Text of the determination
Case No: 244668 Determination Page 1 of 9
Case number: 244668
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim – Section 46 Insurance Contracts Act 1984
25 October 2011
Background
1. The Applicant held an Accidental Damage Home Insurance policy (the policy)
with the Financial Services Provider (FSP).
2. A claim was lodged under the policy for damage to the external brick wall of the
property arising from strong winds on 5 September 2010.
3. The FSP initially accepted the claim and authorised its preferred builder to
undertake repairs to the damaged portion of the external brick wall (the wall).
However, on further investigation and evidence submitted by its consultants the
FSP reversed its decision to accept the claim and informed the Applicant that
the claim was not one for acceptance.
4. The Applicant remains dissatisfied with the FSP‟s decision to decline the claim
and is seeking indemnity in the estimated cost of repairs of between $20,000-
$25,000.
Summary of Applicant’s Position
5. The wall at the insured property partially collapsed due to strong winds on 5
September 2010. The wall had remained in place for over 35 years.
6. The Applicant lodged a claim under his policy with the FSP, which appointed an
assessor to visit the property and carry out an assessment of the loss.
7. The FSP contacted the Applicant on two occasions to inform him that the claim
had been accepted. A contract was received from the FSP‟s appointed builder
which included the demolition of the remaining wall and rebuild o f the entire
boundary wall.
8. The contract was signed and returned to the FSP with a cheque for the excess
($100) as a deposit, which the Applicant maintains was subsequently cashed.
9. The FSP subsequently appointed other consultants and on receiving additional
reports in respect to the loss, the FSP moved away from its original decision to
Determination
Case No: 244668 Determination Page 2 of 9
accept the claim and informed the Applicant the claim would not be one for
acceptance.
10. The Applicant contested the decision to decline the claim and raised the matter
of a contract being entered into with the FSP‟s preferred builder and for which a
deposit had also been paid.
11. The FSP on considering the App licant‟s complaint offered to cash settle the
Applicant‟s claim in an amount equal to the original figure allocated by the FSP
for the cost of repairs. At the time of informing the Applicant of this decision the
FSP did not disclose the quantum of this amount it had originally allocated to
the cost of repairs.
12. The Applicant received an offer from the FSP in the amount of $5,335. The
Applicant is not prepared to accept this in settlement of his claim. Two
independent quotes obtained by the Applicant to repair the damaged wall fall
in the vicinity of $25,000. Demolition costs alone are estimated to be
approximately $5,000.
13. The Applicant maintains that:
The wall was in place many years before the Applicant purchased the
property 33 years prior to the loss.
The garden bed did have a second skin between it and the wall, as has
been acknowledged in the consultants‟ reports .
The “imposed load of vegetation” noted in the report had been removed
many years ago.
The boundary wall was not pushed over by defective design, it was
demolished by strong winds on the date of loss, a day on which extremely
strong winds were recorded.
14. T he Applicant remains dissatisfied with the FSP‟s attitude and management of
the claim.
Summary of FSP’s Position
15. The Applicant lodged a claim under the policy for the partial collapse of an
external wall due to a windstorm.
16. The FSP instructed its preferr ed builder “J” to attend the insured property and
submit a report on the damage and a quote for repairs. J formed the opinion
that the loss was consistent with the Applicant‟s description and submitted a
quote for repair in the amount of $5,335.
17. The Applicant was contacted and informed that the claim had been accepted. A
contract in respect to the scope of repairs was provided to and signed by the
Applicant, subject to the Applicant‟s contribution (excess) which he paid in the
form of a cheque.
Case No: 244668 Determination Page 3 of 9
18. On returning to the property to undertake the repairs, J discovered „structural‟
issues to a hidden retaining wall and requested the appointment of an
engineer.
19. The FSP notes the scope of works contract signed by the Applicant and
provided by J was subject to the disc laimer “ No allowances for any unseen
works or works not mentioned in the above scope ”.
20. The FSP‟s appointed engineer and building consultants , “C” and “Z”, to the
claim and they attended the insured property on 19 October 2010.The
consultants undertook their assessment of the wall along the south side of the
property and the previously concealed brick retaining wall in the back garden.
The consultants formed the view that the damage was not the result of a single
storm/wind event. Rather it was due to progressive degradation over the years
because it was under designed and poorly constructed.
21. The Applicant contacted the FSP on 23 December 2010 and advised that he
had obtained two independent quotes to undertake the repairs and both quotes
were in the vicinity of $25,000.
22. The Applicant wrote to the FSP on 3 February 2011 and in making reference to
Section 46 of the Insurance Contracts Act (1984), maintained that the FSP was
prevented from declining the claim.
23. The FSP has considered whether the Applicant is afforded any protection under
Section 46 of the Act. However, the FSP refers to Nelson v Hollard Insurance
Co P/L [2010] NSWSC 199 and maintains this section does not assist the
Applicant.
24. The FSP reviewed the claim but maintained the decision to decline the claim.
However, in good faith the FSP offered to pay the Applicant $5,335 in line with
the original quote of repairs submitted by J and the contract signed between the
parties.
25. The quotes obtained by the Applicant include more than the part of the wall that
actually collapsed. Neither builder has provided any alternative view to those of
C and Z. The Applicant has failed to make available a written qualified opinion
in support of his position.
26. In the event a claim is accepted the decision to repair, rebuild or pay an insured
for that part of the building that actually sustained damage lies with the FSP.
The FSP does not agree to repair the damage.
27. The FSP considers on the balance of probabilities, the two proximate causes
for the loss are „gradual deterioration‟ and „faulty design‟.
28. The collapse due to wind of the wall which stood for 33 years would not have
occurred unless there were pre-existing structural issues.
29. For a claim to be accepted it must be demonstrated that the cause of the loss is
not excluded under the terms of the policy. Based on the consultants‟ reports
the causes of the loss are excluded under the policy.
Case No: 244668 Determination Page 4 of 9
30. The FSP has formally withdrawn its offer made in good faith to the Applicant to
pay him $5,335 regardless of the fact the claim was not one for acceptance.
31. The policy does not cover the „gradual deterioration‟ of a „faulty design‟ or the
actions of „tree roots‟ and „movement of earth‟. The FSP cons iders on the
balance of probabilities, these are the proximate cause of the loss and that if
the wall did not have these pre-existing issues it would not have collapsed.
32. The FSP relies on the following policy provisions:
“Page 13 Storm, rainwater or wind
We will cover your buildings or contents for loss or damage as a result of storm,
rainwater or wind.
…
Page 32 Exclusions to your cover
Any cover we provide is subject to the following exclusions.
Accidental Damage cover, Additional cover and Strata Title Mortgagee Protection
exclusions
We will NOT cover any loss or damage as a result of, or caused by
Settling, shrinkage or any movement of earth
Erosion, rust, corrosion, gradual deterioration, depreciation, wear or tear
…
Roots from trees, plants, shrubs or grass
…
A defect in an item, structural defects, or faulty workmanship or design
…
Page 51 How we settle a buildings claim
1 We will decide how we will settle your claim
If your buildings suffer loss or damage, we will decide whether to
repair
rebuild, or
pay you the cost to repair or rebuild that part of your buildings that suffered loss
or damage.
If we do, we will
…
Only repair, rebuild or pay you for the part of parts of the building that actually
sustained loss or damage, including damaged portions of fixed coverings to walls
floors and ceilings only in the room, hall or passage where the damage
occurred. ”
Case No: 244668 Determination Page 5 of 9
Issues
33. Whether the FSP is entitled to decline indemnity to the Applicant for his loss
under the policy.
34. Whether the FSP is entitled to withdraw its offer to cash settle the Applicant in
line with the original scope of works approved and subject to a signed contract
between the parties.
Reasons for Decision
35. I am satisfied that a full exchange of information has taken place between each
party and that each party has had the opportunity to address any issues raised.
I have reviewed the submissions of the parties in relation to the terms and conditions
of the policy and will only refer to the relevant submissions and materials
raised.
36. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because due to the circumstances of the dispute, this
dispute has not been the subject of a FOS Recomme ndation and has
proceeded directly to Determination.
I have reviewed the available evidence and am satisfied that it is not in dispute that:
The Applicant suffered a loss as a result of the partial collapse of the
insured property‟s external brick boundary wall.
On the date of loss the insured property was exposed to strong winds.
The FSP after undertaking the original assessment of the loss was
satisfied that the damage claimed was due to the strong wind on the date
of loss.
The insured property is covered for loss or damage arising from Storm,
rainwater or wind. Wind was a contributing factor in the resultant partial
collapse of the external boundary wall.
The Applicant‟s claim was originally accepted and a contract for repairs
was signed between the parties.
The damaged wall was constructed and remained undamaged for
approximately 35 years.
The external skin of the wall appeared to be in an overall good condition.
The Applicant would not reasonably have been aware of the issues
identified and raised by the consultants with the construction of the wall.
The FSP although subsequently took the position that the claim was not
one for acceptance, in good faith offered to pay the Applicant $5,335 in
line with the original scope of works it had initially approved .
Case No: 244668 Determination Page 6 of 9
The available evidence establishes that the partial collapse of the external boundary
wall arose from or at the very least can be partially attributed to prevailing
strong winds on the date of loss. I am satisfied the Applicant has established a
prima facie claim in respect to the partial collapse of the wall. Therefore, the
onus shifts to the FSP to establish it is not liable to provide indemnity to the
Applicant under the policy.
Cause of damage
The FSP having originally accepted the claim proceeded to move away from this
position and declined the claim on the basis of reports obtained from
consultants C and Z. A number of concerns have been raised by the parties in
the management of the claim, these have been discussed below.
The FSP in maintaining its position that the claim was not one for acceptance has
obtained and relies upon the reports submitted by consultants C and Z. I have
reviewed both reports and note Z has relied upon C‟s report as he maintains
that:
“It would be pointless to reiterate the full extent of the joint inspection and wall
assessment as they are accurately detailed in the attached [C‟s name] report
dated 20 October 2010.
The [C‟s name] report is clear and precise and reflects a comprehensive site
analysis, technical content and an ethical determination. I concur fully with the
[C‟s name] report and as such, preparation and presentation of an equally
extensive report on my part would be superfluous.”
I have considered the report submitted by C in its entirety and note that the report
concludes that:
“ Determination
1. We understand that the „brief‟ for our on -site inspection was to report the
condition of the retaining wall behind the collapsed brick boundary fence.
This inner skin of brickwork is not a retaining wall but seemingly a 110mm.
thick brickwork installation and, as such, was not capable of retaining ground
up to a height of 900mm. plus a garden bed on top.
2. The outer skin of brick boundary fence, 2.4 metres tall and unsecured, had
no ability other than its own dead weight to resist forces applied by lateral
wind. Rotational movement away from the vertical would rapidly increase the
chances of the single skin wall becoming unstable and increasingly
vulnerable to lateral wind forces and to gravity.
3. The construction of the south boundary brick fence was structurally defective,
and the twin wall combination structurally flawed from conception. With the
possible exception of the footings, no part of the present wall design can be
re- used in any repair proposal.”
The consultants have alleged that both the internal and external skins of the wall
were defective and the twin wall combination is structurally flawed since original
construction. The consultants in addition to indicating that there are present
structural defects have also referred to other factors contributing to the loss,
which are:
Case No: 244668 Determination Page 7 of 9
Tree roots growing in between the skins of brickwork, separating the two
abutting skins of the lower level brick work.
Compromise of stability of the walls over the last 10 years due to the
introduction of the garden shelf immediately inside the boundary wall.
The inner skins rotating outwards from the visible settlement of the ground
inside the wall between the pool surround and the planter box.
Collapse of the wall would have been possible under self weight alone
once the centre of gravity of the wall moved outside the 110mm width of
the wall base.
The Applicant does not agree with the FSP‟s position that the wall collapsed due to
defective construction and points out that it has remained standing for over 33
years. It is the Applicant‟s position that the cause for the collapse was the
strong winds on the day.
I am satisfied that the consultants appointed by the FSP were qua lified to provide an
opinion on the construction of the wall. However, the FSP and its appointed
consultants have not reasonably established to my satisfaction that the
construction of the boundary wall is defective.
In order to do so, it would need to be shown that the measurements and methods
used in the construction were not in line with the standards required at the time
of construction. The FSP and or the consultants have not made available any
evidence to establish what standards were in place at the time of construction
and how the actual construction falls short of such standards.
Therefore, on the basis of the available evidence, I am not satisfied it has been
established that the proximate cause for the partial collapse of the external wall
was due to defective construction methods.
Notwithstanding, the above comment I do accept that the consultants have identified
a number of concerns in respect to the condition, maintenance and construction
of the external boundary wall which will require further consideration and
rectification by the Applicant outside the scope of the policy.
Extent of damage and cover under the policy
37. The policy is an “Accident Damage Home” policy which covers the Applicant‟s
property for loss or damage arising from accidental loss or damage, including
cover under specific conditions for a range of incidents and additional covers
and legal liability. The policy defines accidental damage as:
“damage to, loss or destruction of the buildings that make up your home, or your
contents and valuable items, when it is caused by an unintentional act, or an
unforseen and uncontrollable incident.”
38. The policy defines an “incident” as:
“a single occurrence or a series of occurrences, including an accident or series
of accidents arising out of one event.”
Case No: 244668 Determination Page 8 of 9
39. On the basis of the provisions and definitions within the policy, I am satisfied
that the scope of cover provided under the policy is limited to damage, loss or
destruction of the insured property arising from a n unforeseen and
uncontrollable event.
40. Therefore, in line with the policy, damage arising from an event of strong winds
would be a loss covered under the policy. I am satisfied that the following
matters need to be considered:
the FSP having assessed the loss was originally satisfied that the strong
wind was capable of causing the partial collapse.
the FSP‟s decision that the partial collapse of the wall was due to factors
excluded by the policy was made after multiple assessments and
appointing suitably qualified consultants.
a contract to repair the damage resulting from the strong wind was
entered into and for which the excess payment was accepted by the FSP.
what would be considered fair under all the circumstances.
41. I am satisfied that the FSP is obliged to provide indemnity to the Applicant for
the loss arising from the partial collapse of the external boundary wall, in line
with the original scope of works agreed upon between the parties. In addition,
based on the available evidence I am satisfied that on the balance of
probabilities, any further damage and or concerns identified beyond the
collapsed portion of the wall are no t the result of the strong wind (the event).
The additional damage has occurred over an extended period of time due to
gradual deterioration, movement of earth and roots from trees and plants .
42. Therefore, I determine the extent of the FSP‟s obligation to provide indemnity to
the Applicant is limited to a payment of $5,335 in line with the original quote
obtained to repair the damage arising from the strong wind and covered under
the policy.
Section 46 Insurance Contracts Act 1984
43. The Applicant has relied on Section 46 of the Act to negate the effect of the
policy exclusions. Given that I have determined that the allegations of
underlying defect does not apply, I am satisfied that section 46 has no
application to this matter.
Determination
44. On the basis of the available information I determine that the FSP is obliged to
honour its original offer to provide indemnity to the Applicant for the damage
arising from the strong winds only.
45. The FSP is not obliged to provide indemnity to the Applicant for any additional
damage or costs in relation to the repair or rectification of the remaining portion
of the external boundary wall, not damage by the strong wind on the date of
loss.
Case No: 244668 Determination Page 9 of 9
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.