporations Act. As such, restricting the FSP from relying on the policy exclusions in this respect. 6. The FSP seeks to rely upon the hydrology reports commissioned by the Insurance Council of Australia (ICA), to decline the claim. However, the Applicants maintain that it is dangerous to rely on such a general hydrology report that does not take into account the specific circumstances of the weather event in the relevant area. 7. The Applicants maintain that the FSP acknowledges that in the instance of water inundation of an insured property occurring from water that escapes solely from a “drain”, the policy will respond. 8. This includes instances where the sole source of inundation has been drain escape water, more commonly referred to as “pipe backflow flooding”. This is Determination Case No: 244684 Determination Page 2 of 14 so even if the water escaping the drain is sourced from a nearby flooding watercourse separated from the insured property by higher ground. 9. Prior to evacuating their home on 11 January 2011, the Applicants witnessed water spurting up from a drain like a fountain, in the proximity of the insured property. There are two stormwater drains located below the insured property. 10. It is likely that before any overland flooding reached the Applicants‟ property that water was initially forced through these stormwater drains causing the initial inundation and damage to the insured property. Therefore, such inundation and resultant damage to the property would only be due to water from the drains as no overland flows had reached the property at this stage. 11. The weather data over the relevant period supports the Applicants‟ position that heavy rain through stormwater run-off, which is covered under the policy, was the proximate cause for the damage to the Applicants‟ property. 12. The Applicants maintain that the FSP has not adequately addressed the issue of multiple events occurring and causing the resultant damage. It is the Applicants‟ position that where it cannot or is difficult to determine what part of the damage was caused solely by stormwater and what damage was due to floodwater, the FSP should pay the full amount. In maintaining this position the Applicants have referred to a previous determination issued by the Service. 13. The Applicants are of the opinion that the FSP‟s definition of “Flood” does not include a natural creek that has been “completely altered”. In order fo r any water that inundated the property to be classed as flood, the FSP must establish that it escaped or overflowed from, or was unable to enter the normal confines of any watercourse. 14. The policy narrows the term “watercourse” by inserting “ including any that may have been modified by human intervention ”. As such, the Applicants maintain the FSP has given the word “watercourse” an express meaning. Had the definition not included the above noted phrase, the word watercourse would have been read in its ordinary and implied meaning. 15. The Macquarie Dictionary defines the term “modified” to mean “ to change somewhat the form or qualities, alter somewhat ”. In comments made by the FSP‟s assessor “P”, he states that the “waterway” adjacent to the property was originally a natural creek however its appearance is completely altered. 16. In not including the term “altered” in the flood definition, the FSP has not contemplated that a “completely altered” watercourse is to be considered a watercourse. Regardless of the source of water that inundated the property, it is believed the water did not come from a source as defined in the policy. Therefore, the creek that has been completely altered is not a watercourse as defined in the policy and as such is not excluded. 17. In the initial telephone call to the FSP after the date of loss, the Applicants were given the impression they would be covered for their loss under the policy. Relying upon this information the Applicants proceeded to clean up the Case No: 244684 Determination Page 3 of 14 property. A considerable amount of items were discarded and it is unreasonable for the FSP to suggest the Applicants took inappropriate steps to mitigate their loss. 18. The Applicants maintain they have suffered severe anxiety and stress due to the FSP‟s initial acceptance and subsequent deni al of the claim. The Applicants are a young student and delivery driver with two young children. 19. The FSP has failed to explain the claims process to the Applicants, as they are still unaware why the second assessor was sent to the property. The walls were painted with lead based paint and which are now damaged, the Applicants cannot afford the repairs and are anxious about their children‟s health. 20. The Applicants, in addition to seeking full indemnity under the claim also believe they are entitled to $3,000 in compensation under paragraph 9.3 of the Terms of Reference (TOR) and a further $3,000 to cover loss of work over a number of months arising from the loss and the FSP declinature of the claim. Summary of FSP’s Position 21. The policy is a defined events policy which does not cover all types of risks and specifically excludes from cover loss or damage arising from the event “Flood”. 22. The policy provides cover for loss or damage arising from storm and rainwater including stormwater run-off from areas surrounding an insured property, or water escaping from any water main, drainpipe street gutter, guttering or surface. The policy provides that cover for loss or damage arising from flood is excluded and that flood does not include stormwater run-off. 23. The assessor “SB” having assessed the property notes in the assessment report that, floodwater from nearby Woogaroo Creek (the creek) combined with the floodwater from Brisbane River (the river), have overflowed causing floodwaters to reach the property with water levels throughout the home measured at 2.4 metres high and appeared to be a dirty colour. 24. SB formed the opinion that the cause of the inundation may be the result of the over flow of the river combined with the nearby creek. 25. The FSP notes the Applicants are of the opinion that the nearby watercourse was actually a council drain and therefore discounted the possibility that the floodwaters from a river or creek had caused the inundation of their home. 26. The Applicants in contending that the loss was due to stormwater run-off and rainwater refer to warnings and information provided by the Bureau of Meteorology (BoM) regarding storms and lightning strikes. The FSP does not dispute that storms accompanied with heavy rain and lightning occurred in the vicinity of the insured property on 11 January 2011. However, the mere presence of storms and rainfall in itself does not support the conclusion that the damage to the Applicants‟ home was due to stormwater run -off. Case No: 244684 Determination Page 4 of 14 27. The FSP arranged for a second assessment of the property b y “CP” on 15 April 2011. CP also formed the opinion that it appeared clear that the source of water that flooded the property is ultimately from the river. 28. As part of his assessment CP also interviewed a resident of Church Street (Goodna), a property to th e west of the creek‟s tributary. This individual advised that the water rose from the waterway at the rear of the property and that the water came from the river. He also confirmed the colour of the water was dirty. 29. CP made note of the drains located adja cent to the Applicants‟ property. On the basis of the information made available by the Applicants and the interviewed witness, CP does not consider these drains to be a cause for the loss. 30. The „Interactive Flood Mapping‟ shows that the flood line extended beyond the boundary of the Applicants‟ property. Therefore, on the basis of the available evidence, the FSP maintains it is reasonable to conclude the damage claimed was caused by water that came from the tributary of the creek. 31. The FSP disagrees with the Applicants‟ contention that the tributary of the creek is a drain and maintains that the available information confirms that this is a tributary of the creek and as such is a watercourse for the purpose of the policy. The water that overflowed from this watercourse or that could not drain into this watercourse is floodwater. 32. The FSP maintains that the electronic messages recorded against the Applicants‟ claim on 12 and 13 January 2011 confirm that there is no indication/reference by the FSP‟s representativ e to the Applicants that their claim had been or would be accepted. 33. The Applicants were advised to take as many photographs and samples as possible and store the damaged items somewhere away from the home for assessment purposes. The Applicants were advised that loss or damage arsing from flood was not covered and that their claim had been lodge on a “consideration only” basis. The FSP rejects the Applicants allegation that they disposed of otherwise salvageable items to their detriment, on the basis of the alleged inaccurate advice from the FSP. 34. Irrespective of whether the Applicants believed they were covered for damage or loss arising from flood, there is an onus on the Applicants to take reasonable measures to protect their property from loss or damage a nd to retain salvageable items to mitigate their loss. 35. It is not in dispute that the Applicants were provided with the relevant policy documents, as required under the Act. 36. The FSP notes the Applicants‟ contention that when read together the definitions of flood, stormwater and rainwater are likely to cause confusion for a reasonable consumer, alleging the FSP has not clearly communicated the flood exclusion. Case No: 244684 Determination Page 5 of 14 37. The FSP refutes this contention and maintains the policy wording is drafted in a manner that clearly explains what the word flood means and conversely what it does not mean. The definition of flood is necessarily broad to ensure it covers the phenomena consistent with overland floodwater flow, including those circumstances where ordinarily dry land is flooded by water which cannot enter a watercourse since the watercourse is already full or overflowing. 38. Similarly the FSP refutes the Applicants‟ allegation that the policy wording in respect to water escaping from a drain (backflow flooding) is unclear or would cause a reasonable person to not understand the meaning and intention of the Product Disclosure Statement (PDS) wording. 39. The Applicants have not made available evidence to support their allegation that stormwater was the cause of inundation of their property. Rather, the evidence shows that the floodwater that inundated the property came from the watercourse that runs approximately 30 metres to the west of the property. This watercourse being an unnamed tributary of the creek, which flows into the river. 40. Therefore, the FSP is entitled to rely on the flood exclusion contained in the policy to decline the Applicants‟ claim. 41. The FSP relies on the following policy provisions: “ Home Building PDS Page 8-13 What we cover – insured events This section describes under the heading: Yes – the insured events you are covered for No – the conditions and exclusions that specifically apply to particular insured events. … Yes You are covered for damage or loss to your home building occurring during the period of cover and caused by the following events: Storm and rainwater including stormwater runoff from areas surrounding the site or water escaping from any water main, drain, pipe, street gutter, guttering or surface. Storm means violent wind (including a cyclone or tornado), thunderstorm or a heavy fall of rain, snow or hail. NO Damage or loss caused by flood . Flood means the inundation or covering of normally dry land by water which: escapes or overflows from, cannot enter, because it is full of has overflowed, or is prevented from entering, because other water has already escaped or been released from it, the normal confines of any watercourse or lake, including any that may have been modified by human intervention, or reservoir, canal, dam or stormwater channel. Case No: 244684 Determination Page 6 of 14 Flood does not mean stormwater runoff from areas surrounding the site, or water escaping from any water main, drain, pipe, street gutter, guttering or surface. ... Page 14 What we do not cover – general exclusions You are not covered under any section of this policy for damage, loss, cost or liability caused by or arising from or involving: … flood, … Page 30 When you claim on your policy, your responsibilities include Preventing further damage or loss Following an event that is likely to result in a claim, you must take all reasonable precautions to prevent any further damage, loss, cost or liability. … Home Contents PDS Page 18-19 Yes You are covered for damage or loss to your home building occurring during the period of cover and caused by the following events: Storm and rainwater including stormwater runoff from areas surrounding the site or water escaping from any water main, drain, pipe, street gutter, guttering or surface. Storm means violent wind (including a cyclone or tornado), thunderstorm or a heavy fall of rain, snow or hail. NO Damage or loss caused by flood . Flood means the inundation or covering of normally dry land by water which: escapes or overflows from, cannot enter, because it is full of has overflowed, or is prevented from entering, because other water has already escaped or been released from it, the normal confines of any watercourse or lake, including any that may have been modified by human intervention, or reservoir, canal, dam or stormwater channel. Flood does not mean stormwater runoff from areas surrounding the site, or water escaping from any water main, drain, pipe, street gutter, guttering or surface. … Page 22 What we do not cover – general exclusions You are not covered under any section of this policy for damage, loss, cost or liability caused by or arising from or involving: … flood, Case No: 244684 Determination Page 7 of 14 … Page 39 When you claim on your policy, your responsibilities include Preventing further damage or loss Following an event that is likely to result in a claim, you must take all reasonable precautions to prevent any further damage, loss, cost or liability.” 42. The FSP provided additional information on 5 December 2011. The FSP submitted that the stormwater run-off in the area would not have been significant and would have ceased many hours prior to the commencement of inundation of the property. In making these submissions, the FSP relied upon hydrologist reports from WM. Further the FSP maintains that backflow flooding by “water from the drain spurting up like a fountain” required further hydro logy information to be obtained. The FSP arranged for a site inspection of the property by its hydrologist on 21 December 2011. 43. According to the hydrologist, the Applicants‟ property is located approximately 1.2kms from the Brisbane River and 600 metres from the Woogaroo Creek and 70 metres to the east of an open drainage channel. The open drainage channel is a modified natural drainage line following through Warren Park. It has a defined bed and banks and is considered a watercourse. The draining surround ing the Applicants‟ property includes underground pipe networks and street drains which drain direct stormwater run-off away towards the open drainage channel. 44. The hydrologist conceded the initial inundation of the Applicants‟ yard to a shallow depth (less than 100mm was caused by floodwater backing up from the Brisbane River via Woogaroo Creek and the open drainage channel through Warren Park which then surcharged from the stormwater in the pits in the vicinity of the Applicants‟ property. Following this, the Applicants‟ property was inundated by direct overland flow of floodwater from the open drainage channel. The initial inundation of the house above flood level (the floor level of the house is 2.15 metres above the ground) and the peak inundation of the house above floor level was caused by direct overland flow and floodwater. Issues 45. Whether the Applicants were clearly informed as to the exclusion contained in the policy. 46. Whether damage to the Applicants‟ property was caused by flood water as defined by the policy or stormwater run-off. Relevant Law 47. Section 35 of the Act provides that, where a claim is made under a prescribed contract and the event giving rise to the claim is a prescribed event in relation to the contract, an insurer may not refuse to pay an amount equal to the minimum amount of cover set out in the regulations made pursuant to the Act unless it can prove that Case No: 244684 Determination Page 8 of 14 before the contract was entered into, the insurer clearly informed the insured in writing of the relevant provisions of the contract, or that the insured knew or a reasonable person in the circumstances could be expected to have known of such provision. Reasons for Decision 48. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the complex nature of the issues. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 49. There has been an exchange of material between the parties. Each party therefore is aware of the issues and has had the opportunity comment. In these circumstances the details contained in the relevant hydrological reports will not be recited in this determination except where considered relevant. 50. Prior to arriving at a determination the Panel has read and considered all the material submitted by the parties to FOS. 51. The Panel notes the following is not in dispute between the parties:  The Applicants at the time of loss held cover for loss or damage to their property arising from the defined events noted within the policy terms and subject to the exclusion provisions.  The FSP provided and the Applicants received the relevant policy documentation in line with the obligations specified in the Act.  The insured property (both building and contents) suffered damage on or about the 11-12 January 2011.  The Applicants were required to evacuate the property on 11 January 2011, at which time the property had not yet been inundated.  The policy provides indemnity for loss or damage arising from storm and rainwater including stormwater run-off, however excludes from cover loss or damage arising from the event “flood”. 52. In view of the issues arising in this dispute, the Panel Chair Ombudsman conducted a site inspection of the property on 6 February 2012. The Applicants and a representative from the FSP were present. 53. The Applicants advised that they did not know the area in which they purchased the property was flood prone. The house is a re-located house and was located on the site in the 1980s. The house is built about 1.2 metres above the ground. According to the female Applicant, she was not at home on the day of the flood, but the male Applicant was. He was able to remain at home until about 12.30pm. 54. The property is located at a low part of Alice Street. Alice Street rises quite significantly in both directions from the Applicants‟ house. To the east of the Case No: 244684 Determination Page 9 of 14 Applicants‟ house is a large gully or a drainage channel. It is not a Creek as referred to in one of the reports. I note it is referred to as an open drainage channel in the latest hydrology report. This is about 60 – 70 metres from the Applicants‟ property. The male Applicant is adamant that the drain under the road and to the side of the property was overflowing. He said it was building up very rapidly. The property also attracts run-off from all directions and all of the drains at the bottom of the steep road suffer from localised flooding. The Applicant advised that the day prior to the flooding, there was water already pooling in his driveway due to the ground being saturated. 55. The Applicants do not dispute that they received the policy however; they question whether the policy clearly informs as to its limitations and maintain they believe they should be covered for the loss suffered due to it being a natural disaster. 56. The Applicants have argued:  the terms of the policy in respect to „Flood‟, „Stormwater run - off‟ and „Water escaping from a drain‟ etc and the exclusion relating to flood is not clear and would prove confusing for a reasonable person.  the PDS‟s are drafted in a manner which discourages consumer engagement and comprehension. 57. The Applicants also note the FSP‟s definition of flood does not include a natural creek that has been “completely altered”. The Applicants maintain that the policy narrows the term “watercourse” by inserting “ including any that may have been modified by human intervention ”. The term “ modified ” means “ changed somewhat or altered somewhat ” as opposed to completely alt ered. As such, a completely altered/modified watercourse would not fall within the policy definition of a water course. 58. The Applicants maintain that due to the limiting of the scope of the term watercourse in the policy and in order to decline indemnity on the basis that water had overflowed from a watercourse, the FSP must first establish that the water which caused the inundation had overflowed or escaped the normal confines of a watercourse as defined under the policy. 59. The FSP refutes the Applicants‟ con tention in this regard and maintains the wording of the policy definitions, terms, conditions and exclusions is drafted in such a way that it clearly explains the intention and application of the provisions. 60. The Panel acknowledges the Applicants‟ comment h owever is not convinced that the Applicants‟ interpretation of the flood definition is accurate on this occasion. The Panel notes that the definition of flood states “… the normal confines of any watercourse or lake, including any…” The Panel is satisfied t hat the wording of the definition is not only reasonably clear in its intention but also clearly informs that water escaping or overflowing from the normal confines of any (emphasis added) watercourse including those that have been modified by human intervention. Case No: 244684 Determination Page 10 of 14 61. Therefore, the Panel is not satisfied that the term “watercourse” has been narrowed in any respect, rather it clearly includes any watercourse including those that flow within their natural confines and those which have had their natural confines and or flow paths modified or changed. 62. Having reviewed the form and content of the FSP‟s „policy documents‟, the Panel is of the view that by reference to the index of the policy, and the reading of policy sections „ What do we mean by that? ‟, „ What we cover - Insured events ‟, and „ What we do not cover – general exclusions‟ this is sufficient to meet the FSP‟s obligations to clearly inform. 63. The Panel is satisfied the FSP‟s policy does not provide flood cover, as distinct from stormwater run-off and / or the inundation of the property by water escaping from any water main, drain, pipe, street gutter, guttering or surface. 64. Therefore, the Panel is satisfied that the FSP, in providing the Applicants with the relevant policy terms and conditions, has fulfilled its obligations under Section 35 of the Act. Exchange of information between the parties after the date of loss 65. The Applicants maintain in the early stages of the claim after a telephone conversation with a representative of the FSP, they were left with the impression that the claim would be accepted. On this basis, the Applicants with the assistance of family and friends proceeded to undertake the cleanup of their property. During this process the Applicants proceeded to discard many items that may have otherwise been salvageable and would not have been discarded had they been aware that the FSP was to decline their claim. 66. The FSP refutes the Applicants allegation in this regard and referring to comments recorded on its claim management system, maintains that the Applicants were not advised that the claim would be accepted. Rather, they were informed if they intended to arrange the cleanup that they would need to take as many photographs of the damage as possible, keep sections of the carpet/s removed and to store the items away from the home for the purpose of assessment. 67. In addition to the above advice, the FSP also refers to the policy provision which places the obligation on a policyholder to take all reasonable precautions to prevent any further damage, loss, cost or liability. 68. In the course of the site inspection, the Applicants confirmed they believe they had been misled, although the female Applicant maintains she had requested her partner‟s friends not to throw out a lot of the items but they did. 69. The Panel notes that the only available evidence of the telephone call in question is limited to the claim notes recorded on the FSP‟s management system. The FSP has not sought or made available any further evidence in this respect such as a statement from t he representative who took the Applicants‟ telephone call. In the absence of substantiating evidence in this respect, the Panel is not satisfied the content of the conversation can be established. Case No: 244684 Determination Page 11 of 14 70. Notwithstanding, the above comments, the Panel has considered the responsibilities placed upon Applicants when claiming under the policy. The Panel is satisfied that following an event for which a claim is lodged the Applicants are obliged to take all reasonable steps to mitigate their loss and prevent any further damage, loss, cost or liability. 71. The Panel acknowledges that it may not have been possible, considering the significant extent of damage to the building, to prevent further deterioration or internal damage during this period. However, in respect to the clean up and subsequent disposing of items, the Panel accepts given the nature of the disaster that many otherwise salvageable items were discarded. Regardless of whether the claim was accepted or declined, it is unlikely the Applicants could avoid the items being discarded 72. Therefore, the Panel is not satisfied that the Applicants have established prejudice in respect to their decision to discard items which they believe may have been otherwise salvageable, on the basis that the FSP would be obliged to replace such items under the claim. Cause of the loss 73. The Applicants maintain that prior to being evacuated on 11 January 2011, they witnessed water spurting up from the stormwater drains in the proximity of their home. It is their belief that before any overland flooding reached their property, the stormwater escaping from the drains inundated their home causing damage. 74. The Applicants are of the opinion that the FSP acknowledges, in the instance of water inundation of an insured property occurring from water that escapes solely from a drain, the policy will respond. This includes instances where the cause for the water escaping the drains is “backwater flooding”. 75. The FSP disputes the Applicants‟ contention in respect to the cause of the loss and maintains that on the basis of the available evidence, the cause for the inundation of the Applicants‟ property and subsequent damage, is floodwater. 76. In maintaining its position that the cause for the loss is floodwater, an event excluded from cover, the FSP relies upon the ICA hydrology report and a hydrology report commissioned by the FSP and submitted by “W”. The relevant information provided in these reports has been summarised below. 77. ICA hydrologist report “Volume 3 Flooding in Ipswich City LGA” provides:  There were four distinct rainfall periods across Ipswich City LGA during the period from 9 January to 13 January (p1) . These occurred at: – around 1000 hours and 1200 hours on 9 January – around 1500 hours to 2100 hours on 9 January – around 0700 to 1100 hours on 10 January – around 0600 hours to 1500 hours on 11 January. Case No: 244684 Determination Page 12 of 14  Over the 5 days from 9-13 moderate to heavy rains fell over Ipswich City LGA (7.2.2).  Rainfall in the 24 hours to 0900 on 9 January was not significant (less than 25mm).  Over the next 24 hours to 0900 on 10 January was moderate (40-80mm).  Rainfall in the 24 hours to 0900 on 11 January was significant (25- 200mm) Rainfall was heaviest in the north-western area of the LGA.  Large releases were made from Wivenhoe Dam over the period from 0600 hours and possibly as early as 0300 hours on 11 January until around 0300 hours on 12 January. (9.3)  It was concluded that the dam release flood was the immediate cause of flooding along the reach of the Brisbane River downstream of the dam, and along tributaries through the Ipswich City LGA. (9.3)  At about 0900 hours on 11 January water levels at One Mile Bridge Alert and Ipswich Alert begin to rise rapidly due to Brisbane River water flowing back up along the Bremer River. The peak water level at these stations occurred on 12 January and was caused by backwater from the Brisbane River and Bremer River flood attempting to flow downstream. 78. The site specific report submitted by the project engineer “TB” on behalf of W and titled “Rainfall and Local Stormwater Behaviour during the January 2011 Event – [Applicants‟ address] provides:  The heavy rainfall recorded at the Wacol Alert rainfall station (3.9kms northeast of the Applicants‟ property) and Opossum Alert rainfall station (3.4kms southwest of the Applicants‟ property), show s to be 94mm and 78mm respectively during the period between 0000 hrs on 10 January 2011 and 1700hrs on 11 January 2011.  No significant rainfall was recorded at either rainfall gauge after about 1600hrs on 11 January 2011, with the peak rainfall intensity recorded in the hour to 1100hrs on 11 January 2011.  The peak stormwater run-off at the subject property would have occurred within about 15 minutes of the peak rainfall intensity.  For durations up to 24 hours at the Wacol Alert station and up to 72 hours a t the Opossum Alert station, the recorded rainfalls had ARI‟s of less than a year. This means the higher rainfall intensities are regularly experienced in the area of interest. The higher rainfall intensities which caused major flooding in the Brisbane and Bremer Rivers occurred further to West of the subject property.  The subject property is located 1.2kms from the Brisbane River, 600m from Woogaroo Creek and within 100m of an open stormwater drain that is a modified natural drainage line flowing through Warren Park. Urban drainage surrounding the subject property is well defined and would include underground pipe networks and street drains to direct stormwater run-off away from the properties. Case No: 244684 Determination Page 13 of 14  Upstream catchments would drain along the streets and around the subject property. There is virtually no external catchment that would direct stormwater run-off flows to the subject property.  The Jindalee Alert gauge is located approximately 11.9kms downstream by river of the property and the Moggill Alert gauge is approximately 8.2kms upstream of the subject property. Therefore, the Brisbane River water level activity at the subject property would be represented by a line approximately 3/5 of the distance between the two water level hydrographs.  Based on the observed peak water level marks and topographic data, the peak water level of the river in the Goodna vicinity was approximately 16.5m AHD. The peak water level of the Brisbane River in the area of the subject property is estimated to have occurred at approximately 1700hrs on 12 January 2011.  The ground levels at the property range from approximately 13.3m AHD at the north western corner to 15m AHD at the south eastern corner. This indicates the entire property would have been inundated by the peak water level of 16.5m AHD.  Initial inundation of the property by floodwater backing up from the Brisbane River, via Woogaroo Creek and the open stormwater drain through Warren Park, would have occurred at about 0100hrs on 12 January 2011, about nine hours after rainfall in the area had ceased. 79. The hydrologist conducted a site inspection on 21 December 2011, this further report was provided to the parties. The hydrologist has basically repeated his earlier findings but has also observed as follows:  The water observed surcharged in the stormwater inlet pits in the vicinity of the Applicants‟ property was floodwater backflow from the Brisbane River and Woogaroo Creek flowing back up along the open drainage channel.  Based on the observed depth of inundation and height of the floor above the surrounding ground (1.25m) the floor level of the house on the subject property will be approximately 14.5m AHD. The house on the subject property would have been inundated above floor level by floodwater at approximately 0300 hours on Wednesday 12 January 2011. 80. The hydrologist determined, it is likely the initial inundation of the Applicants‟ yard to a shallow depth was caused by water surcharging from the nearby stormwater inlet pits. However, by the time the water level reached the height of the floor level of the house, the house was inundated by direct overland flow from the open drainage channel. Given the low intensity rainfall recorded at the property and the height of the floor level above ground level, the property could not have been inundated by stormwater run-off. 81. The Panel accepts that the drain near the Applicants‟ property is designed to take water from the surrounding areas and direct it to the Creek and eventually the river. The Panel accepts that the drain is an open drainage channel or Case No: 244684 Determination Page 14 of 14 stormwater channel and as such is a water course within the terms of the policy. Any water which overflowed from the drain into the Applicants‟ home is captured under the policy definition of floods so that any damage arising from such water is also excluded from cover provided by the policy. 82. The Panel has considered the possibility of contribution to the initial inundation as a result of stormwater run-off and stormwater drains in close proximity to the property. The Pa nel accepts the Applicants‟ observations of water spurting out of these drains prior to evacuating their property. However, the Panel is persuaded by the hydrologist information that such an inundation at best will be limited to the ground or yard of the A pplicants‟ property and would not have exceeded 100mm. The Panel is persuaded on the balance of the evidence that the inundation above the floor level of the Applicants‟ property was due to floodwater inundation in accordance with the terms of the policy. Determination 83. On the basis of the available information, the Panel determines that the FSP is entitled to deny liability to pay the claim in accordance with the terms of the policy.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.